Tender Value
₹7.6 L
EMD Value
₹7,650
Closing Date
28 Oct 2026, 4:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer, RWS & S Division,Guntur
Guntur
Providing drinking water facility to APRS Tadikonda Village and Mandal, Est. Cost Rs. 10.00 Lakhs
1003424
32 DMF 2026 27 Executive Engineer RWS S Division Guntur
OPEN - NCB
Water Supply
GUNTUR, ANDHRA PRADESH
8 documents required · 8 mandatory
₹270
₹7,650
14 Oct 2026
14 Oct 2026
14 Oct 2026
Earth work excavation in BC soils and depositing on bank with initial lead and lift for excavation of foundations of all materials and labour charges for 1st Mattu etc.,,Complete including over heads and contractors profit @ 13.615%.
Earth work excavation in BC soils and depositing on bank with initial lead and lift for excavation of foundations of all materials and labour charges for 2nd Mattu etc.,,Complete including over heads and contractors profit @ 13.615%.
CC (1:4:8) using 40 mm HBG metal for foundation including cost and conveyance of all materials etc., Complete including overheads and contractors profit @ 13.615%
Filling the foundation with sand including cost, conveyance watering and ramming etc complete including over heads and contractors profit @ 13.615%.
M-30 grade concrete using 20 mm HBG metal including cost and conveyance of all materials and labour for bottom Raft excluding cost of steel etc., Complete including overheads and contractors profit @ 13.615%
M-30 grade concrete using 20 mm HBG metal including cost and conveyance of all materials and labour for Side Walls excluding cost of steel etc., Complete including overheads and contractors profit @ 13.615%
M-30 grade concrete using 20 mm HBG metal including cost and conveyance of all materials and labour for Top Slab 0.15 thickness excluding cost of steel etc., Complete including overheads and contractors profit @ 13.615%
Acco proof plastering with CM (1:3), 12mm thick including cost and conveyance of all materials etc., Complete including overheads and contractors profit @ 13.615%
Cement plastering with CM (1:3) 12 mm thick including cost and conveyance of all materials for side walls out sid etc., Complete including overheads and contractors profit @ 13.615%
Snowcem painting including cost and conveyance of all the materials etc., Complete including overheads and contractors profit @ 13.615%
Providing High Yield Deformed (HYSD) /Thermo Mechanically Treated (TMT) /Mild Steel (MS) steel bars( Fe 415 / Fe 500 grade as per ISI 1786-1979 )of difference diameters for RCC works,including labour charges for straightening, cutting, bending to required sizes and sapers, placing in position with cover bolcks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars, including cost and conveyance of binding wire, cover blocks and all incidental ,operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all mterials etc,.completd for finished item of work in all floors ( APSS No 126 ) etc complete including over heads and contractors profit @ 13.615%.
Manufacture, Supply, & Delivery of 110 mm dia HDPE 6 kg/cm2 pipe line From existing Sump at CPWS Scheme head works in Tadikonda to proposed Sump at APRS Tadikonda excluding all taxes etc., Complete including overheads and contractors Profit @ 13.615% .
Manufacture, Supply, & Delivery of 110 mm dia HDPE 6 kg/cm2 pipe line From Proposed Sump to 60 KL OHSR in APRS excluding all taxes etc., Complete including overheads and contractors Profit @ 13.615%
Earth work excavation for 110mm dia HDPE 6 kg/cm2 pipe line From existing Sump at CPWS Scheme head works in Tadikonda to proposed Sump at APRS Tadikonda trenches (2/3 machinery and 1/3 manual) in all soils except rocky soils including lowering, laying and jointing of HDPE pipes with required fittings/specials true to alingment and gradient, refilling with already excavated earth, watering, tamping and removing surplus earth and testing to required hydraulic test pressure excluding cost of specials/fittings for finished item of work.1 rmt etc., Complete including overheads and contractors Profit @ 13.615%
Earth work excavation for 110mm dia HDPE 6 kg/cm2 pipe line From Proposed Sump to 60 KL OHSR in APRS trenches (2/3 machinery and 1/3 manual) in all soils except rocky soils including lowering, laying and jointing of HDPE pipes with required fittings/specials true to alingment and gradient, refilling with already excavated earth, watering, tamping and removing surplus earth and testing to required hydraulic test pressure excluding cost of specials/fittings for finished item of work.1 rmt etc., Complete including overheads and contractors Profit @ 13.615%
Design, Supply, delivery, erection, testing of 5.00 HP - 4 No's Centrifugal mono block Three Phase pumpsets with 86 lps & 46Rm head and commisioning of suitable pumping machinery with all accessories, appurtenances, surge protection devices, ultrasonic flowmeter on common delivery main at each pumping station, piping as per design requirement and as directed by the department, as per the Technical specification, as specified complete as specified in technical specifications and details as given below complete including trial run for (3) months. The tenderer shall include provision for spares and for Five (5) years maintenance in his quotation as specified in technical specifications Part B of Volume-I. The scope of the work includes electrical switchgear panels, electrical equipment connections including required cabling from pump starter panel to transformers, vaccum pumpsets with necessary piping etc., for priming pumps, suitable cranes as per requirement, fire safety equipment, electrical safety system etc., for finished item of work etc., Complete including overheads and contractors Profit @ 13.615%
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Adm. San. for APRS Tadikonda (1).pdf
TENDER_DOCUMENT • 0.09 MB
NIT Vol - I-Tadikonda -10.00L.doc
TENDER_DOCUMENT • 0.17 MB
NITVol -II- Tadikonda -10.00L.doc
TENDER_DOCUMENT • 0.14 MB
Tadikonda Schedule-10.00L.xlsx
TENDER_DOCUMENT • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .