Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.9 LAccepted-Finance | ₹6.9 L | 1 | Accepted-Finance LOwewst Rate quated |
| 2 | 1₹7.1 LRejected-Finance | ₹7.1 L | 1 | Rejected-Finance Above the EstimaTE RATE |
| Sl No | Description | Qty | Unit | Mohamed Hanifa L2 | VGM CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00 | Providing Stainless Steel Bus Shelter at Gundur Roundanal in Gundur Panchayat. Earth work excavation for foundation in ordinary soil with initial lead and lift etc., | 3.46 | Sqm | 250 ₹865 | 222 ₹768.12 |
| 2.00 | Supplying and Filling with M-Sand in layers of 15 cm thick including watering and ramming for consolidation etc. | 2.04 | cum | 1,790 ₹3,651.60 | 1,755 ₹3,580.20 |
| 3.00 | Plain Cement concrete 1:4:8 mix using 40mm guage hard broken granite stone jelly for foundation and flooring including dewatering if found necessary and laid in layers of not more then 10cm thick well rammed and consolidated including curing etc. | 2.19 | cum | 5,300 ₹11,607 | 5,240 ₹11,475.60 |
| 4.00 | Providing steel centering and shuttering with strutting arrangements for sides and soffits etc. | 8.33 | cum | 500 ₹4,165 | 470 ₹3,915.10 |
| 5.00 | Supplying and fabrication of Steel for RCC Works with binding wire including the cost and conveyance of materials to site and all labour charges etc | 0.1 | cum | 89,500 ₹8,950 | 88,996 ₹8,899.60 |
| 6.00 | Reinforced Cement Concrete 1:1 1/2:3 (one cement one and half sand and three aggregates ) mix using 20mm ISS gauge HBBG metal inclding cost and conveyance of all materials and labour charges for mixing, laying, complete and curing etc. | 0.96 | cum | 9,200 ₹8,832 | 8,892 ₹8,536.32 |
| 7.00 | Brick work in cement mortar 1:5 mix using country bricks of standard size 8 3/4" x 41/4" x2 3/4" for foundation and basement etc. | 1.46 | cum | 5,900 ₹8,614 | 5,839 ₹8,524.94 |
| 8.00 | Plastering with cement mortar 1:5 mix 12mm thick etc. | 2.97 | cum | 280 ₹831.60 | 251 ₹745.47 |
| 9.00 | Flooring with cement based Antiskid tiles of approved quality of 20mm thick in cement mortar 1:3 mix 20mm thick and pointing with the same color and finishing perfectly etc. | 18.29 | cum | 1,550 ₹28,349.50 | 1,340 ₹24,508.60 |
| 10.00 | Supplying and Fixing of 4 dia stainless steel pipe for post top 100x50 mm mild steel rect angular tube Fixing with Polycarbonate sheet including welding and Labour charges etc. | 19.16 | cum | 22,500 ₹4.3 L | 22,070 ₹4.2 L |
Tender Value
₹7 L
EMD Value
₹7,000
Closing Date
19 Nov 2025, 3:00 pmClosed
Block Development fficer (V.P)
Blcok development officer VP Thiruverumbur
Construction of Bus Shelter near OFT Arch in Gundur Panchayat Thiruverumbur Block
2025_RDTN_624329_1
B1/2456/2025 Gundur
Open Tender
Civil Works
180 days
Thiruverumbur
Plase refer the tenter notice
4 documents required · 4 mandatory
₹0
₹7,000
Yes
21 Jan 2026
18 Nov 2025
19 Nov 2025
18 Nov 2025
19 Nov 2025
18 Nov 2025
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
TechBId.pdf
Tender Documents • 0.61 MB
BOQ_746609.xls
BOQ • 0.34 MB
pricebid.pdf
Additional Documents • 0.41 MB
Download all tender documents and submit your bid