Loading…
Loading…
Tender Value
₹16.0 L
EMD Value
₹32,000
Closing Date
12 Mar 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Deposit Work
Above/Below/Par
SIGNAL
13 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover.
The tenderer must have successfully completed or substantially completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or One similar work each costing not less than the amount equal to 60% of advertised value of the tender. Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components. Meaning of Similar nature of work : "Any Signaling work "
38 conditions · 31 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
The tenderer must have successfully completed or substantially completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or One similar work each costing not less than the amount equal to 60% of advertised value of the tender. Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components. Meaning of Similar nature of work : "Any Signaling work "
S&T Associated works in c/w construction of RUB in lieu of level crossing No. 90 and level crossing No. 100 in Samdari- Bhildi Section of Jodhpur Division
SNT-JU-39-2025-26~NWR
SNT-JU-39-2025-26
Open
Works - General
12 Months
Jodhpur, Rajasthan
₹0
₹32,000
12 Mar 2026
16 Feb 2026
26 Feb 2026
32 items across 1 schedule · ₹11,46,115.43 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| as or and SM of all to per will and The all | Per Relay | 50.00 | 524.1 | 26,205 | |
| 2 | of or | Numbers | 120.00 | 87.41 | 10,489.2 |
| 3 | 4) | Numbers | 200.00 | 152.98 | 30,596 |
| by | — | — | — | — | |
| 4 | 0.6 A | Numbers | 100.00 | 61.11 | 6,111 |
| 5 | 1.6 A | Numbers | 100.00 | 64.41 | 6,441 |
| 6 | be DG the | Per Conductor | 120.00 | 8.46 | 1,015.2 |
| 7 | as L- the two : two the of two FRP of and for of (ii) | Numbers | 50.00 | 1,778.4 | 88,920 |
| 8 | NE be per No. of if as to OF 5 | Numbers | 4.00 | 14,945.53 | 59,782.12 |
| 9 | the , | Numbers | 4.00 | 1,039.09 | 4,156.36 |
| and for be if be or | — | — | — | — | |
| 10 | SS | Numbers | 4.00 | 6,888.92 | 27,555.68 |
| 11 | (ii) by | Numbers | 8.00 | 9,563.45 | 76,507.6 |
| 12 | Single Case (Large Case) | Numbers | 4.00 | 2,344.49 | 9,377.96 |
| 13 | the of | Numbers | 120.00 | 12.52 | 1,502.4 |
| 14 | mm at the | Metre | 360.00 | 760.66 | 2,73,837.6 |
| 15 | at all the | Metre | 360.00 | 190.17 | 68,461.2 |
| 16 | etc. No. & 120 ISO as fit 3) at and in of as | Numbers | 60.00 | 1,798.2 | 1,07,892 |
| 17 | & of as ISI ISO as fit 3) be and in of as | Metre | 120.00 | 383.47 | 46,016.4 |
| 18 | per | Numbers | 8.00 | 2,148.73 | 17,189.84 |
| 19 | Kit. to out of | Numbers | 4.00 | 1,157.45 | 4,629.8 |
| 20 | be the the be the GI of not and of laid | Metre | 100.00 | 1,202.97 | 1,20,297 |
| 21 | per | Metre | 100.00 | 122.74 | 12,274 |
| 22 | to per etc, soil be of site | cum | 200.00 | 274.28 | 54,856 |
| 23 | of be by the of the | Metre | 1000.00 | 9.1 | 9,100 |
| 24 | 1:4 II by | cum | 2.00 | 1,990.54 | 3,981.08 |
| 25 | Drg | Numbers | 4.00 | 2,232.81 | 8,931.24 |
| 26 | per the be mtr as It as of as | Numbers | 4.00 | 558.2 | 2,232.8 |
| 27 | mid be | Numbers | 2.00 | 5,145.23 | 10,290.46 |
| 28 | mm No. the (i) to 5 by on | Kilometre | 1.00 | 48,313.26 | 48,313.26 |
| 29 | No. the | Kilometre | 0.40 | 12,078.31 | 4,831.32 |
| 30 | as | Kilometre | 0.40 | 10,804.77 | 4,321.91 |
| Schedule total | ₹11,46,115.43 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27.04.22.pdf
ATTACHMENT
AdvancecorrectionsliptoGCC2022.pdf
ATTACHMENT
2022_12_13RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril2022ACSNo_2.pdf
ATTACHMENT
2023_04_26RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_3ACS-311.pdf
ATTACHMENT
2023_04_26RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_4ACS-4.pdf
ATTACHMENT
AdvanceCorrectionSlipNo_5ACS-5.pdf
ATTACHMENT
AdvanceCorrectionSlipNo_6ACS-6.pdf
ATTACHMENT
AdvanceCorrectionSlipNo_7ACS-7.pdf
ATTACHMENT
AdvanceCorrectionSlipNo_8ACS-8.pdf
ATTACHMENT
AdvanceCorrectionSlipNo_9ACS-9.pdf
ATTACHMENT
AdvanceCorrectionSlipNo_10ACS-10.pdf
ATTACHMENT
SNT-JU-39-2025-26TenderDocument_1.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .