Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC GHOSHPARA WARD NO 4 P O P S KALYANI DIST NADIA 741235 | KALYANI | NADIA | WEST BENGAL | 741235 | ₹1.2 Cr | L1 | Accepted-AOC Lowest Bidder |
| 2 | L2₹1.4 Cr+₹13.5 L (10.9%)Rejected-Finance PALPARA STATION MARKET P O P S CHAKDAH DIST NADIA PIN 741222 | CHAKDAH | NADIA | WEST BENGAL | 741222 | ₹1.4 Cr+₹13.5 L (10.9%) | L2 | Rejected-Finance Higher Bidder |
| 3 | L3₹1.4 Cr+₹14.6 L (11.8%)Rejected-Finance 15 1 1F MAYUR BHANJ ROAD POLICE STATION EKBALPORE KOLKATA 700023 | KOLKATA | KOLKATA | WEST BENGAL | 700023 | ₹1.4 Cr+₹14.6 L (11.8%) | L3 | Rejected-Finance Higher Bidder |
| 4 | L4₹1.4 Cr+₹16.2 L (13.1%)Rejected-Finance | ₹1.4 Cr+₹16.2 L (13.1%) | L4 | Rejected-Finance Higher Bidder |
| 5 | L5₹1.4 Cr+₹16.9 L (13.7%)Rejected-Finance S N BANERJEE ROAD SODEPUR NORTH 24 PARGANAS KOLKATA 700110 | KOLKATA | NORTH 24 PARGANAS | WEST BENGAL | 700110 | ₹1.4 Cr+₹16.9 L (13.7%) | L5 | Rejected-Finance Higher Bidder |
Tender Value
₹1.4 Cr
EMD Value
₹2.8 L
Closing Date
17 Jun 2026, 12:00 pmClosed
EXECUTIVEENGINEER_NADIAARSENIC DIVISIONI_PHE_DTE
KALYANI_NADIA
Shifting of pipe line due to widening of Chakdah Bongoan road from Chakdah Chowmatha to Chakdah Bus stand and other allied pertinent works at Palagacha Zone- I under Chakdah Surface based PWSS under Nadia Arsenic Division-I,P.H.E. Dte.
2026_PHED_1025362_1
WBPHE_01_NAD_I_26_27
Open Tender
CIVIL WORKS
Item Rate
90 days
Chakdah (Palagacha Zone-I)
Please refer Tender documents.
4 documents required · 4 mandatory
₹2.8 L
24 Jul 2026
25 May 2026
19 Jun 2026
25 May 2026
17 Jun 2026
26 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Supplying HDPE (Materials grade PE-100) pipes conforming to IS 4984-1995 with latest revision & amendments if any with necessary HDPE specials (excluding cost of CIDF valves) including labour charges for earth work in excavation in any kind of soil including mixed soil with boulder,road sub-grade and aits flank but excluding moorum laterite or sand stone / hard rock cutting with chisel required including cutting road flank/ brick pavement etc. without damaging the exisiting telephone/electrical cable line etc.(in case of damage of any type of cable line by the agency at the time of execution necessary damage charge as applicable by the respective authority will have to be brone by the agency at his own cost)upto the depth (av.) so as to maintain 1.10m.earth cushion from top of the pipe upto G.L. including loading unloading carrying lowering laying fitting fixing carefully pipes, valves and specials with the all types of jointing materials in trenches maintaining proper levels and alignment jointing the pipes and specials by butt welding/ adopting suitable method (But weld jointing with help of hydraulic tack and trimming machines, Hitter etc. for reaching at necessary melting point of HDPE pipe so that joint can be monolithic) so as to facilitate the maintenance of pipe line locally as per conventional method in future.
N.B- i) Manufacture's test ....recovered from the bill.
ii) Laying of pipeline including cost of pipe & fittings/specials but excluding cost of valves.
(B) Pressure Rating : PN 10
a) 75mm dia | - | mtr | 345 | - |
| 1.02 | b) 90mm dia | - | mtr | 467 | - |
| 1.03 | c) 110mm dia | - | mtr | 654 | - |
| 1.04 | d) 125mm dia | - | mtr | 850 | - |
| 1.05 | e) 140mm dia | - | mtr | 1,045 | - |
| 1.06 | f) 160mm dia | - | mtr | 1,341 | - |
| 1.07 | g) 180mm dia | - | mtr | 1,674 | - |
| 1.08 | Supplying, laying, fiting, fixing and jointing of UPVC pipes conforming to IS:4985-2000 with latest revision and amendments, if any, with necessary UPVC/CI specials, CIDF sluice valves, as per relevant I.S. specification including labour charges for earth work in excavation in any kind of soil including mixed soil with boulder ,road sub-grade and its flanks but excluding moorum and laterite or sand stonehard arock including cutting of brick payment without damaging the existing telephone/electrical cable line etc.(in case of damage of any type of cable line during excavation, necessary damaged charges as applicable by the respaective authority will be borne by the agency in his own cost. Loading, unloading, carrying of pipes, specials, valves from the local store to work site and lowering laying of pipes specials valves carefully in trenches maintaining proper levels and alignment ,jointing the pipe and specials including supplying of good quality/approved brand solvent cement (as per IS:14182-1994 including cost of all fabricated PVC fitting i.e. tees,bend, reducers, adopter etc.as per IS:101-1988 and making flange joints including supplying required quantity of nuts, bolts and rubber insertion (CIDF sluice valves will be supplied by the department free of cost) as required at site by adopting suitable method so as to facilate the maintenance of pipe line locally as per conventional method including back filling the trenches with good earth obtained from excavation of trenches including consolidation with watering in layer not exceeding 150mm thk. with maintaining an average depth of
cushion of 1.10mtr. from the top of pipe line including making interconnection with distribution pipes etc. all complete as per drawing direction and satisfaction of the E.I.C. N.B. i) Manufacturer’s test certificate for UPVC pipe & specials to be produced before laying of pipe line. ii) 3rd party inspection of UPVC pipe & specials to be done by CEPET or (India) SGS/NTH Kolkata or as per direction of EIC as per approved vender list. iii)No part payment at any stage on account of supply of materials shall be entertained. iv)Payment will be made on actual consumption of materials. v)UPVC pipes for the works to be supplied as per approved vendor list and as per direction & satisfaction of EIC. No pipes will be allowed beyond recommendated vendor list. vi)Submission of drawing of pipe line with statement of materials consumed between node to node points against each R.A. & final bill.if so. vii) Any deviation from required clear cover of 1.10mtr.due to site adverse condition, prior permission is to be obtained from EIC and payment for such work will be made on prorate basis over the rate of entire item. viii)All pipe connection shall be completed in all respect and as per directionof EIC. Decision of EIC in this respect is final & binding. In case of any deviation/or any left out pipe connections an amount of Rs.10,000.00 for each pipe connection will be realized/recovered from the bill. Pressure rating Class-III
(ii) Laying of pipe line including cost of pipe & fittings/specials but excluding cost of valves.
a) 75 mm OD upvc line | - | mtr | 258 | - |
| 1.09 | c) 90 mm OD upvc line | - | mtr | 342 | - |
| 1.1 | d) 110 mm OD upvc line | - | mtr | 471 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
Tendernotice_2.pdf
PDF • 0.74 MB
BOQ_2519689.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .