| Sl No | Description | Qty | Unit | Woodhill Infrastructure Ltd L1 | Sanjay Singh Bora L3 | GDS INFRASTRUCTURE L2 |
|---|---|---|---|---|---|---|
| .01Note- The Contractor shall quote his/ their rates without GST. GST will be paid extra by the Department as per prevailing rate at the time of payment. | ||||||
| 1.00Providing and applying tack coat using VG 10 grade Bitumen with tack coat distributor at the rate of 0.35 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | ||||||
| 1.01 | Pilkha- Patiya Motor Road Km 1 & 6 (Length - 1.80 Km) | 6,750 | sqm | 11 ₹74,250 Lowest | 14.15 ₹95,512.5 | 14 ₹94,500 |
| 1.02 | Kherna- Ranikhet- Ramnagar Motor Road Km 18 to 21 (Length - 4.00 Km) | 22,761.7 | sqm | 11 ₹2,50,378.7 Lowest | 13.85 ₹3,15,249.54 | 14 ₹3,18,663.8 |
| 1.03 | Kherna- Ranikhet- Ramnagar Motor Road Km 26 to 32 (Length - 7.00 Km) | 39,603.25 | sqm | 11 ₹4,35,635.75 Lowest | 13.85 ₹5,48,505.01 | 14 ₹5,54,445.5 |
| 1.04 | Kherna- Ranikhet- Ramnagar Motor Road Km 38 to 47 (Length - 10.00 Km) | 43,153.75 | sqm | 11 ₹4,74,691.25 Lowest | 13.85 ₹5,97,679.44 | 14 ₹6,04,152.5 |
| 1.05 | Kherna- Ranikhet- Ramnagar Motor Road Km 59 to 60 (Length - 2.00 Km) | 8,522.05 | sqm | 11 ₹93,742.55 Lowest | 13.85 ₹1,18,030.39 | 14 ₹1,19,308.7 |
| 1.06 | Chiliyanaula Link Motor Road Km 1 to 2.60 (Length - 2.60 Km) | 8,623.03 | sqm | 11 ₹94,853.33 Lowest | 13.85 ₹1,19,428.97 | 14 ₹1,20,722.42 |
| 1.07 | Lower Mall Road, Ranikhet Km 1 to 3 (Length - 3.00 Km) | 10,726.81 | sqm | 11 ₹1,17,994.91 Lowest | 13.85 ₹1,48,566.32 | 14 ₹1,50,175.34 |
| 2.00Providing and laying Bituminous Concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects for Grading-II (Bitumen Binder @ 5.4% of mix) | ||||||
Tender Value
Refer Docs
EMD Value
₹9.4 L
Closing Date
1 Dec 2020, 3:00 pmClosed
Superintending Engineer
Superintending Engineer 1st Circle P.W.D. Almora
Improvement of riding quality by 30mm B.C. of Kherna Ranikhet Ramnagar Motor Road and other Motor Road under Central Special Assistance Scheme
2020_pwd_27531_1
4381/Nivida-01/2020 dated 09/11/2020
Open Tender
Civil Works
Item Rate
75 days
Ranikhet
As per technical bid
2 documents required · 2 mandatory
₹5,900
EE PD PWD Ranikhet
₹9.4 L
Almora
26 Dec 2020
13 Nov 2020
1 Dec 2020
14 Nov 2020
1 Dec 2020
24 Nov 2020
23 Nov 2020
Amount
Note- The Contractor shall quote his/ their rates without GST. GST will be paid extra by the Department as per prevailing rate at the time of payment.
Providing and applying tack coat using VG 10 grade Bitumen with tack coat distributor at the rate of 0.35 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
Pilkha- Patiya Motor Road Km 1 & 6 (Length - 1.80 Km)
Kherna- Ranikhet- Ramnagar Motor Road Km 18 to 21 (Length - 4.00 Km)
Kherna- Ranikhet- Ramnagar Motor Road Km 26 to 32 (Length - 7.00 Km)
Kherna- Ranikhet- Ramnagar Motor Road Km 38 to 47 (Length - 10.00 Km)
Kherna- Ranikhet- Ramnagar Motor Road Km 59 to 60 (Length - 2.00 Km)
Chiliyanaula Link Motor Road Km 1 to 2.60 (Length - 2.60 Km)
Lower Mall Road, Ranikhet Km 1 to 3 (Length - 3.00 Km)
Providing and laying Bituminous Concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects for Grading-II (Bitumen Binder @ 5.4% of mix)
Pilkha- Patiya Motor Road Km 1 & 6 (Length - 1.80 Km)
Kherna- Ranikhet- Ramnagar Motor Road Km 18 to 21 (Length - 4.00 Km)
Kherna- Ranikhet- Ramnagar Motor Road Km 26 to 32 (Length - 7.00 Km)
Kherna- Ranikhet- Ramnagar Motor Road Km 38 to 47 (Length - 10.00 Km)
Kherna- Ranikhet- Ramnagar Motor Road Km 59 to 60 (Length - 2.00 Km)
Chiliyanaula Link Motor Road Km 1 to 2.60 (Length - 2.60 Km)
Lower Mall Road, Ranikhet Km 1 to 3 (Length - 3.00 Km)
GDS INFRASTRUCTURE
Sanjay Singh Bora
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .