Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.3 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹29.8 L+₹1.4 L (5.03%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹31.0 L+₹2.7 L (9.48%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | |
| 4 | L4₹31.4 L+₹3.1 L (10.8%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | |
| 5 | L5₹31.8 L+₹3.5 L (12.3%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | SAJAR A L2 | Thavinjal Panchayath Ishtika Manal Thozhilali Co Operative Society Ltd L5 | SAFVAN P P L1 | PROMISE CREST DEVELOPERS PVT. LTD L3 | K MOHAMMED KUNHI L4 | Pratheesh george L6 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00DR RETAINING WALL | |||||||||
| 1.00 | 15.9.1:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar | 61.54 | cum | 916.36 ₹56,392.79 Lowest | 1,050.46 ₹64,645.31 | 935.24 ₹57,554.67 | 1,005 ₹61,847.7 | 1,035.93 ₹63,751.13 | 1,068 ₹65,724.72 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 162.81 | cum | 292.09 ₹47,555.17 | 315.6 ₹51,382.84 | 280.98 ₹45,746.35 Lowest | 308 ₹50,145.48 | 311.23 ₹50,671.36 | 320 ₹52,099.2 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 21.06 | cum | 6,071.3 ₹1,27,861.58 Lowest | 6,959.79 ₹1,46,573.18 | 6,196.43 ₹1,30,496.82 | 6,789 ₹1,42,976.34 | 6,863.54 ₹1,44,546.15 | 7,085 ₹1,49,210.1 |
| 1.00 | OD282914/2026-2027:Dry rubble masonry with hard stone in foundation and plinth without through stone ,levelling up with up to 5m level with all cost, conveyance and all labour charges etc | 328.7 | cum | 3,682.08 ₹12,10,299.7 | 3,531.78 ₹11,60,896.09 | 3,144.42 ₹10,33,570.85 Lowest | 3,445 ₹11,32,371.5 | 3,482.94 ₹11,44,842.38 | 3,600 ₹11,83,320 |
| 1.00 | OD287396/2026-2027:Dry rubble masonry with Departmental Stone in foundation and plinth without through stone ,levelling up with up to 5m level with all cost, conveyance and all labour charges etc | 61.54 | cum | 1,790.53 ₹1,10,189.22 | 1,912.6 ₹1,17,701.4 | 1,702.83 ₹1,04,792.16 Lowest | 1,866 ₹1,14,833.64 | 1,886.16 ₹1,16,074.29 | 1,945 ₹1,19,695.3 |
| 1.01 | 50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge | 66.14 | cum | 564.2 ₹37,316.19 Lowest | 639.91 ₹42,323.65 | 569.73 ₹37,681.94 | 624 ₹41,271.36 | 631.06 ₹41,738.31 | 650 ₹42,991 |
| 1.01 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 94.81 | cum | 7,253.74 ₹6,87,727.09 Lowest | 8,741.68 ₹8,28,798.68 | 7,782.89 ₹7,37,895.8 | 8,528 ₹8,08,539.68 | 8,620.79 ₹8,17,337.1 | 8,800 ₹8,34,328 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 4,409.9 | kilogram | 82.89 ₹3,65,536.61 Lowest | 98.63 ₹4,34,948.44 | 87.82 ₹3,87,277.42 | 96 ₹4,23,350.4 | 97.27 ₹4,28,950.97 | 95 ₹4,18,940.5 |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 35.08 | sqm | 283.93 ₹9,960.26 Lowest | 338.78 ₹11,884.4 | 301.63 ₹10,581.18 | 330 ₹11,576.4 | 334.1 ₹11,720.23 | 360 ₹12,628.8 |
Tender Value
₹33.9 L
EMD Value
₹50,000
Closing Date
23 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Office of the executive engineer Wayanad Jilla Panchayath
Annual Plan-Wayanad DP - 2026-27 - Pr No. 46/27 - GHS Valeri Ground Samrakshana Mathil and School Maintenance - Edavaka GP- 4000000/--General Civil Work
2026_LSGD_888376_5
D2-1281/2026(9)
Open Tender
Civil Works - Buildings
Item Rate
365 days
Kalpetta
Please refer in tender document
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
25 Nov 2026
13 Nov 2026
24 Nov 2026
13 Nov 2026
23 Nov 2026
13 Nov 2026
45 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1DR RETAINING WALL | |||||
| 1.001 | 15.9.1:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar | 61.54 | cum | - | - |
| 1.002 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 162.81 | cum | - | - |
| 1.003 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 21.06 | cum | - | - |
| 1.004 | OD282914/2026-2027:Dry rubble masonry with hard stone in foundation and plinth without through stone ,levelling up with up to 5m level with all cost, conveyance and all labour charges etc | 328.7 | cum | - | - |
| 1.005 | OD287396/2026-2027:Dry rubble masonry with Departmental Stone in foundation and plinth without through stone ,levelling up with up to 5m level with all cost, conveyance and all labour charges etc | 61.54 | cum | - | - |
| 1.006 | 50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge | 66.14 | cum | - | - |
| 1.007 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 94.81 | cum | - | - |
| 1.008 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 4,409.9 | kilogram | - | - |
| 1.009 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 35.08 | sqm | - | - |
stage.html
html • 0.03 MB
finance_1517103.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.79 MB
Tendernotice_2.pdf
PDF • 0.07 MB
Tendernotice_3.pdf
PDF • 0.25 MB
Tendernotice_4.pdf
PDF • 0.14 MB
Tendernotice_5.pdf
PDF • 0.07 MB
Tendernotice_6.pdf
PDF • 0.10 MB
BOQ_1517103.xls
BOQ • 0.31 MB
viewsbdmerged.pdf
Tender Documents • 2.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .