Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.7 LAccepted-AOC | L1 | Accepted-AOC PR.NO.59 DTD.16-11-2019 | |
| 2 | L2₹24.6 L+₹87,812.12 (3.71%)Rejected-AOC | L2 | Rejected-AOC PR.NO.59 DTD.16-11-2019 | |
| 3 | L3₹24.6 L+₹88,041.73 (3.72%)Rejected-Finance | L3 | Rejected-Finance PR.NO.59 DTD.16-11-2019 | |
| 4 | L4₹25.0 L+₹1.3 L (5.60%)Rejected-Finance | L4 | Rejected-Finance PR.NO.59 DTD.16-11-2019 | |
| 5 | L5₹30.3 L+₹6.6 L (27.8%)Rejected-Finance BEVINJA KASARAGOD | L5 | Rejected-Finance PR.NO.59 DTD.16-11-2019 |
Tender Value
₹31.2 L
EMD Value
₹50,000
Closing Date
8 Nov 2019, 6:00 pmClosed
Aiswarya B Singh
The Assistant Engineer, LSGD Sub Division, Kasaragod Block Panchayat
Kasaragod Block Panchayath 2019-20 -Project No-162/20 Bakathimar Pond Improvement in Madhur Grama Panchayath
2019_LSGD_316273_1
23/AE/LSGD/KSD/2019
Open Tender
Civil Works - Water Works
Item Rate
180 days
KASARAGOD
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,800
Yes
online
₹50,000
Yes
10 Mar 2020
1 Nov 2019
14 Nov 2019
1 Nov 2019
8 Nov 2019
1 Nov 2019
Amount
Pond Construction
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
60.7.4 : DR PACKING FOR APRONS - Rough stone dry packing for apron with good quality blasted rubble including packing to compactness to lines levels, cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
50.2.26.1 : Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge.
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
od275217/2019_2020 : Laterate dry masonry with neatly dressed laterate stone of size 30x20x20cm or nearest size for foundation and basement including all cost of materials, labour charges etc.
13.1.1 : 12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.22A.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more
B ABDULLA KUNHI
FAISAL K I
MOHAMMED KUNHI K.A
MUSTHAFA SB
MAHIN K.
Bidder Name
MUSTHAFA SB
SIRAJUDEEN K
MOHAMMED KUNHI K.A
FAISAL K I
MAHIN K.
B ABDULLA KUNHI
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_435894.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .