Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹1.5 Cr
EMD Value
₹2.9 L
Closing Date
16 Oct 2026, 3:30 pm6d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
74 conditions · 2 needing a document upload
Beam bottom's line, level & width should be checked.
Beam side's line , level & plumb should be checked.
Beam to beam measurements shall be checked as per architectural drawing.
Individual level & diagonal of each slab bay shall be checked.
Slab thickness level shall be marked with nails on the peripheral beam's outer side.
Slab thickness & beam depths should be checked
Support props for slab & beam bottoms should be in line & plumb, Bamboo bracing should be done at around 4' ht from floor level. Support props for double staging terraces shall be carefully checked.
Line of external/peripheral beam's side shall be checked & should be cross supported to avoid building out of sides.
Junctions of column & beam shall be checked & should be cross supported to avoid building out of sides.
De-shuttering oil shall be applied to beam/slab shuttering
Formwork of staircase shall be checked for dimensions of tread and riser, level of treads, plumb of risers.
Reinforcement shall be checked for beams and slab as per RCC drawing.
Proper cover for bottom/sides shall be checked for beams.
Proper cover shall be checked for slab.
Electrical points, electrical piping (conduits)/fan hooks shall be checked as per drawing.
Reduction of column as per drawing shall be done if any.
Proper no. of chairs shall be provided for slab.
Parapet (pardi) bars shall be left for balconies/staircase etc.
Ring (stirrups) shall be provided at the free end of each column reinforcement
Gaps between plates/planks should be filled. Taping should be done at ply joints in care of ply shuttering
Approval of architect and RCC consultant shall be taken prior to pouring.
Check the availability of required labour strength, mixer, lift, vibrators, masons, weigh batcher, diesel/petrol and plastics sheets etc. before start of concreting.
Hidden beams/inverted beams/cantilever beams should be checked.
Check for the sunk if any as per the approved drawings.
Packing below supports props should be avoided. If not, single wooden plank should be inserted as packing
In case of large slabs, position of concrete joints shall be decided in advance as per approval by RCC consultant.
Availability of raw material for concrete/RMC per grade of concrete, water. Electricity shall be checked in advance before the start of concreting.
Concreting shall be done for the beams first & then slabs.
Compaction of concrete shall be done by vibrators & tamping rods. (Spare vibrators with fuel shall be ensured.)
The top level of slabs shall be finished by the mason and no one should be allowed to walk on the fresh finished concrete.
Carpenter shall be present below the slab shuttering during concreting to ensure the tightness of the form work.
In case of rains, the finished concrete shall be covered with the big plastic sheets.
Cast 6 cube moulds for testing.
Curing the slab shall be done with pounding method by making ponds in cement & sand mortar(1.10) of size around 5'X5' curing of beams and slabs shall be done for 7 to 10 days or as directed by the consultant.
Date of casting and slab no shall be painted on the front side beam.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Labour Cooperative Societies shall submit only 50% of bid security for which the tenderers are required to upload Registration certificate issued by appropriate authority without which their offer will not be considered. Such firms should also declare that -" We are a Labour Cooperative Society and our Registration No. is .................... with .......................and hence required to deposit only 50% of Bid Security
Any firm recognized by Department of Industrial Policy and Promotion (DIPP) as 'Startups' shall be exempted from payment of Bid Security on submission of Registration Certificate issued by appropriate authority. For such firms it is required to upload a copy of Registration Certificate issued by appropriate authority without which their offer will not be considered. Such firms should also declare that - I/We am/are a Startup firm registered by ........................ Department of Industrial Policy and Promotion (DIPP) and my registration number is ................ valid upto ...................... (Copy enclosed) and hence exempted from submission of Bid Security.
THE OFFERS WITHOUT EARNEST MONEY EXCEPT IN CASE OF EXEMPTION CLAIMED AS PER COMMERCIAL COMPLIANCE OF NIT WILL BE SUMMARILY REJECTED.
KOTA (DRH) - Provision of New Dining Hall & Kitchen, toilet in Room no-3&4, visitor Room near ICU Store Room and Physiotherapy room
179-2026~WCR
179-2026
Open
Works - General
10 Months
Kota, Rajasthan
₹0
₹2.9 L
23 Sept 2026
23 Sept 2026
2 Oct 2026
120 items across 2 schedules · ₹8,17,604.39 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | "Providing and fixing CP Liquid Soap Dispenser with concealed fittings arrangement & accessories of approved quality and colour of CERA CA 211/Jaquar/Hinware or equivalent make with all fittings and fixtures complete including cutting & making good the walls wherever required as per direction of Engineer in charge. The rate is for complete job and nothing shall be paid extra for labour, material taxes, royalty, fixing & transportation etc." | Sqm | 8.00 | 1,003.69 | 8,029.52 |
| 2 | "Providing and fixing Towel Ring CERA CA 205/Jaquar/Hinware or equivalent make with all fittings and fixtures complete including cutting & making good the walls wherever required as per direction of Engineer in charge. The rate is for complete job and nothing shall be paid extra for labour , material taxes, royalty, fixing & transportation etc." | Sqm | 8.00 | 579.53 | 4,636.24 |
| 3 | "Providing and fixing Jayna LSF 140/Jaquar/Cera or equivalent make heavy duty C. P. Grating matt finish of size 140 x140 mm with openable lid and with all fittings and fixture complete including cutting & making good the walls wherever required as per direction of Engineer in charge. The rate is for complete job and nothing shall be paid extra for labour, material taxes, royalty, fixing & transportation etc. " | Sqm | 10.00 | 632.88 | 6,328.8 |
| 4 | Providing and fixing zebra blinds(good quality) in windows of approved colours and design complete in all respect. | Sqm | 10.00 | 2,817.19 | 28,171.9 |
| 5 | Providing & fixing PVC multiple hollow section of approved colour with tongue and groove fixture having wall thickness 1mm and overall thickness 12mm in ceiling on existing frame work. | Sqm | 500.00 | 1,176.41 | 5,88,205 |
| 6 | "Carrying out, preparation and submission of drawings (Both working drawings and detailed structural drawings) including conducting soil investigation.The scope of work includes1. Soil investigation:- Soil investigations to be carried out for a total depth of 20 meter by Mechanical auguring and SBC to be furnished at 1.5meter interval along with soil strata classification and bore-log details at two locations.2. Submission of Conceptual plan:- Based on the Approved GAD furnished by department, conceptual 3D isometric view drawing to be furnished with any modification required.3. submission of Architectural drawings4. Preparation and submission of detailed structural drawings of both foundation and super structure including detailed design calculations for G+2 floors for approval.5. Preparation and submission of following details.A. Drawing showing the plumbing arrangements in each floor. B. Drawing showing the electrical arrangements in each floor C. Drawing showing the sewage arrangements in each floorD. Drawing showing the Communication/S&T arrangements in each floor6. Any suggestion/improvement/alteration made by department should be submitted. After approval of drawing, final copies to be submitted both in soft and hard copy as per needs of Engineer-in charge.7. Separate floor plans are to be submitted apart from the combined plan duly showing the drainage arrangements, compound wall etc.,8. Agency will submit the detailed structural drawing/Design booklet duly signed with Qualification minimum M.Tech/ME(structures). The Design has to be proof checked by any Government recognized institute/University. Cost of proof checking has to be arranged by agency and no extra payment shall be made for the same.Note:- Agency should provide following details-Conceptual drawing, architectural drawingWorking drawing with structural details.It is responsibility of the agency to get approval for drawing and designs from the concerned authorities duly clarifying the doubts at any stage.If any Modification/alteration is suggested by department, same should be carried out under the same scope without demanding any extra payment. Stage payment-1. 50% payment after approval of detailed architectural plan, structural design, design calculation2. 25% payment after submission of detailed drawing showing plumbing arrangements, electrical connections, sewage disposal lines, communication lines and furniture arrangements3. Balance 25% payment will be released after obtaining the clearance from the concerned DEN/Sr. DEN regarding non-requirement of the services.Working schedule.Submission of initial conceptual plan:-15 to 20 days from the date of LOA Carrying out the soil investigation and submission of detailed report along with bore log details:-0-20 days from the date of LOAsubmission and obtaining the approval of plans, structural design and structural drawings for approval:-30 to 60 days from the date of LOA Submission of other connected drawings and details:-After approval of the design and drawing 30-45 days from the approval." | Sqm | 533.50 | 341.58 | 1,82,232.93 |
| Schedule total | ₹8,17,604.39 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Specialcivilcondition_1.pdf
ATTACHMENT
SCAFFOLDINGDRAWING4.80MHT1.pdf
ATTACHMENT
ApprovedBrandListTill12.11.25.pdf
ATTACHMENT
2026_08_12IndianRailwaysStandardGeneralConditionsofContractApril2022AdvanceCorrectionSlipNo_12_compressed.pdf Correction slip
ATTACHMENT
TENDERDOCUMENTFROM164-2026iNCLUDEDbgFORMAT.pdf
ATTACHMENT
ANNEXURE-PCECIRCULAR2016-17-ilovepdf-compressed1-compressed.pdf
ATTACHMENT
Vigilanceguidelines-PublicProcurement.pdf
ATTACHMENT
Acceptanceofe-BankGuaranteee-BGinWorksContractsandPGMS_PMS_PSSAGC2026_06_16.pdf
ATTACHMENT
2026_08_12IndianRailwaysStandardGeneralConditionsofContractApril2022AdvanceCorrectionSlipNo_12_compressed.pdf
ATTACHMENT
2026_08_12IndianRailwaysStandardGeneralConditionsofContractApril2022AdvanceCorrectionSlipNo_12_compressed.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .