Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹5.5 L
EMD Value
₹5,526
Closing Date
30 Oct 2026, 4:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer, RWS&S Kadapa
Kadapa
Construction of CC Drain with cover slab from Meegada Krishna Reddy house to Wellness Center Thripuravaram Village and GP of Khajipeta Mandal
1003015
Tender Notice No.AEE/14-16/2026-27, Dt : 26.09.2026
OPEN - NCB
Drainage Work
YSR
12 documents required · 12 mandatory
₹196
₹5,526
13 Oct 2026
13 Oct 2026
13 Oct 2026
Earthwork excavation in all kinds of soils including boulders upto 0.30m dia for foundation of structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH wiht machinery upto 3mts depth (Taking output 240 cum). but excluding GST as per standard specification and contractors profit at 13.615%.
Supply and fixing of sand in trenches, sides of foundations with intial lead in layers not exceeding 15cm thick , consolidated and deposited layer by watering and raming as per drawing and technical specification excluding GST and all operational charges etc complete finished item of work. and contractors profit at 13.615%.
Vibrated Cement Concrete (1:3:6) using 40 mm 60% and 20mm 40% down graded HBG metal including cost and conveyance of all materials and labour charges centering curing etc.,complete-1 cum with machine mixing for CC Bed of drains including conveyance, seinorage of materials of sand and metal and excluding cost of steel and its fabrication charges & including contractors profit @13.615%. - for CC Bed
Vibrated Cement Concrete (1:2:4) using 20mm down graded HBG metal including cost of all materials, cenetering charges and labour charges etc,,complete -1 cum with Machine mixing for side walls of drains , including conveyance etc., complete & Contractors profit @ 13.615%.- for CC Drain side walls
Reinforced Vibrated Cement Concrete (1:2:4) using 60% of 20mm HBG graded metal and 40% of 12mm HBG graded metal including cost of all materials, cenetering charges and labour charges etc,,complete -1 cum with Machine mixing for side walls of drains , including conveyance etc., complete & Contractors profit @ 13.615%.- for Top Slab Covers
Supplying, Cost of steel including fabrication charges including all operational and incidental charges etc., Steel 110 Kgs per cum (approx) for Top Slabs
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ.xlsx
TENDER_DOCUMENT • 0.01 MB
Thripuravaram.xlsx
TENDER_DOCUMENT • 0.07 MB
VOL-1 Part-A.doc
TENDER_DOCUMENT • 0.22 MB
Vol-Part-B.doc
TENDER_DOCUMENT • 0.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .