Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance 115 116 GANESH NAGAR HOSHANGABAD ROAD BHOPAL M P 462026 IN | BHOPAL | BHOPAL | MADHYA PRADESH | 462026 | Admitted-Finance |
| 4 | Admitted-Finance UNIT NO 514 515 AND 516 5TH FLOOR SUNCITY SUCCESS TOWER GOLF COURSE EXTENSION ROAD GURGAON 122005 | GURGAON | GURGAON | HARYANA | 122005 | Admitted-Finance |
| 5 | Admitted-Finance 1ST FLOOR YMCA CULTURAL CENTER CUM LIBRARY BUILDING 1 JAI SINGH ROAD NEW DELHI 110001 INDIA | NEW DELHI | NEW DELHI | DELHI | 110001 | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
28 Mar 2024, 3:00 pmClosed
Regional Officer Jammu
House no. 281,sector-1,Channi Himmat ,Jammu
CONSULTANCY SERVICES FOR PREPARATION OF DPR FOR CONSTRUCTION/IMPROVEMENT FROM KM 30.00 TO 69.00, FROM KM 69.00 TO 87.00, OF SRINAGAR-SONMARG-ZOJILA ROAD(NH-01) AND FROM KM 0.00 TO 13.00 ,CHAMKOT-TITHWAL ROAD (NH-701).
2024_MoRTH_791055_1
RO/JK/DPR/SRI/GUMRI/28/2024
Open Tender
Consultancy
Works
305 days
Jammu and Kashmir
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
RPAO MoRTH
Exempted
Regional Office Jammu
11 Sept 2024
18 Jan 2024
29 Mar 2024
18 Jan 2024
28 Mar 2024
18 Jan 2024
18 Jan 2024 - 1 Feb 2024
1 Feb 2024
Amount
Estimate of Local Currency Costs I. Remuneration for Local Staff (Including per diem allowance) Professional Staff
Team Leader cum Senior Highway Engineer
Senior Bridge Engineer
Highway cum Pavement Engineer
Meterial cum Geotechnical Engineer - Geologist
Senior Survey Engineer
Traffic and Safety Expert
Environmental Specilist
Quantity Surveyor / Documentation Expert
Land Acquistion Expert
Utility Expert
Sub-Total-1
SUB-PROFESSIONAL STAFF :(To be assessed by consultant as per requirement of assignment and one sub professional be a fresh graduate)
Sub-Professional-1
Sub-Professional-2
Sub-Professional-3
Sub-Professional-4
Sub-Professional-5
Sub-Professional-6
Sub-Professional-7
Sub-Professional-8
Sub-Professional-9
Sub-Professional-10
Sub-Total-2
Total(Sub Total 1 + Sub Total 2)
SUPPORT STAFF
Office Manager
Typist
Office Boy
Night Watchman
Total:
Transportation (Fixed Costs) Rate/Month
The vehicles provided by the consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. A. For use of consultants
Total:
Duty Travel to Site(Fixed Costs): Note: Rate quoted includes Hotel charges, travel cost etc. complete.
Duty Travel to Site (LS)
Total:
Office Rent (Fixed Costs) The rent cost includes maintenance, cleaning, repairing etc. (Rate per Month)
Office Rent (Fixed Costs)
Total:
OFFICE SUPPLIES, UTILITIES AND COMMUNICATIONS (Fixed Costs) Rate/Month
Office Supplies
Drafting Supplies
Computer Running Costs
Domestic and International Communication
Total:
OFFICE FURNITURE AND EQUIPMENT (Rental)
Office Furniture and Ecquipment (LS)
Total:
REPORTS & DOCUMENTS PRINTING
Monthly report (3 copies per Month)
Inception Report & QAP
Submission of preliminary alignment report including, preliminary cost estimate for preferred alignment along-with cost of land acquisition, traffic study and outcome
Environment and Social Impact Screening Report
Draft Feasibility Report
Final Feasibility Report
Strip Plan with LA Reports
Draft LA and Clearances I Report
Final LA and Clearances I Report
Draft Environmental Assessment Report & RAP
Final Environmental Assessment Report and RAP
Draft Detailed Design Report & Drawings etc.
Draft EMP
Draft Bidding Documents
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc.
Final EMP.
Final Bidding Documents
Draft 3(a),3(A) and 3(D) notification for land acquisition (3 copies each)
LA & Clearances II Report
Total:
Survey and Investigation: A. Topographical Survey (Fixed Rate)
Topographic Survey including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer.
Detailed topographic surveys using mobile / aerial LiDAR or better Technology
B. Investigation (Fixed Cost)
Road and Bridge Inventory
FWD Test and Pavement Evaluation
Roughness Survey
Axle Load Survey
Material Survey and Investigation
Sub-grade Investigation
Traffice Survey
Socio-economic & Census Survey/Studies
Land Acquisition Studies
Any other Investigations/Surveys
Sub-Soil Investigation (Boring) Note:*Quantities of boring shall be taken from Financial Proposal Form No.V. for financial evaluation, the sequantities and rates quoted by the consultant will be considered. However, payment shall be made on the actual quantity of boring at rates quoted above by the consultant, which may be substantially more or less than the estimated quantities.
a) Boring in all type of soils (other than hard rock)
b) Boring in hard rock
Total:
C. Network Survey and GPR
Network Survey of the existing Highways as a repository for civil works as per directions from Authority.
GPR Survey for detection of under ground utilities
Total:
Cost of Supply and Fixing Boundary pillars
Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed atan interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/ or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval. (lumpsum )
Total:
Land Acquisition Team including support staff and logistics/ transportation. A. Land Acquisition Team including support staff :
Ex-Land Revenue Inspector/ Officer or equivalent (1*8)
Ex-Kanoogo/Girdwar or equivalent (1*8)
Ex-Patwari or Equivalent (1*8)
Typist (2*8)
Number of Land acquisition Teams (One Only)
Grand Total for All Land acquisition Teams(A)
B. Logistics for Land Acquisition Team
Computer including necessary peripherals (2*8)
Printers (2*8)
Vehicles (Bolero or Equivalent) with monthly running limit of 4000 km (1*8)
Number of Land acquisition Teams (One Only)
Grand Total (B)
Grand Total for All Land acquisition Teams and Logistics (A) + (B)
Note: (i) The consultant shall provide one land acquisition expert along with allied team and supporting logistic as envisaged in clause 5.1.5.1 of TOR for each CALA for stretches proposed for DPR preparation. (ii) Details of land acquisition teams including support staff, logistics support for land acquisition teams to be deployed by the consultant for each CALA as detailed above is minimum. However, the consultant has to ensure adequate manpower given to CALA in terms of area under acquisition in the jurisdiction of each CALA in consultation with MORT&H/BRO, to ensure completion of land acquisition proceedings in time frame stipulated in contract agreement. Cost variation in this regard is not admissible.
Estimate of costs for Expatriate consultants (in Indian Rupees) REMUNERATION OF EXPATRIATE STAFF including per diem allowances.
Staff
Sub-Professional-1
Sub-Professional-2
Sub-Professional-3
Sub-Professional-4
Sub-Professional-5
Sub-Professional-6
Sub-Total-I
Mobiliation and Demobilization
A. International Airfares (Fixed costs)
B. Inland Travel in Home Country (Fixed costs)
C. Other Missc expenses (like DA, internal travel expenses other incidentals)
Sub-Total-II
Total (I+II)
Total cost net of Tax
Taxes and Duties
A. Income Tax (Expatriate)
B. Other Taxes/Duties (if any) Specify clearly
Total
Total cost (inclusive of all the taxes) but net of Goods and service Tax **Total cost net of Goods and Service Tax shall be considered for financial evaluation.
Goods and service Tax
TOTAL COSTS (Including GST)
MSV INTERNATIONAL INC
Technocrats Advisory Services Pvt. Ltd.
Indian Technocrat Limited
Manglam Infra & Engineering Limited
RODIC CONSULTANTS PVT. LTD.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .