Loading…
Loading…
Tender Value
₹11.5 L
EMD Value
₹12,000
Closing Date
21 Jul 2026, 6:00 pm
Executive Engineer, Sauni Yojana Division, Rajkot
THIRD-PARTY INSPECTION/PROJECT MANAGEMENT AGENCY FOR THE SERVICES OF PROJECT MANAGEMENT, CONSTRUCTION, SUPERVISION AND DESIGN REVIEW INSITE/OFFSITE INSPECTION & TESTING OF MATERIALS, MACHINERY, EQUIPMENTS, REVIEW OF QAP ETC. FOR SUPPLYING IRRIGATION WATER FOR FILLING OF VARIOUS CD/PONDS SITUATED WITHIN 3 KM FROM EXISTING MAIN PIPE LINE OF SAUNI YOJANA LINK-1 PACKAGE-1 AND 2 (DIST.-MORBI, TALUKA-MORBI AND TANKARA) THROUGH VARIOUS DIA. HDPE PIPE AND M.S. PIPE LINE BY MAKING CONNECTION FROM EXISTING PIPELINE / SCOUR VALVE WITH ALL ALLIED WORKS ETC.
321545
SBD-06 2026
Open
Miscellaneous Works
Rajkot
18 documents required · 18 mandatory
₹900
Executive Engineer, Sauni Yojna Division, Rajkot
₹12,000
7 Jul 2026
7 Jul 2026
7 Jul 2026
21 Jul 2026
7 Jul 2026
Addenda/Amendments to the above, for the INSPECTION SERVICES OF THE ABOVE
WORK, we the undersigned offer our inspection services from the date of commissioning
including defects liability period as given in Conditions of Contract and in conformity
(insert numbers) for Lump Sum fixed price mention in the summary cost. Our financial
proposal shall be fixed and firm binding upon us subject to the modifications resulting
from contract negotiations up to expiration of the validity period of the proposal. The
amount of consultancy services is inclusive of all taxes, duties, service charges etc.
2. We undertake, if our Bid is accepted, to complete and deliver the Works in accordance
with the Contract within 12months or till the Project Implementation period, inclusive of
monsoons, from the date of receipt of work order to us by you. We will observe the laws
applicable to perform the services.
3. We agree to abide by this Bid for a period of 120 days from of opening of online Bid the
date fixed for receiving the same and it shall remain binding upon us and may be
accepted at any time before the expiry of that Period.
4. In the event of our Bid being accepted, we agree to enter into a formal Contract
Agreement with you incorporating the conditions of Contract thereto annexed and
conditions of form “C” but until such agreement is prepared this Bid together with your
written acceptance thereof shall constitute a binding Contract between us.
5. We agree, if our Bid accepted, to furnish Performance Bond / Security in the forms and of
value specified in the Conditions of Contract of a sum equivalent to Rs. 1.15 Lakh for due
performance of the Contract.
6. We understand that you are not bound to accept the lowest or any Bid you may receive.
(Name of the person)
(In the capacity of)
Duly authorized to sign Bid for and on behalf of
(Fill in block capitals)
The bid is lump sum bid for THIRD-PARTY INSPECTION/PROJECT MANAGEMENT AGENCY FOR
THE SERVICES OF PROJECT MANAGEMENT, CONSTRUCTION, SUPERVISION AND DESIGN REVIEW
INSITE/OFFSITE INSPECTION & TESTING OF MATERIALS, MACHINERY, EQUIPMENTS, REVIEW OF
QAP ETC. FOR SUPPLYING IRRIGATION WATER FOR FILLING OF VARIOUS CD/PONDS SITUATED
WITHIN 3 KM FROM EXISTING MAIN PIPE LINE OF SAUNI YOJANA LINK-1 PACKAGE-1 AND 2 (DIST.-
MORBI, TALUKA-MORBI AND TANKARA) THROUGH VARIOUS DIA. HDPE PIPE AND M.S. PIPE LINE
BY MAKING CONNECTION FROM EXISTING PIPELINE / SCOUR VALVE WITH ALL ALLIED WORKS
The bidder shall quote his firm and fixed lump sum price for the entire work under this
Contract, defined in more details in various sections of this bid document & form “C” of Lump
1. The rates and prices shall be submitted in the formats given in the enclosed Price
Schedules. Rates and prices received in any other formats will be rejected and the Bids
will be disqualified.
2. It will be entirely at the discretion of the NWRWS & KD to accept or reject the bidder’s
proposal, without giving any reasons whatsoever and the bidder shall not be permitted
to withdraw his bid on this account.
in Schedule only will be considered for price evaluation& shall form a part of the
Contract Agreement.
4. Each item is to be individually priced and the amounts shall be added up to arrive at
blank except where the item description requires the item to be priced on "as
applicable" basis. The item shall not be priced if it is "not applicable" to the bidder's
design, in which case the bidder shall add the words "NOTAPPLICABLE". The wording
in the item description is for subject matter guidance only: clause references are
indicative only and all other relevant clauses shall also be referred to. The prices shall
allow for all the works covered under the bid and all liabilities and contractual
obligations whether separately specified or not. Items against which no prices are
quoted shall not be separately paid for and the bidder shall be deemed to have covered
The cost for execution of such items (according to the requirements of the bid
document) in the prices quoted for the other items.
satisfactory working of the system as specified, will not be separately paid for by the
NWRWS & KD when executed and shall be deemed to be already covered by other
items and rates listed in the price sheets and Lump sum prices quoted in Schedule.
6. Interim payment will be made as per break up given in the Price document.
Schedules shall be the basis to work out a schedule of Interim payments during
construction with the successful bidder.
8. The Consultant shall be deemed to have allowed in his price for provision,
maintenance and final removal of all temporary works of whatsoever nature required
for the inspection services for the proper execution of works. The rates shall be
deemed to include any works and setting out that may be required to be carried out for
laying out of all the works involved.
9. Prices shall be entered online and shall be entered in figures and in words. Where
there is a discrepancy between the unit rates and the amount entered, the latter shall
Specifications and the other sections of these bid documents and these documents are
to be taken as mutually explanatory of one another.
11. Prices quoted by the Consultant shall be firm for the entire consultancy work of
Contract without any escalation or extra payment than tendered cost. The Quoted
price should be match with Annexure E and COST SUMMARY SCHEDULE.
12. The Consultant shall interpret the data furnished if any additional survey work or
investigation required shall be carried out by EPC Contractor.
13. The Consultant should acquaint himself with the site conditions including the access to
Work site. The successful bidder shall have to make suitable access to work sites at his
own cost. These accessed will be used by the other contractors working for NWRWS &
KD/ Government.
COST SUMMARY SCHEDULE
FORM OF FINANCIAL PROPOSAL
Description of Services Amount in Rs.
In Figure In words
THIRD-PARTY INSPECTION/PROJECT MANAGEMENT AGENCY FOR
THE SERVICES OF PROJECT MANAGEMENT, CONSTRUCTION,
SUPERVISION AND DESIGN REVIEW INSITE/OFFSITE INSPECTION & Rupees
TESTING OF MATERIALS, MACHINERY, EQUIPMENTS, REVIEW OF Eleven
QAP ETC. FOR SUPPLYING IRRIGATION WATER FOR FILLING OF Lakhs
VARIOUS CD/PONDS SITUATED WITHIN 3 KM FROM EXISTING Forty Nine
MAIN PIPE LINE OF SAUNI YOJANA LINK-1 PACKAGE-1 AND 2 Thousands
(DIST.-MORBI, TALUKA-MORBI AND TANKARA) THROUGH Five
VARIOUS DIA. HDPE PIPE AND M.S. PIPE LINE BY MAKING
CONNECTION FROM EXISTING PIPELINE / SCOUR VALVE WITH ALL
ALLIED WORKS ETC. COMPLETE.
4.0 Summary of costs (Lump - sum fix price)
General Manager “Authorized person of Inspecting Firm.”
Deputy Executive Engineer
Sauni Yojana Sub Division
Construction Inspection of materials Post Construction
Pre-Construction Design Review &
Supervision & allied machineries and Activities &Defect Total
Activity Approval
activities equipment Correction Period
Title Minimum experience required
Remunerati Remunerat Duration Remunerat Duration Remunerat Duration Remunerati Remunerat
Requirem Duration Duration of
on per ion per of ion per of ion per of on per ion per
ents in engageme Engagement Months Total
month,(all month,(all Engageme month,(all Engageme month,(all Engageme month,(all month,(all
Project nt(Days) (Days)
inclusive) inclusive) nt(Days) inclusive) nt(Days) inclusive) nt(Days) inclusive) inclusive)
Part-A(Personals)
Graduate In Civil / Mechanical engineering with over 15 years’
experience in M.S. / Steel pipeline project monitoring of water
supply projects, preferably having design/office experience and
having handled projects of similar nature.
Master's degree in Structural Engineering with 10 years of
2 Structural Engineer
Graduate Mechanical engineer with over 10 years’ experience in
3 Mechanical/Safety Engineer design & inspection of pipe manufacturing, valve and instrument
Water Supply & Pipeline Graduate in Hydraulics/Civil/ Mechanical Engineering with over
Engineer years of experience of similar nature.
Graduate with over 2 years of experience or diploma with over
8 Site Supervision Staff
years’ experience of site pipeline work of similar nature.
(ii) Mechanical / Civil
11 Additional Staff
i. Surveyor Diploma Civil with minimum of 2 years’ Experience of
experience or ITI Surveyor having 2 years of experience
Ii ROU Supervisor Experience in ROU or similar nature of work
Total of Part-A
Part-B(Other Expanses)
1 TRANSPORTATION(i)Two-wheeler
TRANSPORTATION(ii)Four-wheeler
2 COMMUNICATION L.S.
3 OFFICEEXPANCESINCLUDINGRENTANDOTHEROVERHEADS L.S.
4 STATIONERYEXPANCESINCLUDINGALLCONSUMABLES L.S.
5 Any other expenses if any L.S.
Total of Part-B
Schedule of Payment
The breakup of consultancy services shall be as under:
Percentage of L.S.
Name of activity quoted price in Amount in Rs.
A Pre contract activity 2%
B Design Review / Approval 10 %
Construction Supervision
&allied activity
Inspection of the material,
machineries and equipments
Post construction &defect
correction activity
Deputy Executive Engineer
Sauni Yojana Sub Division
Schedule of Payment
A. Pre-constructionActivity:2 % of quoted price
Total Amount: _________________
Total Amount: _________________
Percentage to be
Particulars released of total amount
Particulars released of total amount
On submission of review report on EPC
On submission of methodology & work
2 plan with pert chart & required formats 10%
of various progress report
On setting out for project with required
facility at site with deployment of staff
On review of working survey & setting
out the lineout of the work
5 Any other matter require to perform 10%
Deputy Executive Engineer
Sauni Yojana Sub Division
Schedule of Payment
B. Design Review / Approval: 10 % of quoted price
Total Amount: ________________
Total Amount: ________________
Percentage to be
Sr. released of total
B1 On approval of L.S. &G.A. 20 %
On approval of structural drawing of End 10%
structure& Road / other crossing, etc.
Design of Pipe line, Thrust block,
B3 Supporting structure, Valve chambers,
Surge devices if any, etc.
Deputy Executive Engineer
Sauni Yojana Sub Division
C. Construction & Supervision, scrutiny of design & allied activity of
work: 50% of quoted price
Total Amount: ________________
Total Amount: ________________
Further Break up of Activities for pipe line
Percentage to be
Sr. No Particulars released
of total amount
of total amount
C - A.1 M.S. and HDPE Pipeline work 60 %
C - A.2 Mechanical work 20 %
C - A.3 RCC Work 10 %
C - A.4 After Finalization of ROU 10 %
Deputy Executive Engineer
Sauni Yojana Sub Division
Further Breakup of above activity C
C-A.1 Pipeline work: 60 % of C-A Amount: ____________
Particulars to be Amount in Rs
inspection of pipe, inside & outside
1 coating of pipe and Transportation
Excavation, bedding, lowering, 50 % of C-
laying & jointing of pipeline & PAUT A1
4 Refilling & other items
1. The amount is to be paid on running meter basis. Per meter rate is to be arrived by
dividing the total length of transmission main. Payment is to be made as per progress of
work done. The hydro test payment is to be made after carrying out of test.
2. The Contractor shall submit the copy of attendance sheet for the period of Signed by
competent authority of department.
Note: The Contractor shall submit the copy of attendance sheet for the period of Signed by
competent authority of department.
Deputy Executive Engineer
Sauni Yojana Sub Division
C-A.2 Mechanical Items: 20 % of C Amount: ___________
Sr. No Particulars Amount in Rs
1 On erection of Air valves 35 % of C-A.2
On erection of Scour &
miscellaneous devices.
4 commissioning of Pipeline 15% of C-A.2
Total 100% of C-A.2
Deputy Executive Engineer
Sauni Yojana Sub Division
C-A.3 RCC work: 10% of CA mount: ____________
Sr. Percentage to be
Particulars Amount in Rs.
1 Setting Out 10 % of C-A3
2 Work up to ground level 50 % of C-A3
3 Work up to plinth level 15 % of C-A3
4 On completion of work 25 % of C-A3
Total 100 % of C-A3
Deputy Executive Engineer
Sauni Yojana Sub Division
C-A.4After Finalization of ROU: 10 % of C Amount: ___________
Sr. Percentage to
Particulars Amount in Rs
1 After Finalization of ROU 100 % of C-A.4
Total 100% of C-A.4
Deputy Executive Engineer
Sauni Yojana Sub Division
D. Inspection of material, machineries and equipment: 28 %quoted price
Total Amount: _________________
Total Amount: _________________
Sr. No Particulars Percentage to be Amount in Rs.
D-1 Inspection of M.S. and HDPE 50 % of quoted
Pipeline amount for D
D-2 Inspection of valves and water 25% of Quoted
control hammer amount for D
devices related to Pipeline
D-3 Inspection of other 25% of quoted
Mechanical equipment. amount for D
Note: The Consultant / TPI shall submit the copy of inspection report.
Deputy Executive Engineer
Sauni Yojana Sub Division
D-2Inspection of valves and other Equipment: 25 % of DA mount:
(MECHANICAL of Pipeline) related PERCENTAGE OF QUOTED
1. Sluice / Scour valves 50 % of quoted amount
2. Air valves 50% of quoted amount
Total Total 100 % of quoted amount
Note: The amount is to be paid on basis of quantities of mechanical and items.
Deputy Executive Engineer
Sauni Yojana Sub Division
E. Post Construction Activity & Defect Correction Activity: 10 % of Quoted
Price Total Amount: __________________
Price Total Amount: __________________
Schedule of Payment
(a) Post Correction Activity: 25 % of EA mount_____________
Sr. No Particulars Percentage to be Amount in
1 After Completion of testing during 95 % of E (a)
commissioning Stage
2 After clearing and tiding of sites 5 % of E (a)
by the contractor to complete
&carry out all works required to
finalize the construction contract
administratively
Total 100 % of E (a)
(b) Defect Correction Activity: 25 % of E Amount: ___________
Sr. No Particulars Percentage to be Amount in
1 On completion of outstanding 25 % of E(b)
work at time of taking over
2 After rectification of any defect 25 % of E(b)
observed during the running of
3 Proportionate payment to be 25 % of E(b)
made during defect liability
4 After end of defect liability Period 25 % of E(b)
Total 100 % of quoted
Deputy Executive Engineer
Sauni Yojana Sub Division
(c) ROU Activity: 50 % of E Amount: ___________
Sr. No Particulars Percentage to be Amount in
1 On completion of ROU Payment 100 % of E(c)
as per all Govt. Section
Total 100 % of quoted
Deputy Executive Engineer
Sauni Yojana Sub Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2. F Vol-1 Pre Qualification and TechnicalTPI 3-Km.pdf
4. F Vol-2 Financial Bid - Price Bid 3 km _1.pdf
5. F Vol-2 Part-2C Form TPI 3 km _1.pdf
3. F Vol.-3 Technical Bid TPI 3 km _1.pdf
Download all tender documents and submit your bid