Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.2 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹51.0 L+₹1.2 L (2.51%)Rejected-Finance PO VIKRAMKHAND ROAD LANE NO 05 HOUSE NO 16 ASSAM 788007 | CACHAR | ASSAM | 788007 | L2 | Rejected-Finance Being L2 | |
| 3 | L3₹51.2 L+₹1.5 L (3.06%)Rejected-Finance | L3 | Rejected-Finance Being L3 | |
| 4 | L4₹51.5 L+₹1.7 L (3.52%)Rejected-Finance | L4 | Rejected-Finance Being L4 | |
| 5 | L5₹52.0 L+₹2.3 L (4.61%)Rejected-Finance C O M KHARKARANG LUMJINGSUK BLOCK A MADANRTING SHILLONG 793021 | SHILLONG | EAST KHASI HILLS | MEGHALAYA | 793021 | L5 | Rejected-Finance Being L5 |
| Sl No | Description | Qty | Unit | m/s builders and suppliers L7 | Bhuiya Construction L5 | M/S SANJIB DEB L6 | M/S TAPAN KUMAR RAY L3 | MS AFTAB LASKAR L4 | M/S LUIT CONSTRUCTION L8 | M/S SUBHAM ENTERPRISE L2 | M/S MANIK LAL GUPTA L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling of old unserviceable/damaged ACSR or AAC conductors of any size , jumper from overhead line & stacking serviceable & non serviceable material separately complete all as specified and directed. | 8 | Qtl | 555 ₹4,440 | 551 ₹4,408 Lowest | 555 ₹4,440 | 555 ₹4,440 | 580 ₹4,640 | 555 ₹4,440 | 555 ₹4,440 | 600 ₹4,800 |
| 2.00 | Dismantling of old unserviceable/damaged stay assembly embedded in concrete including demolition of PCC and removing unserviceable meterials from site of work complete all as specified and directed. | 10 | Each set | 520 ₹5,200 | 321 ₹3,210 | 520 ₹5,200 | 440 ₹4,400 | 340 ₹3,400 | 520 ₹5,200 | 420 ₹4,200 | 300 ₹3,000 Lowest |
| 3.00 | Dismantling of cross-arms of MS channel or angle of any sections complete all as specified and directed. | 4 | Qtl | 210 ₹840 | 510 ₹2,040 | 210 ₹840 | 210 ₹840 | 200 ₹800 Lowest | 210 ₹840 | 200 ₹800 Lowest | 200 ₹800 Lowest |
| 4.00 | Dismantling of insulators of any size/type complete all as specified and directed. | 180 | Each | 55 ₹9,900 | 60 ₹10,800 | 50 ₹9,000 | 50 ₹9,000 | 55 ₹9,900 | 55 ₹9,900 | 50 ₹9,000 | 45 ₹8,100 Lowest |
| 5.00 | Excavation in trenches not exceeding 1.5m wide and not exceeding 1.5m in depth for laying of cable/poles and getting out in soft/loose soil complete all as specified and directed. | 880 | Cum | 240 ₹2,11,200 | 240 ₹2,11,200 | 240 ₹2,11,200 | 240 ₹2,11,200 | 220 ₹1,93,600 Lowest | 240 ₹2,11,200 | 240 ₹2,11,200 | 220 ₹1,93,600 Lowest |
| 6.00 | Returning, filling in trenches with soil obtained from excavation including spreading, leveling, watering and well ramming in layers not exceeding 25 cm thick complete all as specified and directed. | 490 | Cum | 320 ₹1,56,800 | 350 ₹1,71,500 | 300 ₹1,47,000 | 230 ₹1,12,700 | 200 ₹98,000 | 350 ₹1,71,500 | 220 ₹1,07,800 | 180 ₹88,200 Lowest |
| 7.00 | Removing excavated materials to a distance not exceeding 50 metre and depositing where directed at a level not exceeding 1.5 metre above the starting point all all as specified and as directed. | 390 | Cum | 170 ₹66,300 Lowest | 170 ₹66,300 Lowest | 170 ₹66,300 Lowest | 170 ₹66,300 Lowest | 170 ₹66,300 Lowest | 170 ₹66,300 Lowest | 170 ₹66,300 Lowest | 170 ₹66,300 Lowest |
| 8.00 | Supply and laying burnt bricks of sub-class 'B' of size 230x115x75mm laid in trenches for cable protection complete all as specified and as directed | 34,160 | Each | 17 ₹5,80,720 | 17 ₹5,80,720 | 15.2 ₹5,19,232 Lowest | 15.2 ₹5,19,232 Lowest | 17 ₹5,80,720 | 18 ₹6,14,880 | 15.2 ₹5,19,232 Lowest | 16 ₹5,46,560 |
| 9.00 | Supply and spread dry fine sand in trenches as sand cushioning to under ground cable for protection with fine river sand and provide reqd cover after punning down complete all as specified and directed. Note: Thickness of sand cushioning after punning down will be measured and paid separately. | 320 | Cum | 1,550 ₹4,96,000 | 1,600 ₹5,12,000 | 1,550 ₹4,96,000 | 1,550 ₹4,96,000 | 1,600 ₹5,12,000 | 1,600 ₹5,12,000 | 1,550 ₹4,96,000 | 1,500 ₹4,80,000 Lowest |
| 10.00 | M&L for cutting existing road / PCC drain for taking out / laying of underground cable and including necessary earth work and making good to match with the existing surface with PCC 1:3:6 type CI using 20mm graded aggregates complete all as specified | 50 | RM | 330 ₹16,500 | 330 ₹16,500 | 330 ₹16,500 | 320 ₹16,000 | 300 ₹15,000 Lowest | 340 ₹17,000 | 300 ₹15,000 Lowest | 300 ₹15,000 Lowest |
Tender Value
₹46 L
EMD Value
₹92,000
Closing Date
7 Aug 2025, 6:00 pmClosed
GE
GE Silchar Masimpur Assam
SPECIAL REPAIR FOR REPLACEMENT OF EXISTING LT OH LINES TO LT UG CABLE ALONGWITH ITS CONNECTED WORKS IN MD ACCN AREA OF KESHAVPUR AND KUMILLA NAGAR AT MASIMPUR UNDER GE SILCHAR
2025_MES_720908_1
8988/E8
Open Tender
Civil Works
Item Rate
180 days
Masimpur
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
GE Silchar
₹92,000
Yes
19 Sept 2025
17 Jul 2025
9 Aug 2025
17 Jul 2025
7 Aug 2025
31 Jul 2025
17 Jul 2025 - 24 Jul 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .