| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹640.91Accepted-AOC | ₹640.91 Quoted ₹6.4 Cr | L1 | Accepted-AOC Bid is responsive |
| 2 | L2₹6.6 Cr+₹23.0 L (3.59%)Rejected-Finance | ₹6.6 Cr+₹23.0 L (3.59%) | L2 | Rejected-Finance Bid is non responsive |
Tender Value
₹6.7 Cr
EMD Value
₹13.3 L
Closing Date
27 Feb 2020, 1:00 pmClosed
CE URRDA
CE URRDA Ist Floor in Directorate panchayati raj Opposite IT Park, Shastradhara Road Dehradun, Uttarakhand 0135-2608125
Upgradation of Premnagar Gadoli to Khanda Motor Road with 05 year PBMC, UT-08-08/XX(WB), Length 8.950
2020_CCUK_89387_1
UT808
National Competitive Bid
Civil Works - Roads
Item Rate
270 days
Srinagar Garhwal
Please refer to technical bid
4 documents required · 4 mandatory
₹5,000
URRDA
₹13.3 L
Srinagar Garhwal
25 May 2020
7 Feb 2020
27 Feb 2020
7 Feb 2020
27 Feb 2020
7 Feb 2020
10 Feb 2020
Amount
Earth work in hill road (hill side cutting):- Excavation in hilly area for construction of road in all types of soils & rocks as met at site , true to lines as per plan,L section , camber, super elevation as required , also including uprooting & cutting of bushes ,dressing of road surface to the required level and slopes, with all lead, lift and safe disposal of surplus excavated material at suitable dumping places by mechanical means/ manual means indicated in the drawing without damaging forest , forest land , utility and private properties ,including slip clearance during hill side cutting as directed by Engineer-in-charge and as per MORD specifications , Clause 1600,
Removal of Unsuitable Soil with Disposal upto 1000 m Removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil, which shall be paid separately as per Clause 303.5.2 as per Technical Specification Clause 302.3.11
Clearance of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side complete as directed by the Engineer-in-charge.
Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment ( Half cut and half fill ) upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. (For making super Elevation.)
Construction of Embankment with Material Obtained from Roadway Cutting- Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Filling/Patri Filling)
Construction of coolie walling including supply of all material, labour, T&P etc. required for proper completion of the work as per direction of Engineer-in-charge. (As per PWD Uttarakhand specifications)
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. (Excavation in foundation for retaining & breast walls in all types of soils and rocks including lead, lift and disposal of surplus material as per direction of engineer - in - charge. For retaining wall & B/W)
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 - Random rubble masonry (In cement mortar 1:5)
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204.(Couresd Rubble Masonary in 1:4 cement sand Mortar)
Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction
Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications)
Providing and Laying ofMechanically Woven Double Twisted Hexagonal shaped Gabions (Zinc plus PVC coated), of size 3mX1mX1m with two diaphragms at 1m interval, having mesh opening 100mmx120 mm,mesh wire diameter 2.7mm/3.7mm, edge/selvedge wire diameter 3.4/4.4 mm and lacing wire diameter 2.2/3.2 mm. (The work includes filling boulders in the gabions).
Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203 of MORD Specifiction
Providing edge stones of Size 450x350x100 mm on valley side of formation as per drawing and technical specification clause 1608.2.6
Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 - P.C.C grade M 10
Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 - P.C.C grade M 20.
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 - R.C.C M 25 height upto 5m
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202
Construction of unlined surface drains of average cross-sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3m and lead of 50 m (average lead 25 m) as per Technical Specification Clause 307.
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204
Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification Clauses 613.3 and 1204
White washing of parapet walls of CD work and tree truncks White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1915
Drainage spouts complete as per drawing and technical Nos. specifications Clause 1209.
Providing ,Fancing and errecting 50 mm dia painted steel pipe railing in three rows on precast M20 RCC vertical post 175 mm x 175mm x 1.80mt high (1.2 mt above GL) three holes 50mm dia for pipe,fixed 2 mt c/c complete as per approved drawing clause 1706.
Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408.
WBM Grading 2 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.
WBM Grading3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.
Low porosity Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
Tack Coat Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.
20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508
Seal Coat SealCoat Providing and laying seal coat sealing the voids in a bituminous surface laid to the s Technical pecificationClause 510 By Manual Means Case -I:Type B Bitumen (VG-10)
ROAD FURNITURE
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical specification Clause 1703. (5th Kilometer Stone (Precast))
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical specification Clause 1703. (Ordinary Kilometer Stone (Precast)
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical specification Clause 1703. (200 m stone (precast))
Providing fixing of Title Information Board with PMGSY Logo at suitable place in the starting of the road as per attached standard drawing duly painted and written as directed by Engineer in charge. as per MORD specification Clause 1701 .
Providing and fixing of semi reflective cautionary, mandatory and informatory sign board as per IRC:67 made of 1.5 mm thick MS Sheet duly stove white colour in front and gray colour on back with red reflective border of 65 mm width and required letters and figures with reflective tape engineering grade as per Clause 1701.3.9 of MORD for Rural Roads of required shade and colour supported and welded on 47mm x 47 mm x 12 SWG sheet tube firmly fixed to the ground by mean of properly designed foundations with M-15 grade cement concrete 450x450x600 mm, 600 mm below ground level as per approved drawing Clause 1701.2.2 1.(600 mm equilateral triangle)
Providing & fixing of PMGSY Logo Board at starting point, end point and at every 2 Km distance of road length as per attached standard drawing duly painted and written as per MORD specification and direction by Engineer in charge.
Providing & fixing of Citizen Information Board with PMGSY Logo at starting or prominent location (where maximum no. of citizens can view the detail of the road) as per attached standard drawing dully painted and written as directed by Engineer in charge. as per MoRD specification Clause 1701 .
Providing & fixing of Maintenance Information Board with PMGSY Logo at starting or prominent location (where maximum no. of citizens can view the detail of the road) as per attached standard drawing dully painted and written as directed by Engineer in charge. as per MoRD specification Clause 1701 .
Direction and place indentification sign board up to 0.9 sqm size board. Providing and erecting direction and place identifications of semi reflective sign boards as per IRC:67 made of 2 mm thick M.S. Sheet duly stove enameled paint in white colour in front and grey colour on back with red reflective border of 70 mm width and required message, letters, figures with reflective engineering grade tape as per MORD specifications of required shade and colour. Supported and welded on 47 mm x 47mm of 12 SWG Square tube of 3050 mm height duly strengthened by 25 mm x 5 mm M/s flat iron on edges on back firmly fixed to the ground by means of properly designed foundations with M-15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per approved drawing and as directed by Engineer in charge/ as per Clause 1701 of MORD Specification.
Emergency Maintenance
Slip Clearance during and after rainy season and disposal of the same on the valley side complete as directed by the Engineer-in-charge.
Ist year 1
IInd year
III rd year
IV th year
V th year
Deploying Hydrulic excavators of 0.90 Cum bucket for opening of road with required slip clearance in all type of soil,Rock and boulders including its operator ,Fuel,all other charge and texes required for proper completion of work.
Ist year
IInd year
III rd year
IV th year
V th year
Construction of coolie walling including supply of all material, labour, T&P etc. required for proper completion of the work as per direction of Engineerin-charge. (As per PWD Uttarakhand specifications)
Ist year
IInd year
III rd year
IV th year
V th year
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25
Ist year
IInd year
III rd year
IV th year
V th year
Routine Maintenance under PBMC
Maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1907.Maintenance of Slab type Culverts by way of clearing, Cleaning, Erosion repair, repairs to cracks, parapet walls and Protection works as per drawing and technical specification Clasue 1908.Maintenance of Causeway by way of minor Surface repairs, replacing Guide Posts, repair of flood gauges, removal of debris, providing boulders and protection work and painting as per technical specification Clause 1909.Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910.Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912.Repair to pot holes and removal of loose material, trimming of sides, cleaning of surface by providing tack coat with bitumen emulsion, 20 mm thick pre-mix carpet using catonic bitumen emulsion and seal coat type B with bitumen emulsion.White washing of parapet walls of CD work and tree truncks white washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1915.Trimming of grass and weeds from the shoulders/berms and disposing off the same to suitable locations as per technical specifications Clause 1914.
Ist year
IInd year
III rd year
IV th year
V th year
M/S SHIVA CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .