Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹98,049.86Admitted-Finance | -0.11% | ₹98,049.86 | L1 | Admitted-Finance |
| 2 | L2₹99,139.41Admitted-Finance | +1.00% | ₹99,139.41 | L2 | Admitted-Finance |
| 3 | L3₹1.0 LAdmitted-Finance | +2.00% | ₹1.0 L | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical r |
Tender Value
₹1.0 L
EMD Value
₹2,020
Closing Date
26 Mar 2026, 4:00 pmClosed
EXECUTIVE ENGINEER REW RAJOURI
OFFICE OF EXECUTIVE ENGINEER REW RAJOURI
Read BOQ
2026_RDPR_306112_3
e-NIT No. 337 REW Rajouri of 2025 Dated 05-03-2026
Open Tender
Civil Works
rajouri
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Yes
Executive Engineer REW Rajouri
₹2,020
13 Apr 2026
21 Mar 2026
26 Mar 2026
21 Mar 2026
26 Mar 2026
21 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation in foundation by manual means over areas(exceeding 30 cm in depth and up to 1.50m depth 1.50 m in width as well as 10 sqm on plan ) , including disposal of excavated earth upto I metre for cutting of edges ,disposal earth to be leveled and neatly dressed.All kinds of soil | |||||
| 2P/Laying of cement conct. 1:3:6( 1 cement :3 coarse sand :6 graded stone aggregates 20mm) Of specified gradeincluding curing but excluding cost of centring and shuttring. all work up to plinth level. | |||||
| 3Cetering and shuttering including strutting propping etc and removal of form for foundation footings, bases of columns etc for mass concrete | |||||
| 4Supply and laying of stone | |||||
| 5Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | |||||
| 6Fillinf available earth (excluding rocks) in trenches plinth sides of foundations in layers not exceeding 20cm in depth consolidating each deposited layer by ramming and watering lead upto 50m and lift upto 1.5m | |||||
| 7carriage of Sand & Agg avg. 25 km lead by MT | |||||
| 8Add Provision for Sign Board | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.21 MB
BOQ_994089.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid