Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹6.1 Laccepted-aoc | accepted-aoc |
Tender Value
₹6.5 L
EMD Value
₹16,300
Closing Date
10 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Engineer, TTD, Tirupati
D.E(Elec)-II, Room No.128, TTD Admn. Bldg., Tirupati
Hiring of Line Array PA system and LED Video Display system & DG Sets in connection with conducting of Godavari Harathi at Kovuru, East Godavari Dist
1005197
508/DE(Elec)-II/TTD/TPT/2026-27
OPEN - NCB
Electrical Works
CHITTOOR, ANDHRA PRADESH
6 documents required · 6 mandatory
₹231
₹16,300
20 Nov 2026
26 Oct 2026
26 Oct 2026
90 days
Line array PA system
Hiring of 4/4 Box Truss for Speakers Line Array Speakers including Transportation for this equipment, with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For Two days and removal of equipment, labour charges etc., complete
Hiring of Delay JBL SRX 725 Line Array Speakers with Speaker stands, Speaker Cable wiring, connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For Two days and removal of equipment, labour charges etc., complete
Hiring of 600 Watts Stage Speakers with Speaker stands, Speaker Cable wiring, connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For Two days and removal of equipment, labour charges etc., complete
Hiring of JBL SRX 828S Bass 2000 Watts Sub-Woofers with Speaker stands, Speaker Cable wiring, connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For Two days and removal of equipment, labour charges etc., complete
Hiring of 30Watt Unit type/ Horn Speakers (Including TT wire required from Amplifier to Speaker) wiring connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For Two days and removal of equipment, labour charges etc., complete
Hiring of SM-58 Shure Microphone with cable necessary connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For Two days and removal of equipment, labour charges etc., complete
Hiring of 1000 XLR Ahuja Microphone with cable necessary connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For Two days and removal of equipment, labour charges etc., complete
Hiring of SHURE UHF WIRELESS MICS with cable necessary connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For Two days and removal of equipment, labour charges etc., complete
Hiring of Cord less Microphone (Shure) necessary connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For Two days and removal of equipment, labour charges etc., complete
Hiring of 4500 Watts P.A. Power Amplifiers with wiring, connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For Two days and removal of equipment, labour charges etc., complete
Hiring of 4000 Watts P.A. Power Amplifiers with wiring, connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For Two days and removal of equipment, labour charges etc., complete
Hiring of 3000 P.A. Power Amplifiers with wiring, connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For Two days and removal of equipment, labour charges etc., complete
Hiring of 1000 P.A. Power Amplifiers with wiring, connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For Two days and removal of equipment, labour charges etc., complete
Hiring of 500 P.A. Power Amplifiers with wiring, connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For Two days and removal of equipment, labour charges etc., complete
Hiring of Audio Mixer Console 32 Channel and Snake cable with connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For Two days and removal of equipment, labour charges etc., complete
Hiring of Audio Mixer Console 24 Channel and Snake cable with connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For Two days and removal of equipment, labour charges etc., complete
Hiring of 22 Channel Snake cable with connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For Two days and removal of equipment, labour charges etc., complete
Hiring of 24 Channel Snake cable with connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For Two days and removal of equipment, labour charges etc., complete
Hiring of Table stand along with Mic clip, Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For Two days and removal of equipment, labour charges etc., complete
Hiring of Floor stand along with Mic clip, Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For Two days and removal of equipment, labour charges etc., complete
Hiring of Power Rack 3 Phase, with wiring, connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For Two days and removal of equipment, labour charges etc., complete
Hiring of Audio Unit Rack with wiring, connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For Two days and removal of equipment, labour charges etc., complete
Hiring of Delay Unit with connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For Two days and removal of equipment, labour charges etc., complete
Hiring of Reverb Unit with connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For Two days and removal of equipment, labour charges etc., complete
Hiring of Cross over with connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For Two days and removal of equipment, labour charges etc., complete
Hiring of Feedback destroyer Unit with connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For Two days and removal of equipment, labour charges etc., complete
Hiring of DVD Player / MP3 Player with connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For Two days and removal of equipment, labour charges etc., complete
Hiring of Graphic Equalizer with connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For Two days and removal of equipment, labour charges etc., complete
Hiring of Effect Processor with connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For Two days and removal of equipment, labour charges etc., complete
Hiring of Output link Amplifier with connections and proper earthing including Transportation for this equipment with Operation, Operator where ever necessary as directed by the TTD R&B Staff/TTD Officials during the execution- For Two days and removal of equipment, labour charges etc., complete
Hiring of Indoor/Outdoor Day & Night Visible True colour Fixed LED video display system in connection with Panchamitheertham at Sri Padmavathi Ammavari Temple, Tairuchanoor for Two days duly drawing OFC cable for all LED Boards for video signal output Brightness: Not lessthan to 2000NIT to 6000NIT, Pixel pitch : 3.9 - 4.8 mm Protection rating: Front side:IP65/66, Rear side: IP54 back size of boards
1. The LED boards to be installed on hire basis must have been purchased not more than 24 months back. Proof of purchase should be submitted along with tender. 2. The work is to be completed one day before the schedule program. The renderer is requested to note the period and quote accordingly. 3. The scaffolding provided to the LED board must be equal to the size of the board. No extra scaffolding on either size of the board will be permitted. 4. Before finalization of the tender, the committee from the department will inspect the quality of the board that are going to be supplied to the department. The tenderer is requested to co-operate with the inspection team of the department. 5. After erection of the LED board, if any lines(horizontally / vertically), heavy dot spots are observed during operation , the board is to be replaced within 12 hours with a new board strictly as per specification. Otherwise payment will not made for the defective board. 6. During operation of the LED board, if the signal loss or any damage to display module occurs, the tenderer has to replace / rectify the same within an hour. Otherwise proportionate deductions per hour will be made and a recover of additional amount occurred by engaging the LED boards locally will be recovered.
Hire charges for supplying, fixing, wiring and 62.5 KVA DG set with suitable change over switch, cables and connections. The DG set should be maintained for all the 24 hours for running the set with operator wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed (Excluding the cost of Diesel Oil) - For One day Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions
Hire charges for supplying, fixing, wiring and 125 KVA DG set with suitable change over switch, cables and connections. The DG set should be maintained for all the 24 hours for running the set with operator wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed (Excluding the cost of Diesel Oil) - For One day Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Online 4 channel Mixer
Providing of Broad Band (Net)
Arrangement of Digital video cameras along with cameramen on hire basis for Vigrlance and Police Department, Tirupati
Transportation charges for DG set of 62.5 KVA / 125 KVA for including loading and unloading charges. The distance for transportation is to be accounted from the place of hiring to the workspot.
Supply & Transportation of Diesel oil for 62.5 KVA/ 125 KVA DG Set Note:- Diesel consumption as per the actual hours operated during program
(Rupees Six Lakhs Fifty Thousand Sixty Two and Paise Forty Five only)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
NIT 508.docx
TENDER_DOCUMENT • 0.19 MB
Schedule 508.xls
TENDER_DOCUMENT • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .