Loading…
Loading…
Tender Value
₹23.8 L
EMD Value
₹29,800
Closing Date
10 Oct 2026, 11:00 am
GM(EXCV)NCL, NIGAHI PROJECT
OFFICE OF GENERAL MANAGER (EXCV)NCL, NIGAHI PROJECT, PO-NIGAHI, DISTT-
OTR Tyre Demounting, mounting, Disassembling, Assembling and Tyre Inflation pressure checking work of various Model 190T Dumpers at New Workshop at site at Nigahi Project for the period of 12 Months/365 days.
2026_NCL_366238_1
NGH/EXCV/TENDERS/26-27/042
Open Tender
Excavation Department Work
Item Rate
365 days
NCL NIGAHI PROJECT
AS PER NIT
4 documents required · 4 mandatory
₹29,800
26 Sept 2026
26 Sept 2026
12 Oct 2026
26 Sept 2026
10 Oct 2026
27 Sept 2026
26 Sept 2026 - 3 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Scope of Work: OTR Tyre Demounting, mounting, Disassembling, Assembling and Tyre Inflation pressure checking work of various Model 190T Dumpers at New Workshop at site at Nigahi Project for the period of 12 Months/365 days. Maximum Likely Manpower to be deployed per shift : 06 Nos ( 3 Nos. skilled and 03 Nos. semiskilled) | - | - | - | - |
| 3 | Description of work at New-Workshop, Nigahi Project at site - Wheel/ OTR demounting from equipment, dismantling of wheel, reassembly after necessary repair, fitment on machine ( irrespective of location of tyres in machine ) size of tyre (37.00 R 57 and 40.00 R 57 ) at New Workshop at site for BH205E, 190T, CAT789D - 190 T Dumpers | - | - | - | - |
| 4 | Cost/ charges for Dismantling of Wheel/ OTR Tyre for size ( 37.00 R 57 and 40.00 R 57) (Minimum 1 No. Skilled + 3 Nos. semi skilled manpower to be deployed for 1.5 hrs.) including Labour charges, Contractor profit,misc. tools tackles,charges, etc. | 315 | Nos | - | - |
| 5 | Cost/Charges for Assembling of wheel/ OTR Tyre for size ( 37.00 R 57 and 40.00 R 57) (Minimum 1 No. Skilled + 3 Nos. semi skilled manpower to be deployed for 2 hrs.) including Labour charges, Contractor profit, tools tackles, any misc. charges etc. | 315 | Nos | - | - |
| 6 | Cost/ charges for Demounting of wheel/ OTR Tyre for size ( 37.00 R 57 and 40.00 R 57) (Minimum 1 No. Skilled + 3 Nos. semi skilled manpower to be deployed for 3 hrs.) including Contractor profit , Labour charges, tools tackles, any misc charges, etc. | 352 | Nos | - | - |
| 7 | Cost/Charges for Fitment of wheel/ OTR Tyre back on machine for size ( 37.00 R 57 and 40.00 R 57) (Minimum 1 No. Skilled + 3 Nos. semi skilled manpower to be deployed for 3.5 hrs.) including Contractor profit , Labour charges,tools-tackles, any misc charges, etc. | 352 | Nos | - | - |
| 8 | Charges for Tyre inflation pressure checking and up keeping work from 6AM to 2 PM and 2 PM to 10PM ( Minimum 2 skilled manpower x 8 hrs. x 2 shifts x 365 days) at NEW WORKSHOP | 5,840 | Hours | - | - |
| 9 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 3.74 MB
ANNEXURESANDOTHERIMPORTENTDOCUMENT.pdf
Tender Documents • 0.30 MB
UNDERTAKINGASPERANNEXURE-II.pdf
Tender Documents • 0.08 MB
BOQ_379162.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .