| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹78.0 LAccepted-AOC | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | MERP CONSTRUCTIONS PRIVATE LIMITED L1 |
|---|---|---|---|---|
| 1.00Detailed Estimate | ||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 14.62 | cum | 342.9 ₹5,014.91 Lowest |
| 1.00 | 50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge | 9.21 | cum | 1,335.62 ₹12,303.73 Lowest |
| 1.00 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 32 | hour | 349.25 ₹11,176 Lowest |
| 1.00 | 16.78.3:Construction of granular sub- base by Providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, Carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in- Charge.With material conforming to Grade - III ( size range 26.5 mm to 0.075 mm) having CBR Value - 20 | 1.62 | cum | 3,244.85 ₹5,256.66 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 4.55 | cum | 8,444.99 ₹38,441.59 Lowest |
| 1.01 | OD271630/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using minimum cement content 330 kg/m3 as per approved design mix, ( excess cement is not payable) including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. There is no additional payment for excess and extra cement used by the contractor as per circular no. CE/BL/GL/6541/2015 dated 30-8-2017.All work upto plinth level. Derived from spec. 5.33.1.1 | 5.27 | cum | 10,414 ₹54,881.78 Lowest |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 32.76 | sqm | 422.87 ₹13,853.22 Lowest |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 213.85 | sqm | 797.67 ₹1,70,580.93 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1,023 | kilogram | 128.42 ₹1,31,373.66 Lowest |
Tender Value
₹79.6 L
EMD Value
₹50,000
Closing Date
26 May 2026, 2:00 pmClosed
Executive Engineer
Buildings Division Ernakulam
Construction of the First Floor of OP Block at Govt Ayurveda College Trippunithura.
2026_PWD_846832_2
PWD/BLDG/TR/416/2026_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
365 days
Tripunithura
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹50,000
Yes
9 Jul 2026
14 May 2026
28 May 2026
14 May 2026
26 May 2026
14 May 2026
14 May 2026 - 26 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Detailed Estimate | |||||
| 1.001 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | - | cum | - | - |
| 1.002 | 50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge | 1 | cum | - | - |
| 1.003 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | - | hour | - | - |
| 1.004 | 16.78.3:Construction of granular sub- base by Providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, Carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in- Charge.With material conforming to Grade - III ( size range 26.5 mm to 0.075 mm) having CBR Value - 20 | - | cum | - | - |
| 1.005 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 1.006 | OD271630/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using minimum cement content 330 kg/m3 as per approved design mix, ( excess cement is not payable) including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. There is no additional payment for excess and extra cement used by the contractor as per circular no. CE/BL/GL/6541/2015 dated 30-8-2017.All work upto plinth level. Derived from spec. 5.33.1.1 | 1 | cum | - | - |
| 1.007 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 1 | sqm | - | - |
| 1.008 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 0.6 | sqm | - | - |
| 1.009 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | - | kilogram | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1437808.xls
BOQ • 0.35 MB
SBD.pdf
Tender Documents • 1.64 MB
NIT.pdf
Other Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .