Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.3 LAccepted-AOC | L1 | Accepted-AOC accepted | |
| 2 | L2₹19.6 L+₹2.3 L (13.4%)Rejected-AOC | L2 | Rejected-AOC rejected | |
| 3 | L3₹19.7 L+₹2.4 L (13.8%)Rejected-AOC VARUTHUNDIL VEEDU NEELESWARAM P O NEDUVATHOOR KOTTARAKKARA KOLLAM 691505 | KOTTARAKKARA | KOLLAM | KERALA | 691505 | L3 | Rejected-AOC rejected | |
| 4 | Rejected-Technical PARAVILA PUTHENVEEDU MUTTAKKAVU NEDUMPANA P O KOLLAM | PATHANAMTHITTA | KERALA | 689694 | - | Rejected-Technical L4 | |
| 5 | Rejected-Technical | - | Rejected-Technical L6 |
Tender Value
₹21.2 L
EMD Value
₹50,000
Closing Date
26 Oct 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Executive Engineer
The Executive Engineer PWD Roads Division kollam
SLTF-FDR 2022-23 Construction of berm concrete and side protection work of Nellikunnam Chepra Road.-Berm concrete and side protection.-General Civil Work
2022_PWD_517479_1
99/ET/EE/2022-23
Open Tender
Civil Works - Roads
Item Rate
180 days
kollam
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
Yes
₹50,000
Yes
24 Nov 2022
17 Oct 2022
28 Oct 2022
17 Oct 2022
26 Oct 2022
17 Oct 2022
Amount
Construction of CC Drain
12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
55.25:Lifting, conveying and fixing the newly casted RCC covering slabs of any thickness on top of drain in position including all labour charges and miscellaneous expenses etc complete
55.23:Supplying and laying interlocking tile 80mm or nearest size thickness, minimum strength M30 including providing a layer of 6mm aggregate for 5cm thickness, then laying interlock cobbles in lines and levels as per the directions of the departmental officers at site inclusive of all cost & conveyance charges etc. complete.
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.B:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M20 (Without formwork)
OD113024/2022-2023: Dry Stone Masonry work for foundation and Superstructure etc. complete as per drawing and technical specifications.
Achankunju
VIWANATHAN R
AFSAL IQBAL NISSABEEGAM
N Surendran
Baby Varghese
BAPPU MOHAMMED
Robin P Alex
Bidder Name
Robin P Alex
Baby Varghese
N Surendran
VIWANATHAN R
BAPPU MOHAMMED
Achankunju
NASHA KABEER
AFSAL IQBAL NISSABEEGAM
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_742414.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .