Loading…
Loading…
Tender Value
₹7.8 L
EMD Value
₹7,843
Closing Date
16 Jun 2026, 6:00 pm
DY.CITY ENGINEER (SOUTH ZONE)
Work regarding leakage repairing, removal of pollution/contamination, and carrying out labour work as required at other locations within the command areas of Smrutimandir Tanki, Ghodasar Tanki, and Rajeshwari Tanki situated in the Ghodasar area of Isanpur Ward of South Zone.
312200
Tender Notice No – 2/ 2026-2027, Tender No. –121
Open
Civil - All
Ahmedabad
5 documents required · 5 mandatory
₹900
municipal commissioner
₹7,843
6 Jun 2026
6 Jun 2026
6 Jun 2026
16 Jun 2026
6 Jun 2026
3)Tender Opening Date:-To Be Intimated After Technical Bid eveluation
Assistant Manager (South zone), Ahmedabad Municipal Corporation
South zone Office Building, Rambaug, Maninagar, Ahmedabad
Deputy Municipal Commisioner
AHMEDABAD MUNICIPAL CORPORATION
"South Zone Office", Opp. Fire Station, Rambaug, Maninagar, Ahmedabad - 380
Municipal Commissioner invites Percentage Rate sealed tenders from interested
contractors for :- œrûtK Ítul Emlvwh Jtuzobtk Dtuztmh rJM<thbtk ytJuj Mb]r<bkœeh xtkfe,Dtuztmh
xtkfe,htsuµhe xtkfelt fbtLz yuhegtbtk jefs hevuhekd fhJt ,vtuÕgwNl œwh fhJt <&t yLg søgtyu sYhegt< bwsc
juch ftb fhJtlt ftb ctc<.
1 Name of work œrûtK Ítul Emlvwh Jtuzobtk Dtuztmh rJM<thbtk ytJuj Mb]r<bkœeh xtkfe,Dtuztmh
xtkfe,htsuµhe xtkfelt fbtLz yuhegtbtk jefs hevuhekd fhJt ,vtuÕgwNl œwh fhJt
<&t yLg søgtyu sYhegt< bwsc juch ftb fhJtlt ftb ctc<.
2 Time Limit 12 Months
3 Tender Validaty Period 120 Days from the date of submission of the tender
4 Eligibility Criteria Register “E2” class in PWD in Govt. R&B/CPWD/AMC or
equivalent registration with any other state Govt. or institutions.
5 Estimated Cost put to tender Rs.
6 Earnest Money Deposit Rs.7843/- (Demand Draft or Bank Guarantee in favour of
Municipal Commissioner, Ahmedabad /) To be submitted as
prescribed in 9.0 below. Demand Draft or Bank Guarantee shall be
from Nationalized Bank / Sheduled Bank and valid for
days.(As per AMC finance dept.circular No-5 Dt.5/5/07 & F.D.
Circular No. 29 Dt.7/08/2010) & attched ANNEXURE - 1 finance
dept.circular No-22 Dt.11/8/11& circular No-8 Dt.04/05/12 , circular
No-03 Dt.13-05-14 & Finance circular No-56 Dt.19-09-16 &
Circular No.18 Dt:23/5/2017 & Circular No.18 Dt:29/5/2018 &
Circular No.12 Dt:22/7/2019 & Circular No.26 Dt:25/11/2019 &
Circular No.21 Dt:19/6/2020. & Circular No.40 Dt:6/11/2020 &
Circular No.41 Dt:- 08/2/2022.
7 Security Deposit 5 % Of the Tender amount in Form Bank Guarantee / Demand
Daft / Pay Order / Banker’s Cheque.
8 Tender fees Rs.900.00 Demand Draft in favour of Municipal Commissioner,
(Non refundable) Ahmedabad)
9 Submission of EMD and In separate sealed cover each for EMD and Tender Fees along
Tender Fees with Tender as described in the invitation of tender and submitted
to Assistant Manager(South zone) , South zone office, Rambaug,
Maninagar Ahmedabad
Tenders issue date As Per NIT
Last date of receiving As per NIT
Date of Opening As per NIT
Price bid e-form as well as Price bid should be submitted online
only and unloaded to n-procure web site mentioned on NIT and
Mode of sending the
only Technical bid should be submitted physically in sealed
envelope systems By RPAD/Speed post/ Hand Delivery in sealed
covers in Duplicate ( One Original & One Duplicate) duly sign &
seal by contractor as per schedule given on NIT.Tenders received
without EMD and without uploading price bid to n procure web site
shall be considered as Non-Responsive and shall be rejected
All general condition of contract of Form B1 condition of contract
14 Terms, Condition, &
shall be applicable and latest AMC circulars and policy should be
Defect & Liability Period The contractor shall be responsible to make good and remedy at
his own expense any defect which may develop or may be noticed
before the period mentioned hereunder from the certified date of
completion, The within 15 days of receipt of the notice. In the case
of failure on the part of the contractor, the Engineer-in-charge may
rectify or remove or re-execute the work at the risk & cost of the
contractor. The Engineer-in-charge shall be entitled to appropriate
the whole or any part of the amount of security deposit towards the
expenses, if any, Incurred by him in rectification, removal or re-
execution. The Defects Liability period shall be as under(a) for all
works costing upto Rs. 50,000 ( amount put to tender), the period
shall be 3 months from the certified date of completion. (b) for all
works costing more than Rs. 50,000 and upto Rs. 1 crore (amount
put tender), the period shall be 6 months from the certified date of
completion or one monsoon, whichever is later. (c) for major
projects costing more than Rs. 1 crore, the period shall be
months from the certified date of completion which should include
one monsoon. (d) For building works, the period specified in (a),
(b) or (c) above OR elapse of monsoon period following the
certified date of completion, whichever is later. For the purpose of
deciding the monsoon period, the 30th September may be treated
as the last date.
16 Liquidity Damages 0.1% per day delay of remaining work after the
completion date but not more than 10% of cost of
remaining works.
17 E.P.F Act ykkdu As per Account department circular no-37
18 GST ykkdu Rates Quoted by the contractor to be inclusive of all
applicable taxes (Excluding GST). Prevailing GST will be
Conditional tenders will not be accepted. Municipal Commissioner reserves the rights to reject any
or all the tenders without assigning any reasons thereof.
Seal and Signature of the Bidder Addl City Engineer
Finance dept. circular No-41 Dt.8-2-22
yt&e <btb Ft<tlt Jzt yr^fthe©eytu/yuftWLx©e <&t rcjfjtfo©elu sKtJJtbtk ytJu Au fu, rm¾gwhexe zevtuÍex <ubs
yluoMxble zevtuÍex MJefthJt ctc<u htßg mhfth©e îtht bksqh &guj cukftule gtœebtk ltKtk rJCtdlt S.yth. lk. EMD/10/2021/7729/DMO
Dt. 28/6/2021 bwsc mw^thtu fhe lJe gtœe cnth vtzJtbtk ytJuj Au.
htsg mhfth©elt ltKtk Ft<tlt S.yth. lk. EMD/10/2021/7729/DMO Dt. 28/6/2021 îtht rm¾gwhexe zevtuÍex
<ubs yluoMxble zevtuÍex btxu bkswh &guj cukftule gtœe ykdu zu.Bgwrl.frb§h ©e (ltKtk) le b¤uj bkswheltk XhtJ ¢btkf 168 <t.05-02-2022
bwscltk mœhnw vrhvºt «rmæ^ > <theF ctœ&e <t.31/03/2022 mw^e y&Jt htßg mhfth ©e îtht yt ctc<u yLg S.yth. «rmæ^ fhJtbtk ytJu
ðgtk mw^e yuluûth- I btk sKtJuj cukftule cukf duhukxe me¾gwhexe zevtuÍex <&t R.yub.ze. MJYvbtk MJefthJttbtk ytJNu.
xuLzhekd ytu&tuhexe îtht cukf duhkxele ytu&uLxemexele aftmKe fhelu sYrhgt< bwsclt fLx[tuj «tumesh muxyv fhJtlt hnuNu.
<ubs mhfth©elt S.yth yLJgu zu. Bgwrlrmvj frbNh©e (VtgltLm) le b¤uj bksqhe bwsc btºt ybœtJtœ Nnuh <&t ybœtJtœ rmJtglt yLg
Nnuhle ntug ylu <u cukf duhkxe ybœtJtœ rM&< mckr^< cukfle NtFt îtht yr^f]< fhtguj ntug <uJe leau sKtJuj cukftule NtFtytule cukf duhkxe
MJefthJtbtk ytJNu. ltKtkFt<t îtht Wvhtuf< mkœCobtk sKtJuj vrhvºttule yLg <btb Nh<tu g&tJ< hnuNu.
(A) Guarantee issued by following banks will be accepted as SD/EMD on permanent
All nationalized banks
(B) Guarantees issued by following banks will be accepted as SD/EMD for the
period up to March- 31, 2022. The validity cut-off date in the GR is with respect
to the date of issue of Bank Guarantee irrespective of the date of termination of
Bank Guarantee.
1 Commercial Banks :-
5. Kotak Mahindra Bank
6. IndusInd Bank
8. Tamilnadu Mercantile Bank
9. Ujjivan Small Finance Bank
10. A U Small Finance Bank
11. Federal Bank
12. Equitas Small Finance Bank
13. Bandhan Bank
14. Standard Chartered Bank
15. City Union Bank
2 Co-operative and Rural Banks Of Gujarat :-
1. The Mehsana Urban Co-operative Bank Ltd
2. The Ahmedabad Mercantile Co-Operative Bank Ltd
3. Nutan nagrik Sahakari Bank Ltd
4. Kalupur Commerical Co-operative Bank Ltd
5. Rajkot Nagarik Sahakari Bank Limited
6. The Gujarat State Co-Operative Bank
7. Sarswat Bank
8.Saurashtra Gramin Bank
Seal and Signature of the Bidder Addl City Engineer
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
GENERAL TERMS & CONDITIONS
1. Scope of Bid
1.1 The Ahmedabad Municipal Corporation hereinafter called "the Employer" invites Tender document for
the construction of works (as defined in these documents, hereinafter referred to as "the Works") detailed
in the table given in the IFB.
1.2 The Works consist of:- Providing and Supplying Chota Hathi for Maintenance Work of Road
Work ,Building Work,Drainage Maintennace at Isanpur Ward in south zone.
2. Source of Funds
1.1 The expenditure on these Works will be met by AHMEDABAD MUNICIPAL CORPORATION.
3. Eligible Bidders
3.1 This invitation for bids is open to bidders who has necessary bid capacity and who meet the following
A bidder shall not be under a declaration of ineligibility for corrupt or fraudulent practice.
The bidders shall have a registration with State PWD, and/or CPWD for "E2" class and or
equivalent. If contractor is not registered with AMC in the relevant class, on award of contract he
shall be required to register himself with AMC within 3 month's time.
Bidders shall provide such evidence of their continued eligibility satisfactory to the Employer, as the
Employer shall reasonably request.Subject to Submition of Succsesful Submition as per Clause –II of
4. Eligible Material, Equipment and Services
4.1 At the Employer's request, the bidder having offered the lowest evaluated financial bid may be
required to provide evidence of the origin of materials, equipment, and services to the satisfaction of the
4.2 For purposes of Sub Clause 4.1, "origin" means the place where the materials are mined, grown,
produced or manufactured; similarly for equipments and from where the services are provided.
5. Qualification of the Bidder
To be qualified for award of Contract, bidders shall:
a) Submit a written power of attorney authorizing the signatory of the bid to commit the
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
FINACIAL CONDITION
1. Cost and Currencies of Bidding
The bidder shall bear all costs associated with the preparation and submission of his bid and the
Employer will in no case be responsible or liable for those costs.
Currencies of Bid and Payment
The rates and the prices shall be quoted by the bidder entirely in Indian Rupees
All payments including advances, if any, shall be made in Indian Rupees.
2. Earnest Money Deposit :-
2.1 Bank guarantees (and other instruments having fixed validity) issued as surety for the bid shall be
valid for 28 days beyond the validity of the bid.
2.2 The EMD of the unsuccessful bidders, except for L1, L2 and L3 bidders, will be returned as promptly
as Early as possible as but not later than 28 days after the expiration of the period of bid validity.
2.3 The EMD of the successful bidder, along with second and third lowest tenders, will be returned when
the bidder has furnished the required performance security and signed
2.4 Earnest Money Deposit may be forfeited
a) if the bidder withdraws his bid during the period of bid validity;
b) in the case of a successful bidder, if the bidder fails within the specified time limit to
i) Furnish the required Performance Security or
ii) Sign the Agreement.
3. (A) Security Deposit :-
Within 10 (ten) Working days of the date of receipt of the Letter of Intent (LOI) the successful bidder
shall deliver to the Employer, a Initial Security Deposit Shall be submitted as per C.E. Circular.in
the form of a Bank Guarantee / DD/ Pay Order / Banker’s cheque for an amount equivalent to 5%
(Five percent) of the Contract Price.
Failure of the same shall make the contractor liable for any penalty as decided by AMC. At
present a policy is framed by Audit department of AMC to charge 4% interest for the
balance period and discontinuity period.
The Security Deposit to be provided by the successful bidder in the form of a bank guarantee as
per format shall be issued as per Memorendum of work.
(E) Retention :-
a). Retention @ 2% of the value of work done will be deducted from each RA bill. It will be released
along with release of payment of Final Bill.
4. Approved Bank: - As per Annexer -I
5. No advance for machinery or materials will be given.
6. Mobilization advance will not be given.
7. Quantities in B.O.Q. may vary up to any extent and contractor shall not claim any extra rate for the
8. Penalty: - As Per City Eng. Circular no-3 Date:-03/09/2016
9. Tax, Duties on Materials
All charge on account of Octroi ,excise duties, terminal tax, sales tax. Service tax, VAT etc. on
material procurement or any other component for the works from any source shall be borne by the
All duties, taxes, Service Tax and other levies payable by the Contractor under the Contract, or for any
other cause as of the date 28 days prior to the deadline for submission of the bids, shall be included in
the rates and prices and the total bid price submitted by the bidder and the evaluation and comparison
of bids by the Employer shall be made accordingly.
Special Clause:
As per construction works welfare cess Act – 1996 non-refundable one percent of tender amount
shall be deducted against works welfare cess.
Seal and Signature of the Bidder Addl. City Engineer
Date: (South Zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGNIERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be 12 Months after the order to start the works. Progress of work should be in
proportion to time limit. The details of reinforcement of R.C.C. work shall be as per design and instructions of
Add. City Engineer and his order will be considered final.
The contractor shall have to maintain account of steel, cement and other materials that may be brought
by him on site. This account shall be regularly maintained and kept open for inspection by Municipal
Staff. Watering of all the items shall be as per instructions otherwise no payment shall be made to
contractors. Mixing of concrete shall be done by concrete mixer machine. Arrangements of binding
vibrator for R.C.C. works if required shall have to be made by the contractor.The contractor shall be
remain responsible for Workmen’s compensation if any accident. The contractor shall arrange for
barricading at night and arrangement of Pagi at night to direct the traffic. He shall be responsible for
any damage to public. If any incident happen, during the execution of work. In case of dispute for
unseen or overlooked items the decision of the Dy. City Engineer shall be final. The contractor shall
have to give site clean of all rubbish during the work and at the time of completion of work and hand
over the site with final finishing of the work as directed. All the rejected materials shall be removed
from site within 24 hours by contractor at this risk and cost. Debris shall have to cart daily from site.
For mixing mortar either for masonry or for plaster or for any other purpose contractor shall have
to prepare through of bigger size and mix the mortar in the required proportion. In on case he shall be
allowed to mix the mortar either on floor or any finished surfaces. The contractor shall have to make his
own arrangement for water required for the work.
If any extra item crops up during the progress of work the same shall be carried out by the contractor and he
shall be paid at the rate fixed by Add.C.E. as per the rate analysis based on latest SOR or if item is not
available in SOR than based on current market rates. In case of extra item decision of Add. City Engg. shall
remain final regarding rate.
If in the interest of the Corporation it is necessary to change either any site or the design of the propose work
the contractor shall carry out the same at his quoted rates without charges any extra and the contractor will
have to carry out the works and he will be paid at the rate quoted by him. No claim for extra rate for
subsequent changes in site and design is entertained.
The cubical contents of the cement bag shall be taken as 1-20 cft. Per bag and the contractors shall have to
prepare the measures boxes according to this measure.
Octroi exemption passes shall not be given for any materials required for the work. Contractor will be fully
responsible for compliance of the various provisions under contract Act. 1970 and the Rules framed the to
The tender for the work shall remain open for a period (120) days from the date of opening of the tenders for
this work and that the tenderer shall not be allowed to withdraw on modify the offer on his own during the
period. If any tenderer withdraw or makes any modifications or addition in the terms and conditions of his
tender not acceptable to the Municipal Corporation the Municipal Corporation shall without prejudice to any
right or remedy be at liberty to forfeit in full the said earnest money and black list the contractor.
Contractors should note the following conditions carefully:-
i) Conditional tender shall not be accepted.
ii) All tenders are to be submitted in duplicate without which the tenders are liable to be rejected.
iii) In case of tender downloaded from website, tender fee & EMD should be submitted in form of
demand draft or in cash.
iv) Condition of Form - B1 Standard Specification of material & code of practice will be applicable. Form
B1 can be is available in website. Specification shall be as per ' R& B Dept. - Govt. of Gujarat
booklets of Building Works & and Road Works Specifications published by Gujarat Book Depot,
Sector-21. Gandhinagar.
CONTRACTOR'S SIGNATURE ADDL.CITY.ENGINEER
& STAMP (South Zone)
AHMEDABAD MUNICIPAL CORPORATION
Tender form B-1
FORM B-1 OF GUJARAT STATE ROADS AND BUILDING DEPARTMENT / WATER
RESOURCES DEPARTMENT may be referred.(only English version)
Note binding on the contractors
01. The terms and conditions of contract mentioned in the Clause no 1 to 77 of Form B-1 of
Gujarat State Road and Building Department / Water Resources Department shall be applicable.
binding on the contractors unless specifically mentioned about it
Hereunder in clause no.15 to
02. Please read “Ahmedabad Municipal Corporation “instead of “Government / Government of
Gujarat “wherever written.
03. Please read “ Ahmedabad Municipal Corporation “ instead of “ Government of Gujarat State
Public Works Department/Public Works Department/ Government “ wherever written.
04. Please read “City Engineer" instead of “Superintending Engineer” or “Executive Engineer”
wherever written.
05. “Ahmedabad Municipal Corporation“ herein called as“AMC “
06. “Governor for the state of Gujarat“ shall be read as “Municipal Commissioner/Ahmedabad
Municipal Corporation ”
07. The contents / details / information mentioned in the relevant point under the heading
Seal and Signature of the Bidder Addl. City Engineer
Technical conditions
1. Tenderer should be registered in PWD/ in Govt. R&B /CPWD / AMC or equivalent
registration with any other state Govt. or institutions. Copy of registration should be
attached with tender document. Tenderer who was not registred in AMC must be get
registred in panel of approved AMC contractor.
2. A booklet of FORM B-1 of Gujarat State Roads & Building Department / Water
Resources Department with the correction slips made up to 15-08-1999 may be referred.
(only English version)
3. In the specification “as directed" / "approved" shall be taken to mean "as directed /
"approved" by the Engineering in charge.
4. Wherever a reference to any Indian standard appears in the specifications, it shall be taken
to mean as reference to the latest edition of the same of force on the date of agreement.
5. In "Mode of measurement" in the specifications wherever a dispute arises in the absence
of specific mention for a particulars point / aspect, the same in the relevant Indian
Standards shall be referred to.
6. All measurement and computations, unless otherwise specified shall be carried out nearest
to the following limits :-
i) Length, width and depth, Height 0.01 Meter
ii) Areas 0.01 Sq.mts.
iii) Cubic contents 0.01 Cu. mts.
In recording dimensions of work, the sequence of length, width and height (Depth) or
thickness shall be followed.
7. Definite particulars covered in the items of work, though not mentioned or elucidate in its
specifications shall be deemed to be included therein.
8. Approval of the samples of various materials given by the Engineer in charge or AMC's
Consultant shall not absolve the contractor from the responsibility of replacing defective
materials brought on site or materials used in the work found defective at a later date. The
contractor shall have no claim to any payment or compensation whatsœver on account of
any such materials being rejected by the Engineer in charge.
9. The contractor’s rate for the item of work shall be for the work completed in all respect.
10. All materials including those of electrical shall be got approved by the Engineer in charge/
Architect before using them in the work.
11. Materials as and when rejected by the Engineer in charge or AMC's Consultant shall be
removed from the site of work within 24 hours.
12. All work shall be carried out in a manner applying the best technique.
13. All tools, templates, machinery and equipment for correct execution of the work as well
as for checking lines, levels, alignment of the works & all precautionary measures during
execution shall have to be kept in sufficient numbers and in good working condition at the
site of the work.
14. Special modes of the construction not adopted in general Engineering practice, if
proposed to be adopted by the contractor shall be considered only if the contractor
provided satisfactory evidence that such special mode of construction and completion of
work to the required strength and quality. Acceptance of the same by the Engineer in
charge shall not however, absolve the contractor from the responsibility of any adverse
effect and concordance of adopting the same in the course of exaction or completion of
15. The contractor shall be responsible for observing the rules and regulation imposed under
the "Minor Mineral Act", and such other laws and rules prescribed by the Government
from time to time.
16. All necessary safety measures and precautions (incl. those laid down in the various
relevant Indian Standard) shall be taken to engrave the safety of men, materials and
machinery on the work and also of the work itself.
17. Quantity measured in the tender is approximate. It may increase or decrease looking to the
quantum of actual work for which no any claim shall be entertained by A.M.C.
18. Contractor shall have to execute extra item if required.
19. The work in general shall be carried out as per standard specifications of the relevant
items to be executed & as per the instruction of Engineer in charge & as per the guidance
of AMC's Consultant for this project.
20. The general terms & conditions of the contract shall be applicable & shall be binding on
the contractor. The contract agreement shall have to be executed between AMC & the
agency to which work is awarded for execution.
21. The time limit shall be reckoned after 15 days from the date of issue of the written work
order to the contractor. No time extension will be granted under any circumstances.
22. In case of any ambiguity in specifications mentioned in this tender, the interpretation
given by Additional City Engineer /Dy.M.C of A.M.C. will be final and binding to the
23. The contractor shall take no advantage of any apparent error or omission in drawing or
specification and the Engineer -in-charge shall make such corrections and interpretations
as necessary to fulfill the intent of the plants and specifications.
24. The quantities of items in BOQ (Bill of Quantities) may vary in case of necessity arises.
25. All prevailing taxes/duties chargeable by State Govt./Central Govt. and the Municipal
Corporation. will be payable by the contractor.
26. No any kind of price rise / price escalation / price variation for cement , steel or labour
27. Contractor is requested to see the site physically before tendering. He is also requested to
quote the rates keeping in view of all the points mentioned in relevant pages of tender
28. Water Supply: The contractor shall arrange at his own cost, a suitable supply of piped
water for the construction of the works and provide a satisfactory supply of potable water
for drinking, washing, sanitation and cleaning down. The contractor will be responsible
for all the costs where applicable of connection, meter installation, water consumed, water
required for testing purposes, disconnection and the laying, maintenances and ultimate
removal of any distribution system around the site.
29. Electricity: Electric supply will be made available at the site by the Contractor and the
contractor must make his own arrangements with the Corporation and Electricity Supply
Authorities and with other contractors to connect and to take a supply from such services,
paying all costs in connection therewith.
The Contractor shall be entitled to use supply Electricity as may be available on the site
for purpose of the work and shall pay such charges as is fixed by the appropriate supply
In case there is any delay in supply of power site of any interruption or fault in the power
during the work. No compensation shall be paid for idle labor staff, machineries and for
use of diesel operating sets etc. as the case may be.
30. Tenders shall submit all the valid/certified documents in support of their initial/eligibility
criteria mentioned above along with the bid. They shall have also to submit the income
tax clearance certificate and solvency certificate.
31. No advance such as secured advance machinery advance, mobilization advance or
materials advance will be given.
32. The contractor shall get the electrical works executed through the authorized Government
approved licensed electrical person or firm in appropriate category in accordance to
contractual provisions.
33. The electrical works shall be carried out strictly in accordance with the directives issued
by Engineer in charge.
34. Contractors shall not have any dispute or claim for any kind of compensations
(i) If the quantity stipulated in the tender items varies or the scope of work changes &
thereby total amount of work increases/ decreases.
thereby total amount of work increases/ decreases.
(ii) If the work gets delayed/ postponed for some administrative/ technical decision
35. In case of any dispute, decision of Municipal Commissioner shall be final and binding on
the contractors.
36. Tenders which do not fulfill all or any of conditions or are submitted incomplete in any
respect will be rejected. Municipal Commissioner reserves the right to increase/decrease
the scope of work. No any claim to that effect shall be entertained. The Municipal
Commissioner also reserves the right to reject any or all the tenders without assigning any
reason thereof.
37. The contractors are requested to quote their rates considering above tender conditions.
38. The contractor shall have to execute the contract agreement within 15 days from the date
if issue of work order.
Eventhough in special case, If work is not started because of monsoon or any other
special reason (like site is not available), after evaluation of situation the actual date of
starting of work will be consider after approval of Dy.M.C. (South zone)
39. The Contractor shall not claim for increase or decrease in the quantity of the item or the
40. The payment shall be made as per the A.M.C policy for the work done by the contractor.
41. Conditional tenderes will not be accepted.
Seal and Signature of the Bidder Addl. City Engineer
ybœtJtœ BGþrlrmvj ftuvotuhuNl
œÂûtKÍtul - Esluh Ftðþ
ftb btxulwk xftJthe œh Jt¤wk xuLzh ylu ftuLx[tfx
xuLzh btxule Nh<tuu
1 y: yt xuLzh su <u Jdolt y.Bgw.ftu y&Jt fuLî{ y&Jt htsg mhfthle btLg gtœelt ftuLx[tfxhtu Che NfNu.dJobuLxlt
btLg ftuLx[[tfxhu y.Bgw.ftuvtuo. bt btLg ftuLx[[tfxhtu le gtœebtkk hSMxuNl fhtJJtlwk hnuNu.
1 c: btLg ©uKelt ftuLx[tfxh <hefu ltuk^Kelwk «btKvºtle MJ «btKe< fhuj lfj xuLzh mt&u stuzJtle hnuNu.
1 f: xuLzhhle jtgft< ftb sJtcœth xuLzhh <ubs su xuLzhh mwaJuj ftuLx[fxhle ©uKebtk ytJ<t ntug <ubs ftb fhJt
mûtb ntug <ublu s ytvJtbtkk ytJNu. ftb yvt<t vnujt ftuLx[tfxhu ftb mkk<tu»tfthf <ubs xtRb jebexbtkk vwÁk fhJt sYhe
mJj<,ylwCJ, ûtb<t ylu VtgltLmegj hemtumo hsw fhJtlt hnuNu.
1 z: ybœtJtœ Bgwrlrmvj ctuzo XhtJ lk - 3836,<t.25/11/2011 &e b¤uj bkswhe ylwmth <&t mexe.Rsluh
mh¾gwjh,lk -17,<t.09/12/2012 bwsc ybœtJtœ Bgwrlrmvj ftuvtuohuNlbtk ftuLx[t¾xh hSMxuNl Ve,heLgwyj Ve
<&t yvd{uzuNl Ve ylu btv œkztu ægtlbtk htFe <u bwsc ybj fhJtltu hnuNu.
1 R: xuLzh Ch<t vnujt xuLzhhu mtRx rlheûtK fhe juJwk. xuLzhh ftblt «fth, ngt< hM<t, vtKe btdo, mkkath ylu
JvhtNlt ceò hM<tytu&e mkk<wÐ ntuJtlwk btle juJtbtkk ytJNu. xuLzhhu ftblu mtRx ylu rcÕzekkd(fu su ftb fhJt, ftb
vwhwk fhJt <&t ftblt buRxulLm btxu cltJuj ntug).<ubs xuLzhhu yt mtRxlt ftb btxu, rcÕzekkd btxu, gtzo, zevtu
btxule søgt vtu<tle he<u bu¤Je juJtle hnuNu. (xuLzhlwk ftb fhJt, ftb vwhwk fhJt <&t ftblt buRxulLm btxule
2: yt ftble mbg bgtoœt (12 btm) le hnuNu. (bubtuhuLzbbt sKtJuj «btKu)
3: xuLzh Jujezexe rvhegz (120 rœJm) (As Per City Eng.Circular no-3 Date:-03/09/2016) )
4: xuLzh Ch<e JF<u yluoMxble ChJtle hnuNu.
xuLzh Vtubo ylu ylwmwrabtkkle œhufu œhuf Ftje søgt xuLzh Chlthu Chuje yt mt&u btufjujt œM<tJus vh< fhJtlt
6: ftuLx[tfxhtuyu leaule ctc<tu ft¤SvwJof JtkkaJt rJlkk<e Au.
1) J^w fu ytuAtle xftJthelt œh Nçœtu <ubs ytkkfztbtkk ytvJt.
2) ftuR fkkvlelu ltbu xuLzh juJtbkkt ytÔgwk ntug <tu fkkvle J<e xuLzh vh mne fhlth Ôgrf<lu yr^f]< fh<wk
bwFðgthltbwk xuLzh mt&u hsw fhJtlwk hnuNu.
3) Bgwrl.ftuvtuohuNllt «J<obtl rlgbtu ylwmth yluMxble ChJtle hnuNu.ylu xuLzh mt&u cezJtle hnuNu.
4) ftuLx[tfxhu RLfbxuût mkkckr^< vtl lkch <&t cukf zexuRj ytvJtle hnuNu.
5) ftuLx[tfxh vtmu ydtWlt ylwCJt ykdult «btKvºttule lfj xuLzh mt&u hsw fhe NfNu.
6) xuLzh Nh<tu ylu MvuNeVefuNl <&t CtJ vºtflt œhuf vtlt ylu rJd<tu vh ftuLx[tfxhu mne fhJe.
7) <btb mw^tht, AufAtf ylu Dwkxujt jFtK vh ftuLx[tfxhu xwkfe mne fhJe.
7: AufAtf xuLzh Chlthlu sKtJJtbtkk ytJu Au fu xuLzh œM<tJustult jFtKbtk ftuR AufAtf fu VhuVth fhJt œuJtNu lrn
ylu ytJe ftuR AufAtf fu VuhVth juJtNu lrn, <ultkk jFtKbtkk ftuR Cwwj ntug <tu <ult vh l Dwkx<t Ftuxt jFtK fu
ytkkfzt vh Auftu bthelu <ult mtawk jFtK fu ytkkfzt MvÐ Wfju <u he<u jFJt. «ðguf mw^tht vh xwk fe mne fhJe.
8 y: xuLzh hsw fh<tkk vnujt Ftm fhelu xuLzhbtk œNtoJuj mwaltytulwk vtjl fhJtbtkk ytÔgw lrn ntug <tu xuLzh ybtLg
dKJtbkkt ytJNu <ule ltuk^ juJt rJlk<e Au. J¤e yt Vtubolwk bwFv]ƒ ylu ftuLx[tfxhtult btdoœNol btxu mtbtLg
rlgbtu ylu mwaltytu vK ft¤SvwJof JtkkaJt rJlkk<e Au.
1) ftuRvK fthK œNtoÔgt rmJtg ftuRvK fu c^t xuLzhtu yMJefth fhJtltu nf yctr^< hnu Au.
8 c: Wvhle ctc<tu Wvhtkk< xuLzh leault mkkstudtubtkk <h< ybtLg XhJtlu vtºt &Nu.
1) xuLzh Chlth, rlg< ftb y&Jt ftb btxu bkswh fhuj y&Jt CtJ vºtflt ftuR ftuz y&Jt vîr< y&Jt rJd<tubtkk
bwfuj Nh< y&Jt mw^thtbtkk ftuR VuhVth mwaJ<t ntug.
2) xuLzhlwk ftuR vtlwk fu vtlt ftZe ltkkÏgwk/ltkkÏgt ntug fu cœÕgwk/cœÕgt ntug.
3) c^t mw^tht J^tht y&Jt atukxtzuje ftvjeytu Wvh xuLzh Chlthu xwkfe mne l fhe ntug.
4) xuLzhbtk <ubKu ftuR AufAtf fhe ntug, ylu
5) xuLzh Chlth y&Jt vuZele ctc<btkk œhuf Ctdeœth y&Jt <u ykkdulwk bwFðgthltbwk ^htJlth Ôgrf< mne l fhu
y&Jt xuLzhbt <u btxu htFJtbtkk ytJuje søgtbtkk mne/mneytu Wvh ftuR mtûteyu mtF fhe l ntug.
8 f: Nh<e xuLzh MJefthJtbtk ytJNu lne.
8 z: xuLzh MJefthJw , hœ fhJw, ftulu ytvJw ylu fgt CtJ&e ytvJw <u ykdu Bgwrl. frb§h©eltu rlKog ytFhe hnuNu. ftuR
fthKmh stu ftuLx[tfxhlu ftb l ytve Nftg <tu <u ykkdu ftuLx[tfxh ftuRvK «fthltu lwfNtle fu J¤<hltu nff œtJtu
fhe NfNu lrn fu ftgœtfeg ftgoJtne yt ykkdu &R NfNu lrn. xuLzh bkswh >ltu y&o ftb ytve s œuJtlwk Au <uJtu &R
9: rJmkkdr< ylu rnmtc stud: nt& ^hJtlt ftbtule ctc< œNtoJ<t CtJ vºtf btklt sÚ&t ylu hfble ftuRvK Cwjawf
leault rlgbtu ylwmth mhCh fhJtbtkk ytJNu.
1) xuLzh Chlthu œhlt Ftltbtkk sKtJuj Nçœtu ylu ytkkfzt Jåau ftuR ymkkdr<lt fumbtkk Nçœtubtkk sKtJuj hfb btLg
htFJtbtkk ytJNu.
2) yufb œh ylu sÚ&tlt Ftuxt dwKtfthlt fthKu ftble ctc<tu œNtoJ<e CtJ vºtf lt Ftltbtkk&e hfbbtkk Cwj
sKtg <tu yufb œh btLg htFJtbkkt ytJNu ylu œhlt yt^thu dwKtfth mw^thJtbkkt ytJNu.
3) yufblt Ftltbtkk&e <ubs ytd¤ Fuka<t mhJt¤tle <btb Cwjtu mw^thJtbkkt ytJNu.
4) ctc<tu y&Jt mhJt¤t mtbu vwhu ytkkfzu fhuj ftuR vK ctc< ægtlbtkk juJtbtkk ytJNu lrn.
10y: ftbltu «tud{um mbg bgtoœt bwsc fhJtltu hnuNu. yt mbg bgtoœt 10 jtF mw^elt ftb btxu yuj.ytu.ytR.
ytÃgt <theF&e 10 rœJm <&t 10 jtF &e Wvhltk ftb btxu yuj.ytu.ytR. ytÃgt <theF&e 15 rœJm&e NY
&guj dKJtbt ytJNu. <&t <u œhrbgtl ftble 5% juFu zevtuÍex Che fhthvºt fhJtltu hnuNu.
xuLzhbtk ftuLx[t¾xh îtht Chujt CtJ <btb «fthlt su <u «J<o<t mhfthe xuût mrn<lt CtJ dKJtbtk ytJNu.
ylu <ubtk atjw ftb œhBgtl su ftuR VuhVth &Nu <ultu J^thtu awfJJtbtk ytJNu lrnk.
10c: mûtb m•tt îtht Yt.10,00,000.00 (œm jtF) mw^elt xuLzhle bkswheltu XhtJ vtzgt ctœ ( LOI) ytvJtbtk
ytJNu ðgth ctœ rœl - 10 btk rm¾gtuhexe zevtuÍex sbt fhtJJtle hnuNu. rm¾gtuhexe zevtuÍex btuze ChJtlt
rfMmtbtk Bgwrl.ftuvtuohuNlbtk «J<obtl rlgb ylwmth ftgoJtne fhJtbtk ytJNu.
10f: mœh ftbltk xuLzhbtk bw¤ bkswh &guj mbgbgtoœt / Extended Time Limit ctœlt ftbdehe vqKo l &tg <tu
FhuFh ctfe ftble hfblt 10% juFu Liquidated Damages (vulÕxe) Jmwj fhJtbtk ytJNu. (mexe
Rsluh(Rsluh Ft<w) mhfgwjh lk.3 <t. 03/09/2016 bwsc.)
11 y: awfJKe xuLzh Chlthu yu Jt< mbS juJtle hnuNu fu <uKu xtkkfujt œh vwhtk &gujt ftb btxult Au ylu <ubtk bswhe,
vtjF, ÃjtLx, œuFhuF,mhJem-ftbdehe, Jes¤e, htugÕxe ylu ytufx[tug Jduhu ykkNu <btb Faoltu <&t sYh sKtg <tu ylu
ðgthu ht<vt¤elt ftblu juJt c^t J^thtlt Faoltu mbtJuN &Nu ylu xtkkfujt CtJ fu œh fh<t J^thtle ftuR awfJKe ykkdult
<ublt ftuR œtJt ægtlbtkk juJtNu lnekk ylu xuLzh Chlth Ftuxe hswyt<lu fthKu y&Jt ftuR Ôgrf<yu(vAe<u ctkk^ftb
rJCtdltu fboathe ntug fu l ntug)<ublu ytvuje btne<elu yt^thu vtA¤&e ftuR œtJt hsw fhJt nfœth hnuNu lnekk. <ublw
xuLzh ChJt <&t <ubtkk swœt swœt CtJ ylu œh ChJt btxu sYhe yuJe <btb btne<e vtu<tlt vûtu l bu¤Je NfJtlu fthKu
vtu<u xuLzh hsw fhJtlu je^u y&Jt <ubtkk&e WCt &<t ftuR stuFb fu sJtcœthebtkk&e Axfe NfNu lnekk. mœh ftbbtk ftuR vK
ò<lt ctk^ftblt bxehegj Wvh CtJ J^thtu ytvJtbtk ytJNu lrnk.
11 c: ftuLx[tfxhtulu vubuLx / hlekd cej Bgwrl. frb§h©elt su <u «J<obtl rlgb bwsc fhJtbt ytJNu.<&t Bgwrl.
frb§h©e/mexe Rsluh©e lt su <u JF<ltk mh¾gwjh «btKu ftbdehe/ybj fhJt ckDlf<ot hnuNu.
11 f: ftuLx[t¾xhlt œhuf hlekd cejbtk&e ftuLx[t¾xhlu awfJJtle &<e fwj hfb Wvh (xuLzh bwsclwk vubuLx + yu¾x[t
ytRxb) 2 % juFu hexulNl ble ftvJtbtk ytJNu su VtRlj cejbtk vh< ytvJtbtk ytJNu.
11 z: htsg / fuL÷ mhfth©elt JF<tuJF<lt ftgœt bwsc su ftuR hfble fvt< fhJtle &Nu <u bwsc ftuLx[[tfxhlt
cejbtkk&e fvt< fhJtbt ytJNu.
12: yu)fhth mkkc^e œM<tJustu fhthlt ydðglt Ctd dKtNu ylu <u mD¤t mne<lt fhth mbd{ ftblu jtdw vzNu.
ce)xuLzhbtk œNtoJuj ftb mkkck^e œM<tJusbtkk œNtoJuj rJd<btkk rJmkkd<<tlt rfMmtbtk leau œNtoJuj ¢btlwmth
œM<tJusbtkk œNtoJuj rJd< d{tng htFJtbkkt ytJNu.
yu) yufb ylu fœ (1) z[turkRd
(2)xuLzh Vtubolwk CtJvºtf
ce) z[tuRkdbtk fœ, ytfth, ytkkfzt fœta Ftuxt ntug <tu btvujtkk fœ, ytfthlu ylwmhJwk.
3. xuLzh Vtubole ylwmwra-ce
Cwj Chujt fu Ftuxt JKollt rfMmtbtkk yt mkkck^e Wvhefûttyu rJmkkd<<t ykdule ltuk^ bwfe
yuze.me.R/zu.Bgwrl.frb./Bgwrl.frb.le bkswhe bu¤JJtbtk ytJNu ylu <u bwsc fhJtbkt ytJuj rlKog ykkr<b dKJtbkkt
13 : xuLzhhu z[tuRkd fu MvuNeVefuNlbtkk hnuje ftuR ûtr< fu Ftbeltu duhjtC juJtle fturNN l fhJe ylu Rsluh Rl-atsuo
Ãjtl <&t MvuNeVefuNlle ûtr<ytu mw^thJe <&t <ulwk mtawk y&oDxl fhtJJwk.
14 : yt Wvhtk< y.Bgw. ftuvtuo. lt slhj ftuLx[tfx fLzeNl vK btLg htFJle hnuNu.
15 : yufe JF<u yuf fh<t J^w søgtytuyu ftb NY fhJtltu Jfo ytuzoh b¤u <tu ftb yuf mt&u s c^u NY fhJw vzNu.
16 :atjw ftbu mrJom jtRllu lwfNtl l &tg <u he<u ftb fhJtlw hnuNu. stu ftuR mrJom jtRllu lwfNtl &Nu <tu <ule
mkvwKo sJtcœthe (òlbtj) ftuLx[tfxhle vtu<tle hnuNu. mtRx Wvh ftb œhBgtl bswhtu fu sl<tlt ftuR btKmlt
òlbtj lu lwfNtl &tg <ule sJtcœthe ftuLx[tfxhle hnuNu.vtujem Vhegtœ &tg <tu <ule sJtcœthe vK ftuLxtfxhle
hnuNu. CuFz Dme l vzu <ule sJtcœthe vK vtujem Vhegtœbt ftuLx[tfxhle hnuNu.CuFz Dme l vzu <u btxu mjtb<elt
vdjt (suJt fu œtuhzwk k ctk^e bswh Ftztbtkk W<thJt, mtuhekkd ylu Mx[[xekkd fhJt rJduhu) je^t Jdh bsqhlu Ftztbtkk k k
W<thNu <tu ftuLx[[tfxh s vtujem Vhegtœbt sJtcœth hnuNu ylu Bgwrl.ftuvtuohuNlltu ftuRvK MxtV ytlt btxu
sJtcœth hnuNu lrn.ytxjwk mbSlu s xuLzh ChJwk. Bswhtultu rJbtu vK W<thJtu.
17 : ftuLx[tfxh îtht xuLzhbt œNtoJuj MveNeVefuNl bwsc MxtLzzo bxehegÕm MvuNeVefuNl bwsc jtJJtlt hnuNu.<&t sYh
sKtg <tu xuMxekd fhtJJtlwk hnuNu.<&t yt ykdu «Joðbtl Bgwrl.ftuvtuohuNlt rlgb bwsc bxehegÕm fu ceò xuMxed hevtuxo
ftuLx[tfxhu vtu<tlt Fauo ftuvtuohuNl sKtJu <u søgtyu fhtJJtlt hnuNu. bxehegÕm jtJJt fu jR sJtltu mkvwKo Fao
ftuLx[tfxhu CtudJJtltu hnuNu.
18 : M&¤ vrhrM&r< / sYhegt< bwsc ftb fhtJ<t xuLzhlt ytRxblt sÚ&tbtk J^ ^x &tg <tu rlgb ylwmth <u ykdu
ftb fhJt ftuLx[tfxh ck^tgujt Au.
19: mtRx vh jtJJtbtk ytJuj btj mtbtl hesufx fhJtbt ytJu <tu <whk< rœl 1btk vh< jR sJtltu hnuNu.
yLg&t <ule lwfNtlle sJtcœthe ftuLx[tfxhle hnuNu.
20 :ftuLx[tfxhlu su ftuLx[tfx ytvJtbtk ytJu Au.<ubt mhfth©elt «Joðbtl rlgb bwsc ve.yuV/juch yufx/vtujemlt
ftgœtlw vtjl fhJtlwk hnuNu <&t yt ykdu Bgwrl.ftuvtuohuNl îtht su btne<e btkdJtbtk ytJu <u ytvJtle hnuNu.
21: ftuRvK ftgœtfeg jexeduNl ybœtJtœ Nnuhle ftuxobt hnuNu.
22: btj su <u Mxtumo Wvh y&Jt mtRx Wvh jtuftulu lz<h l &tg <u he<u mwalt bwsc W<thJtltu <ubs dtuXJJtltu hnuNu.
23: ftuR vK mhfthe fhJuht ChJtle <btb sJtcœthe ftuLx[tfxhle hnuNu.
24: yt xuLzhbtkk stu ftuR ytRxb hne dR ntug <tu <u y&tJ M&¤ M&e<e bwsc xuLzhbtk mbtJuN l ntug <uJe J^thtle
ftbdehe fhJtle &tg <uJt rfMmbtk Bgwrl.ftuvtuohuNlt «Joðbtl rlgb ylwmth J^thtle ytRxblt CtJ lffe fhJtbtk
ytJNu ylu <u bwsc awkfJKe fhJtbtk ytJNu.
25: atjw ftb œhBgtl «tuxufNlle mkvwKo sJtcœthe ftuLx[[tfxhle hnuNu. subtkk vevzt,œtuhzt, Cgmwaf ctuzo,ÃjtMxef
vxe,rJ. ftuLx[tfxhu jtJJtlwk ylu mtaJJtlwwk hnuNu. ylu ftuRvK yfMbt< &Nu <tu <ule mkkvwKo sJtcœthe ftuLx[tfxhle
26: M&¤ Wvh atjw ftbdehe œhBgtl ftb fhlth ftuLx[tfxhlt bswh / fboathe y&Jt yLg Ôgrf<lt yfMbt<lt rfMmbtk
juch yufx bwsc fhJtle &<e ftgoJtne <&t vtujem ftgoJtnele sJtcœthe ftuLx[tfxhle hnuNu.
27: stu MxtV mqalt ytvu <u bwsc mwalt vtu&e ftuLx[tfxhu htFJtle hnuNu. <ubt œhhtus fhuj ftbdehe <&t
yr^ftheytuyu ftb mw^thJt fu vtu{d{um J^thJtlt ltuk^ fhuj ntug <tu <ulwk ftuBÃjtgLm ytvJtlwk hnuNu ytJe ltu^lt sJtc
l &gu fu <u «btKu M&¤ Wvh ybj l &gu ftuLx[tfxhlu vulÕxe fhJtle mððtt yuze.mexe yuLSlehgh©elu hnuNu.
28: œhuf ytRxblt MvuNeVefuNl ybœtJtœ Bgwrlrmvj ftuvtuohuNlltk bkswh &guj <&t btLg htFuj MvuNeVefuNl Nh<tu
bwsc hnuNu su ytRxbbtk MvuNeVefuNl l ntug <uJt mkstudtubtk yuze. mexe.yuLSlegh©eltu rlKog ytFhe
hnuNu.Jtuxhekd fhJtbtk lrn ytJu fu œhhtus J^thtltu zucheÍ WvtzJtbtk lrn ytJu <tu ftuLx[tfxhlt Fauo ylu sutFbu Jdh
ltuxemu Jtuxhekd fhtJJtbtk <&t zucheÍ WvtzJtbtk ytJNu ylu cejbtkk&e hfb ftve juJtbtk ytJNu.
29: juch JuÕVuh Vkkz btxu ntjbtkk htsg mhfth©eyu fhuj nwfb bwsc 1%(yuf xft) hfb cejbtk&e ftve juJtbt ytJNu.
30: su ftbtubtk atubtmtlt mbgdt¤tlu ctœ ytvJtle Nh<tultu WÕjuF ntug ðgtk atubtmtltu vehegz <t.15 swl &e
mÃxuBch Mþ^eltu dKJtbtk ytJNu. yt mbg œhBgtl ftuLx[tfxh îtht ftbdehe fhe Nftg <ub l ntug <tu <u mbgdt¤tu
ctœ fhe ftble mbgbgtoœt dKJtbtk ytJNu <&t sYhegt< Bþscle xtEb jebex J^the vK ytvJtbtk ytJNu.
31: ftuLx[tfxhu «J<obtl ybœtJtœ Bgw.lemevtj ftuvtuohuNl lt JF<tuJF< lt mhfgwjh bwsc ve yuV,Jux <&t ylu
muÕm xuût lu jd<t vwhtJt vubuLx fh<e JF<u sYh vzu&e hsw fhJtlt hnuNu.
yufhthlwk Vtubo
1) nwk /ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt xuLzh hsw fh<tkk vnujtkk buk/ybu M&¤le bwjtft< je^e
Au ylu ftblu jd<t btjmtbtl, bswhe ylu ceS ctc<tulu jd<e M&trlf vrhrM&r<le ò<-
btne<e bu¤Je Au.
2) nwk /ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt ftuLx[tfxhtule Nh<tu rJd<tu ylu xuLzhlu jd<t
œM<tJustu ft¤SvwJof yÇgtm fgtuo Au ylu <u bwsc <ultu ybj fhJt mkkb< Awk/Aeyu.
ftuLx[tfxhle mne - rm¬tu yuze.mexe yuLSlegh
btuctEj lkch mt&u (œrûtK Ítul)
mh¾gwjh lkch 3, <theF 3/9/16
Bgwrlrmvj ftuvtuohuNlbtk Rsluh rJCtd îtht htuz, vtKe, rcÕzekd, z[ulus, jtRx rJduhult ònuh sl<tle mrwJ^tlt
rmrJj ftbtu fhJtbtk ytJu Au. mkcr^< ftbtubtk swœt swœt Ítul <&t «tusufx îtht yufmwºt<t s¤JtR hnu <u nu<w &e
y.Bgw.ftu.îtht JF<tu JF< fhJtbtk ytJuj swœt swœt mhfgwjhtubtk leau bwscltu mw^thtu Bgwrlrmvj frbNlh©ele
b¤uj bkswhe ylwmth fhJtbtk ytJu Au.
1. y.Bgw.ftu. îtht Rsluh Ft<t îtht bkdtJJttbtk ytJ<t xuLzhbtk ftble sYhe Nh<tu mt&u Vtubo ce-1 le
jtdw vz<e <btb Nh<tu bwscle ftbdehe fhJtle hnuNu vhk<w vulÕxe btxu ltKtkFt<wk vrhvºt lk.-18,
<t.-04/07/2012 lt bwœt lk.1-R btk mwaÔgt bwscltu yuxjufu leau bwscltu fjtuÍ xuLzhtubtk htFJtltu
rlg< mbgbgtoœtbtk ftb vwht l &tg <tu vuLtÕxe Jmwj juJt ctc<:-
(1) nJu vAelt <btb xuLzhbtk bw¤ bkswh &guj mbgbgtoœt / Extended Time Limit ctœlt FhuFh ctfe
ftble hfblt 10% juFu Liquidated Damages (vulÕxe) Jmwj fhJtle Nh< nJu vAelt ftbtbtk
htFJtle hnuNu <&t ntjbtk atj<t ftbtubtk <&t su ftblt Vtglj cej cluj l ntug <uJt ftbbtk vK bw¤
bkswh &guj mbgbgtoœt / Extended Time Limit ctœ &guj ftble vulÕxe Jmwj fhJt ykdu bq¤
bkswh &guj mbgbgtoœt / Liquidated Damages ctœlt FhuFh ctfe ftble hfblt 10% juFu
Liquidated Damages (vulÕxe) Jmwj fhJtlwk sYh sKtg <tu yt bwscltu rlKog juJtle m•tt
Bgw.frbNlh©elu ytvJtbtk ytJuj Au.
(2) xuLzhbtk Milestone recovery (Time yt^the<) le Nh< htFJtbtk ytJuj ntug Au sultu ybj
Ft<tyu fhJtltu ntug Au. vhk<w, ftbdehelt ybjefhK œhrbgtl y.Bgw.ftu.lt fthKtumh ftbbtk rJjkc
&guj ntug sule òK Bgw.frbNlh©elu fhuj ntug <&tmûtb m•ttyu bwœT< J^ fhuj ntug <u JF<u mbd{ ftb
Extended Time Limit btk vwKo &guj ntug <tu Milestone recovery (Time yt^trh<) le
fvt< fhJtle hnuNu lne su bwsclu Nh< nJu vAelt ftbbtk htFJtle hnuNu. Yt bwscltu ybj ntjbtk
atjw ftbbtk <&t su ftblwk Vtglj cej cluj l ntug <uJt ftbbtk fhJtlwk sYh sKtg <tu yt ykdu
Bgw.frbNlh©ele sYhe bkswhe bu¤JJtle hnuNu.
2. y.Bgw.ftu. îtht Rsluh Ft<t îtht bkdtJJttbtk ytJ<t rmrJj ftbtult xuLzhbtk (1) stu xuLzh mekdj-cez
vræ^r<&e bkdtJuj ntug ylu xuLzhle hfb 50 jtF&e ytuAe ntug <tu xuLzhle Jujezexe vehegz 90 rœJm
yLtu xuLzhle hfb 50 jtF&e J^w ntug <tu xuflefj cez FtuÕgt <theF &e xuLzhle Jujezexe vehegz
rœJm <&t (2) stu xuLzh xw-cez vræ^r<&e bkdtJuj ntug <tu œhuf rfMmtbtk xuflefj cez FtuÕgt <theF &e
xuLzhle Jujezexe vehegz 120 rœJm Au.
3. su ftuLx[t¾xhtu ze, R-1 ylu R-2btk ytJ<tk ntug <uytulu Yt.1.00 fhtuz mw^elt ftbtu btxu ltKtk Ft<tlt
mh¾gwjh lkch 43, <theF 17/10/2012 btk mwaÔgt bwscltu ybj fhJtltu hnuNu.
CONTRACTOR'SSIGNATURE ADDL.CITYENGINEER
& STAMP (South Zone)
FORM OF BANK GUARANTEE
(hereinafter called the Tenderer) is desirous and preferred to tender for works in accordance with the
terms and conditions of tender for the work of
1 .Therefore. We hereby affirm that -we are guarantors on behalf of the Tenderer up to
(in figures) and we undertake to pay to Municipal Commissioner, Ahmedabad Municipal Corporation,
A'bad specified up to his first written demand, without demur without delay and without the necessity of a
previous of judicial or administrative procedures and without the necessity to prove to the Bank the
defects or short comings or debits of the contractor any sum within the limit of
2. We further agree that the Guarantee herein contemned shall remain in full force and effect during the
period that would be taken for the acceptance of tender.
However unless a demand of claim under this guarantee is made on its in writing on or before the (Date
to be specified will not he less than 180 days from the stipulated date of receiving the tender) we shall be
discharge form all liabilities under the guarantee thereafter.
3. We undertake not to revoke the guarantee during it currency except with the previous consent of the
Municipal Commissioner, Ahmedabad Municipal Corporation, A'bad in writing.
4. We lastly undertake not to revoke the guarantee for any charge in constitution of the Tenderer or of
Signature & Seal of Guarantor...........................
5. The contractors shall have to furnish income tax clearance certificate before his tender is accepted
and intimate assessment number and ward under which he is assessed.
6. Copies of certificate as regards previous experience, if any, must accompany the tender.
Signature of Contractor Add.C.E (S.Z) Dy. Municipal Commissioner (S.Z)
Date Ahmedabad Municipal Corporation
TECHNICAL SPECIFACATION :
Transporting from AMC store and laying spigot and socket New DI pipe line DI-k-9 pipes of various
classes with CI/DI/MS specials of following diameters. Rate includes excavation up to minimum
1.0 mt. depth from top of pipe / as per requirement in any soil, refilling after laying pipe, covering
and temptation of carting surplus earth up to 30 mt. lead and watering and compaction. Clearing
the site. All Joints shall be made tight & leak free etc. comp.
Mode of measurement shall be on Rmt. basis
Removing & relaying of existing CI/DI pipe line & Specials, Cleaning of pipe & Specials from
Inside, including excavation, refilling etc. comp. in line & level with any type of joints as per
instruction of engg. in charge.
Mode of measurement shall be on Rmt. basis
Labour charges for installing and jointing Sluice Valves including loading, transporting from
owner's store, lowering in location to the required with excavation refilling alignment by crane/
tripod and chain block including cost of total nos. of nuts, bolts, Necessary gaskets and excluding
fixing of tail pieces with lead & jute etc complete as directed by Engg. in charge.
Mode of measurement shall be on Nos. basis
Cutting of existing pipelines of following diameters including carting of nece. specials from AMC
store to site and from site to AMC store (recovered materials) nace. labours for excavation, jodan
& backfilling fitter, supervisor, etc. complete. Rate also includes electric cutter, dewatering pump
fuel and transportation of machineries, chain pulley block if requires working at an instructed
specific time of day or night etc. complete
Mode of measurement shall be on Nos. basis
Labour Charges for repairing the joint leakage in the existing C.I./DI Pipe line with specials incl.
required materials such as jute and lead etc , nece. excavation in any type of soil, refilling,
nacessary trust block etc.comp. as per instruction of engg.in charge.(Joint reparied under this
item should not be paid in next four months under normal condition)
Mode of measurement shall be on Nos. basis
Excavation for trail pit of maximum diamension of 1.5 mt x0.75 x 1.5 mt depth for location of
existing line including excavation but excluding cost asphalt cutting but including refilling,
watering etc. comp as per instruction of Engg in charge.
Mode of measurement shall be on Nos. basis
Making hole on existing CI/DI/MS water pipe line including nacessary GI fittings item also includes
necessary excavation, dewatering and refilling as per instruction engg. In charge etc.comp.
15 mm Dia, 20 mm Dia, 25 mm Dia, 2.0" DIA (on CI/DI UP TO 300 MM DIA), 50 mm Dia
Mode of measurement shall be on Nos. basis
Labour Work for temp Jodan of ex.line for running water supply incl making collar between gap of
pipe & jointing with jute & day after removing all this as per inst etc.comp as dire.
Mode of measurement shall be on Nos. basis
Labour charges for doing washout of water pipe line at end including necessary excavation
refilling the pit. Allowing the water to flow for 15 minutes twice or thrice as per site condition
during supply hour, dewatering the pit and plugging with existing wooden butch. etc. comp. as
per instruction
Mode of measurement shall be on Nos. basis
Conveyance charge of earth ,lime,murrum, building rubbish,manual garbage,sludge,excavated
rock ,fly ash, aggregate of any kind etc. comp.up to 5.0 Km. lead
Mode of measurement shall be on Nos. basis
Extra rate over item of excavation of earth for excavation of asphalt pavement of thickness up to
0.20 meter including demolishing the asphalt carpet,metal,soiling etc.comp. with stacking the
material as directed.
Mode of measurement shall be on Smt. basis
Supplying Pneumatic Breaker Machine for RCC Slab or Asphalt Demolishing Work on site by using
Operator, fuel, power Supply etc. Complete as Directed. (No payment should be allowed for non
working condition of machinery and for pipe line excavation and M.H. work.Allowed only for
break down work) ( Based on Previously approved rate by C E sir )Supplying Pneumatic Breaker
Machine for RCC Slab or Asphalt Demolishing Work on site by using Operator, fuel, power Supply
etc. Complete as Directed. (No payment should be allowed for non working condition of
machinery and for pipe line excavation and M.H. work. Allowed only for break down work.
Mode of measurement shall be on Hour basis
Providing & Supplying JCB Machine on rental basis in case of emergency situation and break
down type work & also during unavoidable condition as per instruction of engg.incharge , rate
includes all nece. shifting, fuel and operating charges and stacking of useful & non-useful
materials separately up to store. (No payment should be allowed for non working condition of
machinery and for pipe line excavation and laying work)
Mode of measurement shall be on Hour basis
Providing and operation dewatering Pump including fuel charges & operator Charges etc. as
directed etc. comp. (Shift for Eight Hour) (For Each Pump Set, No payment should be allowed for
non working condition of machinery)
Mode of measurement shall be on Hour basis
Supplying, labour for excavation of all types of soil at any depth including excavation of asphalt
pavement of any thickness, demolition of brick work in CM of any proportion including stacking of
serviceable materials and disposal of unserviceable material etc. comp. as directed.
Mode of measurement shall be on Nos. basis
Labours charges for collecting specials from Municipals store loading , transportation, unloading
to the site, laying and fixing CI specials inclusive of all jointing materials like lead, spun etc.and
labour, exacavation re-filling and nece. Dewatering as per instrucation of engg. Incharge.
Mode of measurement shall be on Kg. basis
Reinstatement of Asphalt road using the same material.
Mode of measurement shall be on Smt. basis
Supplying wooden taper bunches from jungle wood (Like limda, ambo)Etc.comp.
Mode of measurement shall be on Nos. basis
Supplying and Spreading good quality coarse sand free from Impurities including Transporation to
Site and labour cost for Spreading etc. Comp. as directed.( Approved AMC rate)
Mode of measurement shall be on Cmt. basis
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (South Zone)
Ahmedabad Municipal Corporation
Engineering Department
œrûtK Ítul Emlvwh Jtuzobtk Dtuztmh rJM<thbtk ytJuj Mb]r<bkœeh xtkfe,Dtuztmh xtkfe,htsuµhe xtkfelt fbtLz
yuhegtbtk jefs hevuhekd fhJt ,vtuÕgwNl œwh fhJt <&t yLg søgtyu sYhegt< bwsc juch ftb fhJtlt ftb
Sr Item Description Rate Per Amount
Transporting from AMC store and laying spigot and socket
New DI pipe line DI-k-9 pipes of various classes with
CI/DI/MS specials of following diameters. Rate includes
excavation up to minimum 1.0 mt. depth from top of pipe / as
per requirement in any soil, refilling after laying pipe, covering
and temptation of carting surplus earth up to 30 mt. lead and
watering and compaction. Clearing the site. All Joints shall be
made tight & leak free etc. comp.
A 100.00 (A) 100 mm dia 64.29 Rmt
B 10.00 (B) 150 mm dia. 77.68 Rmt
C 10.00 (C) 200 mm dia. 93.75 Rmt
Removing & relaying of existing CI/DI pipe line & Specials,
Cleaning of pipe & Specials from Inside, including excavation,
refilling etc. comp. in line & level with any type of joints as per -
instruction of engg. in charge.
10.00 (A) 80 mm dia 63.39 Rmt
10.00 (B) 100 mm dia 64.29 Rmt
Labour charges for installing and jointing Sluice Valves
including loading, transporting from owner's store, lowering in
location to the required with excavation refilling alignment by
3 crane/ tripod and chain block including cost of total nos. of
nuts, bolts, Necessary gaskets and excluding fixing of tail
pieces with lead & jute etc complete as directed by Engg. in
Cutting of existing pipelines of following diameters including
carting of nece. specials from AMC store to site and from site
to AMC store (recovered materials) nace. labours for
4 excavation, jodan & backfilling fitter, supervisor, etc.
complete. Rate also includes electric cutter, dewatering pump -
fuel and transportation of machineries, chain pulley block if
requires working at an instructed specific time of day or night
(C) 150 mm dia.
(D) 200 mm dia.
(E) 250 mm dia.
(F) 300 mm dia.
(G) 400 mm dia.
Labour Charges for repairing the joint leakage in the existing
C.I./DI Pipe line with specials incl. required materials such as
jute and lead etc , nece. excavation in any type of soil,
refilling, nacessary trust block etc.comp. as per instruction of -
engg.in charge.(Joint reparied under this item should not be
paid in next four months under normal condition)
80 Mm dia. to 100 MM dia. 379.46 joint
150 Mm dia. to 250 MM dia. 446.43 joint
300 mm to 450 mm dia line 803.57 No.
Excavation for trail pit of maximum diamension of 1.5 mt
x0.75 x 1.5 mt depth for location of existing line including
6 16.00 excavation but excluding cost asphalt cutting but including 223.21 No
refilling, watering etc. comp as per instruction of Engg in
Making hole on existing CI/DI/MS water pipe line including
7 nacessary GI fittings item also includes necessary excavation,
dewatering and refilling as per instruction engg. In charge
C 5.00 25 mm Dia 535.71 No
D 5.00 2.0" DIA (on CI/DI UP TO 300 MM DIA) 2678.57 No
E 3.00 50 mm Dia (Above CI/DI UP TO 300 MM DIA) 4017.86 No
Labour Work for temp Jodan of ex.line for running water
8 3.00 supply incl making collar between gap of pipe & jointing with 267.86 NOs
jute & day after removing all this as per inst etc.comp as dire.
Labour charges for doing washout of water pipe line at end
including necessary excavation refilling the pit. Allowing the
9 50.00 water to flow for 15 minutes twice or thrice as per site 669.64 No
condition during supply hour, dewatering the pit and plugging
with existing wooden butch. etc. comp. as per instruction
Conveyance charge of earth ,lime,murrum, building
rubbish,manual garbage,sludge,excavated rock ,fly ash,
aggregate of any kind etc. comp.up to 5.0 Km. lead (Based on
Building SOR 2015-16, P-589 - Item code- 3.2.1)
Extra rate over item of excavation of earth for excavation of
11 asphalt pavement of thickness up to 0.20 meter including
demolishing the asphalt carpet,metal,soiling etc.comp. with -
stacking the material as directed.
A 10.00 a) up to 0.20 meter thickness (By Manual) 71.43 Smt
b)Up to 0.30 meter (By Breaker Machine including cost of
operator, fuel, & transportation etc complete.
Supplying Pneumatic Breaker Machine for RCC Slab or
Asphalt Demolishing Work on site by using Operator, fuel,
power Supply etc. Complete as Directed. (No payment should
be allowed for non working condition of machinery and for
pipe line excavation and M.H. work.Allowed only for break
down work) ( Based on Previously approved rate by C E sir
)Supplying Pneumatic Breaker Machine for RCC Slab or
Asphalt Demolishing Work on site by using Operator, fuel,
power Supply etc. Complete as Directed. (No payment should
be allowed for non working condition of machinery and for
pipe line excavation and M.H. work. Allowed only for break
down work) ( Based on Previously approved rate by C E sir )
Providing & Supplying JCB Machine on rental basis in case of
emergency situation and break down type work & also during
unavoidable condition as per instruction of engg.incharge , rate
includes all nece. shifting, fuel and operating charges and
stacking of useful & non-useful materials separately up to
store. (No payment should be allowed for non working
condition of machinery and for pipe line excavation and laying
work) ( Based on Previously approved rate by C E sir )
Providing and operation dewatering Pump including fuel
charges & operator Charges etc. as directed etc. comp. (Shift
14 40.00 for Eight Hour) (For Each Pump Set, No payment should be 535.71 Hr
allowed for non working condition of machinery ) ( Based on
Previously approved rate by C E sir )
Supplying, labour for excavation of all types of soil at any
depth including excavation of asphalt pavement of any
15 thickness, demolition of brick work in CM of any proportion
including stacking of serviceable materials and disposal of
unserviceable material etc. comp. as directed.
Mazdoor at day /night (As per min.wages circular of GOG)
Fitter at day / Night (As per min.wages circular of GOG)
Makadam/ supervision/Fitter at day / Night
Labours charges for collecting specials from Municipals store
loading , transportation, unloading to the site, laying and fixing CI
16 500.00 specials inclusive of all jointing materials like lead, spun etc.and 21.43 Kg
labour, exacavation re-filling and nece. dewatering as per
instrucation of engg. incharge.
Reinstatement of Asphalt road using the same material. (Drainage
SOR 2009-10, Miscellaneous Work Item No. 426, Page No. 13)
Supplying wooden taper bunches from jungle wood (Like limda,
ambo)Etc.comp. -
5 (A)15 Mm dia. to 20 MM dia. 13.39 No
5.00 (B) 25 Mm dia. to 37 MM dia. 17.86 No
5.00 (D) 80 mm dia to 100 mm dia line 312.50 No
Supplying and Spreading good quality coarse sand free from
19 60.00 Impurities including Transporation to Site and labour cost for 312.50 Cmt
Spreading etc. Comp. as directed.( Approved AMC rate)
Contractor’s Quoted Rate: -
Net Quoted Tender Amount Rs.
Seal and Signature of the Bidder Addl. City Engineer
Date: (South Zone)
Ahmedabad Municipal Corporation
PRICE BID / TENDER FORM
ESTIMATED COST PUT
SR.NO. NAME OF WORK
1 œrûtK Ítul Emlvwh Jtuzobtk Dtuztmh rJM<thbtk ytJuj Mb]r<bkœeh
xtkfe,Dtuztmh xtkfe,htsuµhe xtkfelt fbtLz yuhegtbtk jefs
hevuhekd fhJt ,vtuÕgwNl œwh fhJt <&t yLg søgtyu sYhegt<
bwsc juch ftb fhJtlt ftb ctc<.
I/We am/are willing to carry out work at __________% above / below (should be written in
figures and words) the estimated cost mentioned above. The amount of my/our tender
works out as under
Estimated cost put to tender : Rs 7,84,293.28 Estimated cost put to tender: Rs
Add_____% above : Rs ___________ 7,84,293.28 Deduct _____% below : Rs
Signature of contractor with seal Additional City Engineer ( S.Z )
Date Ahmedabad Municipal Corporation
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
technical bid 121.pdf
price bid 121.pdf
Download all tender documents and submit your bid