Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10.1 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹14.0 L+₹3.9 L (38.1%)Rejected-Finance ESD NO II UHL STAGE III BVPCL CHULLAH | LANGNA | MANDYA | KARNATAKA | 571401 | 2 | Rejected-Finance L2 | |
| 3 | 3₹14.1 L+₹4.0 L (39.3%)Rejected-Finance | 3 | Rejected-Finance L3 | |
| 4 | 4₹16.9 L+₹6.8 L (66.7%)Rejected-Finance R O VILLAGE KHERI CHANGAN PO KANGTA FELOG TEHSIL DADAHU ST DISTT SIRMOUR HP | 4 | Rejected-Finance L4 | |
| 5 | 5₹19.3 L+₹9.2 L (90.5%)Rejected-Finance VILLAGE P O BURWA TEHSIL MANALI DISTT KULLU HP | 5 | Rejected-Finance L5 |
Tender Value
₹21.2 L
EMD Value
₹39,500
Closing Date
24 Oct 2020, 10:00 amClosed
Executive Engineer
Executive Engineer HPPWD Division Nahan
5/7 meter wide Formation Cutting in km 0/0 to 1/330
2020_PWD_41711_2
NAHAN 8037-70
Open Tender
Civil Works - Roads
Item Rate
90 days
Nahan
As per Bidding Document
8 documents required · 8 mandatory
₹500
EE Nahan
₹39,500
29 Dec 2020
17 Oct 2020
24 Oct 2020
17 Oct 2020
24 Oct 2020
17 Oct 2020
Amount
Excavation in earth work in hilly area all heights and depths, in all kind of soil including saturated soil comprising of mixed soil, ordinary rock and hard rock. All work of rock cuttings by blasting shall be carried out by taking all necessary precautions against soil erosion, damage to hill side, water pollution etc. and to protect stability of hill side. Rock shall be excavated with chiselling and wedging out rock . All earth work in cutting excavation, including rock excavation shall be carried out true to lines, grades. Side slopes, width, camber, super elevations and level as shown on the drawings or as directed by the Engineer-in-Charge, in conformity with the requirement of technical specification of Rural Roads August , 2004(Two thousand four), and clause 1603.1 to achieve designed width including hauling and stacking of materials useful for construction at suitable sites and safe disposal of unsuitable cut materials In specified manner, trimming, filling of unevenness , blind age and finishing of the road to specified dimensions or as directed by the Engineer –in-Charge for smooth riding. The recovery of the useful stones will be made for 658.68 (Six hundred fifty eight point Six eight) cubic metre in all cases, failing which recovery @ Rs. 170/- (One hundred seventy only) per cubic metre shall be effected. Any loss to the public and private property during the course of excavation/cutting shall be the absolute responsibility of the contractor, which shall have to be duly compensated by him in all cases including haulage of material with in all leads, lifts and carriage of materials and as directed by the Engineer In-charge.
ANIL KUMAR
KESHWA NAND
Kirpal Singh
Pratap Singh
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .