Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAccepted-AOC | L1 | Accepted-AOC You are placed in L1 | |
| 2 | Rejected-Technical INS VALSURA JAMNAGAR | JAMNAGAR | GUJARAT | 360520 | - | Rejected-Technical Rate quoted is high hence rejected | |
| 3 | Rejected-Technical | - | Rejected-Technical Rate quoted is high hence rejected | |
| 4 | Rejected-Technical 101 VRAJ APARTMENT OPP POLICE HEAD QUARTERS SARU SECTION ROAD JAMNAGAR 381008 | JAMNAGAR | 381008 | - | Rejected-Technical Rate quoted is high hence rejected | |
| 5 | Rejected-Technical SHREE NIVAS LIMDA LANE JAMNAGAR GUJARAT PIN 361001 | JAMNAGAR | GUJARAT | 361001 | - | Rejected-Technical Rate quoted is high hence rejected |
Tender Value
Refer Docs
Closing Date
10 Jun 2020, 9:00 amClosed
Maj V E Pawar, GE
Garrison Engineer (Air Force ) Jamnagar No2, Air Force Station-2, PIN-361004
OUTSOURCING OF RESOURES FOR MANAGEMENT AND OPERATION OF WWR PUMP HOUSE, VIJAY WELL PUM HOUSE, 12END PUMP HOUSE AND 06 END PUMP HOUSE AT AIR FORCE STATION JAMNAGAR UNDER GE(AF) JAMNAGAR NO2
2020_MES_349489_1
3010/10/E3
Limited
Job Works
Works
30 days
GE(AF) Jamnagar No.2
Please refer Tender documents.
1 document required · 1 mandatory
₹0
Exempted
4 Sept 2020
3 Jun 2020
11 Jun 2020
3 Jun 2020
10 Jun 2020
3 Jun 2020
OUTSOURCING OF RESOURES FOR MANAGEMENT AND OPERATION OF WWR PUMP HOUSE, VIJAY WELL PUM HOUSE, 12END PUMP HOUSE AND 06 END PUMP HOUSE AT AIR FORCE STATION JAMNAGAR UNDER GE(AF) JAMNAGAR NO2 1. Outsourcing for manning and operation of water supply installation located at 12 End Open Well and 06 End Open Well Tehcnical area at air force station Jamnagar for continous operation (as per schedule) of various assests souch as Pumps, Motors, Chemical dozing plant, dual media filter by back washing on daily basis and water supply headers to provide water supply to various users inside technical area by providing one fitter general mechanic (FGM), with minimum 2 years of hands on experience for operation of pumping and distribution system, for shift of 8 hours with 2 shifts per day (including sunday and National holiday) shift timing 0600 hrs to 1400 hrs and 1400 hrs to 2200 hrs. The contractor will be responsible for routine/preventive maintenance of equipments as mentioned above, ceaning of surrounding area of the installation and the building, valve pits, earth pits, minor repair for leakage like providing gland packing, replacement of flange gasket and maintenance of control panel pumping set/LT panel and tightening of loose connnections in panels etc. The contractor and his operator must adhered to all instructions as conveyed by JE/AGE from time to time. Nothing extra has been admissible for routine /preventive maintenance. Non compliance of instructions may leads to recovery as deemed fit as the discreation of GE(AF) No2. (Period : 15 Jun 2020 to 15 Aug 2020 = 62 days) (2 shift per day x 62 days = 124 shifts) - 124 shifts. 2. Outsourcing for manning and operation of Fire Fighting system located at WWR FIRE FIGHTING PUMP HOUSE and Vijay Well Pump House Tehcnical Area at air force station Jamnagar for operation (as per schedule) of various assests souch as centrifugal Pumps,jockey Pump, diesel engine driven pump including control valves (Hydrant and Sluice valve) by providing one fitter general mechanic (FGM), with minimum 2 years of hands on experience for operation of fire hydrants, pumping and distribution system, for shift of 8 hours with 3 shifts per day (including sunday and National holiday) shift timing 0600 hrs to 1400 hrs , 1400 hrs to 2200 hrs and 2200 hrs to 0600 hrs. The contractor will be responsible for routine/preventive maintenance of equipments as mentioned above, cleaning of surrounding area of the installation and the building, valve pits, earth pits, minor repair for leakage like providing gland packing, replacement of flange gasket and maintenance of control panel pumping set/LT panel and tightening of loose connnections in panels etc. The contractor and his operator must adhered to all instructions as conveyed by JE/AGE from time to time. Nothing extra has been admissible for routine /preventive maintenance. Non compliance of instructions may leads to recovery as deemed fit as the discreation of GE(AF) No2. (Period : 15 Jun 2020 to 15 Aug 2020 = 62 days) (3 shift per day x 62 days = 186 shifts) - 186 shifts.
M/s SK Traders
Shree Khatuwala Trading Company
jagdish machinery stores
Krishna Bhoomi Enterprise
M/s super construction
Magnus Enterprise
Nirmal Construction
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_390384.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .