Loading…
Loading…
Tender Value
₹32.6 L
EMD Value
₹33,000
Closing Date
27 Jan 2026, 6:00 pmClosed
SOCIAL FORESTRY DIVISION - BOTAD
CONSTRUCTION OF A KITCHEN, SHRUNGAR KAKSH, UJANI GHAR AT PANCHAVATI KENDRA, VILLAGE: BUDHEL, TA.DIST.BHAVNAGAR IN SOCIAL FORESTRY RANGE BHAVNAGAR, SOCIAL FORESTRY DIVISION , BOTAD
263844
14/2026
Open
Civil Works
Works
Botad
₹1,500
Deputy Conservator of Forests Social Forestry Division Botad
₹33,000
10 Jan 2026
10 Jan 2026
10 Jan 2026
27 Jan 2026
10 Jan 2026
NAME OF WORK : Construction of Kitchen, Shrungar Kaksh, Ujani Ghar, and Ladies & Gents Toilet Block at Panchavati Kendra,
Village Budhel, Social Forestry Range, Bhavnagar, Social Forestry Division, Botad
TOTAL AMOUNT PUT TO TENDER
TOTAL AMOUNT PUT TO TENDER
PERCENTAGE RATE TENDER
Sr.No. Schedule Amount
1 Schedule - "B"- 1
2 Schedule - "B"- 2
Total Amount Rs.
Total Amount Rs.
I/We am/are willing to carry out the work @ % Above / Below Percentage (should be writen in figures and
words) of the Estimated rates mentioned above amount of my / our Tender works out as under.
Estimated Amount Estimated Amount
Put to Tender Rs. 3259500/- Put to Tender Rs. 3259500/-
Add % Rs. Deduct %Rs.
Total Rs. Total Rs.
(In Words (In Words
Signature of the Contractor
Deputy Conservator Of Forests
Social Forestry Division
Bhavnagar of Social Forestry Range Division-Botad
Name of Work :- Construction of a Kitchen, Shrungar Kaksh, Ujani Ghar at Panchavati Kendra, Village: Budhel in Social Forestry Range, Bhavnagar of Social Forestry Division , Botad
Quantities Total amount
Quantities Total amount
estimated but according
Item No. Item of work Unit
may be more or In figures In words estimated
less quantities
Excavation for foundation upto 1.5 m depth including sorting out and stacking
Rupees One Hundred Sixty and Eighty
1 79.79 of useful materials and disposing off the excavated stuff upto 50 Meter lead.(B) 160.89 CuM
Nine Paise Only
Dense or Hard soil
Providing and laying cement concrete 1:4:8 (1- Cement : 4- coarse sand : 8 -
Rupees Two Thousand Nine Hundred
2 29.23 Crushed stone aggregates 40 mm nominal size) and curing complete excluding cost 2951.97 CuM
Fifty One and Ninety Seven Paise Only
of formwork in (A) Foundation and Plinth
Brick work using common burnt clay building bricks having crushing strength not
Rupees Five Thousand Two Hundred
3 78.36 less than 35 kg./Sq.Cm. in foundation and plinth in Cement Mortar 1:5. (1- Cement : 5245.48 CuM
Forty Five and Forty Eight Paise Only
5 -fine sand) (C) Fly Ash Bricks
Providing formwork with sheathing steel sheets so as to give a rough finish including
centering shuttering strutting and propping etc. height of propping and centering
below supporting floor to ceiling not exceeding 4 M. and removal of the same for
Rupees Three Hundred Forty Eight and
4 23.83 in situ reinforced concrete and plain concrete work in. (C) Vertical surface such as 348.51 SqM
Fifty One Paise Only
walls (any thickness) partitions and the like including attached buttresses & string
course & the like.
Providing and laying cement concrete 1:2:4 (1- Cement : 2- Coarse sand : 4- graded
Rupees Three Thousand Eight Hundred
5 3.80 stone aggregates 20 mm nominal size) and curing complete excluding cost of 3824.10 CuM
Twenty Four and Ten Paise Only
formwork in (A) Foundation and Plinth
Filling in foundation and plinth with murrum or selected soil in layers of 20cm.
Rupees Three Hundred Four and Sixty
6 59.84 thickness including watering, ramming and consolidating etc. complete. 304.60 CuM
Brick work using common burnt clay building bricks having crushing strength not
less than 35 kg./Sq.Cm. in superstructure above plinth level upto floor two level in Rupees Five Thousand Five Hundred
Cement Mortar 1:5. (1- Cement : 5 -fine sand) (C) Fly Ash Bricks Thirty Three and Ninety Paise Only
Providing and laying cement concrete 1:2:4 (1- Cement : 2- Coarse sand : 4- graded
stone aggregates 20 mm nominal size) for reinforced concrete Chhajjas not
exceeding 10cm. thickness upto floor two level including finishing the exposed Rupees Six Thousand Seven Hundred
surfaces with cement mortar 1:3 (1-cement, 3 Fine sand) to give a smooth and even Twelve and Ten Paise Only
surface centering and formwork and curing complete excluding cost of
Bhavnagar of Social Forestry Range Division-Botad
Name of Work :- Construction of a Kitchen, Shrungar Kaksh, Ujani Ghar at Panchavati Kendra, Village: Budhel in Social Forestry Range, Bhavnagar of Social Forestry Division , Botad
Quantities Total amount
Quantities Total amount
estimated but according
Item No. Item of work Unit
may be more or In figures In words estimated
less quantities
Providing and laying controlled cement concrete M.200 exposed work with curing
etc. complete including the cost of formwork but excluding the cost of Rupees Ten Thousand Seven Hundred
reinforcement for R.C.C. work in(A) BEAMS :(i) Having cross-sectional area 0.05 to Sixty Two and Sixty Five Paise Only
Providing and Laying controlled cement concrete M-200 and finishing smooth with
Rupees Seven Thousand One Hundred
curing etc. complete including the cost of formwork but excluding the cost of
10 15.47 7143.93 Forty Three and Ninety Three Paise CuM
reinforsement for R.C.C work in (iii) Slabs having more than 10 cm and upto 13 cm. Only
Providing TMT Bar FE 500/500D reinforcement for R.C.C. work including bending, Rupees Seventy Seven and Twenty
binding and placing in position complete upto floor two level Nine Paise Only
Brick work using common burnt clay building bricks having crushing strength not
Rupees Five Thousand Five Hundred
12 7.32 less than 35 kg./Sq.Cm. in superstructure above floor two level in Cement Mortar 5533.90 CuM
Thirty Three and Ninety Paise Only
1:5. (1- Cement : 5 -fine sand) (C) Fly Ash Bricks
Providing 10mm thick cement plaster in single coat on concrete ceillingss for
interior plastering upto floor two level and finished even and smooth in (i)Cement Rupees Two Hundred Twenty Seven
mortar 1:3 (1-cement:3-sand) icluding a Floating Coat of Neat Cement Slurry and Sixty One Paise Only
Providing 15mm thick cement plaster in single coat on Rough (Similar)side of single
or half brick walls for interior plastering upto floor two level and finished even and Rupees Two Hundred Twenty Seven
smooth in (ii) Cement mortar 1:4 (1-cement :4-sand) icluding a Floating Coat of and Ninety Seven Paise Only
Neat Cement Slurry
Providing and laying Granite stone slab flooring over 20mm (average)base of
cement mortar 1:6 (1-cement : 6 coarse sand) or L.M. 1:1.5(1- lime putty : 1.5 - Rupees Two Thousand Nine Hundred
coarse sand) laid and jointed with gray cement slurry including rubbing and Sixty and Eighty Three Paise Only
polishing complete. (A) Granite slab 18 mm thick
Providing and fixing 35 mm thick panelled ,glazed or panelled and glazed shutters,
for Doors windows and clearstory windows including anodised alluminium But Rupees Three Thousand Six Hundred
hinges with necessary screws and indian teak wood shutters with. (A) Plywood Fifty Three and Thirty Seven Paise Only
Bhavnagar of Social Forestry Range Division-Botad
Name of Work :- Construction of a Kitchen, Shrungar Kaksh, Ujani Ghar at Panchavati Kendra, Village: Budhel in Social Forestry Range, Bhavnagar of Social Forestry Division , Botad
Quantities Total amount
Quantities Total amount
estimated but according
Item No. Item of work Unit
may be more or In figures In words estimated
less quantities
Providing and fixing extruded aluminum window having extruded aluminum Colour
Powder Coated section frame main outer size 127mm x 38.10mm x 1.35mm (of
Jindal Section no:2443,@ Wt.1.384 Kg/mt),horizontal Four track member size
122.20mm x 31.75mm x 1.10mm (of Jindal Section no:8787,@ Wt.
Kg/mt),vertical member of size 122.20mm x 31.75mm x 1.50mm (of Jindal Section
no:8935,@ Wt. 1.398 Kg/mt) with sliding shutters of horizontal member size 40mm
Rupees Two Thousand One Hundred
17 19.85 x 18mm x 1.29mm (of Jindal Section no:8949 @ wt.of 0.456Kg/mt),vertical member 2140.33 SqM
Forty and Thirty Three Paise Only
of size 40mm x 18mm x 1.29mm (of Jindal Section no:8947 @ wt.of
0.456Kg/mt/Section 8948,@ Wt. 0.457 Kg/mt) with 5 mm thick transparent bronze
colour tinted float glass with powder coated aluminum fittings and fixtures and
transparent silicon sealant glass fixing to frame as per details etc complete for
Providing and fixing M.S. grills of required pattern to wooden frames of windows
etc. with M.S. flats at required spacings and frame alround, square or round bars Rupees One Hundred Eight and
with round headed bolts and nuts or by screws (A) Plain Grill. Seventy Six Paise Only
Providing and laying polished Kota stone slab flooring over 20mm (Average) thick
base of cement mortar 1:6 (1-cement : 6-coarse sand) or L.M. 1.1.5 (1-Lime putty
Rupees One Thousand Nineteen and
19 134.33 :1.5 - coarse sand) laid over and jointed with grey cement slurry mixed with pigment 1019.39 SqM
Thirty Nine Paise Only
to match the shade of slab including rubbing and polishing etc. complete. (A) 25mm
Providing and laying coloured glazed tiles of the size 300 mm x 200 mm x 8 mm /
Rupees One Thousand Five Hundred
300 mm x 450 mm x 8 mm in skirting, risers of steps and dado on 10 mm. thick
20 118.40 1523.67 Twenty Three and Sixty Seven Paise SqM
cement plaster 1:3 (1 cement : 3 coarse sand) & jointed with white cement slurry. Only
20mm thick sand faced cement plaster on walls upto height 10 metres above
ground level consisting of 12mm thick backing coat of C.M. 1:3 (1-cement : 3-sand) Rupees Three Hundred Fifty and Fifty
and 8mm thick finishing coat of C.M. 1:1 (1-cement : 1-sand) etc. complete. Seven Paise Only
Bhavnagar of Social Forestry Range Division-Botad
Name of Work :- Construction of a Kitchen, Shrungar Kaksh, Ujani Ghar at Panchavati Kendra, Village: Budhel in Social Forestry Range, Bhavnagar of Social Forestry Division , Botad
Quantities Total amount
Quantities Total amount
estimated but according
Item No. Item of work Unit
may be more or In figures In words estimated
less quantities
Applying two coats of putty & two coats of primer of approved brand and
manufacture on new wall surface to give an even shade including thoroughly
22 235.03 40.59 Rupees Forty and Fifty Nine Paise Only SqM
brushing the surface free from mortar dropping and other foreign matter and sand
papered smooth.
Ceilling painting (three coats) with plastic emulsion paint of approved brand and
manufacture on undecorated wall surface to give an even shade including throughly Rupees One Hundred Thirty Six and
brushing the surface free from mortar droppings and other foreign matter and sand Twenty Seven Paise Only
papered smooth.
Wall painting (three coats) with plastic emulsion paint of approved brand and
manufacture on undecorated wall surface to give an even shade including throughly Rupees One Hundred Twenty Eight
brushing the surface free from mortar droppings and other foreign matter and sand and Thirty Eight Paise Only
papered smooth.
Finishing wall with weather proof exterior emulsion paint on wall surface (two
coats) to give an required shape even shade after thoroughly brushing the surface Rupees One Hundred Twenty Two and
to remove all dirt, and remains of loose powdered materials.etc complete . Fourteen Paise Only
Painting two coats (excluding priming coat) on new wood and wood based surface
with enamel paint, interior to give an even shade including cleaning the surface of Rupees Ninety Five and Ninety Five
all dirt, dust and other foreign matter sand papering and stopping. Paise Only
Painting one coats (excluding priming coat) on previously painted wood and wood
Rupees Sixty and Eighty Eight Paise
27 19.85 based surface with enamel paint, to give an even shade including cleaning the of 60.88 SqM
all dirt, dust and other foreign matter.
Total Amount Rs.
Total Amount Rs.
Add 18 % for GST Rs.
Total Amount Rs.
Total Amount Rs.
I/We are aready to carry out the above mentioned work @___________above/below the Estimated Rates mentioned above and position of My/Our tender works out as under ::
IF TENDER IS BELOW IF TENDER IS ABOVE
[1] Estimated cost of work Rs. Estimate cost of work Rs.
[2] Deduct % below_________ Rs. Deduct % Above_________ Rs.
Bhavnagar of Social Forestry Range Division-Botad
Name of Work :- Construction of a Kitchen, Shrungar Kaksh, Ujani Ghar at Panchavati Kendra, Village: Budhel in Social Forestry Range, Bhavnagar of Social Forestry Division , Botad
Quantities Total amount
Quantities Total amount
estimated but according
Item No. Item of work Unit
may be more or In figures In words estimated
less quantities
[3] Net amount of Tender Rs. Net amount of Tender Rs.
[4] Rs. In words Rs. Rs. In words Rs.
Signature of contractor
1) All the work shall be carried out as per Public Works Deptt., Hand Book, and other I.S. Specifications and other I.S. Specifications and other specifications of the Division or as directed.
2) All the columns in Schedule should be filled in Ink and Total of the entires in the Last column should be struck by the contractor under his signature.
3) Rates quoted includes clearance of site (prior to commencement of work and at its closer) in all respects and hold good for work under all conditions, site moisture weather etc.
4) The contractor shall exhibit the details of work, tender amount and specifications as per Govt. Circular No. ED/6 /32772/N Dtd. 26.4.78 and as per G.R. No. TNC/9/24/C Dtd. 18.11.91 as directed by the
Engineer-in-charge of the work, on board at site of work which contractor is not entitle for any extra payment.
5) Testing of materials be as per statement attached with the Specifications, the materials shall be testes. Bill for testing shall be paid by the Deptt., and 1% of the (one percent) of amount put to tender after
deducting the cost of materials as per Schedule - A shall be deducted from the running account bills of the works. (As per G.R. (R&B) Deptt., No. TNC/1085/4/C dtd. 20.12.91.
6) The contractor shall quote even "NIL" if no reduction is proposed.
7) One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS". In terms of the Gujarat Government Gazette Extra ordinary dated 12.12.04.
Implementation of building and other construction works. (Requlation of equipments and conditions of service Act-1996)
8) In R.C.C. item where there is a change in grade of mix or change as per actual mix design the difference of cement consumption shall be added/deducted from rate of original item at the rate of star rate
mentioned in this tender.
9) As per Govt. in Finance Department Reso. Dt. 15.09.2018 and No.GST/1017/1087/GST Cell and No. TJR/102017/599/Z, Dt.28.09.2018 GST from the bill above Rs.2.50 lacs shall be deducted at 1% towards
CGST and 1% towards SGST totalling to 2% of Bill Amount as per Close-51 of CGST Act
Signature of contractor
Bhavnagar of Social Forestry Range Division-Botad
Name of Work :-Construction of a Toilet Block for Laddies and Gents at Panchavati Kendra, Village: Budhel in Social Forestry Range , Bhavnagar of Social Forestry Range Division , Botad
Item of work Tendered rates
Quantities Total amount
Quantities Total amount
estimated but according
may be more In figures In words estimated
or less quantities
Excavation for foundation upto 1.5 m depth including sorting out and stacking of useful
materials and disposing off the excavated stuff upto 50 Meter lead.(B) Dense or Hard soil Rupees One Hundred Sixty and Eighty
Nine Paise Only
Excavation for foundation for depth from 1.5 m to 3.0 m including sorting out and stacking
Rupees Two Hundred Ninety Four and
2 4.20 of useful materials and disposing off the excavated stuff upto 50 Meter lead.(C) Hard 294.05 CuM
Five Paise Only
Providing and laying cement concrete 1:4:8 (1- Cement : 4- coarse sand : 8 - Crushed stone
aggregates 40 mm nominal size) and curing complete excluding cost of formwork in (A) Rupees Two Thousand Nine Hundred
Foundation and Plinth Fifty Two and Twenty Three Paise Only
Brick work using common burnt clay building bricks having crushing strength not less than
kg./Sq.Cm. in foundation and plinth in Cement Mortar 1:5. (1- Cement : 5 -fine sand) (C) Fly Ash Rupees Five Thousand Two Hundred
Bricks Forty Five and Forty Eight Paise Only
Providing formwork with sheathing steel sheets so as to give a rough finish including centering
shuttering strutting and propping etc. height of propping and centering below supporting floor
to ceiling not exceeding 4 M. and removal of the same for in situ reinforced concrete and plain Rupees Two Hundred Eighty Six and
5 11.31 concrete work in. (C) Vertical surface such as walls (any thickness) partitions and the like 286.94 SqM
Ninety Four Paise Only
including attached buttresses & string course & the like.
Providing and laying cement concrete 1:2:4 (1- Cement : 2- Coarse sand : 4- graded stone Rupees Three Thousand Eight
6 1.37 aggregates 20 mm nominal size) and curing complete excluding cost of formwork in (A) 3824.10 Hundred Twenty Four and Ten Paise CuM
Foundation and Plinth Only
Filling available excavated earth (excluding rock) in trenches. plinth, sides of foundations etc. in
Rupees One Hundred Thirty Seven and
7 7.75 layers not exceeding 20 cm. in depth consolidating each disposited layer by ramming and 137.47 CuM
Forty Seven Paise Only
Brick work using common burnt clay building bricks having crushing strength not less than
Rupees Four Thousand Nine Hundred
8 16.19 kg./Sq.Cm. in superstructure above plinth level upto floor two level in Cement Mortar 1:5. (1- 4957.05 CuM
Fifty Seven and Five Paise Only
Cement : 5 -fine sand) (C) Fly Ash Bricks
(i) Half brick masonry in common brunt clay building bricks having crushing strength not less
Rupees Seven Hundred Twenty Five
9 3.68 than 35 Kg/Sq.Cm. in Cement mortar 1:4 (1- Cement : 4 -coarse sand ) in foundation and plinth 725.55 SqM
and Fifty Five Paise Only
© Fly Ash Bricks
Providing and laying ordinary cement concrete 1:2:4 (1- Cement 2- coarse sand : 4- graded stone
Rupees Eight Thousand Seven
aggregates 20 mm nominal size) for R.C.C lintel including finishing smooth with,curing etc.
10 1.25 8720.97 Hundred Twenty and Ninety Seven CuM
complete including the cost of formwork but excluding the cost of reinforcement.
Providing and laying controlled cement concrete M.200 exposed work with curing etc. complete
Rupees Ten Thousand Seven Hundred
11 0.21 including the cost of formwork but excluding the cost of reinforcement for R.C.C. work in(A) 10762.65 CuM
Sixty Two and Sixty Five Paise Only
BEAMS :(i) Having cross-sectional area 0.05 to 0.08 Sq.M
Bhavnagar of Social Forestry Range Division-Botad
Name of Work :-Construction of a Toilet Block for Laddies and Gents at Panchavati Kendra, Village: Budhel in Social Forestry Range , Bhavnagar of Social Forestry Range Division , Botad
Item of work Tendered rates
Quantities Total amount
Quantities Total amount
estimated but according
may be more In figures In words estimated
or less quantities
Providing and Laying controlled cement concrete M-200 and finishing smooth with curing etc.
Rupees Seven Thousand Nine
complete including the cost of formwork but excluding the cost of reinforsement for R.C.C work
12 5.42 Hundred Fifty Six and Fifty Three Paise CuM
in (iii) Slabs having more than 10 cm and upto 13 cm. thickness
Providing TMT Bar FE 500/500D reinforcement for R.C.C. work including bending, binding and 77.29 Rupees Seventy Seven and Twenty
placing in position complete upto floor two level Nine Paise Only
Labour Charges for Edge Finished for Granite Rupees Forty Three and Forty Three
Providing and laying Granite stone slab flooring over 20mm (average)base of cement mortar 1:6
(1-cement : 6 coarse sand) or L.M. 1:1.5(1- lime putty : 1.5 - coarse sand) laid and jointed with Rupees Two Thousand Nine Hundred
gray cement slurry including rubbing and polishing complete. (A) Granite slab 18 mm thick Sixty One and Thirty Two Paise Only
Providing and fixing standared extruded of alluminium section of size 63mm x 38.10mm x
1.2mm (Jindal Section :2434, @ Wt. 0.643 Kg/mt) with colour anodized alluminium frame for Rupees One Thousand One Hundred
ventilation with 5 mm thick frosted glass as details etc complete for Ventilation Seventy Five and Fifty Six Paise Only
Providing and fixing Precast RCC members of size 250 mm x 25 mm for Sills of Doors and
17 11.90 404.00 Rupees Four Hundred Four Only Rmt
Windows including Loading Transportation , Unloading etc. complete
Providing 10mm thick cement plaster in single coat on concrete ceillingss for interior plastering
Rupees Two Hundred Twenty Seven
18 27.83 upto floor two level and finished even and smooth in (i)Cement mortar 1:3 (1-cement:3-sand) 227.61 SqM
and Sixty One Paise Only
icluding a Floating Coat of Neat Cement Slurry
Providing 15mm thick cement plaster in single coat on Rough (Similar)side of single or half brick
Rupees One Hundred Seventy Six and
19 132.85 walls for interior plastering upto floor two level and finished even and smooth in (ii) Cement 176.14 SqM
Fourteen Paise Only
mortar 1:4 (1-cement :4-sand)
Providing and laying coloured glazed tiles of the size 300 mm x 200 mm x 8 mm / 300 mm x 450 Rupees One Thousand Five Hundred
20 156.92 mm x 8 mm in skirting, risers of steps and dado on 10 mm. thick cement plaster 1:3 (1 cement : 1523.67 Twenty Three and Sixty Seven Paise SqM
3 coarse sand) & jointed with white cement slurry. Only
20mm thick sand faced cement plaster on walls upto height 10 metres above ground level
Rupees Three Hundred Fifty and Fifty
21 100.67 consisting of 12mm thick backing coat of C.M. 1:3 (1-cement : 3-sand) and 8mm thick finishing 350.57 SqM
Seven Paise Only
coat of C.M. 1:1 (1-cement : 1-sand) etc. complete.
Providing and laying cement concrete flooring 1:2:4 (1-cement : 2-coarse sand : 4-graded stone
Rupees Three Hundred Forty Seven
22 22.41 aggregate 20mm nominal size) laid in one layer and finished with a floating coat of neat 347.15 SqM
and Fifteen Paise Only
cement. (B) 50mm thick.
Providing cement vata (10cm. x 10 cm. size) quarter round in cement mortar 1:1 including neat Rupees Twenty Four and Twenty Eight
cement finishing, watering etc. complete. Paise Only
Wall (Ceilling ) painting (three coats) with plastic emulsion paint of approved brand and
manufacture on undecorated wall surface to give an even shade including throughly brushing Rupees One Hundred Thirty Six and
the surface free from mortar droppings and other foreign matter and sand papered smooth. Twenty Seven Paise Only
Providing and laying polished Kota stone slab flooring over 20mm (Average) thick base of
Rupees One Thousand One Hundred
25 4.32 cement mortar 1:6 (1-cement : 6-coarse sand) or L.M. 1.1.5 laid over and jointed with grey 1116.68 SqM
Sixteen and Sixty Eight Paise Only
cement slurry including rubbing and polishing etc. complete. (B) 30 mm thick
Bhavnagar of Social Forestry Range Division-Botad
Name of Work :-Construction of a Toilet Block for Laddies and Gents at Panchavati Kendra, Village: Budhel in Social Forestry Range , Bhavnagar of Social Forestry Range Division , Botad
Item of work Tendered rates
Quantities Total amount
Quantities Total amount
estimated but according
may be more In figures In words estimated
or less quantities
Providing and laying polished kota stone slab 25mm thick in risers of steps,skirting Dedo and
pillars laid on 10mm thick cement mortar 1:3 (1-Cement : 3 coarse sand) and jointed with gray Rupees One Thousand One Hundred
cement slury mixed with pigment to match the shade of slab including rubbing and polishing etc. Thirty Five and Forty Eight Paise Only
Finishing wall with weather proof exterior emulsion paint on wall surface (two coats) to give an
Rupees One Hundred Twenty Two and
27 100.67 required shape even shade after thoroughly brushing the surface to remove all dirt, and remains 122.14 SqM
Fourteen Paise Only
of loose powdered materials.etc complete .
Providing laying and jointing in true line and level 40mm dia. U.P.V.C. Pipe ( SCH- 40) for cold
water including fittings make PRINCE / SUPREME / ASTRAL / FINOLEX or equivalent as approved
by Engineer In Charge. Pipe shall be fixed on the wall with the help of clamp at every two metre Rupees One Hundred Forty Eight and
C/C or shall be concelled as directed including necessary fittings etc. including testing of pipe Twelve Paise Only
and joints and fixing the same with adhesive solvent, including cost of all materials.
Providing laying and jointing in true line and level 15mm dia. U.P.V.C. Pipe ( SCH- 40) for cold
water including fittings make PRINCE / SUPREME / ASTRAL / FINOLEX or equivalent as approved
by Engineer In Charge. Pipe shall be fixed on the wall with the help of clamp at every two metre Rupees Seventy Two and Sixty Five
C/C or shall be concelled as directed including necessary fittings etc. including testing of pipe Paise Only
and joints and fixing the same with adhesive solvent, including cost of all materials.
Providing laying and jointing in true line and level 25mm dia. U.P.V.C. Pipe ( SCH- 40) for cold
water including fittings make PRINCE / SUPREME / ASTRAL / FINOLEX or equivalent as approved
by Engineer In Charge. Pipe shall be fixed on the wall with the help of clamp at every two metre Rupees Ninety One and Eighty Four
C/C or shall be concelled as directed including necessary fittings etc. including testing of pipe Paise Only
and joints and fixing the same with adhesive solvent, including cost of all materials.
Providing and fixing Gun metal check or non-return fullway wheel valve.(E) 40mm dia. Rupees Six Hundred Sixty Three and
Forty Three Paise Only
Providing and fixing wsh down water closet (European type, W.C. Pan) with integral P or S trap
including jointing the trap with soil pipe in Cement Mortar 1:1 (1-Cement : 1-fine sand) (Seal and Rupees One Thousand Three Hundred
cover to be measured and paid for separately)(A) vitreous China Pattern :(i) in white colour Fifty Six and Eighty One Paise Only
Providing and fixing plastic seat and cover for wash down water closer with C.P. brass hinges and Rupees Two Hundred Ninety One and
rubber buffers. (B) Black plastic seal and cover. Thirty Three Paise Only
Providing and fixing chromium plated brass half trun flush cock of approved quality including Rupees Two Hundred Sixty Three and
fixing in pipe line etc. complete.(ii) 25mm dia. Seventy Seven Paise Only
Providing and fixing Urinal or approved quality including conecting the Urinal with waste pipe
Rupees One Thousand Seventy Four
35 2 tap etc. complete.(A) White earthenware flat back or corner type size 430mm x 260mm x 1074.86 SqM
and Eighty Six Paise Only
Providing and fixing washbasin with single hole for pillar tap with C.I. or M.S. brackets painted
white including sutting holes and making good the same but excluding fittings.(A) Vitreous Rupees One Thousand Five Hundred
China:(ii) Flat Back washbasin 550 mm x v 400mm size. (i) In white colour. Twenty and Twenty Four Paise Only
Bhavnagar of Social Forestry Range Division-Botad
Name of Work :-Construction of a Toilet Block for Laddies and Gents at Panchavati Kendra, Village: Budhel in Social Forestry Range , Bhavnagar of Social Forestry Range Division , Botad
Item of work Tendered rates
Quantities Total amount
Quantities Total amount
estimated but according
may be more In figures In words estimated
or less quantities
Providing and fixing C.P. brass waste for washbasin or sink. (A) 32mmdia. Rupees Sixty Seven and Ninety One
Providing and fixing M.I. fisher union for washbasin or sink. (A) 32mm dia. Rupees Seventy Eight and Seventy
Five Paise Only
Providing and fixing pillar tap, capstan head, screw down high pressure with screws, shanks and Rupees Three Hundred Eight and
back nuts. (i) 15mm dia. Seventy Three Paise Only
Providing and fixing screw down bib taps of following size.(B) Brass chromium plated screws
Rupees One Hundred Eighty Six and
40 6 down Bib Tap. (i) 15mm dia. 186.83 SqM
Eighty Three Paise Only
Providing and fixing PVC SWR Nahni trap IS 14735 for drain - 100 mm diameter with jali of the
Rupees Six Hundred and Twenty Three
41 9 following nominal diameter of self cleansing design with C.I scread down or hinged grating 600.23 SqM
including the cost of cutting and making good the walls.
Providing and fixing to wall ceiling and floor 10.0 Kg. F/Cm2 working pressure polythene pipes of
the following outside Dia. Low densidy, complete with special falnge compression type fittings, Rupees Two Hundred Eighty and
wall clipsetc. including making good the wall ceiling and floor.(F) 75mm Twenty Three Paise Only
Providing and fixing to wall ceiling and floor 10.0 Kg. F/Cm2 working pressure poluthene pipes of
the following outside Dia. Low densidy, complete with special falnge compression type fittings, Rupees Two Hundred Fifty Eight and
wall clipsetc. including making good the wall ceiling and floor.(G)110 mm Twenty Three Paise Only
Structural steel work ( Confirming to IS 4923-1997) riveted, bolted or welded in builtup for all
type sections, in framed work, including cutting, hoisting, fixing in position and applying a Rupees One Hundred Thirty One and
priming coat of approved steel primer all complete as per the structural designs and directions Eighty Three Paise Only
of Engineer in charge.
Providing and fixing M.S. grills of required pattern to wooden frames of windows etc. with M.S.
Rupees One Hundred Eight and
45 160.50 flats at required spacings and frame alround, square or round bars with round headed bolts and 108.76 SqM
Seventy Six Paise Only
nuts or by screws (A) Plain Grill.
Painting two coats (excluding priming coat) on new steel and other metal surface with enamel
paint, brushing, interior to give an even shade including cleaning the surface an even shade Rupees Ninety Four and Thirty Nine
including cleanicn the surface of all dirt, dust and other foreign matter. Paise Only
Bhavnagar of Social Forestry Range Division-Botad
Name of Work :-Construction of a Toilet Block for Laddies and Gents at Panchavati Kendra, Village: Budhel in Social Forestry Range , Bhavnagar of Social Forestry Range Division , Botad
Item of work Tendered rates
Quantities Total amount
Quantities Total amount
estimated but according
may be more In figures In words estimated
or less quantities
Painting three coats (including priming coat) on new steel and other metal surface with enamel
Rupees One Hundred Thirty Two and
47 6.42 paint, brushing, interior to give an even shade including cleaning the surface of all dirt, dust and 132.02 SqM
other foreign matter.
Providing and fixing S.W. gully trap with C.I. grating brick masonry chamber and water tight C.I.
Rupees One Thousand Two Hundred
48 1 cover with frame of 300mm x 300mm size (inside) with standard weight.(i) Square mouth traps. 1292.19 SqM
Ninety Two and Nineteen Paise Only
(A) 100mm x 100mm size P type.
Total Amount Rs.
Total Amount Rs.
Add 18 % for GST Rs.
Total Amount Rs.
Total Amount Rs.
I/We are aready to carry out the above mentioned work @___________above/below the Estimated Rates mentioned above and position of My/Our tender works out as under ::
IF TENDER IS BELOW IF TENDER IS ABOVE
[1] Estimated cost of work Rs. Estimate cost of work Rs.
[2] Deduct % below_________ Rs. Deduct % Above_________ Rs.
[3] Net amount of Tender Rs. Net amount of Tender Rs.
[4] Rs. In words Rs. Rs. In words Rs.
Signature of contractor
1) All the work shall be carried out as per Public Works Deptt., Hand Book, and other I.S. Specifications and other I.S. Specifications and other specifications of the Division or as directed.
2) All the columns in Schedule should be filled in Ink and Total of the entires in the Last column should be struck by the contractor under his signature.
3) Rates quoted includes clearance of site (prior to commencement of work and at its closer) in all respects and hold good for work under all conditions, site moisture weather etc.
4) The contractor shall exhibit the details of work, tender amount and specifications as per Govt. Circular No. ED/6 /32772/N Dtd. 26.4.78 and as per G.R. No. TNC/9/24/C Dtd. 18.11.91 as directed by the
Engineer-in-charge of the work, on board at site of work which contractor is not entitle for any extra payment.
5) Testing of materials be as per statement attached with the Specifications, the materials shall be testes. Bill for testing shall be paid by the Deptt., and 1% of the (one percent) of amount put to tender after
deducting the cost of materials as per Schedule - A shall be deducted from the running account bills of the works. (As per G.R. (R&B) Deptt., No. TNC/1085/4/C dtd. 20.12.91.
6) The contractor shall quote even "NIL" if no reduction is proposed.
7) One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS". In terms of the Gujarat Government Gazette Extra ordinary dated 12.12.04.
Implementation of building and other construction works. (Requlation of equipments and conditions of service Act-1996)
Bhavnagar of Social Forestry Range Division-Botad
Name of Work :-Construction of a Toilet Block for Laddies and Gents at Panchavati Kendra, Village: Budhel in Social Forestry Range , Bhavnagar of Social Forestry Range Division , Botad
Item of work Tendered rates
Quantities Total amount
Quantities Total amount
estimated but according
may be more In figures In words estimated
or less quantities
8) In R.C.C. item where there is a change in grade of mix or change as per actual mix design the difference of cement consumption shall be added/deducted from rate of original item at the rate of star rate
mentioned in this tender.
9) As per Govt. in Finance Department Reso. Dt. 15.09.2018 and No.GST/1017/1087/GST Cell and No. TJR/102017/599/Z, Dt.28.09.2018 GST from the bill above Rs.2.50 lacs shall be deducted at 1% towards
CGST and 1% towards SGST totalling to 2% of Bill Amount as per Close-51 of CGST Act
Signature of contractor
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
02 Form B-1.pdf
03 Schedule B.pdf
04 Specifications of Building Work.pdf
05 Vendor Civil work.pdf
06 TEST REQUIRE FOR CONSTRUCTION MATERIAL.pdf
01 Tender (1).pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].