Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹51.9 LAccepted-AOC | L1 | Accepted-AOC The firm is L1 | |
| 2 | L2₹58.6 L+₹6.7 L (12.9%)Rejected-Finance 55 SURYA SEN STREET ROOM NO 307 KOLKATA 700009 | KOLKATA | WEST BENGAL | 700009 | L2 | Rejected-Finance The firm is L2. | |
| 3 | L3₹59.8 L+₹7.9 L (15.3%)Rejected-Finance | L3 | Rejected-Finance The firm is L3. | |
| 4 | L4₹61.3 L+₹9.4 L (18.1%)Rejected-Finance P 27 1 RASHTRAGURU AVENUE DUM DUM KOLKATA 700028 | 24 PARAGANAS NORTH | WEST BENGAL | 700028 | L4 | Rejected-Finance The firm is L4. | |
| 5 | L5₹61.6 L+₹9.7 L (18.7%)Rejected-Finance PLOT NO 28 BRAHMESHWAR BAG TANKAPANI ROAD BHUBANESHWAR 751018 | KHORDHA | ODISHA | 751018 | L5 | Rejected-Finance The firm is L5. |
Tender Value
₹69.5 L
EMD Value
₹1.4 L
Closing Date
10 Sept 2019, 6:00 pmClosed
AGM (E-E)
NSCBI AIRPORT, Kolkata
R and M Electrical Installations at NSCBI Airport, Kolkata (Other areas). SH Operation and Maintenance of IE installations at Old ITB and DTB for Three years.
2019_AAI_30758_1
AAC/Other areas/OandM/Old ITB and DTB/19-20
Open Tender
Electrical Works
Works
1095 days
NSCBI AIRPORT, Kolkata
Please refer Tender documents.
15 documents required · 15 mandatory
₹1,120
Yes
Airports Authority of India
₹1.4 L
Yes
24 Jan 2020
26 Aug 2019
16 Sept 2019
27 Aug 2019
10 Sept 2019
27 Aug 2019
27 Aug 2019 - 30 Aug 2019
Amount
Round the clock operation & maintenance of all Internal & External Electrical Installation at Old ITB (International Terminal Building), CUDCT (Common User Domestic Cargo Terminal) & old DTB (Domestic Terminal Building) as indicated under inventory list & as per provision of the particular specification & to carry out routine / preventive maintenance / attending to complaints / faults / break downs and taking rectification action as required ensuring serviceability / satisfactory working condition of the systems by engaging skilled/unskilled manpowers as per requirement including Sundays & Holidays and maintenance of records / documentation etc. as per the detailed specifications, terms and conditions etc as required.
The execution of Delhi Schedule of Rates (E&M) 2018 of estimated amount of Rs 3,00,000.00 Items mentioned in Chapter 1 to Chapter 17 including Appendix-I & II as when required basis for repair and maintenance of internal and External Electrical installations at different locations under NSCBI Airport, Kolkata as required. [Quoting Rs.90,000.00 in the Rate stands for 10% below the Estimated amount of Rs 1,00,000.00, Similarly Quoting Rs.1,05,000.00 in the Rate stands for 5% above the Estimated amount of Rs 1,00,000.00] (Note: Payment of DSR rate will be made after deduction of GST considered in the Rate of DSR-2018)
a) For First Year
b) For Second Year
c) For Third Year
GANGA ACTION PLAN CONTRACT WORKERS CO-OP SOCIETY LTD
SOM ENGINEERING WORKS
Youngmen Traders
M/S DURGA SUPPLY AGENCIES
M/s J.K. Electric Engineering Works
M/s. A S Traders
TECHSUPPORT
SHREE GOURI ELECTRIC ENTERPRISE
S. N ELECTRICALS
Voltas Limited
ABHISHEK ASSOCIATES
T K MAZUMDER
stage.html
html • 0.08 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .