Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Others-NOT MEETING PQC |
Tender Value
Refer Docs
Closing Date
16 Aug 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
HEAD PROCUREMENT
PATNA BIHAR
SUPPLY AND INSTALLATION OF ELECTROMELT AUTO DIRECT ELECTRIC MELTING OF SULPHUR
2024_HPCLB_203657_1
HBL/TEN/PUB/24-25/175
Open Tender
Miscellaneous Goods
Works
28 days
SUGAULI EAST CHAMPARAN BIHAR
AS ATTACHED
2 documents required · 2 mandatory
₹0
Exempted
5 Oct 2024
3 Aug 2024
17 Aug 2024
3 Aug 2024
16 Aug 2024
3 Aug 2024
3 Aug 2024 - 16 Aug 2024
A. SUPPLY PORTION - ELECTROMELT SYSTEM: AUTO DIRECT ELECTRIC MELTING OF SULPHUR FOR BATCH TYPE SULPHUR BURNER. 1. ELECTROMELT: Low Power - Quick Heat System for melting of Sulphur. 2. Electric Heaters: Heavy Duty SS-304/316L Integrated Casing Electric Heater Suitable for Quick Heat Generation Power: 10-15 KW/Hr. (Electromelt) for ASB. 3. Control Panel: Microprocessor based Auto Digital Heater Control & Monitoring in Auto/Manual modes. Distribution & Safety: 1 No. 4. Temp. SENSORS, signal CABLES etc. 5. Internal electric wires/cables from Panel to Heaters 180 Mtrs. Required Sensors. B. SERVICE PORTION - INSTALLATION & COMMISSIONING OF ELECTROMELT AUTO-DIRECT ELECTRIC MELTING OF SULPHUR FOR SULPHUR BURNER IN BOILING HOUSE. 1. Actual erection will be carried out by vendor staff under vendor supervision. And Boarding & Lodging will be provided Vendor 2. Work shall be carried out as per the best engineering practices at Sugar Industries. 3. Supplies shall be fully guaranteed against any manufacturing defects / poor workmanship/ inferior design or quality etc. for a period of 12 months from the date of commissioning or 18 months from the date of delivery whichever is earlier. During this period, seller will arrange to repair / replace any defective part free of cost or replace complete equipment, if required. Vendor shall be held liable for any direct/consequential damage arising from a fault or malfunction of equipment to vendor’s own risk. The repair /replacement will be done at factory site (During Guarantee period).
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .