Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹16.7 LAccepted-AOC AT WARD NO 10 PO MANDUA DIST KEONJHAR PIN 758014 | KEONJHAR | KEONJHAR | ODISHA | 758014 | ₹16.7 L Quoted ₹14.3 L | 1 | Accepted-AOC Lowest |
| 2 | 2₹14.2 L−₹13,556.37 (0.95%)Rejected-Finance | ₹14.2 L−₹13,556.37 (0.95%) | 2 | Rejected-Finance Second |
Tender Value
₹16 L
EMD Value
₹16,000
Closing Date
2 May 2026, 5:00 pmClosed
Executive Officer Barbil Municipality
Executive Officer Barbil Municipality
Development of Water Body at Nalda, Ward No.1, Barbil
2026_ORULB_128192_15
BBLM-1/2026-27
Open Tender
Civil Works - Others
Percentage
90 days
Barbil
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹16,000
Yes
25 Jun 2026
20 Apr 2026
4 May 2026
20 Apr 2026
2 May 2026
20 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation of ordinary soil with initial lead of 50 mtr and lift of 1.5 mtr including dressing leveling the bed.and Traspoting the same within 5km lead. | - | Cum | - | - |
| 2 | Earth work excavation of foundation in hard Soil with initial lead of 50 mtr and lift of 1.5 mtr including dressing leveling the bed. | - | Cum | - | - |
| 3 | Supplying and filling in with clean coarse river sand in foundation and plinth including ramming consolidating with all cost of materials, labour, T. & P. etc. complete. | - | Cum | - | - |
| 4 | Plain cement concrete (1:3:6) using 40 mm. size CBHG stone metal of approved quality & from approved quarry including lowering, laying the concrete, watering and curing etc. complete to required levels laid in layers including cost conveyance, royalities & taxes of all mateirals & cost of all labour with T & P etc all complete in all respect as per Direction of the Engineer in charge. | - | Cum | - | - |
| 5 | Reinforced Cement Concrete of M-20 grade using 20 mm and down size hard crusher broken granite stone chips of approved quality & from approved quarry including lowering, laying the concrete, watering and curing etc. complete to required levels laid in layers including cost, conveyance, royalities & taxes of all mateirals & cost of all labour with T & P required for the work etc all complete in all respect as per Direction of the Engineer in charge with C/S. | - | Cum | - | - |
| 6 | Supplying, fitting & placing uncoated HYSD bar reinforcement complete as per drawing and techinical specification with cost, conveyance of rod & binding, wire etc complete. including cost of materials labour complete . | - | qtl | - | - |
| 7 | Grouting approns and revertment 23 cm deep with cement concrete (1:4:8) with 2.5cm crusher broken metal including watering & curring etc complete with cost, conveyance royalties & taxes of all materials & all labour with T & P required for the work etc. all complete in all respect as per the Direction of the Engineer in charge. | - | sqm | - | - |
| 8 | 6mm thick cement plaster (1:4) over RCC work finished smooth including close deep chipping and slurry treatment including watering & curring etc complete with cost, conveyance royalties & taxes of all materials & all labour with T & P required for the work etc. all complete in all respect as per the Direction of the Engineer in charge. | - | sqm | - | - |
| 9 | Rough stone dry packing in approns and revetments with hard granite stones (15cm to 30cm) ,including watering & curring etc complete with cost, conveyance royalties & taxes of all materials & all labour with T & P required for the work etc. all complete in all respect as per the Direction of the Engineer in charge. | - | Cum | - | - |
| 10 | Supplying all labour T&P for fixing of G.I. pipe including with cost, conveyance royalties & taxes of all materials & all labour with T & P required for the work etc.and painting all complete in all respect as per the Direction of the Engineer in charge. | - | Cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
DTCN.pdf
Tender Documents • 0.73 MB
BOQ_588100.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .