| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹14.2 LAdmitted-Finance | +4.50% | ₹14.2 L | L1 | Admitted-Finance |
| 2 | L2₹14.3 LAdmitted-Finance AT WARD NO 10 PO MANDUA DIST KEONJHAR PIN 758014 | KEONJHAR | KEONJHAR | ODISHA | 758014 | +5.50% | ₹14.3 L | L2 | Admitted-Finance |
Tender Value
₹16 L
EMD Value
₹16,000
Closing Date
2 May 2026, 5:00 pmClosed
Executive Officer Barbil Municipality
Executive Officer Barbil Municipality
Development of Water Body at Nalda, Ward No.1, Barbil
2026_ORULB_128192_15
BBLM-1/2026-27
Open Tender
Civil Works - Others
90 days
Barbil
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹16,000
Yes
14 May 2026
20 Apr 2026
4 May 2026
20 Apr 2026
2 May 2026
20 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work excavation of ordinary soil with initial lead of 50 mtr and lift of 1.5 mtr including dressing leveling the bed.and Traspoting the same within 5km lead. | - | Cum | - | - | BI01010001010000000000000515BI0100001113 |
| 2 | Earth work excavation of foundation in hard Soil with initial lead of 50 mtr and lift of 1.5 mtr including dressing leveling the bed. | - | Cum | - | - | BI01010001010000000000000515BI0100001114 |
| 3 | Supplying and filling in with clean coarse river sand in foundation and plinth including ramming consolidating with all cost of materials, labour, T. & P. etc. complete. | - | Cum | - | - | BI01010001010000000000000515BI0100001115 |
| 4 | Plain cement concrete (1:3:6) using 40 mm. size CBHG stone metal of approved quality & from approved quarry including lowering, laying the concrete, watering and curing etc. complete to required levels laid in layers including cost conveyance, royalities & taxes of all mateirals & cost of all labour with T & P etc all complete in all respect as per Direction of the Engineer in charge. | - | Cum | - | - | BI01010001010000000000000515BI0100001116 |
| 5 | Reinforced Cement Concrete of M-20 grade using 20 mm and down size hard crusher broken granite stone chips of approved quality & from approved quarry including lowering, laying the concrete, watering and curing etc. complete to required levels laid in layers including cost, conveyance, royalities & taxes of all mateirals & cost of all labour with T & P required for the work etc all complete in all respect as per Direction of the Engineer in charge with C/S. | - | Cum | - | - | BI01010001010000000000000515BI0100001117 |
| 6 | Supplying, fitting & placing uncoated HYSD bar reinforcement complete as per drawing and techinical specification with cost, conveyance of rod & binding, wire etc complete. including cost of materials labour complete . | - | qtl | - | - | BI01010001010000000000000515BI0100001118 |
| 7 | Grouting approns and revertment 23 cm deep with cement concrete (1:4:8) with 2.5cm crusher broken metal including watering & curring etc complete with cost, conveyance royalties & taxes of all materials & all labour with T & P required for the work etc. all complete in all respect as per the Direction of the Engineer in charge. | - | sqm | - | - | BI01010001010000000000000515BI0100001119 |
| 8 | 6mm thick cement plaster (1:4) over RCC work finished smooth including close deep chipping and slurry treatment including watering & curring etc complete with cost, conveyance royalties & taxes of all materials & all labour with T & P required for the work etc. all complete in all respect as per the Direction of the Engineer in charge. | - | sqm | - | - | BI01010001010000000000000515BI0100001120 |
| 9 | Rough stone dry packing in approns and revetments with hard granite stones (15cm to 30cm) ,including watering & curring etc complete with cost, conveyance royalties & taxes of all materials & all labour with T & P required for the work etc. all complete in all respect as per the Direction of the Engineer in charge. | - | Cum | - | - | BI01010001010000000000000515BI0100001121 |
| 10 | Supplying all labour T&P for fixing of G.I. pipe including with cost, conveyance royalties & taxes of all materials & all labour with T & P required for the work etc.and painting all complete in all respect as per the Direction of the Engineer in charge. | - | Cum | - | - | BI01010001010000000000000515BI0100001122 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
DTCN.pdf
Tender Documents • 0.73 MB
BOQ_588100.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid