| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.1 LAccepted-AOC | L1 | Accepted-AOC lowest tenderer | |
| 2 | L2₹29.3 L+₹4.9 L (20.0%)Rejected-Finance THEERTHAM NADUVILEMURI PADANILAM POST NOORANAD ALAPPUZHA DIST KERALA 690529 | ALAPPUZHA | KERALA | 690529 | L2 | Rejected-Finance Other than Lowest tenderer | |
| 3 | L3₹31.5 L+₹7.0 L (28.7%)Rejected-Finance | L3 | Rejected-Finance Other than Lowest tenderer | |
| 4 | L4₹32.4 L+₹7.9 L (32.4%)Rejected-Finance | L4 | Rejected-Finance Other than Lowest tenderer | |
| 5 | L5₹32.7 L+₹8.3 L (33.9%)Rejected-Finance | L5 | Rejected-Finance Other than Lowest tenderer |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
18 Nov 2021, 6:00 pmClosed
GE NS KOCHI
Military Engineer Services Garrison Engineer (Naval Services) Kataribagh, Naval Base Post Kochi 682004.
PREVENTIVE/ROUTINE MAINTENANCE OF DESICCANT DEHUMIDIFIER AT SEAKING SIMULATOR AT INS GARUDA AND ROUTINE MAINTENANCE OF VRF AC IN CRL, ASR, DIVING SCHOOL AT NAVAL BASE KOCHI
2021_MES_484088_1
8851/E8
Open Tender
Electrical and Maintenance Works
Item Rate
330 days
KOCHI
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE NS KOCHI
₹60,000
Yes
18 Jan 2022
27 Oct 2021
20 Nov 2021
27 Oct 2021
18 Nov 2021
11 Nov 2021
27 Oct 2021 - 10 Nov 2021
Amount
Preventive maintenance and check up of Dehumidifier Installed at FATS Garuda, capacity of 4850/5000 CFM including complete accessories and controls, and the entire system to be checked and servicing by OEM or their authorised service agency for every month interval throughout CA duration and incase of any breakdown occurs at any time, the tenderer shall be attend the complaint and made serviceable with in time including minor spares such as fuses, wires, nut, bolts etc. for above mentioned all as specified and directed by Engineer-in-charge. (a) Dehumidifier Model No FLI 7300, Ser No. 2013-BAC-18620 Make: Bry-Air Note: - Major spare parts are measured and paid separately under relevant item in BOQ and labour charges for replacement shall be deemed to include in the quoted rate above.
Preventive maintenance and check up of Dehumidifier Installed at FATS Garuda, capacity of 4850/5000 CFM including complete accessories and controls and the entire system to be checked and servicing by OEM or their authorised dealer for every 30 days interval throughout CA duration and incase of any breakdown occurs at any time, the tenderer shall be attend the complaint and made serviceable with in time including minor spares such as fuses, wires, nut, bolts, etc., for above mentioned all as specified and directed by Engineer-in-charge. (a) Dehumidifier Model No FLI 7300, Ser No. 2018-BAC-28982 Make: Bry-Air Note: - Major spare parts are measured and paid separately under relevant item in BOQ and labour charges for replacement shall be deemed to include in the quoted rate above.
Supply only React filter Air inlet pre-filter all as specified and directed by Engineer-in-charge. Make:- Recommended by OEM (Bry- Air)
Supply only SSR (Solid state relay), working capacity 90-250V AC, all as specified and directed by Engineer-in-charge.Make:- Recommended by OEM (Bry- Air)
Supply only Thermostat 50-300 DEC all as specified and directed by Engineer-in-charge. Make:- Recommended by OEM (Bry- Air)
Supply only Limit Switch all as specified and directed by Engineer-in-charge. Make:- Recommended by OEM (Bry- Air)
Supply only Process filter Air inlet Pre Filter all as specified and directed by Engineer-in-charge.Make:- Recommended by OEM (Bry- Air)
Supply only Pressure Switch all as specified and directed by Engineer-in-charge. Make:- Recommended by OEM (Bry- Air)
Supply only Bed drive motor including arrangement pulley, chain, controllers complete all as specified and directed by Engineer-in-charge.Make:- Recommended by OEM (Bry- Air)
Supply only Idler bracket assembly suitable for Existing Dehumidifier, Model No. FLI 7300, Part No 43115, testing, all as specified and directed by Engineer-in-charge. Make:- Recommended by OEM (Bry- Air)
Preventive maintenance and Monthly routine checkup of the VRF unit of capacity 78 HP having 05 outdoor units, 8 Ceiling Suspended AHU'S indoor units installed at Diving school on monthly basis including all kind of replacement of spare parts. Make: LG Note: contractor shall be responsible for replacement of false ceiling, if damage occurred while servicing of Ceiling suspended units.
Material and Labour for monthly Servicing of VRF system, indoor units -05 Nos ,Each cassette type having capacity of 5 HP at Diving school Briefing room ,clean with mild Air blower in the coil side and remove the inside fine filter, cleaned with Soap solution after cleaning process fix in proper place , check the drainage water tank and cleaned ,replace the communication cables and sensor if found defective all as specified and directed.
Material and labour for Monthly services of outdoor unit of VRF system make Blue star with capacity 12 HP at ASR complex, completely by disconnecting/ covering all electric/electronic boards and wiring and servicing condenser coils and compressor, reservoir areas completely wet servicing by using approved chemicals by OEM manufacturer and re-assembling setting all parameters by using software’s by an OEM engineer testing all included and directed by Engineer in charge.
Material and Labour for monthly Servicing of VRF system, indoor units - 02 nos of cassette type of having capacity 12 HP, Make Blue star at ASR complex, clean with mild Air blower in the coil side and remove the inside fine filter, cleaned with Soap solution after cleaning process fix in proper place, check the drainage water tank and cleaned, replace the communication cables and sensor if found defective all as specified and directed.
Material and labour for Monthly services of outdoor unit- 02 nos of VRF system make Voltas with capacity 24 HP at Command Ref Library bldg, completely by disconnecting/ covering all electric/electronic boards and wiring and servicing condenser coils and compressor, reservoir areas completely wet servicing by using approved chemicals by OEM manufacturer and re assembling setting all parameters by using software’s by an OEM engineer testing all included and directed by Engineer in charge.
Material and Labour for monthly Servicing of VRF system, indoor units - 05 Nos of cassette type of having capacity of 24 HP at Command Ref Library bldg, clean with mild Air blower in the coil side and remove the inside fine filter, cleaned with Soap solution after cleaning process fix in proper place , check the drainage water tank and cleaned ,replace the communication cables and sensor if found defective complete all as specified and directed. Notes for item No 12 to 17: 1.The contractor shall ensure visit of OEM manufacturer Engineer monthly once and report/ serviceability of Outdoor units and same shall be submitted to this Office. The charges for all OEM procedures are deemed to be included in the quoted rates. The reports of OEM Engineer shall be produced before submitting RARs. 2. AC mechanic must be experienced in VRF Plants and capable for carrying out any type of maintenance or attending breakdown in above mentioned plants. 3. In case of any breakdown the additional man power if required will be arranged by the contractor without any price adjustment.
Supply and replacement of catch all core as suitable in existing pipe line of VRF suction/discharge line all as specified and directed
Supply and fix in replacement of VRF AC of 12 HP capacity all as specified and directed. Make: Recommended by OEM blue star/Voltas
Taking down unserviceable Digital compressor unit of VRF AC of 6 HP/5.5TR capacity and replace with new compressor unit in the existing unserviceable sealed compressor unit with and including initial charging of gas and oil complete all as specified and directed by Engineer in charge. MODEL :ZRD72KCTFD-433 OF VOLTAS
All As per item No. 20 but capacity of outdoor unit 10 to 16 HP all as specified and directed by Engineer in charge. Make: As recommended by OEM (LG)
Taking down unserviceable fixed compressor unit of VRF ACs of 6 HP/5.5TR capacity and replace with new compressor unit in exchange of the existing unserviceable sealed compressor unit with and including initial charging of gas and oil complete all as specified and directed by Engineer in charge. MAKE :ZR61KCTFD-420 OF VOLTAS
All As per item No. 22 but capacity of outdoor unit 10 to 16 HP all as specified and directed by Engineer in charge. Make: As recommended by OEM (LG)
Supply and fix in replacement of Liquid line solenoid valve for VRF system. Make: Blue star/LG
Supply and fix in replacement of Main PCB Board for Cassette type Indoor unit at VRF system. Make: Recommended by OEM LG
Supply and fix in replacement of remote Control for Cassette type Indoor unit at VRF system. Make: Recommended by OEM LG
Supply and fix in replacement of Ceiling suspended AHU's Fan Blower unit Bushes Make: Recommended by OEM LG
Supply and fix in replacement of Fan blades suitable for existing outdoor units of capacity 10-15 HP VRF systems.
Supply and fixing of Thermal insulation class "O" nitrile rubber insulation density 45-55 kg/m3, for suction/discharge piping of VRF pipe lines suitable size of dia as per site complete all as specified and directed.
Supply and fixing External PCB For VRF outdoor capacity of 10 to 16 HP suitable for existing LG make out door units complete all as specified and directed.
Supply and fixing Power PCB For VRF indoor capacity of 10 to 16 HP suitable for existing LG make out door units complete all as specified and directed.
Supply and fix Condenser coil, for Outdoor units of VRF Unit up to capacity 12 HP including leak testing by using nitrogen all as per OEM recommendation and directed.
Supply and fix Main PCB for four way cassette/CSU units indoor units of VRF Unit up to 16 HP including testing all as directed
Supply and fix Drain Pump for four way cassette/CSU units indoor units of VRF Unit up to 16 HP including testing all as directed
Supply and fix Blower motor for four way cassette/ CSU units indoor units of VRF Unit up to 16 HP including testing all as directed
Supply and fix Linear expansion Valve for four way cassette/CSU units indoor units of VRF Unit up to 16 HP including testing all as directed
Amount of Credit Schedule shall be deducted to arrive the Contract Sum.
Green Ray Enterprises
SREENARAYANA ENTERPRISES
AISWARYA ENTERPRISES
S. M. Enterprises
General Engineering and Constructions
Jack Electrolinks Private Limited
COCHIN CHEMICALS
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .