SW 1: Construction of 2-lane ROB in lieu of LC No.27 at KM 29/13-14 in Pedakurapadu station yard. SW 2: Construction of 2-lane ROB in lieu of LC No.40 at KM 42/29-30 between Sattenapalli - Reddigudem stations.
49-DyCE-GS-GNT-89
49-DyCE-GS-GNT-89
Open
18 Months
Palnadu, Andhra Pradesh
₹0
₹1.7 Cr
1 Jun 2026
1 Jun 2026
15 Jun 2026
A-List of items that are covered by SCR USSOR 2021( Preliminary works and Soil Above/
B-List of items that are covered by SCR USSOR 2021 (Earthwork)
C-List of items that are covered by SCR USSOR 2021( Foundation, Sub Structure & Super Above/
D-List of items that are covered by CPWD's Delhi schedule of Rates 2023 Vol.1 & Vol.2
E-List of items that are covered by SCR USSOR 2021 (Structural Steel)
F-List of items that are covered by SCR USSOR 2021 (Reinforcement)
G- List of items that are covered by SCR USSOR 2021( CEMENT)
H-List of items that are not covered by SCR USSOR 2021 and CPWD's Delhi schedule of Rates Above/
Preparation of GAD, Detailed design for foundation, sub-structure of viaduct span of ROB/RUB and approach spans, Design of Reinforced Earth Retaining Wall etc. as provided in Scope of Work as per relevant IR, BIS, IRC and other codes for the option of ROB/RUB alignment/span selected by Employer: This item includes: (i) Integrated Key Plan of entire ROB/RUB alignment covering railway portion, takeoff and landing approaches, arrangements of ROB/RUB approaches with NHAI/other roads department will be developed and included in GAD as per the Technical Requirement mentioned in the SCC. (ii) Preparation of GADs as per check list of SC Railway and codal provision. (iii) Preparation of preliminary and detailed design of foundation substructure, Superstructure including staircase, approach slab (wherever applicable) & Good for construction drawings (GFC Drawings) and all other drawing as required for construction of Railway portion of the ROB and both approaches. (iv) Submission of proof checked detailed design and Good for Construction Drawings for foundation, substructure, superstructure (if non- RDSO span is adopted), reinforced earth wall and retaining wall. (v) The detailed design 1 of super structure will be further governed as per para (iv) of deliverable in part -1 chapter -III. (vi) Preparation of bill of quantity (BOQ), detailed estimate, technical specifications and tender document as per preliminary design and drawings. (vii) Checking of design /drawing submitted by contractor for bearing, launching scheme, temporary arrangement drawing etc , if required. (viii) Technical support for getting approval from Railway /CRS including approval of temporary staging and launching scheme if required. (ix) Designer support during construction of ROB/RUB including site visit as per requirement of SCR. This will include modification in design / drawings as and when required. (x) Out station visit with stakeholder attached by consultant team on specific advice of SCR and nothing extra will be paid for visits for such meeting during currency of contract. (xi) Proof checking of designs from reputed institute like IIT/NIT with approval of institute by Railways Note: In case consultant is not required to be prepared GAD for any ROB, RUB deduction @ Rs. 15,000/- per ROB/RUB shall be made. In case the consultant is not required to prepare the design of the Reinforced Earth Retaining Wall, a deduction of 1,00,000/- per NS item will be made If sub-item (vi) regarding BOQ, tender document is not operated further deduction @Rs. 20,000/- per ROB will be made.
Preparation and submission of Completion drawings of Major / Minor bridges showing plan,elevation, section, notes and other relevant particulars to appropriate scale as per Railway Engineering code, prepared in AUTO CAD on 75 2 Micron thickness film, including submission of check print for proof check, to incorporate corrections and modifications as suggested by the Railway administration. Showing the exg. particulars in Indian ink and completed in Red ink as per the details given by Railways, with contractor's materials, labour, tools, plant etc., in the following sizes as per special conditions and as directed by the Engineer-in-charge. Sizes above A-0 size
Extra over item No. 041011 for launching girders under traffic blocks 10% of item no 041011 (payment will be made for quantity involved for launching of girders for the main span only)
Supplying (including loading and unloading),spreading,watering,Compaction with mechanical compactors of 4 the rock based crushed from stones granular material for backfill of RE Walls as filter media for using behind RE walls to the specifications of MORTH 3100. The granular fill material from stone crushing will be as per the specifications for reinforced soil walls as per Table No.6 and Clause 26.3.6 of IS 18591 - 2024. Note: The rate includes all incidental charges,taxes tolls,transportation etc.
Designing of the RCC wall panel & Corner Stone for RE wall to MORTH specifications,Supplying and erecting of panels of any approved shape and finish as directed ,Precast concrete facia panels of minimum thickness to Morth specifications 3100 of M 35 grade concrete and min reinforcing steel @ 85 kgs per Cum, Erection, with all acceessories such 5 as EDPM pads , 12 mm dia 304 grade Stainless steel hooks for holding panels, Geo-textile for sealing of panel joints and all all other incidental charges.1) Design of the structure as whole shall be made to MORTH 3100 specifications and IS 18591 blended to achive stabilty of structure as a whole . Design shall be done for holding panels to reinforement of earth ( GEO- Grids) to SS hooks. Rate for this item shall include Cement and reinforcing steel to Fe 500 D or more ,304 stainless steel hooking arrangement to hold Geo -Grids ,all materials moulds finishing ingradients etc .Steel and cement shall from of approved brands of RDSO /S.C.Rly 3). Rate excludes GEO- Grids of reinforcing earth and holding the panel.
Supplying ( including loading and unloading), spreading, watering, Compaction with rollers to MORTH 3100 6 specifications of the granular material for backfill of RE Walls in the Reinforced Earth fill zone of the granular fill material with rock base / pond ash of thermal plant to the specifications of MORTH 3100. The granular fill material from stone crushing / pond ash will be as per the specifications for reinforced soil walls as per Table No.4 and Clauses 26.3.1.2 and 26.3.5 of IS 18591 - 2024. Note: The rate includes all incidental charges,taxes tolls,transportation etc
Supplying, fixing in position of 150 mm dia RCC NP2 Perforated Pipes of Holes size 15mm @ 75mm sapcing c/c 7 in half surface in top at required locations as per design, including all fixtures bends with cement Mortar for drainage arrangements of RE Wall for discharge of seepage water including transportation, labour, machinery etc, and as directed by the Engineer-in-charge.
Providing, laying & Fixing in position Precast RCC Crash barrier with Friction Slab of M35 grade Including the 8 cost of Cement , Fine Aggregrate , Coarse Aggregarte and Plasticizer . The Cost excludes the cost of Reinforcement Steel but includes Erection with Crane With Suitable Capacity, Centering and shuttering & Cement Cost as per Approved Structural Design and Labour , Lead and Lift as directed by Engineer In-Charge. (Cement Content of min 385 kg/m)
Supply & laying of Poly Vinyl Chloride sheet, 400 micron thick at required locations with all contractor's labour, materials, tools and plant, lead, lift, consumables, transportation , machinery etc., complete and as directed by the Engineer- in-charge Unit Above/
C1-List of items that are covered by SCR USSOR 2021(Bearings)
Item Breakup - A-List of items that are covered by SCR USSOR 2021( Preliminary works and Soil Investigation)
30m to 40m Conducting in-situ full size Plate Load Test (PLT) at selected location as per IS:1888 including making loading arrangements & casting of RCC/cast in-situ concrete footing as per codal provisions including excavation and refilling of trial pit.
Plate size 45cm x 45cm
Taking out 100mm dia. & 450mm long undisturbed Each samples of soil from bore holes, including provision of air tight containers for packing and, labeling incl. transporting the samples to laboratory. Piston sampler shall be used for extracting undisturbed samples where necessary. Samples shall be collected as per IS:2720.
Conducting standard penetration test as per IS:2131 at Each approximate1.5m intervals in bore holes, as directed by the Engineer in charge Conducting laboratory Tests on collected soil samples as per relevant IS code
Moisture Content/Dry Density
Atterberg Limits
Specific Gravity
Grain size analysis including Hydrometer analysis
Direct Shear Test
Natural Density
Consolidation Test
Unconfined Compression Test
Tri-axial Test Conducting Laboratory tests on collected ROCK SAMPLES as per relevant IS code
Water Absorption & Porosity
Unconfined Compression Test
Point Load Test
Modulus of Elasticity
Abrasion Testing
Conducting chemical analysis of ground water samples to Each determine suitability for concreting a n d aggressiveness in relation to attack on concrete / reinforcement including determination of pH value. Total 5645868.16
Item Breakup - B-List of items that are covered by SCR USSOR 2021 (Earthwork)
Preparation of foundation for Embankment by clearing, 100 Sqm grubbing, stripping top soil (average 150 mm) and stacking beyond foundation area, thereafter ploughing and pulverizing 150 - 200 mm of top of soil with tractor trolley, mixing water to achieve OMC with water sprinkler or left for natural drying, as required, and compaction with vibratory roller of suitable capacity to achieve 98% MDD for laying first layer of soil for embankment construction. GUNTUR DIVISION-GATI SHAKTI/SOUTH CENTRAL RLY Earthwork in filling in embankment, guide bunds, around buried type abutments, bridge gaps, trolley refuges, platforms etc. with contractor's own earth conforming to Soil Quality Class SQ1/SQ2/SQ3, after preparation of foundations as applicable, benching in existing banks wherever required, spreading in layers with motor grader, bringing the moisture content to OMC, mechanical compaction to specified density and dressing of bank to final profile as per RDSO Specifications: RDSO/2020/GE: IRS-0004 with latest correction slips. Note: 1) Foundation preparation, Benching including additional earthwork on account of this, wherever required, shall be paid extra under relevant schedule item for benching. 2) Payment for Earthwork under this item shall be made based on the cross section measurements calculated (i) with original ground profile of existing bank based on initial ground levels before doing benching and (ii) final profile of the bank worked out with final levels as per prevailing guidelines.
Using Soil Class SQ2 Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in layers with approved material and consolidation of the layers by ramming and watering etc. including all lift, disposal of surplus soil up to a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer in charge. Note: This item will be used for excavation work in connection with other miscellaneous works also like side drains, foundation for OHE masts and other miscellaneous structures in connection with Gauge Conversion, Doubling, New lines.
All kinds of soils
Soft rock (not requiring blasting)
Hard rock (blasting prohibited ) 6 022011(022020) Extra over item nos. 022011 to 022014 for executing the cum 31405.50 37.93 1191210.62 work under water and/or liquid mud to compensate all additional arrangements including pumping out water as required. Note: The extra percentage rate is applicable only for the quantity of work executed under water. [RATE = 20%] 7 022012(022020) Extra over item nos. 022011 to 022014 for executing the cum 1596.00 77.54 123753.84 work under water and/or liquid mud to compensate all additional arrangements including pumping out water as required. Note: The extra percentage rate is applicable only for the quantity of work executed under water. [RATE = 20%] 8 022014(022020) Extra over item nos. 022011 to 022014 for executing the cum 1596.00 211.66 337809.36 work under water and/or liquid mud to compensate all additional arrangements including pumping out water as required. Note: The extra percentage rate is applicable only for the quantity of work executed under water. [RATE = 20%] Total 17777042.15
Item Breakup - C-List of items that are covered by SCR USSOR 2021( Foundation, Sub Structure & Super Structure Other than Steel)
With provision of one 50mm wide retro-reflective tape in Metre horizontal direction, duly secured/tight with vertical posts.
With provision of painting verticals & horizontals with red Metre luminous paints / strips of 30cm each with a gap of 30 cm. GUNTUR DIVISION-GATI SHAKTI/SOUTH CENTRAL RLY Provision of barricading with contractor's bamboos / ballies vertical post of 100mm dia. planted at every 2m interval, projecting at least 1.5m above ground level and driven firmly (minimum 0.5m) inside ground and including painting verticals & horizontals with red luminous paints / strips at alternative bay on barricade. Barricades shall be maintained through out the execution of the work and shall be removed in workman like manner on completion of the work only after instruction of Engineer in-Charge. Note: (1) 60% payment shall be made on provision of barricading at work-site and balance 40% payment after removal of barricades. (2) The released bamboos / ballies shall be the property of the Contractor.
With 3 horizontal bamboo / balli members of minimum RM 50mm dia. spaced equally Providing and laying in position Plain cement concrete of specified Nominal Mix for miscellaneous works like side drains, foundation for OHE masts and other miscellaneous structures excluding the cost of Cement, centering and shuttering - All work up to plinth level :
1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded cum stone aggregate 20 mm nominal size)
1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded cum stone aggregate 20 mm nominal size)
1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded cum stone aggregate 20 mm nominal size)
Providing and laying in position machine batched, cum machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality in RCC raft foundation & Pile cap including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as per specifications and direction of t h e Engineer in charge. Note: 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item. Providing and laying in position machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality for the following Reinforced cement concrete structural elements up to height of 9.0 m from foundation top level, including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as per specifications and direction of the Engineer in charge. N o t e : 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item.
Abutment & Pier
Abutment cap, Pier Cap, Inspection Platform & Pedestal cum over Pier cap, Fender wall, Diaphragm wall etc.
Approach slab at formation level, Dirt wall/ ballast wall at cum formation level
Extra for every increase of 1m or part thereof in the cum height above 9.0 m
Providing and laying Plain Cement Concrete 1:3:6 with cum graded stone aggregate of 40mm nominal size, in foundation and floors, retaining walls of bridges including mechanical mixing, vibrating, pumping and bailing out water where ever required with all materials and labour complete but excluding the cost of cement and shuttering as per drawings and technical specifications as directed by Engineer. GUNTUR DIVISION-GATI SHAKTI/SOUTH CENTRAL RLY
Providing and fixing Weep Holes in Abutments, Wing Metre walls and Return walls etc., of new bridges with 110mm dia UPVC pipe Type A ISI marked with all contractor's men, material, transportation, all taxes as per specifications and as directed by Engineer-in-Charge. Centering and shuttering including strutting, propping etc. and removal of form for :
All types of bridge sub-structures, e.g. pier, abutment, Sqm wing wall, retaining wall, RCC box type foundations, Abutment cap, Pier Cap, Inspection Platform & Pedestal over Pier cap, Fender wall, Diaphragm wall etc. up to 5m above ground level
All types of bridge super-structures, e.g. slabs, I-girders, Sqm T-girders, Box girders etc. up to 5m above ground level.
Extra for additional height over item no. 025031 & Sqm 025032 wherever required with adequate bracing, propping etc. over initial height of 5 metres for every additional height of 1 metre or part thereof.
Providing and launching in position machine batched, cum machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality for the Precast Prestressed (Post-tensioned) Concrete Girder/Box Girders/Slabs in contactor's casting yard in the vicinity of worksite, including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability, complete as per drawings, specifications and direction of the Engineer. Note: 1. Payment for Shuttering, Cement, Reinforcement, HTS cables, Sheathing, Anchorage Cones, stressing of cables, grouting of the ducts and launching of girder/slab in position shall be made extra under relevant items. However, deduction shall be made in case of slab as per relevant item. 2. For pre-cast item, loading in transport vehicle in casting yard is included and shall not be paid extra. 3. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons at the stage of Mix Design and in that case deduction shall be made as per relevant item. Providing and fixing in position of standard preformed sealed and slab type or strip seal elastomeric type expansion joints for Railway bridge or Road Over Bridges as per approved drawings and latest MORTH/IRC specifications complete in all respect as directed by Engineer in-charge.
For 40mm expansion
For 80mm expansion Load testing of one or more spans of bridge as selected by the Engineer as per approved load test procedure following relevant IS/IRC/Railway codes with contractor's labour, deflection measuring instruments, loading materials, recording and analyzing the load testing results including all lead & lift, etc. complete as required. The rates are all inclusive and will be paid after load test is finished and girder is cleared of the kentledges/loading material etc. The load shall be 1.25 times the stipulated design load.
For Span design load up to 100 MT Providing and fixing in position GI Drainage Spouts of required length with Grating in RCC slab and filling bitumen along kerb as shown in drawing with contractor's pipes, bitumen, tools, equipment, lead, lifts etc. complete as per specifications and as directed by Engineer in-charge.
100mm dia. Drainage Spouts
Supplying and laying 160mm dia. PVC Pipes Class-I, Metre capable for a pressure of 2.5 kg/sqm in footpath of ROB for laying cable with all contractor's materials labour, tools, plant, machinery, vehicles, consumables, lead, lift etc. complete as per specifications and as directed by Engineer in-charge. Launching in position, by any approved method, pre- fabricated Steel Girders, precast PSC girders/slabs, casted at casting bed developed at site, to correct alignment and level over the bed block / pedestal with all required arrangements, complete in all respect.
PSC girders / slabs
Providing and fixing of Drainage Spouts of 110mm UPVC Metre Type A ISI marked (Working pressure 4 kg/sqcm) using suitable clamps and adhesive etc., complete. GUNTUR DIVISION-GATI SHAKTI/SOUTH CENTRAL RLY Providing & laying non pressure NP-4 Class RCC pipe with collars, jointing with 1:2 cement and ordinary sand mortar including testing of joints, but excluding earthwork with all labour and material as a complete job. Cement for mortar will be paid separately.(Pipes of 600mm dia and above will be laid using crane/hydra).
Supplying, spreading and filling coarse sand (no cohesive cum materials to be used) of approved quality including watering and ramming in foundation, behind the abutment, wing wall, retaining wall in layers not exceeding 150mm thick including its compaction as per direction of Engineer-in-charge. The rate includes all lead, lift, ascent, descent, crossing of Railway line etc. complete with contractor's labour, materials, tools and plant. Recoupment of ballast in running line with railway's stone ballast from existing stacks available along alignment either on top of cutting or on cess or at toe of bank by head leads or by any other means and spreading to make up deficiency in the required profile with contractor's labour, tools & plants, as directed by Engineer-in-charge. Note: Payment shall be made based on ballast stack measurement.
For average lead up to 50m and lift up to 5m
Extra over item no. 082011 for each additional average Each lead of 50m or part thereof when total average lead exceeds 50m, but up to 250m. Note: This item may be used only in exceptional circumstance under prior order on record.
Boxing and profiling of ballast as per procedure TRM prescribed in latest edition of IRPWM including cess dressing on both sides of track. The work will include removing excess ballast from track and putting the same in crib and shoulder by leading to a maximum of 50m including crossing of track, deweeding on ballast section etc and as directed by Engineer-In charge. Manufacturing, supply and stacking of machine crushed Track Ballast conforming to RDSO Specification (IRS-GE- 1) with latest correction slips at Railway depot or nominated location. Note: Distance of nearest quarry mentioned in each sub-item is only for the purpose of selecting the items for preparation of estimates/tender schedule, based on the minimum distance between nearest quarry and centre of supply points and will not affect the selection of quarry during physical supply in any way till prescribed specification is met fully.
When distance of nearest quarry is up to 10 km
Opening of level crossing up to required width from Sqm centre line of track for replacement of sleepers by digging of pucca road surface up to bottom of sleeper, removing of ballast, muck etc., screening of ballast & stacking the same near level crossing and disposing of all debris, replacing the required sleeper duly packing the sleeper to make fit for normal traffic and closing of LC surface with screened ballast to original level by proper ramming and consolidation to smooth motarable surface as directed by engineer in-charge.
Dismantling existing check rail of Level Crossing, blocks, RM bolts & nuts and stacking these in a countable manner near LC, free from any infringements as directed by Engineer in-charge.
Dismantling exiting Rail Height Gauge carefully and Each stacking the released material in countable manner, free from any infringements as directed by Engineer in- Charge including removal of cement concrete foundation and making surface clean.
Dismantling existing lifting barrier along with winch Set assembly and other components like boom, fringes, locking arrangements, pedestal, boom rest, locking rods/wires, pulley stakes, turn out wheels, 'A' base and other materials connected with functioning of lifting barrier, removing engineering indicators on track and level crossing road signages without any damage including demolishing concrete base of existing structures, filling, ramming and levelling the ground disturbed during demolition, clearing debris and stacking all released material in a neat and countable manner and clear of infringements, as directed. Note: Barriers on both sides of level crossing constitute one set. GUNTUR DIVISION-GATI SHAKTI/SOUTH CENTRAL RLY
Dismantling of existing rail fencing, fixed adjoining MT running lines of track, duly excavating and levelling the foundation by hand compaction, removing connections and carting the released material up to a lead of 250m by suitable means and stacking the same, as directed by engineer in-charge. Note: The released materials shall be handed over duly stacking the same in measurable fashion.
Dismantling existing whistle boards along with post Each including demolishing base concrete and levelling of ground, stacking released materials at the level crossing concerned including clearing of debris, with contractor's labour, tools, vehicles, consumables, all lead and lift etc., complete without damage as directed by the Engineer-in- charge.
Manufacture of flared portion of Guard Rail by cutting Set and bending to required shape & RDSO's approved drawings. Note: (1) Rails shall be supplied by Railways. (2) One set consists of two rails i.e. both left and right.
Providing and fixing of flared portion of guard rails of any Set rail section over PSC sleepers including fixing of with all fittings, including leading of rails and fittings, squaring and adjusting spacing of sleepers as required, providing nose blocks duly cutting wooden blocks supplied by railways and fixing it with bolts of 16mm dia as directed complete and finished as per RDSO's approved drawing. Note: 1.One set consists of LH & RH side rails of one end. 2.Required P.Way fittings will be supplied at SSE stores depot.
Drilling holes 25mm to 40mm dia. with drill twist in the Each foot of guard rails for fixing guard rails on bridge as directed.
Drilling of 25mm to 40mm dia. holes in PSC sleepers with Each suitable rotary hammer / drilling machine at indicated location for fixing of guard rails on bridges & its approaches as per approved drawing and fixing of contractor's HDPE dowels and adhesive of approved quality to Drawing no. RDSO/T-3002, procured from RDSO's approved sources with contractor's materials and consumable. Total 115377113.55
Item Breakup - D-List of items that are covered by CPWD's Delhi schedule of Rates 2023 Vol.1 & Vol.2
Item Breakup - E-List of items that are covered by SCR USSOR 2021 (Structural Steel)
Providing, fabricating & fixing in position to exact design MT profiles, H.T.S. cables of all classification made from Low Relaxation strands conforming to IS:14268- latest version i n Prestressed (Post-tensioned) Concrete girders/slabs etc. including supplying, cutting, making into cables with necessary spacers, colour coding, protecting with water soluble oil at all time, anchoring of cables, supplying and placing spiral corrugated type galvanized metal steel ducts sheathing made up of Cold Rolled Cold Annealed (CRCA) mild steel conforming to IS:513 of required diameter/ thickness, vent pipe, placing, bending, routing, fixing, stressing & grouting of cable ducts with cement grout, Anchorage sets in required number with provision for future prestressing if any including all lead and lift with contractor's own materials, labour, equipments etc. complete as per drawings & specifications. Rate also includes covering anchorage pads with epoxy mortar of approved quality to avoid corrosion. Cement for grouting to be paid separately. Payment shall be made in terms of weight of HTS cables as per drawing. GUNTUR DIVISION-GATI SHAKTI/SOUTH CENTRAL RLY Supplying, fabrication, assembling of all types of steel girders of specified spans with structural steel conforming to Quality "B0" Grade Designation E250 conforming to IS:2062, erection / slewing / end launching of steel girders with cranes or any other approved launching methods as per site conditions (not requiring traffic block) on sub-structure including provision of trolley refuges etc., complete as per approved QAP and drawings conforming to IRS-B1-2001 and other relevant codes and specifications. Note: 1. Detailed fabrication and erection drawings & launching methodology will be prepared by the contractor and got approved from Railway. 2. The rate is all inclusive including launching in position, complete in all respect except cost of (i) Painting / Metalising; (ii) Bearings & (iii) HSFG bolts which shall be paid extra under relevant item. 3. The payment shall be made on the theoretical weight of main components and gusset plates only. 4. Payment Schedule: (i) Receipt of material at site: 40% (ii) Fabrication of girders: 20% (iii) Erection/Launching: 20% (iv) Completion in all respects: 20%
Plate Girder/Semi (Steel Work)
Extra for using steel conforming to Grade Designation MT E350 instead of Grade Designation E250 of Quality "B0" as per IS: 2062
Supplying and fixing HSFG bolts of any dia and any Kg length with suitable nuts including DTI washers conforming to IRS-B1-2001 f o r bridges and steel structures with contractors labour, tools and plants and lead and lift etc., complete. Metallizing of steel work of girders with sprayed aluminium after surface preparation by Sand/grit blasting, followed by one coat of etch primer (IS:5666) & one coat of Zinc Chrome primer (IS:104) and two coats of aluminium paint (IS:2339) with all labour, T&P and material as a complete job duly conforming to all relevant specifications and process given under Clause 39 of IRS-B1-2001. Note: Nominal Thickness of sprayed Aluminium coating shall be 150 microns. DFT of Zinc chrome primer shall be 25-30 microns and DFT of each coat of Aluminium paint shall be 12-14 microns.
On new girder during fabrication
Providing and fixing railing used in rows for footpath or Kg anti-crash barrier railing with B class G.I. pipe 65/50 mm nominal dia including cost of M.S. angle and channels in vertical posts, welding / bolting, priming painting with one coat ready mix Zinc Chromate conforming to IS:104 with DFT of 25-30Microns, followed by one coat of Zinc Chrome red oxide conforming to IS:2074 with DFT of 25 Microns with all material, labour, T&P as a complete job. Note: Cost of painting shall be paid extra under relevant item.
Supplying, Fabricating and fixing access ladders, MT inspection platforms, Trolley refuges etc., on bridges with structural steel conforming to IS:2062 including welding / bolting, priming painting with one coat of ready mixed paint of Zinc Chromate (IS:104) with DFT of 25-30 microns followed by one coat of Zinc Chrome Red Oxide (IS:2074) with DFT of 25 microns with all material, labour, T&P as a complete job. Note: Painting shall be paid separately under relevant item. Painting of cleaned plate/composite bridge girders including all scaffolding along with provision of Jhoola / hanging scaffolding ladders etc. where required.
With two coats of Aluminium paint in dual containers Sqm conforming to IS:2339 with DFT of 15 - 20 Microns for each coat.
Supplying fabricating and erecting welded and/or bolted MT and/or riveted steel work in built up sections, trusses and framed work, staging, racks, Height Gauge etc. for Steel Structures other than bridge girders, using RSJ, tees, angles and channels/flats, plates, gussets, round or square bars, cleats, bolts etc., with contractors own steel including cutting, bending, straightening, drilling, riveting, hoisting, fixing, erecting, welding, bolting etc., with Providing stiffeners wherever required as per approved drawing including applying a priming coat of a approved steel primer with all contractor's materials, labour, tools & plants, lead & lift including crossing of tracks if required etc., complete as per specification and as directed by Engineer-in-charge. Note: The payment shall be made on the theoretical weight of main components and gusset plates only. Total 185219296.38
Item Breakup - F-List of items that are covered by SCR USSOR 2021 (Reinforcement)
Thermo-Mechanically Treated bars of grade Fe-500D or Kg more of approved brands/makes. Total 299025783.00
Item Breakup - G- List of items that are covered by SCR USSOR 2021( CEMENT)
Ordinary Portland brands/makes Total 67937781.60
Item Breakup - C1-List of items that are covered by SCR USSOR 2021(Bearings)
Design, manufacturing, supplying and fixing in position Cubic elastomeric bearing true to line and level conforming to Centimetre IS:3400, IS:226, BS-5400 under prestressed concrete girders/ Steel Girders, for Pre-cast as well as cast-in-situ girders as per approved drawing. The rate shall include cost of load test of one no. bearing from Railway approved firms and all fixing materials, equipments, machineries, labour, taxes, loading, unloading, leading, lifting etc. complete. Rates include getting the drawing approved from Railway and cost of inspection during manufacturing from railway approved organization.Note : 1. The rate is for finished item complete and paid only after fixing in position below the girder. 2. The volume shall be as given in the drawing and no deduction shall be made for inserted steel plates etc. Design, supply, fitting and fixing in position true to line and level POT-PTFE bearing of 300MT Capacity, consisting of a metal piston supported by a disc or un reinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against stainless steel mating surface, complete assembly to be of cast steel / fabricated structural steel, metal and elastomer elements complete as per IS:2062, IS:1030, AISI:304, AISI:316, IS:6911, BS:3784, IS:3400, IS:226, BS- 5400, Bridge Code and as per approved drawing and Technical Specifications. The design of the bearings shall be submitted by the manufacturers / contractor and got approved from Railway before fixing. Test report after inspection of the bearings shall be submitted and got approved before the materials are lifted from the manufacturer premises.
POT-cum -PTFE Bearing (Free end)
POT Bearing-Fixed Type
POT-cum -PTFE Guided (L)Bearing
POT-cum -PTFE Guided (T)Bearing Total 9336712.40
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
1Systemimprovments1.pdf
ATTACHMENT
Bidcapacity10crs.pdf
ATTACHMENT
4-BidSecurity1.pdf
ATTACHMENT
5-ConditionsforMetalizingandPainting.pdf
ATTACHMENT
6-DefectsLiabilityClause_1.pdf
ATTACHMENT
7-EstablishmentofSitelab.pdf
ATTACHMENT
8-GeneralconditionDoc.pdf
ATTACHMENT
9-Instructiontothetenders.pdf
ATTACHMENT
10-Safetyprecautions.pdf
ATTACHMENT
11-SAFETYPRECAUTIONSTOBETAKENATWORKSITE.pdf
ATTACHMENT
ACSs_1.pdf
ATTACHMENT
GCC-2022.pdf
ATTACHMENT
JVAgtFormat-1.pdf
ATTACHMENT
JVMOUFormat-2.pdf
ATTACHMENT
SpecialConditionsforJCB.pdf
ATTACHMENT
NewSimilarNature2025.pdf
ATTACHMENT
26.02.2026_RevisedApprovedlistofBrandsandMakes2026withallenclosures.pdf Revised Approved list of Brands
ATTACHMENT
ACS7to10.pdf
ATTACHMENT
GCCACS11.pdf
ATTACHMENT
LCNo-27HQReleaseApproved1.pdf
ATTACHMENT
LCNo-40HQReleaseApproved1.pdf
ATTACHMENT
SpecialconditionsforLCNo2740-1-76.pdf
ATTACHMENT
SpecialconditionsforLCNo2740-77-153_11zon.pdf
ATTACHMENT
GS89MasterDocument01Works2022.pdf
ATTACHMENT
GS-89MasterDocument02Works2022.pdf
ATTACHMENT
26.02.2026_RevisedApprovedlistofBrandsandMakes2026withallenclosures.pdf
ATTACHMENT
Download all tender documents and submit your bid