Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-AOC | ₹3.0 L | L1 | Accepted-AOC lowest bidder accepted as per committe resolutions |
| 2 | L2₹3.0 L+₹2,894.58 (0.97%)Rejected-AOC | ₹3.0 L+₹2,894.58 (0.97%) | L2 | Rejected-AOC second bidder |
| 3 | L3₹3.0 L+₹3,278.09 (1.10%)Rejected-Finance | ₹3.0 L+₹3,278.09 (1.10%) | L3 | Rejected-Finance THIRD BIDDER |
| Sl No | Description | Qty | Unit | ALI MOHAMMED K K L1 | SUJEESH RADHSKRISHNAN L2 | vishnu m v L3 |
|---|---|---|---|---|---|---|
| 1.00Maintenance of well | ||||||
| 1.00 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 57 | hour | 314.2 ₹17,909.4 Lowest | 317.38 ₹18,090.66 | 317.38 ₹18,090.66 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 53.17 | cum | 234.26 ₹12,456.78 Lowest | 236.63 ₹12,582.8 | 236.63 ₹12,582.8 |
| 1.00 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 549.09 | cum | 119.13 ₹65,413.33 Lowest | 120.34 ₹66,077.73 | 120.34 ₹66,077.73 |
| 1.00 | OD44783/2026-2027:ENGAGING COOLIE | 54 | Day | 984.06 ₹53,139.24 Lowest | 994 ₹53,676 | 994 ₹53,676 |
| 1.00 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 82.82 | sqm | 336.23 ₹27,845.56 Lowest | 339.63 ₹28,127.14 | 339.63 ₹28,127.14 |
| 1.01 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 558.17 | kg | 162.25 ₹90,562.43 Lowest | 163.89 ₹91,477.83 | 163.89 ₹91,477.83 |
| 1.01 | 13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer | 82.82 | sqm | 73.51 ₹6,087.88 Lowest | 74 ₹6,128.46 | 74.26 ₹6,149.99 |
| 1.01 | 13.88:Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. | 164.01 | sqm | 18.62 ₹3,053.94 Lowest | 18.81 ₹3,085.1 | 18.81 ₹3,085.1 |
| 1.01 | 13.98.1:Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade:One or more coats on old work | 136.08 | sqm | 103.61 ₹14,099.66 Lowest | 104 ₹14,152.74 | 106.66 ₹14,514.72 |
Tender Value
₹3.0 L
EMD Value
₹7,498
Closing Date
15 Jun 2026, 4:00 pmClosed
ASSISTANT ENGINEER
ae nannamukku
NANNAMUKKU GP202627P.NO.67/26 RENOVATION OF PUBLIC WELL
2026_LSGD_854448_1
001/2026/AE/LSGD/NNMK
Open Tender
Civil Works - Water Works
Item Rate
NANNAMUKKU GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹665
Yes
₹7,498
Yes
16 Jul 2026
5 Jun 2026
16 Jun 2026
5 Jun 2026
15 Jun 2026
5 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Maintenance of well | |||||
| 1.001 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | - | hour | - | - |
| 1.002 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 1 | cum | - | - |
| 1.003 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 0.8 | cum | - | - |
| 1.004 | OD44783/2026-2027:ENGAGING COOLIE | - | Day | - | - |
| 1.005 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 0.8 | sqm | - | - |
| 1.006 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 0.4 | kg | - | - |
| 1.007 | 13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer | 0.8 | sqm | - | - |
| 1.008 | 13.88:Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. | 0.6 | sqm | - | - |
| 1.009 | 13.98.1:Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade:One or more coats on old work | 0.6 | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1444179.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.37 MB
Tendernotice_2.pdf
PDF • 0.29 MB
Tendernotice_3.pdf
PDF • 0.24 MB
BOQ_1444179.xls
BOQ • 0.30 MB
viewsbd.pdf
Tender Documents • 1.63 MB
affi.pdf
Tender Documents • 0.28 MB
pa.pdf
Tender Documents • 0.30 MB
ipact.pdf
Tender Documents • 0.23 MB
epay.pdf
Tender Documents • 0.28 MB
fot.pdf
Tender Documents • 0.29 MB
FEE.pdf
Tender Documents • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .