| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹40.5 LAccepted-AOC | 1 | Accepted-AOC agmt executed | |
| 2 | 2₹44.8 L+₹4.3 L (10.7%)Rejected-AOC TN | VIRUDHUNAGAR | TAMIL NADU | 626001 | 2 | Rejected-AOC L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical L4 | |
| 4 | Rejected-Technical | - | Rejected-Technical L3 |
| Sl No | Description | Qty | Unit | SHINE MM L1 | Vineeth R L2 | SHANDAS. K.G L3 | RAJESH.P.L L4 |
|---|---|---|---|---|---|---|---|
| 1.00POND | |||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 140.4 | cum | 325 ₹45,630 | 324.29 ₹45,530.32 Lowest | 356.69 ₹50,079.28 | 400 ₹56,160 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 480 | cum | 250 ₹1,20,000 | 232.24 ₹1,11,475.2 Lowest | 255.45 ₹1,22,616 | 300 ₹1,44,000 |
| 1.00 | 2.33.1:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth | 10 | each | 50 ₹500 Lowest | 496.54 ₹4,965.4 | 546.15 ₹5,461.5 | 600 ₹6,000 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 26.3 | cum | 8,000 ₹2,10,400 | 7,151.48 ₹1,88,083.92 Lowest | 7,865.9 ₹2,06,873.17 | 8,109.18 ₹2,13,271.43 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 56 | sqm | 370 ₹20,720 | 348.12 ₹19,494.72 Lowest | 382.9 ₹21,442.4 | 400 ₹22,400 |
| 1.01 | OD118653/2025-2026:DRY RUBBLE MASONRY :-Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc.complete as per direction of departmental officers at site. | 396.2 | cum | 3,000 ₹11,88,600 Lowest | 3,600.1 ₹14,26,359.62 | 3,959.74 ₹15,68,848.99 | 4,082.21 ₹16,17,371.6 |
| 1.01 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 82 | cum | 6,000 ₹4,92,000 Lowest | 7,521.63 ₹6,16,773.66 | 8,273.03 ₹6,78,388.46 | 8,528.9 ₹6,99,369.8 |
| 1.01 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 35.7 | cum | 9,000 ₹3,21,300 | 8,982.46 ₹3,20,673.82 Lowest | 9,879.79 ₹3,52,708.5 | 10,185.35 ₹3,63,617 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 3,900 | kilogram | 95 ₹3,70,500 Lowest | 101.34 ₹3,95,226 | 111.47 ₹4,34,733 | 114.92 ₹4,48,188 |
Tender Value
₹50.8 L
EMD Value
₹50,000
Closing Date
25 May 2026, 6:00 pmClosed
ASSISTANT EXECUTIVE ENGINEER
CORPORATION OF TVM
PROJECT NO.2058/26 COMPLETION OF KOTTILAKKONAM KULAM IN PEROORKADA WARD
2026_LSGD_851562_1
AEE2/TENDER/2058/26-27
Open Tender
Civil Works - Others
Item Rate
180 days
TVM CORPORATION
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
29 Sept 2026
18 May 2026
26 May 2026
18 May 2026
25 May 2026
18 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1POND | |||||
| 1.001 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | - | cum | - | - |
| 1.002 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | - | cum | - | - |
| 1.003 | 2.33.1:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth | - | each | - | - |
| 1.004 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.005 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | - | sqm | - | - |
| 1.006 | OD118653/2025-2026:DRY RUBBLE MASONRY :-Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc.complete as per direction of departmental officers at site. | 1 | cum | - | - |
| 1.007 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | - | cum | - | - |
| 1.008 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.009 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | - | kilogram | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1438843.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1438843.xls
BOQ • 0.31 MB
PRELIAGT.pdf
Tender Documents • 0.14 MB
1Integrity.pdf
Tender Documents • 0.23 MB
AFFIDAVIT.pdf
Tender Documents • 0.13 MB
1Epay.pdf
Tender Documents • 0.23 MB
FORM.pdf
Tender Documents • 0.03 MB
SBD2058.pdf
Tender Documents • 3.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .