| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18 LAccepted-AOC 1170 BENGALI MOHALLA NEAR PRABHAKAR HOSPITAL AMBALA CANTT 133001 | AMBALA | HARYANA | 133001 | ₹18 L Quoted ₹18.9 L | L1 | Accepted-AOC BEING LOWEST BIDDER |
| 2 | L2₹21 L+₹2.1 L (10.8%)Rejected-Finance | ₹21 L+₹2.1 L (10.8%) | L2 | Rejected-Finance Other than lowest bidder |
| 3 | L3₹22.0 L+₹3.0 L (15.9%)Rejected-Finance 195 MAHESH NAGAR AMBALA CANTT 133001 | AMBALA | HARYANA | 133001 | ₹22.0 L+₹3.0 L (15.9%) | L3 | Rejected-Finance Other than lowest bidder |
| 4 | L4₹22.6 L+₹3.6 L (19.1%)Rejected-Finance 154 GANDHI MARKET AMBALA CANTT HARYANA 133001 | AMBALA CANTT | AMBALA | HARYANA | 133001 | ₹22.6 L+₹3.6 L (19.1%) | L4 | Rejected-Finance Other than lowest bidder |
| 5 | L5₹23.4 L+₹4.5 L (23.8%)Rejected-Finance 186 GANDHI MARKET AMBALA CANTT 133001 | AMBALA CANTT | AMBALA | HARYANA | 133001 | ₹23.4 L+₹4.5 L (23.8%) | L5 | Rejected-Finance Other than lowest bidder |
| Sl No | Description | Qty | Unit | Raman Electric Trading Co L3 | kapil enterprises L6 | M/S Sonu Traders L5 | Esha Engineers L4 | LAKHANPAL ELECTRIC L2 | The Rahul Vig L1 | MM Engineers L7 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavating in trenches in soft/loose soil not exceeding 1.50 metre wide and not exceeding 1.50 metre in depth for foundation for pipes, wells, cesspits, manholes, pier holes,cables etc not exceeding 10 Sqm on plan and not exceeding 1.50 metre in depth and getting out complete all as specified and directed. | 480 | Cubic Metre | 90 ₹43,200 | 120 ₹57,600 | 90 ₹43,200 | 60 ₹28,800 Lowest | 90 ₹43,200 | 150 ₹72,000 | 125 ₹60,000 |
| 2.00 | Returning, filling in, spreading, leveling, watering and well ramming in layers not exceeding 25cm thick each complete all as specified and directed. | 328 | Cubic Metre | 20 ₹6,560 | 20 ₹6,560 | 30 ₹9,840 | 20 ₹6,560 | 40 ₹13,120 | 150 ₹49,200 | 15 ₹4,920 Lowest |
| 3.00 | Removal of excavated soil to a distance not exceeding 50 metre and depositing where directed at a level not exceeding 1.5 metre above the starting point complete all as specified and directed. | 184 | Cubic Metre | 20 ₹3,680 | 20 ₹3,680 | 30 ₹5,520 | 20 ₹3,680 | 50 ₹9,200 | 150 ₹27,600 | 15 ₹2,760 Lowest |
| 4.00 | Material and labour for sand cushioning to cable with a layer of sand 8 cm deep before laying the cable and 15 cms deep after laying the cable (punned down to 18 cms depth after laying and stretching of cable) complete all as specified and directed. | 154 | Cubic Metre | 280 ₹43,120 | 350 ₹53,900 | 350 ₹53,900 | 400 ₹61,600 | 100 ₹15,400 Lowest | 300 ₹46,200 | 480 ₹73,920 |
| 5.00 | Material and labour for bricks, common burnt clay, sub class "B", old size, laid in vertical direction to cable as cable protection complete all as specified and directed. | 15 | 1000 Nos | 2,700 ₹40,500 | 5,000 ₹75,000 | 3,000 ₹45,000 | 4,000 ₹60,000 | 2,200 ₹33,000 Lowest | 3,000 ₹45,000 | 5,000 ₹75,000 |
| 6.00 | All as per Ser Item No 5.00 here in before but Reuse of old brick complete all as specified and directed.
Note:- Old bricks retrieved from Ser Item No 11.00 to 15.00 here in after shall be re-used. | 3,000 | Each | 0.5 ₹1,500 Lowest | 0.5 ₹1,500 Lowest | 2 ₹6,000 | 2 ₹6,000 | 0.5 ₹1,500 Lowest | 2 ₹6,000 | 5 ₹15,000 |
| 7.00 | Material and labour for PCC (1:4:8) type D-2 using 40mm graded crushed stone aggregate as in foundation for pole/stay assembly including necessary formwork complete all as specified and directed | 0.3 | Cubic Metre | 1,000 ₹300 Lowest | 2,000 ₹600 | 2,500 ₹750 | 3,000 ₹900 | 1,400 ₹420 | 3,000 ₹900 | 2,880 ₹864 |
| 8.00 | Material and Labour PCC (1:2:4) type B-2 using 20mm graded stone aggregate as in foundation for pole/stay assembly, coping of poles complete all as specified. | 0.2 | Cubic Metre | 1,000 ₹200 Lowest | 2,000 ₹400 | 2,500 ₹500 | 4,000 ₹800 | 1,400 ₹280 | 3,000 ₹600 | 2,880 ₹576 |
| 9.00 | Material and labour for PCC (1:3:6) type C-2 using 40mm graded crushed stone aggregate as in foundation for pole/stay assembly including necessary formwork complete all as specified and directed | 3 | Cubic Metre | 1,000 ₹3,000 Lowest | 2,000 ₹6,000 | 2,500 ₹7,500 | 4,200 ₹12,600 | 1,600 ₹4,800 | 3,000 ₹9,000 | 2,880 ₹8,640 |
| 10.00 | Disconnecting & taking out defective underground cable from trenches, pole, pipe, floor, wall etc and locate the fault, rectify the defect and relaying the XLPE cable underground PVC insulated and overall sheathed aluminum conductor heavy duty 1100 volts including connecting and testing for any size complete all as specified and directed.
Note:- Excavation/earth work & sand cushioning, bricks and joint shall be measured & paid for separately. | 400 | Running Metre | 20 ₹8,000 | 20 ₹8,000 | 10 ₹4,000 | 5 ₹2,000 Lowest | 90 ₹36,000 | 10 ₹4,000 | 65 ₹26,000 |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
11 Jun 2026, 6:00 pmClosed
GE UTILITY AMBALA
GE UTILITY AMBALA CANTT 133001
REPAIR MAINTENANCE OF STREET LIGHTS HIGH MAST LIGHTS PERIMETER LIGHTS INCL ALLIED WORK AT SECTOR B2 UNDER GE UTILITY AMBALA CANTT
2026_MES_766597_1
CA NO GE U AMB 51 OF 2026-27
Open Tender
Civil Works
Item Rate
240 days
GE UTILITY AMBALA CANTT
AS PER TENDER DOCUMENTS
7 documents required · 7 mandatory
₹500
GE UTILITY AMBALA CANTT
₹60,000
14 Aug 2026
20 May 2026
13 Jun 2026
20 May 2026
11 Jun 2026
4 Jun 2026
20 May 2026 - 27 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavating in trenches in soft/loose soil not exceeding 1.50 metre wide and not exceeding 1.50 metre in depth for foundation for pipes, wells, cesspits, manholes, pier holes,cables etc not exceeding 10 Sqm on plan and not exceeding 1.50 metre in depth and getting out complete all as specified and directed. | 480 | Cubic Metre | - | - |
| 2 | Returning, filling in, spreading, leveling, watering and well ramming in layers not exceeding 25cm thick each complete all as specified and directed. | 328 | Cubic Metre | - | - |
| 3 | Removal of excavated soil to a distance not exceeding 50 metre and depositing where directed at a level not exceeding 1.5 metre above the starting point complete all as specified and directed. | 184 | Cubic Metre | - | - |
| 4 | Material and labour for sand cushioning to cable with a layer of sand 8 cm deep before laying the cable and 15 cms deep after laying the cable (punned down to 18 cms depth after laying and stretching of cable) complete all as specified and directed. | 154 | Cubic Metre | - | - |
| 5 | Material and labour for bricks, common burnt clay, sub class "B", old size, laid in vertical direction to cable as cable protection complete all as specified and directed. | 15 | 1000 Nos | - | - |
| 6 | All as per Ser Item No 5.00 here in before but Reuse of old brick complete all as specified and directed.
Note:- Old bricks retrieved from Ser Item No 11.00 to 15.00 here in after shall be re-used. | 3,000 | Each | - | - |
| 7 | Material and labour for PCC (1:4:8) type D-2 using 40mm graded crushed stone aggregate as in foundation for pole/stay assembly including necessary formwork complete all as specified and directed | 0.3 | Cubic Metre | - | - |
| 8 | Material and Labour PCC (1:2:4) type B-2 using 20mm graded stone aggregate as in foundation for pole/stay assembly, coping of poles complete all as specified. | 0.2 | Cubic Metre | - | - |
| 9 | Material and labour for PCC (1:3:6) type C-2 using 40mm graded crushed stone aggregate as in foundation for pole/stay assembly including necessary formwork complete all as specified and directed | 3 | Cubic Metre | - | - |
| 10 | Disconnecting & taking out defective underground cable from trenches, pole, pipe, floor, wall etc and locate the fault, rectify the defect and relaying the XLPE cable underground PVC insulated and overall sheathed aluminum conductor heavy duty 1100 volts including connecting and testing for any size complete all as specified and directed.
Note:- Excavation/earth work & sand cushioning, bricks and joint shall be measured & paid for separately. | 400 | Running Metre | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.48 MB
Tender.pdf
Tender Documents • 0.84 MB
BOQ_858567.xls
BOQ • 0.77 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .