WC4804 Upgradation of bay equipment at Gooty substation under reconductoring of Gooty Thumkur Pavagada 400KV Double circuit line with HTLS conductor
SR1/NT/W-HF/DOM/B00/26/13161
Open
Electrical Work/ Equipment
Works
Gooty SS
As per Tender Documents
₹2,500
₹1.9 L
19 Sept 2026
19 Sept 2026
12 Oct 2026
19 Sept 2026
10 Oct 2026
19 Sept 2026
28 Sept 2026
Name of Package : WC-4402: 400KV AIS Substation Extension Package of Kurnool-3 PS due to Re-Arrangement in Electrical Layout at Kurnool-III Pooling Station
Specification No. : SR-I/C&M/WC-4402/2025(SR1/NT/W-AIS/DOM/B00/25/13182), (RFx: 5002004796)
Completion Period 12.0
Contract & Materials Dept.,
Power Grid Corporation of India Ltd.,
Kavadiguda Main Road,
Secunderabad -500080.
: Attachments: General guidelines for filling up the Attachments
WC-4804: “Upgradation of bay equipment at Gooty substation under reconductoring of Gooty-Thumkur (Pavagada) 400KV D/C line with HTLS conductor”
Specification No: SR-I/C&M/WC-4804/2026/RFx: 5002005649 (SR1/NT/W-AIS/DOM/B00/26/12524)
1 Fill up only green shaded cells in the relevent attachments.
2 Attachments 3(JV), 4, 4(A), 4(B), 5, 5(A), 5(B), 6, 7, 9, 10, 11, 12, 13,14, 14-IP, 15, 16, 17, 19 and Bid Form for 1st Envelope are included here.
3 Attachment 1 Bid Security : Not Applicable.
3 Attachment 2 Power of Attorney : No specific format is provided by POWERGRID. Bidder may use their own format.
4 Attachment-3 (QR Schedule) : Format attached in Volume-III of Bidding Documents.
5 Attachment 8 Manufacturer’s Authorisation Form : To be furnished as per proforma provided in the bidding document, on the letter head of the each Manufactures proposed to supply main items. Not included here.
6 Attachment 18 Safety Pact : To be submitted as per ITB Clause No. 9.3(s) and as per remarks in the safety pact.
7 Attachment-20 to 27: To be submitted as perproforma provided in the bidding document.
Note : Enable the Active X Control & Macros. Also ensure to keep option of "Trust acess to VBA project object Model" cheched [√]. Ensure that you work on MS Excel 2007 or higher version.
WC-4804: “Upgradation of bay equipment at Gooty substation under reconductoring of Gooty-Thumkur (Pavagada) 400KV D/C line with HTLS conductor”
Specification No: SR-I/C&M/WC-4804/2026/RFx: 5002005649 (SR1/NT/W-AIS/DOM/B00/26/12524) Sole Bidder 1
JV (Joint Venture) 2 or More
Whether Bidder is MSE [Select from drop down menu] 0
Specify type of Bidder [Select from drop down menu] SOLE BIDDER SOLE BIDDER 1 1 0
1 JOINT VENTURE (JV)
Name of Sole Bidder
Address of Sole Bidder
Address of other Partner
Name of other Partner - 2 (More, if any)
Address of other Partner - 2 (More, if any) …… ……. …….. …… ……. ……..
Any Tower Parts Manufacturer proposed other than the bidder [Yes / No] No
Proposed Tower Parts Manufacturer other than the bidder, if any [Maximum two nos.]
NOTE: (In case of JV, all partners of the Joint Venture shall be MSEs to consdier its bid as bid from MSE, JV bidder with at least one non-MSE partner (whether lead or other partner) shall not be eligible for the benefit available to the MSE bidders)
Specification No: SR-I/C&M/WC-4804/2026/RFx: 5002005649 (SR1/NT/W-AIS/DOM/B00/26/12524) Attachment-3(JV) SOLE BIDDER 0
WC-4804: “Upgradation of bay equipment at Gooty substation under reconductoring of Gooty-Thumkur (Pavagada) 400KV D/C line with HTLS conductor”
(Joint Venture Agreement and Power of Attorney for Joint Venture*)
Bidder’s Name and Address : To:
Contract & Materials Dept., 1 &
Name : Power Grid Corporation of India Ltd.,
Address : Kavadiguda Main Road,
Secunderabad -500080.
This Attachment is Not Applicable
Name(s) and Addresse(s) of other partner(s)
The Joint Venture Agreement (as per the proforma attached at no. 15 in Section-VI, Sample Forms and Procedures, Conditions of Contract, Vol.-I of the Bidding Documents) and Power of Attorney for Joint Venture (as per the proforma attached at no. 14 in Section-VI, Sample Forms and Procedures, Conditions of Contract, Vol.-I of the Bidding Documents) are enclosed herewith.
Date : Printed Name : 0
Place : Designation : 12
Specification No: SR-I/C&M/WC-4804/2026/RFx: 5002005649 (SR1/NT/W-AIS/DOM/B00/26/12524) ATTACHMENT-3 (QR)
WC-4804: “Upgradation of bay equipment at Gooty substation under reconductoring of Gooty-Thumkur (Pavagada) 400KV D/C line with HTLS conductor”
(Qualifying Requirement Data)
Bidder’s Name and Address : To:
Contract & Materials Dept.,
Name: Power Grid Corporation of India Ltd.,
Address: Kavadiguda Main Road,
Secunderabad -500080.
Attachment-3 (QR) is attached with this Volume.
Date : Printed Name :
Place : Designation :
Specification No: SR-I/C&M/WC-4804/2026/RFx: 5002005649 (SR1/NT/W-AIS/DOM/B00/26/12524) Attachment-4
WC-4804: “Upgradation of bay equipment at Gooty substation under reconductoring of Gooty-Thumkur (Pavagada) 400KV D/C line with HTLS conductor”
(Form of Certificate of Origin and Eligibility)
Bidder’s Name and Address : To:
Contract & Materials Dept.,
Name : Power Grid Corporation of India Ltd.,
Address : Kavadiguda Main Road,
Secunderabad -500080.
We hereby certify that equipment and materials to be supplied are produced in [Name of Countries], eligible source country. Equipments & Materials produced in [Name of countries] Company incorporated & registered in [Name of countries]
We hereby certify that our company is incorporated and registered in [Name of Countries], eligible source country. [Name of Countries] [Name of Countries] [Name of Countries], [Name of Countries],
Date : Printed Name :
Place : Designation :
country. country. [Name of Countries], [Name of Countries],
Specification No: SR-I/C&M/WC-4804/2026/RFx: 5002005649 (SR1/NT/W-AIS/DOM/B00/26/12524) Attachment-4(A)
WC-4804: “Upgradation of bay equipment at Gooty substation under reconductoring of Gooty-Thumkur (Pavagada) 400KV D/C line with HTLS conductor”
(List of Special Maintenance Tools & Tackles)
Bidder’s Name and Address : To:
Contract & Materials Dept.,
Name : Power Grid Corporation of India Ltd.,
Address : Kavadiguda Main Road,
Secunderabad -500080.
We are furnishing below the list of special maintenance tools & tackles for various equipment under the subject package. The prices for these tools & tackles are included in our lumpsum bid price. We further confirm that the list of special maintenance tools & tackles includes all the items specifically identified in your bidding documents as brought out below:
S.No. For Equipment Item Description Unit Quantity
Notwithstanding what is stated above, we further confirm that any additional special maintenance tools and tackles, required for the equipment under this package shall be furnished by us at no extra cost to the employer.
Date : Printed Name :
Place : Designation :
Specification No: SR-I/C&M/WC-4804/2026/RFx: 5002005649 (SR1/NT/W-AIS/DOM/B00/26/12524) Attachment-4(B)
WC-4804: “Upgradation of bay equipment at Gooty substation under reconductoring of Gooty-Thumkur (Pavagada) 400KV D/C line with HTLS conductor”
(List of Special Maintenance Tools & Tackles)
Bidder’s Name and Address : To:
Contract & Materials Dept.,
Name : Power Grid Corporation of India Ltd.,
Address : Kavadiguda Main Road,
Secunderabad -500080.
We are furnishing below the list of special maintenance tools & tackles for various equipment under the subject package. The prices for these tools & tackles which are to be taken back after the completion of the work by us are not included in our lumpsum bid price. We further confirm that the list of special maintenance tools & tackles includes all the items specifically identified in your bidding documents as brought out below:
Date : Printed Name :
Place : Designation :
Specification No: SR-I/C&M/WC-4804/2026/RFx: 5002005649 (SR1/NT/W-AIS/DOM/B00/26/12524) Attachment-5
WC-4804: “Upgradation of bay equipment at Gooty substation under reconductoring of Gooty-Thumkur (Pavagada) 400KV D/C line with HTLS conductor”
(Subcontractors Proposed by the Bidder)
Bidder’s Name and Address : To:
Contract & Materials Dept.,
Name : Power Grid Corporation of India Ltd.,
Address : Kavadiguda Main Road,
Secunderabad -500080.
1.We hereby furnish the details of the items/ sub-assemblies (supply items), we propose to buy for the purpose of furnishing and installation of the subject Package :
Sl. No. Item Description Quantity proposed to be bought/sub-contracted Details of the proposed sub-contractor/sub-vendor
2. We hereby delare that we would not subcontract the erection portion of the contract without prior approval of the Employer.
Date : Printed Name :
Place : Designation :
Specification No: SR-I/C&M/WC-4804/2026/RFx: 5002005649 (SR1/NT/W-AIS/DOM/B00/26/12524) ATTACHMENT-5A
WC-4804: “Upgradation of bay equipment at Gooty substation under reconductoring of Gooty-Thumkur (Pavagada) 400KV D/C line with HTLS conductor”
Bidder’s Name and Address : To:
Contract & Materials Dept.,
Name : Power Grid Corporation of India Ltd.,
Address : Kavadiguda Main Road,
Secunderabad -500080.
1. We hereby furnish the details of the items, components, raw material, services which we propose to buy/avail from Micro and Small Enterprises (MSEs) for the purpose of completion of works under the subject package :
Sl. No. Item Description Quantity proposed to be bought/sub-contracted Name of Micro and Small Enterprises (MSEs)
Name & Address Category (Micro or Small)
2. The above is a list of items we propose to procure from MSEs. However, based on the situations during the execution of the contract, the above list may undergo changes. We hereby confirm that the details regarding actual procurement from MSEs carried out by us, as per the format provided at Section VI, Forms and Procedures, Volume-I of bidding documents, shall be submitted along with the bills for payment against supplies made/works done during execution of contract.
Date : Printed Name :
Place : Designation :
SR-I/C&M/WC-4402/2025(SR1/NT/W-AIS/DOM/B00/25/13182), (RFx: 5002004796) ATTACHMENT-5A
WC-4804: “Upgradation of bay equipment at Gooty substation under reconductoring of Gooty-Thumkur (Pavagada) 400KV D/C line with HTLS conductor”
(Declaration to source material/equipment and services from within Arunachal Pradesh)
Bidder’s Name and Address : To:
Contract & Materials Dept.,
Name : Power Grid Corporation of India Ltd.,
Address : Kavadiguda Main Road,
In line with ITB Clause 9.3 (e), we intend to supply following items which are to be manufactured within Arunachal Pradesh. We further declare that we would source material / services for atleast 30% of the Installation Price of Second /Services contract from within Arunachal Pradesh.
Sl. No. Item Description Quantity proposed to be bought/sub-contracted Details / write-up to engage the Locals sub-contractor/sub-vendor
Date : Printed Name :
Place : Designation :
Specification No: SR-I/C&M/WC-4804/2026/RFx: 5002005649 (SR1/NT/W-AIS/DOM/B00/26/12524) Attachment-6
WC-4804: “Upgradation of bay equipment at Gooty substation under reconductoring of Gooty-Thumkur (Pavagada) 400KV D/C line with HTLS conductor”
(Alternative, Deviations and Exceptions to the Provisions)
Bidder’s Name and Address : To:
Contract & Materials Dept.,
Name : Power Grid Corporation of India Ltd.,
Address : Kavadiguda Main Road,
Secunderabad -500080.
The bidder shall itemize any deviation from the Specifications included in his bid. Each item shall be listed (separate sheets may be used and enclosed with this Attachment) with the following information:
Sl. No. Reference clause in the Specifications Deviation Cost of withdrawal of the deviation
The above deviations and variations are exhaustive. We confirm that we shall withdraw the deviations proposed by us at the cost of withdrawal indicated in this attachment, failing which our bid may be rejected and Bid Security forfeited.
Date : Printed Name :
Place : Designation :
Specification No: SR-I/C&M/WC-4804/2026/RFx: 5002005649 (SR1/NT/W-AIS/DOM/B00/26/12524) Annexure I toAttachment-6
(Alternative, Deviations and Exceptions to the Provisions)
Sl. No. Reference clause in the Specifications Deviation Cost of withdrawal of the deviation
Date : Printed Name :
Place : Designation :
Specification No: SR-I/C&M/WC-4804/2026/RFx: 5002005649 (SR1/NT/W-AIS/DOM/B00/26/12524) Attachment-7
WC-4804: “Upgradation of bay equipment at Gooty substation under reconductoring of Gooty-Thumkur (Pavagada) 400KV D/C line with HTLS conductor”
(Details of Alternative Bid)
Bidder’s Name and Address : To:
Contract & Materials Dept.,
Name : Power Grid Corporation of India Ltd.,
Address : Kavadiguda Main Road,
Secunderabad -500080.
No Alternative Bid
Date : Printed Name :
Place : Designation :
Specification No: SR-I/C&M/WC-4804/2026/RFx: 5002005649 (SR1/NT/W-AIS/DOM/B00/26/12524)
WC-4804: “Upgradation of bay equipment at Gooty substation under reconductoring of Gooty-Thumkur (Pavagada) 400KV D/C line with HTLS conductor”
(Work Completion Schedule)
Bidder’s Name and Address :
We hereby declare that the following Work Completion Schedule shall be followed by us in furnishing and installation of the subject Package i.e., WC-4804: “Upgradation of bay equipment at Gooty substation under reconductoring of Gooty-Thumkur (Pavagada) 400KV D/C line with HTLS conductor” for the period commencing from the effective date of Contract to us :
Sl. No. Description of Work Period in months from the effective date of contract
1 Detailed Engineering and drawing submission
a) commencement
2 Procurement of equipment/ components & assembly
a) commencement
a) commencement
4 Manufacturing
a) commencement
5 Shipments & Delivery
a) commencement
6 Establishment of site office
7 Installation at Site
a) commencement
8 Testing & Pre-commissioning
a) commencement
9 Trial Operation
a) commencement
Date : Printed Name :
Place : Designation :
Note : Bidders to enclose a detailed network covering all the activities to be undertaken for completion of the project indicating key dates for various milestones for each phase constituent-wise.
Specification No: SR-I/C&M/WC-4804/2026/RFx: 5002005649 (SR1/NT/W-AIS/DOM/B00/26/12524) Attachment-10
WC-4804: “Upgradation of bay equipment at Gooty substation under reconductoring of Gooty-Thumkur (Pavagada) 400KV D/C line with HTLS conductor”
(Guarantee Declaration)
Bidder’s Name and Address : To:
Contract & Materials Dept.,
Name : Power Grid Corporation of India Ltd.,
Address : Kavadiguda Main Road,
Secunderabad -500080.
We confirm that the equipments offered shall have minimum performance specified in Technical Specifications. We further gurantee the performance/efficiency of the equipments in response to the Technical Specifications.
Date : Printed Name :
Place : Designation :
Specification No: SR-I/C&M/WC-4804/2026/RFx: 5002005649 (SR1/NT/W-AIS/DOM/B00/26/12524) Attachment-11
WC-4804: “Upgradation of bay equipment at Gooty substation under reconductoring of Gooty-Thumkur (Pavagada) 400KV D/C line with HTLS conductor”
(Information regarding Ex-employees of POWERGRID in our Organisation)
Bidder’s Name and Address : To:
Contract & Materials Dept.,
Name : Power Grid Corporation of India Ltd.,
Address : Kavadiguda Main Road,
Secunderabad -500080.
We declare that we are aware of and have gone through the “Code of Business Conduct and Ethics for Senior Management Personnel”1 and “Code of Business Conduct and Ethics for Board Members”1 of POWERGRID (hereinafter referred to as the “Code of Conduct”). We further understand that as per the “Code of Conduct”, Senior Management Personnel including Board Members, who have retired/resigned from POWERGRID, shall not accept any appointment or post, as detailed in the referred “Code of Conduct”, within 1 year from the date of cessation of service/directorship unless approved by the Competent Authority. Accordingly,We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
*In case the date of joining in the bidder’s organization of such ex-employee is within 1 year from the date of retirement/resignation from POWERGRID, No Objection Certificate/ approval from the Competent Authority must be furnished along with the bid or subsequent through clarification pursuant to ITB Clause 21.
In case of non-submission of No Objection Certificate/approval of the Competent Authority, as required, We understand that POWERGRID shall deal with such cases as per its Policy and procedures in vogue, which may also result in rejection of our bid. We also confirm that POWERGRID shall be the sole judge in this regard. We further declare that any misrepresentation or submission of false/forged documents/information in this regard shall be dealt with as per the provisions of the Integrity Pact and/or the Bidding Documents and/or POWERGRID’s policy and procedures.
Date : Printed Name :
Place : Designation :
Note: 1. “Code of Business Conduct and Ethics for Senior Management Personnel” and “Code of Business Conduct and Ethics for Board Members” are available on POWERGRID’s website https://www.powergridindia.com. 2. The information in similar format should be furnished for each partner of joint venture in case of joint venture bid. 3. In case bidder has furnished no details on ex-employees of POWERGRID or has left blank or has indicated ‘-‘ against the same, it shall be deemed that they have not employed any such person in their organization.
Specification No: SR-I/C&M/WC-4804/2026/RFx: 5002005649 (SR1/NT/W-AIS/DOM/B00/26/12524) Attachment-11
WC-4804: “Upgradation of bay equipment at Gooty substation under reconductoring of Gooty-Thumkur (Pavagada) 400KV D/C line with HTLS conductor”
(Information regarding Ex-employees of POWERGRID in our Organisation)
Name(s) and Addresse(s) of other partner(s) To:
Contract & Materials Dept.,
Name : Power Grid Corporation of India Ltd.,
Address : Kavadiguda Main Road,
Secunderabad -500080.
We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
Date : Printed Name :
Place : Designation :
Specification No: SR-I/C&M/WC-4804/2026/RFx: 5002005649 (SR1/NT/W-AIS/DOM/B00/26/12524) Attachment-11
WC-4804: “Upgradation of bay equipment at Gooty substation under reconductoring of Gooty-Thumkur (Pavagada) 400KV D/C line with HTLS conductor”
(Information regarding Ex-employees of POWERGRID in our Organisation)
Name(s) and Addresse(s) of other partner(s) To:
Contract & Materials Dept.,
Name : Power Grid Corporation of India Ltd.,
Address : Kavadiguda Main Road,
Secunderabad -500080.
We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
Date : Printed Name :
Place : Designation :
Specification No: SR-I/C&M/WC-4804/2026/RFx: 5002005649 (SR1/NT/W-AIS/DOM/B00/26/12524) ATTACHMENT-12
WC-4804: “Upgradation of bay equipment at Gooty substation under reconductoring of Gooty-Thumkur (Pavagada) 400KV D/C line with HTLS conductor”
(Price Adjustment Data)
Bidder’s Name and Address (Sole Bidder) : To:
0 Contract & Materials Dept.,
Name : 0 Power Grid Corporation of India Ltd.,
Address : 0 Kavadiguda Main Road,
0 Secunderabad -500080.
We hereby furnish the relevant details pertaining to the price adjustment provisions for equipment as specified in your specifications and documents for the Substation Package SS86. The necessary documentary evidence is enclosed.
Sl. No. Name of Materials/Labour Value of co-efficient Name of the published index Value of index
In accordance with Clause 2, Appendix-2, Form of Contract Agreement, Section-VI; Forms. Volume-I
A) For Equipment Ex-Works Price Component
I Reactor (excluding Insulating Oil) (ratings above 10MVAR or voltage above 33kV up to 400kV)
i) Copper a= Price Indices for copper wire rod, as published by IEEMA.
ii) Electrical Lamination Steel b= Price of CRGO Electrical Steel Lamination as published by IEEMA.
iii) Construction Steel c= Average price of Steel Plates (10mm thick), as published by IEEMA
iv) Insulating Material d= Price of Insulating Materials , as published by IEEMA.
v) Labour l= Indian field labour index – namely All-India Average Consumer Price Index Numbers for Industrial Workers (monthly) (Base 2016=100), as published by Labour Bureau, Shimla, Government of India (http://labourbureaunew.gov.in)
ERROR -Sum of all the coefficients including labour is not equal to 0.85
The sum of all the coefficients including labour shall be a+b+c+d+l=0.85
II Insulating oil for Reactors (ratings above 10MVAR or voltage above 33kV up to 400kV):
a) Insulating Oil e= 0.85 Transformer Oil (TO): Transformer oil conforming to IS:335-1993, supplied in drum(Ex-Refinery, Mumbai) as published by IEEMA.
I Circuit Breaker
a) Raw Material
b) Labour l= Indian field labour index – namely All India average consumer price index for Industrial Workers (monthly) (Base: 2016= 100), as published by Labour Bureau, Shimla, Government of India (www.labourbureau.nic.in).
The sum of the value of coefficients for raw materials: a+b+c+d=0.55 to 0.65 and sum of all the coefficients including labour shall be a+b+c+d+l=0.85.
a) Raw Material
b) Labour I= l= Indian field labour index – namely All India average consumer price index for Industrial Workers (monthly) (Base: 2001= 100), as published by Labour Bureau, Shimla, Government of India (www.labourbureau.nic.in).
The sum of the value of coefficients for raw materials: a+b+c+d=0.55 to 0.65 and sum of all the coefficients including labour shall be a+b+c+d+l=0.85.
II Capacitive VoltageTransformer
a) Raw Material
b) Labour l= Indian field labour index – namely All India average consumer price index for Industrial Workers (monthly) (Base: 2016= 100), as published by Labour Bureau, Shimla, Government of India (www.labourbureau.nic.in).
The sum of the value of coefficients for raw materials: a+b+c+d=0.55 to 0.65 and sum of all the coefficients including labour shall be a+b+c+d+l=0.85.
III Current Transformer
a) Raw Material
b) Labour l= Indian field labour index – namely All India average consumer price index for Industrial Workers (monthly) (Base: 2016= 100), as published by Labour Bureau, Shimla, Government of India (www.labourbureau.nic.in).
The sum of the value of coefficients for raw materials: a+b+c+d=0.55 to 0.65 and sum of all the coefficients including labour shall be a+b+c+d+l=0.85.
a) Raw Material
b) Labour l= Indian field labour index – namely All India average consumer price index for Industrial Workers (monthly) (Base: 2016= 100), as published by Labour Bureau, Shimla, Government of India (www.labourbureau.nic.in).
The sum of the value of coefficients for raw materials: a+b+c+d=0.55 to 0.65 and sum of all the coefficients including labour shall be a+b+c+d+l=0.85.
V Surge Arrester
a) Raw Material
b) Labour I= Indian field labour index – namely All India average consumer price index for Industrial Workers (monthly) (Base: 2016= 100), as published by Labour Bureau, Shimla, Government of India (www.labourbureau.nic.in).
The sum of the value of coefficients for raw materials: a+b+c+d=0.55 to 0.65 and sum of all the coefficients including labour shall be a+b+c+d+l=0.85.
VI PVC/XLPE Insulated Power and Control Cable
a) a=PVC Compound 0.15
b) Published Price of Metal IEEMA
i) Aluminium per MT IEEMA
ii) Copper per MT IEEMA
c) Weight in MT of Metal per kM (Size wise)
VII Substation Structures
i) Lattice Steel Structures & Pipe Structures (including bolts & nuts, washers & foundation bolts)
a) Raw Materials
i) a=Structural steel 0.58 JPC Market Price (Retail) for average Price of Steel Angles of size 50 x 50 x 6 mm of all cities in Rs./MT as published by Joint Plant Committee(JPC).
ii) b=Electrolytic Zinc 0.16 IEEMA
b) Labour 0.11 Indian field labour index – namely All India average consumer price index for Industrial Workers (monthly) (Base: 2016= 100), as published by Labour Bureau, Shimla, Government of India (www.labourbureau.nic.in).
VIII. Series Reactor [ 420 kV, 12 ohm, 2500A, 1-ph air core dry type Series Reactor]
a) Raw Material Copper(a)
i) Aluminium(a) Aluminium(a)
b) Labour I= 0.85 Indian field labour index – namely All India average consumer price index for Industrial Workers (monthly) (Base: 2001= 100), as published by Labour Bureau, Shimla, Government of India (www.labourbureau.nic.in).
The value of coefficient for raw materials: a=0.65 to 0.73 and value of coefficient for labour shall be between 0.12 and 0.20, so that sum of all the coefficients including labour shall be a+l=0.85
B. For Installation Price Component
I Installation price component (including Civil works but excluding ‘supply & placement of reinforcement steel’ and ‘concreting’)
i) Labour I= 0.80 Indian field labour index – namely All India average consumer price index for Industrial Workers (monthly) (Base: 2016= 100), as published by Labour Bureau, Shimla, Government of India (www.labourbureau.nic.in).
II Supply & Placement of Reinforcement Steel
i) HSD 0.10 Wholesale Price Index Number for `HSD’(Individual Commodity) (monthly) (Base: 2011-12=100), as published by Office of Economic Advisor, Ministry of Commerce & Industry(www.eaindustry.nic.in).
ii) Labour I= 0.05 Indian field labour index – namely All India average consumer price index for Industrial Workers (monthly) (Base: 2016= 100), as published by Labour Bureau, Shimla, Government of India (www.labourbureau.nic.in).
iii) Manufacture of Basic Metals 0.65 Wholesale Price Index Number for `Manufacture of Basic Metals’(Group Item) (monthly) (Base: 2011-12=100), as published by Office of Economic Advisor, Ministry of Commerce & Industry(www.eaindustry.nic.in).
III For Concereting
i) HSD 0.20 Wholesale Price Index Number for `HSD’(Individual Commodity) (monthly) (Base: 2011-12=100), as published by Office of Economic Advisor, Ministry of Commerce & Industry(www.eaindustry.nic.in).
ii) Labour I= 0.10 Indian field labour index – namely All India average consumer price index for Industrial Workers (monthly) (Base: 2016= 100), as published by Labour Bureau, Shimla, Government of India (www.labourbureau.nic.in).
iii) Manufacture of cement, lime and plaster 0.30 Wholesale Price Index Number for `Manufacture of cement, lime and plaster’(Group Item) (monthly) (Base: 2011-12=100), as published by Office of Economic Advisor, Ministry of Commerce & Industry (www.eaindustry.nic.in)
iv) Cutting, shaping and finishing of stone 0.20 Wholesale Price Index Number for `Cutting, shaping and finishing of stone’(Group Item) (monthly) (Base: 2011-12=100), as published by Office of Economic Advisor, Ministry of Commerce & Industry(www.eaindustry.nic.in).
The Bidders are required to estimate and indicate the values of different coefficients for each of the items in the price variation formulae within the specified range such that their summation is as specified in the Bidding Documents. Where no value or ‘-’ or ‘shall be furnished later’ is specified against the coefficient, the same will be deemed to be zero and the fixed component would be suitably adjusted. If the values of all coefficients in price variation formulae indicated by the Bidder are within the specified range but their sum exceeds the summation specified in the Bidding Documents, the values of the coefficients shall be pro-rata adjusted such that the summation remains as per the provisions of the Bidding Documents. If the values of all coefficients indicated by the Bidder are within the specified range but their summation is less than the value specified in the Bidding Documents, the values of the coefficients as indicated by the Bidder shall be considered as such and the fixed component in the price variation formulae would be suitably adjusted. Further, if any of values of the coefficients indicated by the Bidder is out of the range specified in the Bidding Documents, the lower of the values, as indicated by the Bidder vis-à-vis lower value of the range for that coefficient specified in the Bidding Documents, shall be considered and the fixed component would be suitably adjusted.
Date : 00-Jan-00 Printed Name : 0
Place : 0 Designation : 0
Specification No: SR-I/C&M/WC-4804/2026/RFx: 5002005649 (SR1/NT/W-AIS/DOM/B00/26/12524) Attachment-13
WC-4804: “Upgradation of bay equipment at Gooty substation under reconductoring of Gooty-Thumkur (Pavagada) 400KV D/C line with HTLS conductor”
(Declaration regarding Social Accountability)
Bidder’s Name and Address : To:
Contract & Materials Dept.,
Name : Power Grid Corporation of India Ltd.,
Address : Kavadiguda Main Road,
Secunderabad -500080.
We conform that we stand committed to comply to all requirements of Social Accountability Standards i.e., SA8000 (latest Standard available at www.sa-intl.org) and maintain the necessary records.
Date : Printed Name :
Place : Designation :
Specification No: SR-I/C&M/WC-4804/2026/RFx: 5002005649 (SR1/NT/W-AIS/DOM/B00/26/12524) Attachment-14
WC-4804: “Upgradation of bay equipment at Gooty substation under reconductoring of Gooty-Thumkur (Pavagada) 400KV D/C line with HTLS conductor”
Bidder’s Name and Address : To:
Contract & Materials Dept.,
Name : Power Grid Corporation of India Ltd.,
Address : Kavadiguda Main Road,
Secunderabad -500080.
Integrity Pact is NOT Applicable
Date : Printed Name :
Place : Designation :
Specification No: SR-I/C&M/WC-4804/2026/RFx: 5002005649 (SR1/NT/W-AIS/DOM/B00/26/12524) Attachment-15
WC-4804: “Upgradation of bay equipment at Gooty substation under reconductoring of Gooty-Thumkur (Pavagada) 400KV D/C line with HTLS conductor”
(Option for Interest Bearing Advance(s) (Initial Advance and/or Engineering Advance) and Information for E-payment, PF details and declaration regarding Micro/Small & Medium Enterprises)
Bidder’s Name and Address : Contract & Materials Dept.,
Name : Power Grid Corporation of India Ltd.,
Address : Kavadiguda Main Road,
Secunderabad -500080.
I We have read the provisions in the Bidding Documents regarding furnishing the option for advance payment. Accordingly, as per ITB Clause 9.3 as provided in Section BDS, Section III, Vol.-I of the Bidding Documents, we hereby confirm to opt the following:
Interest Bearing Advance(s)
(a) Supply Portion:
(i) Interest bearing Initial advance :
(ii) Interest Bearing Engineering Advance (for Substation Portion):
(b) Services Portion: Interest Bearing Initial Advance
II We are furnishing the following details of Statutory Registration Numbers and details of Bank for electronic payment.
1. Name of the Supplier/ Contractor in whose favour payment is to be made
2. Address with PIN Code and State
Registered Office:
Correspondence Address:
3.(a) Status – Company/others
[Declaration of Micro/ Small/ Medium Enterprise under Micro/ Small & Medium Enterprises Development Act 2006, if applicable]
3.(b) Are you a MSE owned by SC/ST* entrepreneurs in line with Public Procurement Policy for Micro and Small Enterprises (MSEs) order 2012 including subsequent amendment/notification/order (Indicate Yes/No) 0
3.(c) If 3(b) is ‘Yes’ please mention whether you are (Proprietary MSE/ Partnership MSE/ Private Limited Company) owned by SC/ST entrepreneurs
3.(d) Are you a MSE owned by women in line with Public Procurement Policy for Micro and Small Enterprises (MSEs) order 2012, Public Procurement Policy for Micro and Small Enterprises (MSEs) Amendment Order 2018 including subsequent amendment/notification/order (Indicate Yes/No)
4. Permanent Account (PAN) No.
5. GSTIN Numbers
I. GSTIN in the Sates/UT from where the supply of goods take place
Name of the States/UT GSTIN number
II. GSTIN in the States/UT where the supply for services take place (states where sites under the subject package is situated)
Name of the States/UT GSTIN number
6. PF Registration No. of the Company
7. PF Regional Office covered (with Address)
8. Name of Contact Person
9. Contact Details
10. Bank Details for Electronic Payment
Name of the Bank:
Address of Branch:
Type of Account:
Type of Account: Current Account
11. 9 digit MICR code printed at bottom in middle, next to cheque no.
12. IFSC (for RTGS)/NEFT Code (to be obtained from the Bank) Sample Cancelled Cheque to be enclosed
We hereby declare that the above information are true and correct and we agree that the payment on account of this Contract, in the event of award, be made in the above account maintained in the above mentioned Bank.
*The definition of MSEs owned by SC/ST is as given under:
a. In case of proprietary MSE, proprietor(s) shall be SC /ST.
b. In case of partnership MSE, the SC/ST partners shall be holding at least 51% shares in the unit.
c. In case of Private Limited companies, at least 51% share shall be held by SC/ST promoters.
Documentary evidence: Please provide scanned copy(ies) of the SC/ST certificate(s) issued by District Authority as applicable for SC/ST MSE category as per (a), (b) or (c) above.
Date : Printed Name :
Place : Designation :
Specification No: SR-I/C&M/WC-4804/2026/RFx: 5002005649 (SR1/NT/W-AIS/DOM/B00/26/12524) Attachment-16
WC-4804: “Upgradation of bay equipment at Gooty substation under reconductoring of Gooty-Thumkur (Pavagada) 400KV D/C line with HTLS conductor”
(Additional Information)
Bidder’s Name and Address : To:
Contract & Materials Dept.,
Name : Power Grid Corporation of India Ltd.,
Address : Kavadiguda Main Road,
Secunderabad -500080.
In support of the additional information required as per ITB Sub-Clause 9.3 (p) of the Bidding Documents, we furnish herewith our data/details/documents etc., alongwith other information, as follows (the stipulations have been reproduced in italics for ready reference):
1.0 The Bidder shall furnish
A certificate from their Banker(s) (as per prescribed formats in Form 16, Section-VI: Sample Forms and Procedures) indicating various fund based/non fund based limits sanctioned to the Bidder and the extent of utilization as on date. Such certificate should have been issued not earlier than three months prior to the date of bid opening. Wherever necessary the Employer may make queries with the Bidders’ Bankers. [Reference ITB clause 9.3(p)(i)]
1.1 In accordance with 1.0, certificate(s) from banker as per requisite format, indicating various fund based/non fund based limits sanctioned to the bidder or each member of the joint venture and the extent of utilization as on date is/are enclosed, as per the following details:
Name of the Bidder (Sole Bidder)
Name of the Banker by whom certificate issued
Date of certificate (should not be earlier than 3 months prior to date of bid opening)
Whether fund based/non fund based limits are indicated in the certificate
Whether extent of utilization is indicated in the certificate
1.2 The Bidder should accordingly also provide the following information/documents
(i) Details of Banker:
Address of Banker
Contact Name and Title
(ii) As per para 1.0, Authorization Letter(s) from the bidder (in case of JV bidder, from all the partners) addressed to the Banker(s), authorizing POWERGRID to seek queries about the bidder with the Banker(s) and advising the Banker(s) to reply the same promptly, is/are enclosed as per following details:
Sl. No. Letter Ref. Date Addressed to (name of the Bank)
(iii) As per para BDS/ITB clause 9.3 q, Bidder shall furnish the details of their Provident Fund Code Number
Sl. No. Name of Bidders/JV Partners Provident Fund Code Number Details
2.0 Litigation History
The bidder should provide detailed information on any litigation or arbitration arising out of contracts completed or under execution by it over the last five years. A consistent history of awards involving litigation against the Bidder or any partner of JV may result in rejection of Bid. [Reference ITB clause 9.3(p)(ii)]
2.1 Details of litigation history resulting from Contracts completed or under execution by the bidder over the last five years
Year Name of client, cause of litigation/arbitration and matter in dispute Details of Contract and date Award for or against the bidder Disputed amount
3 Details regarding previous transgressions of Integrity Pact
The bidder should provide detailed information on any transgression of Integrity Pact that occurred in the last 10 years with any other Public Sector Undertaking or Government Department or any other Company, in any country.
3.1 Details regarding previous transgressions of Integrity Pact that occurred in the last 10 years
Year Name of client Details of Transgression of Integrity Pact by the bidder
4.0 OTHER INFORMATION
4.1 Current Contract Commitments of works in progress
Bidders (individual firms or each partners of JV) should provide information on their current commitments on all contracts that have been awarded, or for which a letter of intent or acceptance has been received, or for contracts approaching completion, but for which an unqualified, full completion certificate has yet to be issued.
Details of Contract Value of outstanding work (Rs.) Estimated completion date
4.2 Financial Data:
Details Actual (Previous five years) Projection for next five years
Total Liability
Current Liability
Profit before taxes
Profit after taxes
Date : Printed Name :
Place : Designation :
Specification No: SR-I/C&M/WC-4804/2026/RFx: 5002005649 (SR1/NT/W-AIS/DOM/B00/26/12524) Attachment-17
WC-4804: “Upgradation of bay equipment at Gooty substation under reconductoring of Gooty-Thumkur (Pavagada) 400KV D/C line with HTLS conductor”
(Declaration for tax exemptions, reductions, allowances or benefits)
Bidder’s Name and Address : To:
Contract & Materials Dept.,
Name : Power Grid Corporation of India Ltd.,
Address : Kavadiguda Main Road,
Secunderabad -500080.
1 We confirm that we are solely responsible for obtaining following tax exemptions, reductions, allowances or benefits in respect of supplies under the subject package, in case of award. We further confirm that we have considered the same in our bid thereby passing on the benefit to POWERGRID while quoting our prices. In case of our failure to receive such benefits, partly or fully, for any reason whatsoever, the Employer will not compensate us.
2 We are furnishing the following information required by the Employer for issue of requisite certificate if and as permitted in terms of the applicable Govt. of India policies/procedures (in case of award):
Applicable Act, Notification No. and Clause Ref. No. Sl. No. Description of item on which applicable Country of origin Remarks, if any
(The requirements listed above are as per current Notification of Govt. of India indicated above. These may be modified, if necessary, in terms of the Notifications.)
Date : Printed Name :
Place : Designation :
Specification No: SR-I/C&M/WC-4804/2026/RFx: 5002005649 (SR1/NT/W-AIS/DOM/B00/26/12524) Attachment-17
WC-4804: “Upgradation of bay equipment at Gooty substation under reconductoring of Gooty-Thumkur (Pavagada) 400KV D/C line with HTLS conductor”
(Information regarding Ex-employees of POWERGRID in our Organisation)
Name(s) and Addresse(s) of other partner(s) To:
Contract & Materials Dept.,
Name : …… ……. …….. …… ……. …….. Power Grid Corporation of India Ltd.,
Address : …… ……. …….. …… ……. …….. Kavadiguda Main Road,
We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
Date : Printed Name :
Place : Designation :
Specification No: SR-I/C&M/WC-4804/2026/RFx: 5002005649 (SR1/NT/W-AIS/DOM/B00/26/12524) Attachment-17
WC-4804: “Upgradation of bay equipment at Gooty substation under reconductoring of Gooty-Thumkur (Pavagada) 400KV D/C line with HTLS conductor”
(Information regarding Ex-employees of POWERGRID in our Organisation)
Name(s) and Addresse(s) of other partner(s) To:
Contract & Materials Dept.,
Name : Power Grid Corporation of India Ltd.,
Address : Kavadiguda Main Road,
Secunderabad -500080.
We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
Date : Printed Name :
Place : Designation :
Specification No: SR-I/C&M/WC-4804/2026/RFx: 5002005649 (SR1/NT/W-AIS/DOM/B00/26/12524) Attachment-18
WC-4804: “Upgradation of bay equipment at Gooty substation under reconductoring of Gooty-Thumkur (Pavagada) 400KV D/C line with HTLS conductor”
Bidder’s Name and Address : To:
Contract & Materials Dept.,
Name : Power Grid Corporation of India Ltd.,
Address : Kavadiguda Main Road,
Secunderabad -500080.
Safety Pact is annexed separately herewith this Volume.
Date : Printed Name :
Place : Designation :
Specification No: SR-I/C&M/WC-4804/2026/RFx: 5002005649 (SR1/NT/W-AIS/DOM/B00/26/12524) Attachment-19
WC-4804: “Upgradation of bay equipment at Gooty substation under reconductoring of Gooty-Thumkur (Pavagada) 400KV D/C line with HTLS conductor”
Bidder’s Name and Address : To:
Contract & Materials Dept.,
Name : Power Grid Corporation of India Ltd.,
Address : Kavadiguda Main Road,
Secunderabad -500080.
Further, we hereby confirm that except as mentioned in the Attachment – 6 (Alternative, Deviations and Exceptions to the Provisions) hereof forming part of our First Envelope :
Date : Printed Name :
Place : Designation :
Specification No. :SR-I/C&M/WC-4402/2025(SR1/NT/W-AIS/DOM/B00/25/13182), (RFx: 5002004796) Attachment-20
WC-4804: “Upgradation of bay equipment at Gooty substation under reconductoring of Gooty-Thumkur (Pavagada) 400KV D/C line with HTLS conductor”
(Declaration of Key Managerial Person and Power of Attorney holder)
Bidder’s Name and Address : To:
Contract & Materials Dept.,
Name : Power Grid Corporation of India Ltd.,
Address : Kavadiguda Main Road,
Secunderabad -500080.
1. We confirm that the declarations made in our bid, particularly Attachment-3 (QR) regarding eligibility/qualification data and documents submitted in our bid in support of the declarations, are true and correct to the best of our knowledge. 2. We further confirm that we have filled up Attachment-3(QR). We also confirm that in support of meeting the Technical experience requirement as per Annexure-A (BDS), we have enclosed self-certified copy of Contract/ Award Letter and certificate from the utility for which the contract has been executed. 3. We shall furnish clarification to bid, if any sought by Employer pursuant to ITB clause 21.1. We understand that if we fail to rectify/furnish the requested documents if any, within 7 working days’ notice, our bid is liable to be rejected. 4. We understand that any false declaration and/or misrepresentation of facts and/or furnishing of false/forged documents /information may lead to our debarment from participation in Employer tenders and that our Bid Security/ Contract Performance Guarantee may be forfeited besides other actions as deemed to be appropriate as per the provisions of the Bidding Document/Integrity Pact/Employer’s policy.
5. Our Balance Bid Capacity net of works under execution, calculated as per Clause ITB 23.2.1 (i.e. 3T-B), as on 1st date** of the Quarter in which First Envelope Bids are to be opened i.e. 01st
(MM/YYYY) in equivalent Indian Rupees is
Crore. The details of value used for working out the Balance Bid Capacity as above, are as follows:
A. Maximum value of Transmission & Distribution (T&D) works (including substation, transmission lines, distribution for all verticals), executed in any one financial year during the last 5 financial years taking into account the completed as well as the works in progress
S N FY Value of Total Sales (including Taxes and Duties)(T)
B. Value of existing commitments and ongoing similar works yet to be completed as on the 1st date of quarter of the financial year in which the bids are opened(B) as on 1st date of the Quarter in which First Envelope Bids are to be opened
S N Value of Balance Works (B1) against the Contracts awarded by Employer Value of Balance Works (B2) against the Contracts awarded by Utilities other than Employer Total value of Balance Works (B){B=B1+B2}
[**1st day of the quarter in which the first envelope bids are opened for e.g. If the actual date of opening of first envelope bids is 15th June 2016, the Balance bid capacity as on 01st April 2016 is to be declared)]
6. Notwithstanding above, we also understand that the Bid Capacity as declared hereinabove, shall be subject to assessment, if any, by the Employer, which shall be final and binding. We also confirm that the Employer may verify the supporting documents/ details in connection with above declarations. We further understand that in case of any unethical practices inter-alia including any misrepresentation of facts, submission of false and/or forged details/ documents/ declaration by us, we may be debarred from the participation in Employer’s tenders in future as considered appropriate by Employer and our Bid Security/ Contract Performance Guarantee shall be forfeited besides taking other actions as deemed appropriate.
Date : Printed Name :
Place : Designation :
Note: Key Managerial Personnel (KMP) of the company shall include CEO/Managing Director/ Company Secretary/ Director/ CFO/any of the partner in case of partnership firm/any other officer entrusted with substantial powers of the management of the affairs of the company/firm.
Bidders are advised to print this declaration on the Company Letter Head and upload the duly signed and scanned copy along with the First Envelope Bid.
Specification No. :SR-I/C&M/WC-4402/2025(SR1/NT/W-AIS/DOM/B00/25/13182), (RFx: 5002004796) Attachment-25
WC-4804: “Upgradation of bay equipment at Gooty substation under reconductoring of Gooty-Thumkur (Pavagada) 400KV D/C line with HTLS conductor”
(Compliance to the process related to the e-RA Terms & Conditions and the Business Rules governing the e-RA)
Bidder’s Name and Address : To:
Contract & Materials Dept.,
Name : Power Grid Corporation of India Ltd.,
Address : Kavadiguda Main Road,
Secunderabad -500080.
We confirm that:
1) The undersigned is authorized representative of the Bidder.
2) We have studied the e-Reverse Auction Terms & Conditions and the Business Rules governing the e-Reverse Auction as mentioned in your letter and confirm our agreement to them.
3) We understand that ASP shall arrange to demonstrate/ train (if not trained earlier) bidders’ nominated person(s), without any cost. They will also explain all the Rules related to e-Reverse Auction/ Business Rules Document to be adopted along with bid manual. We have further noticed that we at own discretion may ask for additional training to use the e-RA platform well in advance before start of the e-RA event by contacting the ASP at any suitable time. All such additional trainings shall also be free of cost.
We hereby confirm that we will honor the Bids placed by us during the auction process.
Date : Printed Name :
Place : Designation :
Specification No: SR-I/C&M/WC-4804/2026/RFx: 5002005649 (SR1/NT/W-AIS/DOM/B00/26/12524) Bid Form 1st Envelope 1 one 1 st 1 January
2 two 2 nd 2 February
BID FORM (First Envelope) 3 three 3 rd 3 March
4 four 4 th 4 April
Bid Proposal Ref. No. 5 five 5 th 5 May
Date : 6 six 6 th #VALUE! 6 June
7 seven 7 th #VALUE! 7 July
To: 8 eight 8 th #VALUE! 8 August
Contract & Materials Dept., 9 nine 9 th #VALUE! 9 September
Power Grid Corporation of India Ltd., 10 ten 10 th 10 October
Kavadiguda Main Road, 11 eleven 11 th 11 November
Secunderabad -500080. 12 twelve 12 th 12 December
13 thirteen 13 th
14 fourteen 14 th
Name of Contract : WC-4804: “Upgradation of bay equipment at Gooty substation under reconductoring of Gooty-Thumkur (Pavagada) 400KV D/C line with HTLS conductor” 15 fifteen 15 th
Dear Ladies and/or Gentlemen, Enter details here. 0 16 sixteen 16 th
1.0 Having examined the Bidding Documents, including Amendment Nos. ...[Enter the Amendment]… dated …[Enter the Date in dd-mm-yyyy]… the receipt of which is hereby acknowledged, we the undersigned, offer to design, manufacture, test, deliver, install and commission (including carrying out Trial operation, Performance & Guarantee Test as per the provision of Technical Specification) the Facilities under the above-named package in full conformity with the said Bidding Documents. In accordance with ITB Clause 9.1 of the Bidding Documents, as per which the bid shall be submitted by the bidder under “Single Stage - Two Envelope” procedure of bidding. Accordingly, we hereby submit our Bid, in two envelopes i.e. First Envelope – Techno – Commercial Part & Second Envelope - Price Part (to be opened subsequently). ...[Enter the Amendment]… …[Enter the Date in dd-mm-yyyy]… the receipt of which is hereby acknowledged, we the undersigned, offer to design, manufacture, test, deliver, install and commission (including carrying out Trial operation, Performance & Guarantee Test as per the provision of Technical Specification) the Facilities under the above-named package in full conformity with the said Bidding Documents. In accordance with ITB Clause 9.1 of the Bidding Documents, as per which the bid shall be submitted by the bidder under “Single Stage - Two Envelope” procedure of bidding. Accordingly, we hereby submit our Bid, in two envelopes i.e. First Envelope – Techno – Commercial Part & Second Envelope - Price Part (to be opened subsequently). 17 seventeen 17 th
1.1 We meet the eligibility requirements and have no conflict of interest in accordance with ITB Clause 2
2.0 Attachments to the Bid Form (First Envelope) Bank Draft 18 eighteen 18 th
In line with the requirement of the Bidding Documents, we enclose herewith the following Attachments: Pay Order 19 nineteen 19 th
(a) Attachment 1() : Not Applicable
(b) Attachment 2() : A power of attorney duly authorized by a Notary Public indicating that the person(s) signing the bid have the authority to sign the bid and thus that the bid is binding upon us during the full period of its validity in accordance with the ITB Clause 14. Bank Guarantee (0) 21 st
(c) Attachment 3() : The documentary evidence that we are eligible to bid in accordance with ITB Clause 2. Further, in terms of ITB Clause 9.3 (c) & (e), the qualification data has been furnished as per your format enclosed with the bidding documents Attachment-3(QR). 22 th
Further, the required Joint Venture Agreement signed by us and our Partners has also been furnished as per your format Attachment-3(JV). SOLE BIDDER Applicable 23 th
Further the required deed of Joint Undertaking signed by us and Tower Manufacturer has also been furnished as per your format. 0 1 Not Applicable 24 th
(d) Attachment 4() : The documentary evidence establishing in accordance with ITB Clause 3, Vol.-I of the Bidding Documents that the facilities offered by us are eligible facilities and conform to the Bidding Documents has been furnished as Attachment 4. A list of Special Tools & Tackles to be used by us for erection, testing & Commissioning and to be handed over to Employer, the cost of which is included is our Bid Price, is also enclosed as per your format as Attachment 4A. A list of Special Tools & Tackles to be brought by the contractor for erection, testing & Commissioning and to be taken back after completion of work, whose cost in not included in our bid price, is enclosed as per your format as Attachment 4B. 25 th
(e) Attachment 5() : The details of all major items of services or supply which we propose subletting in case of award, giving details of the name and nationality of the proposed subcontractor/sub-vendor for each item. 26 th
(f) Attachment 5A() : (Items, Components, Raw Material, Services proposed to be sourced from Micro and Small Enterprises): The details of the items, components, raw material, services which is proposed to bought/availed from Micro and Small Enterprises for the purpose of completion of works 27 th
(g) Attachment 6() : The variation and deviations from the requirements of the Conditions of Contract, Technical Specification and Drawings (excluding critical provisions as mentioned at clause 6.0 below) in your format enclosed with the Bidding Documents, including, inter alia, the cost of withdrawal of the variations and deviations indicated therein. 28 th
(h) Attachment 7() : The details of Alternative Bids made by us indicating the complete Technical Specifications and the deviation to contractual and commercial conditions. (Not Applicable) 29 th
(i) Attachment 8() : Manufacturer’s Authorisation Forms. 30 th
(j) Attachment 9() : Work Completion Schedule. 31 st
(k) Attachment 10() : Guarantee Declaration.
(l) Attachment 11() : Information regarding ex-employees of Employer in our firm.
(m) Attachment 12() : Filled up information regarding Price Adjustment Data as per the format enclosed in the bidding documents.
(n) Attachment 13() : Declaration regarding Social Accountability.
(o) Attachment 14() : Integrity Pact, in a separate envelope, duly signed on each page by the person signing the bid.
(p) Attachment 15() : Option for Interest Bearing Advance(s) (Initial Advance and/or Engineering Advance) and Information for E-payment, PF details and declaration regarding Micro/Small & Medium Enterprises
(q) Attachment 16() : Additional Information.
(r) Attachment 17() : Declaration for tax exemptions, reductions, allowances or benefits
(s) Attachment 18() : Safety Pact
(t) Attachment 19 () : Declaration.
(u) Attachment 20 () : Declaration of Key Managerial Person jointly with Power of Attorney holder
(v) Attachment 21 () : Affidavit of Self certification regarding Minimum Local Content in line with PPP-MII order, if applicable
(w) Attachment 22 () : Certificate from statutory auditor or cost auditor of the company (in the case of companies) or from a practicing cost accountant or practicing chartered accountant (in respect of suppliers other than companies) giving the percentage of Local Content, in line with PPP-MII order, if applicable
(x) Attachment 23 () : Compliance to the process related to the e-RA Terms & Conditions and the Business Rules governing the e-RA.
(y) Attachment 24 () : Declaration by the Bidder regarding events encountered pursuant to ITB Clause 2.1
(z) Attachment 25 () : Undertaking by the bidder regarding Compliance of DMI&SP policy
(aa) Attachment 26 () : Certification by the Bidder as per DoE Order in line with ITB Clause 2.1
(bb) Attachment 27 () : Bid Securing Declaration
2.2 We are a Micro and Small Enterprise (MSE) registered with
a designated Authority of GoI under the Public Procurement Policy for MSEs order 2012, Notification dated 01/06/2020 and 26/06/2020 including subsequent amendments, read in conjunction with related notifications issued from time to time for such enterprises. (applicable for MSE only)
3.0 We are aware that, in line with Clause No. 27.1 (ITB), our Second Envelope (Price Part) is liable to be rejected in case the same contains any deviation/omission from the contractual and commercial conditions and technical Specifications other than those identified in this First Envelope.
4.0 We confirm that except as otherwise specifically provided our Bid Prices in Second Envelope include all taxes, duties, levies and charges as may be assessed on us, our Sub-Contractor/Sub-Vendor or their employees by all municipal, state or national government authorities in connection with the Facilities, in and outside of India.
4.1 100% of applicable Taxes and Duties i.e. GST which are payable by the Employer under the Contract, shall be reimbursed by the Employer on production of satisfactory documentary evidence by the Contractor in accordance with the provisions of the Bidding Documents.
4.3 We confirm that we have also registered/we shall also get registered in the GST Network with a GSTIN, in all the states where the project is located and the states from which we shall make our supply of goods
5.0 Construction of the Contract
5.1 We declare that we have studied Clause GCC 2.1 relating to mode of contracting for Domestic Bidders and we are making this proposal with a stipulation that you shall award us two separate Contracts viz ‘First Contract’ for ex-works supply of all equipment and materials including mandatory spares and ‘Second Contract’ for providing all the services i.e. inland transportation for delivery at site, insurance, unloading, storage, handling at site, installation, testing and commissioning including Trial operation in respect of all the equipment supplied under the ‘First Contract’ and other services specified in the Contract Documents. We declare that the award of two contracts, will not, in any way, dilute our responsibility for successful operation of plant/equipment and fulfillment of all obligations as per Bidding Documents and that both the Contracts will have a cross-fall breach clause i.e. a breach in one Contract will automatically be classified as a breach of the other contract which will confer on you the right to terminate the other contract at our risk and cost.
6.0 We have read the provisions of following clauses and confirm that the specified stipulations of these clauses are acceptable to us:
(a) GCC 2.14 Governing Law
(b) GCC 5.7 Contractors Responsibility
(c) GCC 8 Terms of Payment
(d) GCC 9.3 Performance Security
(e) GCC 10 Taxes and Duties
(f) GCC 21.2 Completion Time Guarantee
(g) GCC 22 Defect Liability
(h) GCC 23 Functional Guarantee
(i) GCC 25 Patent Indemnity
(j) GCC 26 Limitation of Liability
(k) GCC 38 Settlement of Disputes
(l) GCC 39 Arbitration
(m) GCC 40 Conciliation
(n) Appendix 2 to Form of Contract Agreement Price Adjustment
Further we understand that deviation taken in any of the above clauses by us may make our bid non-responsive as per provision of bidding documents and be rejected by you.
7.0 We undertake, if our bid is accepted, to commence the work immediately upon your Notification of Award to us, and to achieve the delivery of goods and related services within the time stated in the Bidding Documents.
8.0 If our bid is accepted, we undertake to provide a Performance Security in the form and amounts, and within the times specified in the Bidding Documents.
9.0 We agree to abide by this bid for a period of six (06) months from the date fixed for opening of bids as stipulated in the Bidding Documents, and it shall remain binding upon us and may be accepted by you at any time before the expiration of that period.
10.0 Until a formal Contract is prepared and executed between us, this bid, together with your written acceptance thereof in the form of your Notification of Award shall constitute a binding contract between us.
11.0 We understand that you are not bound to accept the lowest or any bid you may receive.
12.0 Commissions or gratuities, if any, paid or to be paid by us to agents relating to this Bid, and to contract execution, if we are awarded the contract, are listed below:-
Name and Address of Agent Amount and Currency Purpose of Commission or Gratuity
(If none, state “none”)
13.0 # (For Joint Venture only) We, the partners of Joint Venture submitting this bid, do agree and confirm that in case of Award of Contract on the Joint Venture, we shall be jointly and severally liable and responsible for the execution of the Contract in accordance with Contract terms and conditions.
14.0 We, hereby, declare that only the persons or firms interested in this proposal as principals are named here and that no other persons or firms other than those mentioned herein have any interest in this proposal or in the Contract to be entered into, if the award is made on us, that this proposal is made without any connection with any other person, firm or party likewise submitting a proposal is in all respects for and in good faith, without collusion or fraud.
Thanking you, we remain,
Yours faithfully,
For and on behalf of
Date : Printed Name :
Place : Designation :
In case of bid from a Joint Venture, name & designation of representative of JV partner is to be provided and Bid Form is also to be signed by him
Other Partner -1 Other Partner -2 2
Printed Name : Printed Name :
Designation : Designation :
Please provide additional information of the Bidder
Business Address :
Country of Incorporation :
State/Province to be indicated :
Name of Principal Officer :
Address of Principal Officer :
Note: Bidders may note that no prescribed proforma has been enclosed for Attachment 2() Power of Attorney. Bidders may use their own proforma for furnishing the required information with the bid.
Note: Bidders may note that no prescribed proforma has been enclosed for Attachment 2() Power of Attorney. Bidders may use their own proforma for furnishing the required information with the bid.
23 Twenty Three
27 Twenty Seven
28 Twenty Eight
33 Thirty Three
37 Thirty Seven
38 Thirty Eight
73 Seventy Three
74 Seventy Four
75 Seventy Five
77 Seventy Seven
78 Seventy Eight
79 Seventy Nine
83 Eighty Three
87 Eighty Seven
88 Eighty Eight
93 Ninety Three
97 Ninety Seven
98 Ninety Eight
100 One Hundred
Package Name WC-4402 : 400KV AIS Substation Extension Package of Kurnool-3 PS due to Re-Arrangement in Electrical Layout at Kurnool-III Pooling Station
Package Code SR-I/C&M/WC-4402
Specification No. SR-I/C&M/WC-4402/2025(SR1/NT/W-AIS/DOM/B00/25/13182), (RFx: 5002004796)
Contract & Materials Dept.,
Power Grid Corporation of India Ltd.,
SRTS-I, Kavadiguda Main Road,
Secunderabad -500080.
Specification No: SR-I/C&M/WC-4804/2026/RFx: 5002005649 (SR1/NT/W-AIS/DOM/B00/26/12524)
1 Fill up only green shaded cells in Sch-1, Sch-2, Sch-3, Sch-4, Sch-7 and Bid Form 2nd Envelope.
2 All the cells in Sch-5 & Sch-6 are auto filled, therefore no cell is required to be filled up there.
3 Instructions / error messages, if any, will be displayed automatically after selecting the cell.
4 After filling up all the schedues, save the file, take print out of all the schedules and Bid form and sign & stamp and submit them as hard copy of the 2nd envelope (Price part) of the bid. Also ensure to submit the soft copy of the the same file on CD/ DVD.
I While filling up the worksheets following may please be observed :
(i) Fill up only green shaded cells.
(ii) Certain data type entries have been restricted, such as Numeric values or limits of numeric values.
(iii) Select only the options provided in pull down menus.
(iv) Do not link any cell of this work book with any other work book.
(v) Do not use copy & paste or cut & paste options for filling up the data.
(vi) Do not reformat any of the cell of the work book.
II This Workbook consists of following worksheets :
Opening page of the workbook.
Names of Bidder :
● Select Sole Bidder or JV (Joint Venture) from the pull down menu. Do not leave this cell blank.
● Select nos. of the JV Partners other than the Lead Partner from drop down menu.
● In case of JV partners more than 2, enter details of 3rd & more partners along with details of 2nd partner.
● Fill up names and address of the Sole Bidder and /or Joint Venture.
● Fill up date in dd-mmm-yyyy format from drop down menu.
● Click for Sch-1 given at the right top of the worksheet to go to Sch-1.
Sch-1 (Ex-works Prices) :
● Fill up unit rates for all the items in numeric values greater than 0 (zero). If unit rate is left blank, the corresponding item shall be deemed to be included in the total price.
● Corresponding cell for mode of transaction shall be come enable only after filling up the unit rate, therefore first fill up the unit rate and then mode of transaction for the corresponding item.
● Select either Direct or Bought-out from the drop down menu. Do not leave the cell blank the same shall be deemed to be Bought-out if the cell is left blank.
● Total amount shall get calculated automatically.
● Type Test charges shall appear automatically after filling up Sch-7 appropriately.
Sch-2 (Freight & Insurance Charges) :
● Fill up unit rates for all the items in numeric values greater than 0 (zero). If unit rate is left blank, the corresponding item shall be deemed to be included in the total price.
● Total amount shall get calculated automatically.
Sch-3 (Erection Charges) :
● Fill up unit rates for all the items in numeric values greater than 0 (zero). If unit rate is left blank, the corresponding item shall be deemed to be included in the total price.
● Total amount shall get calculated automatically.
Sch-4 (Training Charges) :
● Not applicable, hence no cell is required to be filled up.
Sch-4b (Maintenance Charges during and after Defect Liability Period) :
● Not applicable, hence no cell is required to be filled up.
Sch-5 (Summary of Taxes and Duties applicable on the Goods) :
● No cell is required to be filled in by the bidder in this worksheet.
● Summary of all the Schedules without considering discount (mentioned in the work sheet discount) shall be displayed automatically.
● No cell is required to be filled in by the bidder in this worksheet.
Sch-7 (Type Test Charges) :
● Fill up the rates & location where type tests are proposed.
● Total of this Sch-7 shall automatically appear in Sch-1.
Bid from 2nd Envelope :
● Fill up ref. no. as bidder's ref no. of this letter.
● This letter shall consider the net price as per Sch-6 (After Discount).
● Fill up names & Designation of the representatives of other JV partner(s) if the bidder is JV (Joint Venture) .
● Fill up additional information as required.
Happy Bidding !
WC-4804: “Upgradation of bay equipment at Gooty substation under reconductoring of Gooty-Thumkur (Pavagada) 400KV D/C line with HTLS conductor”
Specification No: SR-I/C&M/WC-4804/2026/RFx: 5002005649 (SR1/NT/W-AIS/DOM/B00/26/12524) Sole Bidder 1 Sole Bidder 1
Joint Venture 2 or More JV (Joint Venture) 2 or More
Enter following details of the bidder
Specify type of Bidder [Select from drop down menu] Sole Bidder Sole Bidder 1 0 Sole Bidder 1 0
Name of Sole Bidder
Address of Sole Bidder
Name of other Partner - 1
Address of other Partner - 1
Name of other Partner - 2 (more, if any) …….. …….. …….. …….. …….. ……..
Address of other Partner - 2 (more, if any) …….. …….. …….. …….. …….. ……..
email ID of Bid Signatory
Mobile No. of Bid Signatory
Tel No. of Bid Signatory
Fax No. of Bid Signatory
Specification No: SR-I/C&M/WC-4804/2026/RFx: 5002005649 (SR1/NT/W-AIS/DOM/B00/26/12524) Schedule - 1 Schedule - 1 Direct Total 0 Sole Bidder `
BO Total #REF! 0
WC-4804: “Upgradation of bay equipment at Gooty substation under reconductoring of Gooty-Thumkur (Pavagada) 400KV D/C line with HTLS conductor”
(SCHEDULE OF RATES AND PRICES)
Bidder’s Name and Address (Sole Bidder) : To:
Contract & Materials Dept.,
Name : Power Grid Corporation of India Ltd., , & …….. …….. …….. …….. …….. ……..
Address : SRTS-I, Kavadiguda Main Road,
Secunderabad -500080.
PLANT AND EQUIPMENT (INCLUDING MANDATORY SPARES PARTS) TO BE SUPPLIED, INCLUDING TYPE TEST CHARGES FOR TESTS TO BE CONDUCTED Direct
All Prices are in Indian Rupees. Bought-Out
SI. No. PR No PR Line Item No Activity Description Material Code HSN Code Whether HSN in column ‘ 6 ’ is confirmed. If not indicate applicable the HSN code * Rate of GST applicable (in %) Whether rate of GST in column ‘4’ is confirmed. If not indicate applicable rate of GST * Item Description Unit Qty. Unit Ex-works price (excluding GST) Total Ex-works price (excluding GST) GST Tax as confirmed by Bidder
Bay Upgradation at Gooty SS
1 1000011301 85462040 18 Erection Hardware for 400kV D type layout-Line bay as per technicalspecification SET 2 Included 0.00 0 0.00
2 1000011297 85354010 18 Erection Hardware for 400kV D type layout-Spare bay of half dia. asper technical specification SET 2 Included 0.00 0 0.00
Total Ex-works Price 0.00 0.00
Total Type Test charges as per Schedule-7 0.00
Total Ex-works Price including Type Test charges 0.00
Total GST Tax as confirmed by Bidder 0.00
Note : Specify amount of GST on the transaction between the Contractor and the Employer.
* In case the bidder leaves the cell for confirmation of the HSN code and/or GST rate “blank”, the HSN code and corresponding GST rate indicated by the Employer shall be deemed to be the one confirmed by the Bidder.
Date: -- Printed Name :
Place: Designation :
Specification No: SR-I/C&M/WC-4804/2026/RFx: 5002005649 (SR1/NT/W-AIS/DOM/B00/26/12524) Schedule - 1 Direct Total 0 Sole Bidder `
BO Total #REF! 0
WC-4804: “Upgradation of bay equipment at Gooty substation under reconductoring of Gooty-Thumkur (Pavagada) 400KV D/C line with HTLS conductor”
(SCHEDULE OF RATES AND PRICES : EX-WORKS PRICES)
Bidder’s Name and Address (Sole Bidder) : To:
Contract Services
Name : Power Grid Corporation of India Ltd., , & …….. …….. …….. …….. …….. ……..
Address : "Saudamini", Plot No.-2
Gurgaon (Haryana) - 122001
Plant and Equipment (including Mandatory Spares Parts) to be supplied, including Type Test Charges for Tests to be conducted. Direct
All Prices are in Indian Rupees. Bought-Out
SI. No. Item Description Unit Qty. Unit Ex-works price Total Ex-works price Mode of Transaction (Direct / Bought-out)
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
Total Ex-Works Price Direct 0.00 Direct
Total Ex-Works Price Bought Out 0.00
Total Ex-Works Price 0.00
Total Type Test charges as per Schedule-7 #REF! #REF! #REF!
Total Ex-works Price including Type Test charges #REF! #REF! #REF!
Discount Sch-1 #REF! MPD Sch-1 #REF!
Dis Alert #REF!
Note : Specify amount of Excise Duty, Sales Tax/'VAT and other taxes payable on the transaction between the Contractor and the Employer and octroi/entry tax as applicable for destination site/state on all items of supply including bought-out finished items (to be identified in the Contract), which shall be dispatched directly from the sub-vendor’s works to the Employer’s site (sale-in-transit), separately in Schedule-5. Excise Duty, Sales tax and other levies for all the bought-out items are to be included in the EXW Price (Col. No. 5) only and not to be indicated in Schedule-5.
Place : Printed Name :
Specification No: SR-I/C&M/WC-4804/2026/RFx: 5002005649 (SR1/NT/W-AIS/DOM/B00/26/12524) Schedule - 2
WC-4804: “Upgradation of bay equipment at Gooty substation under reconductoring of Gooty-Thumkur (Pavagada) 400KV D/C line with HTLS conductor”
(SCHEDULE OF RATES AND PRICES)
Bidder’s Name and Address (Sole Bidder) : To:
Contract & Materials Dept.,
Name : Power Grid Corporation of India Ltd.,
Address : SRTS-I, Kavadiguda Main Road,
Secunderabad -500080.
LOCAL TRANSPORTATION, IN-TRANSIT INSURANCE, LOADING AND UNLOADING
All Prices are in Indian Rupees.
SI. No. PR No PR Line Item No Activity Description Material Code Description Unit Quantity Unit Freight, In-transit Insurance, loading & unloading Charges Total Freight, In-transit Insurance, loading & unloading Charges
Bay Upgradation at Gooty SS 0 0 0
1 1000011301 Erection Hardware for 400kV D type layout-Line bay as per technicalspecification SET 2 Included
2 1000011297 Erection Hardware for 400kV D type layout-Spare bay of half dia. asper technical specification SET 2 Included
Total F&I Price 0.00
Date: -- Printed Name :
Place: Designation :
Specification No: SR-I/C&M/WC-4804/2026/RFx: 5002005649 (SR1/NT/W-AIS/DOM/B00/26/12524) Schedule - 2 Dis
WC-4804: “Upgradation of bay equipment at Gooty substation under reconductoring of Gooty-Thumkur (Pavagada) 400KV D/C line with HTLS conductor” As per Lum-sum 0
(SCHEDULE OF RATES AND PRICES : FREIGHT & INSURANCE CHARGES) AS per Percent #REF!
As per lum-sum on Sch-2 0.00%
Bidder’s Name and Address (Sole Bidder) : To: As per Percent on Sch-2 #REF!
Contract & Materials Dept., Total Discount #REF!
Name : Power Grid Corporation of India Ltd.,
Address : SRTS-I, Kavadiguda Main Road,
Secunderabad -500080. Multipackage Discount 0.00%
All Prices are in Indian Rupees. Amount after Discount (Rs.) Dis Alert Amount after MPD (Rs.)
SI. No. Description Unit Quantity Unit Freight & Insurance Charges Total Freight & Insurance Charges Unit Freight & Insurance Charges Total Freight & Insurance Charges Unit Freight & Insurance Charges Total Freight & Insurance Charges
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
Total F&I Price #REF!
Place : Printed Name :
Designation : 0
Specification No: SR-I/C&M/WC-4804/2026/RFx: 5002005649 (SR1/NT/W-AIS/DOM/B00/26/12524) Schedule - 3
WC-4804: “Upgradation of bay equipment at Gooty substation under reconductoring of Gooty-Thumkur (Pavagada) 400KV D/C line with HTLS conductor” As per Lum-sum 0.00%
(SCHEDULE OF RATES AND PRICES ) AS per Percent #REF!
As per lum-sum on Sch-3 0.00%
Bidder’s Name and Address (Sole Bidder) : To: As per Percent on Sch-3 #REF!
Contract & Materials Dept., Total Discount #REF!
Name : Power Grid Corporation of India Ltd.,
Address : SRTS-I, Kavadiguda Main Road,
Secunderabad -500080. Multipackage lum-sum 0.00%
INSTALLATION CHARGES Amount after Discount (Rs.) Dis Alert Amount after MPD (Rs.)
All Prices are in Indian Rupees.
SI. No. PR No PR Line Item No Activity Header PR Activity No Activity Description Service Code SAC (Service Accounting Codes) Whether SAC in column '8’ is confirmed. If not indicate applicable the SAC * Rate of GST applicable ( in %) Whether rate of GST in column ‘4’ is confirmed. If not indicate applicable rate of GST * Description Unit Quantity Unit Erection Charges Total Erection Charges Total GST as confirmed by Bidder Unit Erection Charges Total Erection Charges Unit Erection Charges Total Erection Charges
Augmentation of transformation capacity at 400/220KV Nagarjunasgar substation Bay Upgradation at Gooty SS
1 100000341 998736 18 Erection Hardware for 400kV D type layout-Line bay as per technicalspecification SET 2 Included 0.00 0 0
2 100000347 998736 18 Erection Hardware for 400kV D type layout-Spare bay of half dia. asper technical specification SET 2 Included 0.00 0 0
Total Installation Charges 0.00 0
Total GST as confirmed by Bidder 0.00
* In case the bidder leaves the cell for confirmation of the SAC and/or GST rate “blank”, the SAC and corresponding GST rate indicated by the Employer shall be deemed to be the one confirmed by the Bidder.
Date : -- Printed Name:
Place : Designation :
Specification No: SR-I/C&M/WC-4804/2026/RFx: 5002005649 (SR1/NT/W-AIS/DOM/B00/26/12524) Schedule - 3
WC-4804: “Upgradation of bay equipment at Gooty substation under reconductoring of Gooty-Thumkur (Pavagada) 400KV D/C line with HTLS conductor” As per Lum-sum 0.00%
(SCHEDULE OF RATES AND PRICES : ERECTION CHARGES) AS per Percent #REF!
As per lum-sum on Sch-3 0.00%
Bidder’s Name and Address (Sole Bidder) : To: As per Percent on Sch-3 #REF!
Contract & Materials Dept., Total Discount #REF!
Name : Power Grid Corporation of India Ltd.,
Address : SRTS-I, Kavadiguda Main Road,
Secunderabad -500080. Multipackage lum-sum 0.00%
All Prices are in Indian Rupees. Amount after Discount (Rs.) Dis Alert Amount after MPD (Rs.)
SI. No. Description Unit Quantity Unit Erection Charges Total Erection Charges Unit Erection Charges Total Erection Charges Unit Erection Charges Total Erection Charges
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! (a) Detailed Soil Investigation
#REF! #REF! #REF! #REF! #REF! (b) All kinds of soil except fissured rock & hard rock
#REF! #REF! #REF! #REF! #REF! (e) River Crossing Location
#REF! #REF! #REF! #REF! #REF! (f)
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
Total Erection Price (A+B) #REF!
Place : Printed Name :
Designation : 0
Specification No: SR-I/C&M/WC-4804/2026/RFx: 5002005649 (SR1/NT/W-AIS/DOM/B00/26/12524) Schedule - 4
WC-4804: “Upgradation of bay equipment at Gooty substation under reconductoring of Gooty-Thumkur (Pavagada) 400KV D/C line with HTLS conductor”
(SCHEDULE OF RATES AND PRICES )
Bidder’s Name and Address (Sole Bidder) : To:
Contract & Materials Dept.,
Name : Power Grid Corporation of India Ltd.,
Address : SRTS-I, Kavadiguda Main Road,
Secunderabad -500080.
Training Charges for Training to be imparted
SI. No. PR No PR Line Item No Activity Header PR Activity No Activity Description Service Code SAC (Service Accounting Codes) Whether SAC in column '8’ is confirmed. If not indicate applicable the SAC * Rate of GST applicable ( in %) Whether rate of GST in column ‘4’ is confirmed. If not indicate applicable rate of GST * Description Unit Quantity Unit Training Charges excluding GST Total Training Charges excluding GST Total GST as confirmed by Bidder
Revaluation of J column Tax Calculation
NOT APPLICABLE Revaluation of J column Tax Calculation
Included 0.00 0 0
Total Training Charges 0.00 0
Total GST as confirmed by Bidder 0.00
Date : -- Date: -- Printed Name :
Place : Place: Designation :
Specification No: SR-I/C&M/WC-4804/2026/RFx: 5002005649 (SR1/NT/W-AIS/DOM/B00/26/12524) Schedule - 4b
WC-4804: “Upgradation of bay equipment at Gooty substation under reconductoring of Gooty-Thumkur (Pavagada) 400KV D/C line with HTLS conductor”
(SCHEDULE OF RATES AND PRICES )
Bidder’s Name and Address (Sole Bidder) : To:
Contract & Materials Dept.,
Name : Power Grid Corporation of India Ltd.,
Address : SRTS-I, Kavadiguda Main Road,
Secunderabad -500080.
Maintenance Charges during & after Defect Laibility Period
SI. No. PR No PR Line Item No Activity Header PR Activity No Activity Description Service Code SAC (Service Accounting Codes) Whether SAC in column '8’ is confirmed. If not indicate applicable the SAC * Rate of GST applicable ( in %) Whether rate of GST in column ‘4’ is confirmed. If not indicate applicable rate of GST * Description Unit Quantity Unit Maintenance Charges excluding GST Total Maintenance Charges excluding GST Total GST as confirmed by Bidder
0 Revaluation of P column Tax Calculation
A. #REF! Revaluation of P column Tax Calculation
1 Included 0.00 0 0
2 Included 0.00 0 0
3 Included 0.00 0 0
4 Included 0.00 0 0
B. #REF! Revaluation of P column Tax Calculation
1 Included 0.00 0 0
2 Included 0.00 0 0
3 Included 0.00 0 0
4 Included 0.00 0 0
Total Maintenance Charges during and after Defect Liabilty Period 0.00 0
Total GST as confirmed by Bidder 0.00
Date : -- Printed Name :
Place : Designation :
Specification No: SR-I/C&M/WC-4804/2026/RFx: 5002005649 (SR1/NT/W-AIS/DOM/B00/26/12524) Schedule - 5
WC-4804: “Upgradation of bay equipment at Gooty substation under reconductoring of Gooty-Thumkur (Pavagada) 400KV D/C line with HTLS conductor”
(SUMMARY OF TAXES & DUTIES APPLICABLE ON PLANT & EQUIPMENT)
Bidder’s Name and Address (Sole Bidder) : To:
Contract & Materials Dept.,
Name : Power Grid Corporation of India Ltd.,
Address : SRTS-I, Kavadiguda Main Road,
Secunderabad -500080.
Sl. No. Item Nos. Total Price (INR) After Discount After MPDiscount
1 TOTAL GST ON GOODS Excise Duty #REF! Excise Duty #REF!
Total GST for Supply of Goods (inter-alia including Type Test Charges) between the Contractor and the Employer (identified in Schedule 1') which are not included in the Ex-works price as per the provision of the Bidding Documents, as applicable. 0.00
2 TOTAL GST ON SERVICES Sales Tax 0.00 Sales Tax 0.00
Total GST on Installation Services (Schedule-3), Training to be imparted in India (Schedule-4) 0.00 #REF! 0 #REF! 0
GRAND TOTAL [1+2] 0.00 Grand Total after Discount #REF! Grand Total after MPD #REF!
Date: -- Printed Name :
Place: Designation :
Specification No: SR-I/C&M/WC-4804/2026/RFx: 5002005649 (SR1/NT/W-AIS/DOM/B00/26/12524) Schedule - 5
WC-4804: “Upgradation of bay equipment at Gooty substation under reconductoring of Gooty-Thumkur (Pavagada) 400KV D/C line with HTLS conductor”
SUMMARY OF TAXES & DUTIES APPLICABLE ON GOODS
Bidder’s Name and Address (Sole Bidder) : To:
Contract & Materials Dept.,
Name : Power Grid Corporation of India Ltd.,
Address : SRTS-I, Kavadiguda Main Road,
Secunderabad -500080.
Sl. No. Item Nos. Total Price (INR)
1 TOTAL GST ON GOODS 0.00
Total GST for Supply of Goods (inter-alia including Type Test Charges) between the Contractor and the Employer (identified in Schedule 1') which are not included in the Ex-works price as per the provision of the Bidding Documents, as applicable.
2 TOTAL GST ON SERVICES 0.00
Total GST on Installation Services (Schedule-3), Training to be imparted in India (Schedule-4a) and Maintenance Charges during and after Defect Liabilty Period (Schedule-4b)
GRAND TOTAL [1+2] 0.00
Date : -- Printed Name :
Place : Designation :
Specification No: SR-I/C&M/WC-4804/2026/RFx: 5002005649 (SR1/NT/W-AIS/DOM/B00/26/12524) Schedule - 6
WC-4804: “Upgradation of bay equipment at Gooty substation under reconductoring of Gooty-Thumkur (Pavagada) 400KV D/C line with HTLS conductor”
(GRAND SUMMARY)
Bidder’s Name and Address (Sole Bidder) : To:
Contract & Materials Dept.,
Name : Power Grid Corporation of India Ltd.,
Address : SRTS-I, Kavadiguda Main Road,
Secunderabad -500080.
Sl. No. Description Total Price (INR)
1 TOTAL SCHEDULE NO. 1 0.00
Ex-works price of Plant and Equipment including Type Test Charges
2 TOTAL SCHEDULE NO. 2 0.00
Local Transportation, In-transit Insurance, loading & unloading
3 TOTAL SCHEDULE NO. 3 0.00
Installation Charges
4 TOTAL SCHEDULE NO. 4 0.00
Training Charges
4b TOTAL SCHEDULE NO. 4b 0.00
Maintenance Charges during & after Defect Laibility Period
5 TOTAL SCHEDULE NO. 5 0.00
Taxes and Duties
6 TOTAL SCHEDULE NO. 7 0.00
Type Test Charges [Total of this Schedule is included in Schedule - 1 above.]
GRAND TOTAL [1+2+3+4+5] 0.00
Date : -- Printed Name :
Place : Designation :
Specification No: SR-I/C&M/WC-4804/2026/RFx: 5002005649 (SR1/NT/W-AIS/DOM/B00/26/12524) Schedule - 6 After Discount
WC-4804: “Upgradation of bay equipment at Gooty substation under reconductoring of Gooty-Thumkur (Pavagada) 400KV D/C line with HTLS conductor”
(GRAND SUMMARY)
Bidder’s Name and Address (Sole Bidder) : To:
Contract & Materials Dept.,
Name : Power Grid Corporation of India Ltd.,
Address : SRTS-I, Kavadiguda Main Road,
Secunderabad -500080.
Sl. No. Description Total Price (INR)
1 TOTAL SCHEDULE NO. 1 0.00
Ex-works price of Plant and Equipment including Type Test Charges
2 TOTAL SCHEDULE NO. 2 0.00
Local Transportation, In-transit Insurance, loading & unloading
3 TOTAL SCHEDULE NO. 3 0.00
Installation Charges
4 TOTAL SCHEDULE NO. 4 0.00
Training Charges
4b TOTAL SCHEDULE NO. 4b 0.00
Maintenance Charges during & after Defect Laibility Period
5 TOTAL SCHEDULE NO. 5 0.00
Taxes and Duties
6 TOTAL SCHEDULE NO. 7 0.00
Type Test Charges [Total of this Schedule is included in Schedule - 1 above.]
GRAND TOTAL [1+2+3+4+5] 0.00
Date : -- Printed Name :
Place : Designation :
Specification No: SR-I/C&M/WC-4804/2026/RFx: 5002005649 (SR1/NT/W-AIS/DOM/B00/26/12524) Schedule 7
WC-4804: “Upgradation of bay equipment at Gooty substation under reconductoring of Gooty-Thumkur (Pavagada) 400KV D/C line with HTLS conductor” As per Lum-sum 0.00%
(SCHEDULE OF RATES AND PRICES ) AS per Percent #REF!
As per lum-sum on Sch-7 0.00%
Bidder’s Name and Address (Sole Bidder) : To: As per Percent on Sch-7 #REF!
Contract & Materials Dept., Total Discount #REF!
Name : Power Grid Corporation of India Ltd.,
Address : SRTS-I, Kavadiguda Main Road,
Secunderabad -500080. Multipackage Discount 0.0000%
Type tests on Earthwire, Hardwar Fittings & accessories of conductor & earthwire:
SL. NO. PR No Line Item No Code HSN Code Whether HSN in column ‘2’ is confirmed. If not indicate applicable the HSN code * Rate of GST applicable ( in %) Whether rate of GST in column ‘4’ is confirmed. If not indicate applicable rate of GST * Description of Test Unit Quantity Unit Test Charge Total Test Charges (Rs.) Total GST as confirmed by Bidder Revaluation of M column Tax Calculation Total Test Charges After Discount (Rs.) Dis Alert Total Test Charges After MPD (Rs.)
1 Included 0.00 0 0.00
2 Included 0.00 0 0.00
TOTAL TYPE TEST CHARGES 0.00
Total GST as confirmed by Bidder 0.00
Date : -- -- Printed Name :
Place : Designation :
Note : Bidder should indicate the name of test laboratories where type tests are proposed to be conducted
Specification No: SR-I/C&M/WC-4804/2026/RFx: 5002005649 (SR1/NT/W-AIS/DOM/B00/26/12524)
WC-4804: “Upgradation of bay equipment at Gooty substation under reconductoring of Gooty-Thumkur (Pavagada) 400KV D/C line with HTLS conductor” 0 0
(SCHEDULE OF RATES AND PRICES ) 0 0
Bidder’s Name and Address (Sole Bidder) :
SL. NO. Description of Test #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
Specification No: SR-I/C&M/WC-4804/2026/RFx: 5002005649 (SR1/NT/W-AIS/DOM/B00/26/12524)
WC-4804: “Upgradation of bay equipment at Gooty substation under reconductoring of Gooty-Thumkur (Pavagada) 400KV D/C line with HTLS conductor” As per Lum-sum 0.00%
(SCHEDULE OF RATES AND PRICES : TYPE TEST CHARGES) AS per Percent #REF!
As per lum-sum on Sch-7 0.00%
Bidder’s Name and Address (Sole Bidder) : To: As per Percent on Sch-7 #REF!
Contract & Materials Dept., Total Discount #REF!
Name : Power Grid Corporation of India Ltd.,
Address : SRTS-I, Kavadiguda Main Road,
Secunderabad -500080. Multipackage Discount 0.0000%
Type Tests on Earthwire
SL. NO. Description of Test Unit Quantity Unit Test Charge Total Test Charges (Rs.) Total Test Charges After Discount (Rs.) Dis Alert Total Test Charges After MPD (Rs.)
(a) #REF! #REF! #REF! #REF! #REF!
(b) #REF! #REF! #REF! #REF! #REF!
Sub-Total (I) #REF!
TOTAL TEST CHARGES (I) #REF!
Discount Sche-7 #REF! MPD Sche-7 #REF!
Dis Alert #REF!
Date : -- Printed Name :
Place : Designation :
Note : Bidder should indicate the name of test laboratories where type tests are proposed to be conducted
Specification No: SR-I/C&M/WC-4804/2026/RFx: 5002005649 (SR1/NT/W-AIS/DOM/B00/26/12524)
WC-4804: “Upgradation of bay equipment at Gooty substation under reconductoring of Gooty-Thumkur (Pavagada) 400KV D/C line with HTLS conductor” 0 0 0
(SCHEDULE OF RATES AND PRICES : TYPE TEST CHARGES) 0 0 0
Bidder’s Name and Address (Sole Bidder) : 0
SL. NO. Description of Test 0
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
Specification No: SR-I/C&M/WC-4804/2026/RFx: 5002005649 (SR1/NT/W-AIS/DOM/B00/26/12524) Letter of Discount
LETTER OF DISCOUNT
Contract & Materials Dept.,
Power Grid Corporation of India Ltd.,
SRTS-I, Kavadiguda Main Road,
Secunderabad -500080.
Subject : WC-4804: “Upgradation of bay equipment at Gooty substation under reconductoring of Gooty-Thumkur (Pavagada) 400KV D/C line with HTLS conductor”
With reference to the subject tender, we hereby offer unconditional discount on the prices quoted by us as per details given here below : Eq Weightage of Rs/ % Final Discount Factor
1 Discount on lum-sum basis on total price quoted by us without Taxes & Duties. [The discount shall be proportionately applicable on all the items of all the Schdules i.e. Sch-1 (without type test charges), Sch-2, Sch-3, Sch-4a, Sch-4b & Sch-7] In Rs. 0.00 0.0000000000%
2 Discount on percent basis on total price quoted by us without Taxes & Duties. [The discount shall be applicable on all the items of all the Schdules i.e. Sch-1 (without type test charges), Sch-2 , Sch-3, Sch-4a, Sch-4b & Sch-7] In Percent (%) 0.00 0.00%
3 Discount on lum-sum basis on the Schedules as given below : [The discount shall be proportionately applicable on all the relevent items of the respective Schdules.] In Rs.
Schedule-1 : Ex works prices In Rs. 0.00 0.0000000000% Schedule-1 : Ex-Works Price 0.0000000000%
Schedule-2 : Freight & Insurance In Rs. 0.00 0.0000000000% Schedule-2 : Freight & Insurance 0.0000000000%
Schedule-3 : Erection Charges In Rs. 0.00 0.0000000000% Schedule-3 : Erection Charges 0.0000000000%
Schedule-4a : Training Charges In Rs. 0.00 0.0000000000% Schedule-4a : Training Charges 0.0000000000%
Schedule-4b : Maintenance Charges during and after DLP In Rs. 0.00 0.0000000000% Schedule-4b : Maintenance Charges 0.0000000000%
Schedule-7 : Type Test Charges In Rs. 0.00 0.0000000000% Schedule-7 : Type Test Charges 0.0000000000%
4 Discount on percent basis on the Schedules as given below : [The discount shall be applicable on all the relevent items of the respective Schdules.] In Percent (%)
Schedule-1 : Ex works prices In Percent (%) 0.00 0.00%
Schedule-2 : Freight & Insurance In Percent (%) 0.00 0.00%
Schedule-3 : Erection Charges In Percent (%) 0.00 0.00%
Schedule-4a : Training Charges In Percent (%) 0.00 0.00%
Schedule-4b : Maintenance Charges during and after DLP In Percent (%) 0.00 0.00%
Schedule-7 : Type Test Charges In Percent (%) 0.00 0.00%
Discount(s) offered at sl. No. 1 to 4 will get displayed and accounted for automatically in the respective items of the Schedules.
5 We hereby offer Multi-package discount as given below:
Multi-Package Discount(s) offered at sl. No. 5 will not get automatically accounted for in the respective items of the Schedules. The same shall be worked out saparately for evaluation.
Please consider this letter of discount as the integral part of our price bid.
Thanking you, we remain,
Yours faithfully,
For and on behalf of
Date : -- Printed Name :
Place : Designation :
Details of Octroi
Sl No. Description of Items Amount on which Octroi is applicable Rate of Octroi Octroi
Details of Entry Tax
Sl No. Description of Items Amount on which Entry Tax is applicable Rate of Entry Tax Entry Tax
Details of Other Taxes & Duties
Sl No. Description of Items Amount on which Other Taxes & Duties are applicable Description of Taxes & Duties Rate of Taxes & Duties Amount of Taxes & Duties
Specification No: SR-I/C&M/WC-4804/2026/RFx: 5002005649 (SR1/NT/W-AIS/DOM/B00/26/12524) Bid Form 2nd Envelope Sole Bidder 1 st 1 January
0 2 nd 2 February
BID FORM (Second Envelope) 3 rd 3 March
Bid Proposal Ref. No. 5 th 5 May
Date : -- 6 th #VALUE! 6 June
7 th #VALUE! 7 July
To: 8 th #VALUE! 8 August
Contract & Materials Dept., 9 th #VALUE! 9 September
Power Grid Corporation of India Ltd., 10 th 10 October
SRTS-I, Kavadiguda Main Road, 11 th 11 November
Secunderabad -500080. 12 th 12 December
Name of Contract : WC-4804: “Upgradation of bay equipment at Gooty substation under reconductoring of Gooty-Thumkur (Pavagada) 400KV D/C line with HTLS conductor” 15 th
Dear Ladies and/or Gentlemen, 16 th
Schedule 1 Plant and Equipment (Including Mandatory Spare Parts) to be supplied, including Type Test Charges. 21 st
Schedule 2 Local Transportation, In-transit Insurance, loading and unloading 22 th
Schedule 3 Installation Charges. 23 th
Schedule 4 Training charges for training to be imparted. 24 th
Schedule 4b Maintenance Charges during & after Defect Laibility Period.
Schedule 5 Taxes and Duties not included in Schedule 1 25 th
Schedule 6 Grand Summary [Schedule 1to 5] 26 th
Schedule 7 Break-up of Type Test Charges for Type Tests to be conducted 27 th
2.5 We declare that items left blank in the Schedules will be deemed to have been included in other items. The TOTAL for each Schedule and the TOTAL of Grand Summary shall be deemed to be the total price for executing the Facilities and sections thereof in complete accordance with the Contract, whether or not each individual item has been priced. 31 st
3.0 We confirm that except as otherwise specifically provided our Bid Prices in this Second Envelope include all taxes, duties, levies and charges as may be assessed on us/our Associate (applicable for Foreign Bidder), our Sub-Contractor/Sub-Vendor or their employees by all municipal, state or national government authorities in connection with the Facilities, in and outside of India.
3.1 100% of applicable Taxes and Duties i.e GST which are payable by the Employer under the Contract, shall be reimbursed by the Employer on production of satisfactory documentary evidence by the Contractor in accordance with the provisions of the Bidding Documents.
3.3 We confirm that we have also registered/we shall also get registered in the GST Network with a GSTIN, in all the states where the project is located and the states from which we shall make our supply of goods.
4.0 # (For Joint Venture only) We, the partners of Joint Venture submitting this bid, do agree and confirm that in case of Award of Contract on the Joint Venture, we shall be jointly and severally liable and responsible for the execution of the Contract in accordance with Contract terms and conditions. 1
5.0 We, hereby, declare that only the persons or firms interested in this proposal as principals are named here and that no other persons or firms other than those mentioned herein have any interest in this proposal or in the Contract to be entered into, if the award is made on us, that this proposal is made without any connection with any other person, firm or party likewise submitting a proposal is in all respects for and in good faith, without collusion or fraud.
Thanking you, we remain,
Yours faithfully,
For and on behalf of
Date : -- Printed Name :
Place : Designation :
In case of bid from a Joint Venture, name & designation of representative of JV partner is to be provided and Bid Form is also to be signed by him.
Please provide additional information of the Bidder
Business Address :
Country of Incorporation :
State/Province to be indicated :
Name of Principal Officer :
Address of Principal Officer :
Note: Bidders may note that no prescribed proforma has been enclosed for Attachment 2 : Power of Attorney. Bidders may use their own proforma for furnishing the required information with the bid.
STATEMENT OF QUOTED / CORRECTED PRICES
All Figures are in Rupees
Sl. No. Price Component Quoted Price Corrected Price
1 TOTAL SCHEDULE NO. 1:Ex-Works Price of Plant and Equipment including Type Test Charges 0.00 0.00
2 TOTAL SCHEDULE NO.2: Local Transportation, Insurance and other Incidental Services. 0.00 0.00
3 TOTAL SCHEDULE NO.3: Installation Charges 0.00 0.00
4 TOTAL SCHEDULE NO.4: Training Charges Not Applicable Not Applicable
5 TOTAL BID PRICE: (Excluding Taxes & Duties) 0.00 0.00
6 DISCOUNT #REF! #REF! #REF!
7 NET BID PRICE (Excluding Taxes & Duties) #REF! #REF!
8 TAXES & DUTIES PAYABLE ADDITIONALLY
A) EXCISE DUTY 0 0.00
B) CENTRAL SALES TAX 0 0.00
C) VAT #REF! 0.00
D) ENTRY TAX / OCTROI #REF! 0.00
F) TOTAL TAXES & DUTIES #REF! 0.00
8 TOTAL BID PRICE (INCLUDING TAXES & DUTIES) #REF! 0.00
9 TOTAL SCHEDULE NO.7: Type Test Charges [Total of this Schedule is included in Schedule-1 above] 0.00 0.00
I) Bidder has indicated the following taxes and duties additionally applicable for their bid:
Excise Duty % as Excise Duty
#REF! VAT #REF! #REF!
#REF! Entry Tax/ Octroi #REF! #REF!
Others as Others
II) With regard to Entry Tax, it may be mentioned that the substations covered under the subject pacakge falls in State of MP, where an entry tax @ 2% of Purchase Price is applicable. In view of the above, the taxes and duties inter-alia including entry tax applicable for the bids are calculated :
a) Ex-Works Price of Direct Supplies (after discount, if any) Rs. 0
b) Excise Duty, as applicable on (a) above at the rate : 10.00% Rs. 0
c) Amount on which Sales Tax is applicable 0.00 0
d) CST, as applicable on (a) + ED (b) above at the rate : 2.00% Rs. 0
e) VAT, as applicable on (a) + ED (b) above at the rate : 1.00% 0
g) Purchase Price for Entry Tax (Total Ex-Works+F&I+ED+CST+Others) Rs. 0
h) Entry Tax, as applicable on (e) above at the rate : Rs. 0.00
WC-4402 : 400KV AIS Substation Extension Package of Kurnool-3 PS due to Re-Arrangement in Electrical Layout at Kurnool-III Pooling Station Statement of Quoted / Corrected Prices Page
Spec. No. SR-I/C&M/WC-4402/2025(SR1/NT/W-AIS/DOM/B00/25/13182), (RFx: 5002004796)
STATEMENT OF QUOTED / CORRECTED PRICES
All Figures are in Rupees
Sl. No. Price Component Quoted Price Corrected Price
1 TOTAL SCHEDULE NO. 1:Ex-Works Price of Plant and Equipment including Type Test Charges 0.00 0.00
2 TOTAL SCHEDULE NO.2: Local Transportation, Insurance and other Incidental Services. 0.00 0.00
3 TOTAL SCHEDULE NO.3: Installation Charges 0.00 0.00
4 TOTAL SCHEDULE NO.4: Training Charges Not Applicable Not Applicable
5 TOTAL BID PRICE: (Excluding Taxes & Duties) 0.00 0.00
6 DISCOUNT #REF! #REF!
7 NET BID PRICE (Excluding Taxes & Duties) #REF! #REF!
8 TAXES & DUTIES PAYABLE ADDITIONALLY
A) EXCISE DUTY #REF! 0.00
B) CENTRAL SALES TAX /VAT #REF! #REF!
C) ENTRY TAX / OCTROI #REF! #REF!
D) OTHERS #REF! 0.00
E) TOTAL TAXES & DUTIES #REF! #REF!
8 TOTAL BID PRICE (INCLUDING TAXES & DUTIES) #REF! #REF!
9 TOTAL SCHEDULE NO.7: Type Test Charges [Total of this Schedule is included in Schedule-1 above] 0.00 0.00
I) Bidder has indicated the following taxes and duties additionally applicable for their bid:
a) Excise Duty Rs. #REF!
b) CST /VAT Rs. #REF!
c) Entry Tax / Octroi Rs. #REF!
d) Others Rs. #REF!
II) Bidder has offered following discount(s)
III) With regard to Entry Tax, it may be mentioned that the substations covered under the subject pacakge falls in State of MP, where an entry tax @ 1% of Purchase Price is applicable. In view of the above, the taxes and duties inter-alia including entry tax applicable for the bids are calculated : Details of dicounts
a) Ex-Works Price of Direct Supplies (after discount, if any) Rs. 0 Gross LS #REF! #REF! #REF! Gross % #REF! #REF! #REF!
b) Excise Duty @ 10.3% of (a) above Rs. 0 #REF! #REF!
c) CST / VAT @ 2% of Ex-Works of Direct Supplies (a) + ED (b) above Rs. #REF! Sch-1 Direct LS #REF! #REF! #REF! Sch-1 Direct % #REF! #REF! #REF!
d) Others Rs. Sch-1 BO LS #REF! #REF! #REF! Sch-1 BO % #REF! #REF! #REF!
e) Purchase Price for Entry Tax (Total Ex-Works+F&I+ED+CST+Others) Rs. #REF! Sch-2 LS #REF! #REF! #REF! Sch-2 % #REF! #REF! #REF!
f) Entry Tax @ 1% of (e) above Rs. #REF! Sch-3 LS #REF! #REF! #REF! Sch-3 % #REF! #REF! #REF!
Sch-7 LS #REF! #REF! #REF! Sch-7 % #REF! #REF! #REF!
WC-4804: “Upgradation of bay equipment at Gooty substation under reconductoring of Gooty-Thumkur (Pavagada) 400KV D/C line with HTLS conductor” Statement of Quoted / Corrected Prices Page Different Manner #REF!
Text for Discount #REF!
23 Twenty Three
27 Twenty Seven
28 Twenty Eight
33 Thirty Three
37 Thirty Seven
38 Thirty Eight
73 Seventy Three
74 Seventy Four
75 Seventy Five
77 Seventy Seven
78 Seventy Eight
79 Seventy Nine
83 Eighty Three
87 Eighty Seven
88 Eighty Eight
93 Ninety Three
97 Ninety Seven
98 Ninety Eight
100 One Hundred
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html
First Envelope and Bid Forms.xls
xls • 2.38 MB
Price_Schedule.xlsx
xlsx • 1.67 MB
Safety Pact.docx
docx • 0.03 MB
safety plan.docx
docx • 0.06 MB
Vol-III_01_Attachment-3(QR).docx
docx • 0.09 MB
Vol-III_02_Attachment-8-Not applicable.docx
docx • 0.03 MB
Vol-III_03_Attachment-20_KMP Declaration.doc
doc • 0.06 MB
Vol-III_05_Attachment-22 Certificate from Cost Auditor.docx
docx • 0.03 MB
Vol-III_07_Attachment -24_Declaration Regarding events encountered.docx
docx • 0.04 MB
Vol-III_08-Attachment-25- Undertaking Compliance of DMI&SP policy.docx
docx • 0.03 MB
Vol-III_09_Attachment-26-Certification by the Bidder per DoE Order.docx
docx • 0.03 MB
Vol-III_11_Attachment-28.docx
docx • 0.03 MB
Vol-III_13_Attachment-29_CIPP.docx
docx • 0.03 MB
Vol-III_13_Attachment-30_Whistle Blower.docx
docx • 0.03 MB
Vol-III_14_Legends for Units.pdf
pdf • 0.03 MB
1_0 GTR Rev 15.pdf
pdf • 7.12 MB
Section Project_Rev-01.pdf
pdf • 0.50 MB
Section_Switchyard Erection_Rev_10.pdf
pdf • 5.99 MB
Specific Requirement with Annexures_Rev 10.pdf
pdf • 9.19 MB
Annexure-I_List of Drawings.pdf
pdf • 0.13 MB
GA Layout_Gooty SS.pdf
pdf • 0.27 MB
SLD_Gooty SS.pdf
pdf • 0.28 MB
3. Frequently Asked Questions.pdf
pdf • 0.23 MB
00_Cover Pages.doc
doc • 1.59 MB
00_Main Index_Vol-I.doc
doc • 0.04 MB
01-Section - I IFB SSTE_Vol-I.docx
docx • 0.09 MB
02 Section - II ITB SSTE S&I DCB-PRANIT_Vol-I.docx
docx • 0.15 MB
03 Section - III BDS SSTE_Vol-I.docx
docx • 0.13 MB
04-Annexure-A (BDS)_Vol-I-QR.doc
doc • 0.24 MB
05-Section - IV GCC -S&I Rev 3-DCB.pdf
pdf • 1.93 MB
06-Section - V_SCC-AIS_Vol-I.doc
doc • 0.38 MB
07-Appendix -I to SCC_Vol-I.doc
doc • 0.31 MB
08-Appendix-II SCC_Vol-I.pdf
pdf • 0.62 MB
08-Section-VI_Sample Forms and Procedures_Vol-I.doc
doc • 0.59 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .