Tender Value
₹7.9 L
EMD Value
₹8,000
Closing Date
8 Apr 2026, 5:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Deputy Executive Engineer, Irrigation Sub Division,Una
Repairing and restoration of CT Crossing structure on LBMC of raval irrigation scheme at che 5900 and repairing and restoration of CT crossing structure on LBMC of Raval Irrigation scheme at che 1650
291675
5 of 2025-26
Open
Civil - All
Gir Somnath
6 documents required · 6 mandatory
₹900
Executive Engineer Gir Somnath irrigation Division Veraval
₹8,000
30 Mar 2026
30 Mar 2026
30 Mar 2026
8 Apr 2026
30 Mar 2026
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr. )
Item Description of Item (with brief Quantity Unit Rate In Amount
No specification and reference to book of figures
specifications)
1 Dismantling of RCC work viz. slab, beam, 13.97 Sqmt 1362.00
lintel, barrel, staircase, etc. including
removing the steel from the dismantled
portion without damage to reinforcement
sorting and stacking of useful and unuseful
material from the dismantled material as
directed etc comp.
2 Dismantling stone/brick masonry & 9.00 Cum 616.00
stacking of useful and unuseful material
from the dismantled materials as directed
etc complete.(a) In cement mortar
3 Excavation in all sort of strata and 56.50 Cum 83.00
formations incl. depositing the unuseful
excavated stuff as and where directed incl
sorting and stacking useful materials as
directed upto 30 mt lead etc. complete
incl. dewatering. ( Depth 0 TO 3.0 mt )
(For all type canal & foundation trenches
of C.D. works ) A) IN OVERBURDEN INCL.
4 Prov. & Laying in position "NOMINAL MIX' 7.50 Sqm 3816.00
cement concrete using cement, sand and
crushed aggregate by mass and machine
mix for C.C. work incl. necessary
formworks centering scaffolding
compaction by mechanical vibrator,curing
as directed with all lead & lift etc complete
C) Concrete grade 1:2:4 and MSA-40mm
5 Prov. and Laying in position Controlled 34.80 Cum 4766.00
cement concrete using cement, sand and
crushed aggregate by mass and machine
mix for R.C.C/CC work including necessary
formworks centering scaffolding
compaction by mechanical vibrator,curing
as directed with all lead & lift etc complete
Excluding the cost of reinforcement FOR
PIER AND ABT.A) Concrete grade M-15
6 Prov. and Laying in position Controlled 15.20 Km 5448.00
cement concrete using cement, sand and
crushed aggregate by mass and machine
mix for R.C.C/CC work including necessary
formworks centering scaffolding
compaction by mechanical vibrator,curing
as directed with all lead & lift etc complete
Excluding the cost of reinforcement FOR
SOLID SLAB AND ROAD BRIDGE A)
Concrete grade M-20 and MSA-20mm
7 Providing,cutting,bending,binding and 0.66 Km 66268.00
fixing in position as per drawing.TMT BAR
, Fe-415 reinforcement for R.C.C. works
and anchor bars incl cost of black annealed
16 to 18 BWG M.S.. Wire etc.complete with
all lead and lift.
8 Back filling with appropriate excavated 200.00 Km 84.00
material behind the structures or refilling
the trenches with excavated useful
material including watering ramming,
consolidation etc complete with all lead
9 Providing murrum including spreading 600.00 Km 166.00
the same and dressing the side slope & top
surface in required grade and camber with
lead upto 1.0 km etc complete.
10 Clearing the silt from canal /drain bed by 1925.00 Km 166.00
digging the same to the required bed level
and gradient including depositing the
excavated earth regularly on spoil bank for
utilizing the same for preparing the bund
after bracking the clods as and where
directed for lead upto 30 mt and lift as
under. ( Excluding weed cutting )
I/We am/are willing to carry out the work at… % above/below percent (Should be written
in figures and words) of the estimated rate mentioned above. Amount of my /our tender works out
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
(B) For Item Rate Tender (For above INR 10 Cr.):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification
and reference to book of In In
specifications) figures Words
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ……………………………… (in
(C)Net Tendered Amount (A-B) (in figure) ………………………………
1 The Contractor shall exhibit a board with detailed specification and details of work as directed
by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.:
No. MIS 102010/17/K1, dtd. 30/07/2018 as stated in S.O.R. therefore in R.C.C. items where there
is a change as per actual mix design the cost of difference of cement consumption have been
deducted from the rate of original item at the rate of input rate mentioned in all the tender.
Signature of Contractor Deputy Executive Engineer,
Irrigation Sub Division,
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
6.C.T.Crossing Tender.pdf
6.BOQ.pdf
6.Tender Notice No 5 of 2025-26.pdf
Download all tender documents and submit your bid