Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹57.0 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹58.3 L+₹1.3 L (2.32%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹59.9 L+₹2.9 L (5.11%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹62.5 L+₹5.6 L (9.77%)Admitted-Finance AT SAUNTAPUR PO GUDESHIRA PS DIST BARGARH BARGARH | BARGARH | ODISHA | 768027 | L4 | Admitted-Finance | ||
| 5 | L5₹62.7 L+₹5.7 L (10.1%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹70.4 L
EMD Value
₹70,441
Closing Date
16 Jun 2026, 5:00 pmClosed
SUPERINTENDING ENGINEER (R AND B) DIVISION
THE SUPERINTENDING ENGINEER (R AND B) DIVISION BARGARH, AT-NEAR GOVT BUS STAND INFRONT OF WOMENS COLLEGE BARGARH
BUILDING WORK (CIVIL, EI AND PH)
2026_EICCL_130703_1
IFB-SE PWD BGH No.01 OF 2026-27
Open Tender
Civil Works - Buildings
Percentage
180 days
Bargarh
Please refer the tender documents
2 documents required · 2 mandatory
₹10,000
₹70,441
Yes
1 Aug 2026
4 Jun 2026
17 Jun 2026
4 Jun 2026
16 Jun 2026
4 Jun 2026
4 Jun 2026 - 16 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORK
Earth Work in exavation of foundation in hard soil within initial leads of 50m & lifts of 1.5m including dressing and levelling of bed etc. and adding contractor's profit and over head charges, etc. complete in all respect | 254.63 | cum | 276.89 | ₹70,504.5 |
| 2 | Supplying & filling of foundation with course sand well watered and rammed including cost, cost of all labour, carriage, royalty complete in all respect. | 605.37 | cum | 621.48 | ₹3,76,225.35 |
| 3 | Cement Concrete (1:3:6) using 40mm size hard granite C.B. metal approved quality from approved quarry including cost, carriage, royalty, cost of all labour. etc complete and as directed by E.I.C. | 62.99 | cum | 5,572.49 | ₹3,51,011.15 |
| 4 | R.C.C. M-20 grade with 20mm and down grade C.B. chips of approved quality from approved quarry including hoisting, laying hire charges of concrete mixture, vibrator, watering, curing and cost of all materials and labour, centering shuttering etc complete but excluding cost of reinforcement. COLOUM BASE FOOTING | 37.17 | cum | 6,058.08 | ₹2,25,178.83 |
| 4.01 | COLUMN IN SUPER STRUCTURE Ground Floor | 7.88 | cum | 15,320.99 | ₹1,20,729.4 |
| 4.02 | First Floor | 1.78 | cum | 14,952.49 | ₹26,615.43 |
| 4.03 | First Floor | 1.94 | cum | 17,370.41 | ₹33,698.6 |
| 4.04 | PLINTH BAND | 11.12 | cum | 6,928.42 | ₹77,044.03 |
| 4.05 | LINTEL BAND Ground Floor | 4.72 | cum | 13,721.35 | ₹64,764.77 |
| 4.06 | ROOF BEAM Ground Floor | 14.82 | cum | 15,320.99 | ₹2,27,057.07 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.42 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 2.89 MB
Tendernotice_1.pdf
PDF • 1.33 MB
BOQ_594121.xls
BOQ • 0.37 MB
1stcorrigendumtcn1.pdf
PDF • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .