Loading…
Loading…
Tender Value
₹18.1 L
EMD Value
₹36,204
Closing Date
20 Jul 2026, 2:00 pm
Ex. Engineer R and B Division Shopian
Shopian
Development of Recreational Skating Ring Facilities for Tourist/Visitors at Shopian
2026_PWDJK_314957_2
25/2638-47/RnB/SPN/e-tender of 07-07-2026
Open Tender
Civil Works
40 days
Shopian
Please refer Tender documents.
5 documents required · 5 mandatory
₹800
bearing Account Number 0470010200000099
₹36,204
7 Jul 2026
7 Jul 2026
21 Jul 2026
8 Jul 2026
20 Jul 2026
8 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m
in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and
ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as
directed: All Kinds of soil | - | Cum | 0.6 | - |
| 2 | Providing and laying stone soling duly hand packed in maintaning level and section including all carriages and headload complete | 1 | Cum | 1 | ₹1 |
| 3 | Providing and laying in position cement concrete 1:4:8 (1
Cement:4 Corase sand: 8 grade stone aggregate 40 mm
nominal size crushed including curing but excluding the
cost of centring and shuttering. All work upto plinth level
including all carriages and headload complete | - | Cum | 0.6 | - |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level: 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)including all carriages and headload complete | 1 | Cum | 0.4 | ₹0.4 |
| 5 | Reinforcement for R.C.C. work including straightening,
cutting, bending, placing in position and binding all
complete Thermo-Mechanically Treated bars of grade Fe 500D or more. | - | Kgs | 0.8 | - |
| 6 | Providing and laying in position cement concrete 1:2:4 (1
Cement:2 Corase sand: 4 grade stone aggregate 20 mm
nominal size crushed including curing but excluding the
cost of centring and shuttering. All work upto plinth level including all carriages and headload complete | - | Cum | 0.6 | - |
| 7 | Centering and shuttering including strutting, propping etc
and removal of form work for foundation, footings etc etc | 1 | Sqm | 0.4 | ₹0.4 |
| 8 | Supply and filling sand incluing levelling, watering , raming, compacting and consolidation including all carriages and headload complete | 1 | Cum | 0.2 | ₹0.2 |
| 9 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer and epoxy paint all including all carriages and headload complete | - | Kgs | 0.6 | - |
| 10 | Kota stone slab flooring 25 mm thick over 20mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including rubbing, polishing and curing complete with base of cement mortar 1:4 (1 cement : 4 coarse sand) : including all carriages and headload complete | - | Sqm | 0.2 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
BOQ_1020251.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid