| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.5 LAccepted-AOC | L1 | Accepted-AOC Being lowest | |
| 2 | L2₹39.6 L+₹2.1 L (5.66%)Rejected-Finance RAJKOT ROAD AIR FORCE STATION HALWARA 141106 PUNJAB | HALWARA | LUDHIANA | PUNJAB | 141106 | L2 | Rejected-Finance Other than lowest | |
| 3 | L3₹39.7 L+₹2.3 L (6.02%)Rejected-Finance KHATA NO 254 529 KHASRA NO 364 2 MIN PREET NAGAR A GALI NO 2 HARERI ROAD OPP STAR STUDIO HERARI SANGRUR | SANGRUR | SANGRUR | PUNJAB | L3 | Rejected-Finance Other than lowest |
| Sl No | Description | Qty | Unit | M/S SANGA SINGH AND CO L2 | CHOUDHARY ENTERPRISES L1 | JINDAL AND COMPANY L3 |
|---|---|---|---|---|---|---|
| 1.00 | M&L for preparation of old treated horizontal concrete or bituminous surfaces exceeding 10cm width or girth with wire brushes etc and painting lines, dashes, strips, circles and other marking with one coat of water thinnable/matt finished road marking paint white/orange/yellow/black or any other colour using mechanical pavement marking machine as approved by GE, complete all as specified and directed. | 48,000 | Sqm | 26 ₹12,48,000 | 24.21 ₹11,62,080 Lowest | 28 ₹13,44,000 |
| 2.00 | M&L for preparation of old treated horizontal concrete or bituminous surfaces exceeding 10cm width or girth with wire brushes etc and painting lines, dashes, strips, circles and other marking with one coat of water thinnable/matt finished road marking paint white/orange/yellow/black or any other colour by brushing / rolling manually as approved by GE, complete all as specified and directed. | 40,000 | Sqm | 29.5 ₹11,80,000 | 27.1 ₹10,84,000 | 25.5 ₹10,20,000 Lowest |
| 3.00 | M&L for preparation of old treated horizontal concrete or bituminous surfaces not exceeding 10cm width or girth with wire brushes etc and painting lines, dashes, strips, circles and other marking with one coat of water thinnable/matt finished road marking paint white/orange/yellow/black or any other colour using mechanical pavement marking machine as approved by GE, complete all as specified and directed. | 2,000 | 10 RM | 33 ₹66,000 | 24.31 ₹48,620 Lowest | 30 ₹60,000 |
| 4.00 | M&L for preparation of old treated horizontal concrete or bituminous surfaces not exceeding 10cm width or girth with wire brushes etc and painting lines, dashes, strips, circles and other marking with one coat of water thinnable/matt finished road marking paint white/orange/yellow/black or any other colour using manually pavement marking machine as approved by GE, complete alll as specified and directed. | 1,650 | 10 RM | 30 ₹49,500 | 31 ₹51,150 | 29 ₹47,850 Lowest |
| 5.00 | M&L for one coat of white wash on old rigid / flexible surfaces including preparation of surfaces, complete alll as specified and directed. | 5,000 | Sqm | 8 ₹40,000 | 4.36 ₹21,800 Lowest | 6 ₹30,000 |
| 6.00Notes for SI item No 1 to 5 :- (i) Mechanical pavement marking machine & make of paint shall be approved by GE before commencement of work. | ||||||
| 7.00M&L for execution of Runway Rehabilition Scheme(RRS) within the time schedule, complete all as specified and directed. Note:- (i) The T&P,materials and manpower involved in the execution of RRS shall be measured and paid seperately in the respective items. (ii) Contractor will arrange tools,plants.labour and machinery as per CA for Runway Rehabilition Scheme(RRS) on short notice of within 03 Hrs, on receive of message / phone call or any other means of communication recepit from engineer in charge/ GE. The tools and plants should reach at given location in technical area within 3 hours. (III) Atlest 30% of Building material required in item no 7.02 to 7.07 is to be stacked by the contractor within one month of placing the work order at a place directed by the engneer in charge inside the technical area. No Claim of contractor whatsoever shall be considered if deployed tools, plants, labour and machinery remain idle/static and payment shall only be made, if exercise executed. However the contractor can remove the T&P, labour etc after 03 days, if excercise shall not take place due to any reason and quoted rate shall deemed to be included for this provision. The Air Force authority shall carried out field testing by their own T&P on completion of exercise, if any defect is found during testing, the same shall be rectified by the contractor without any extra cost to Govt. (IV) The RRS exercise (Runway Rehabilition Scheme) is to be completed within 7 hours after commencement in all respect . Flow chart of RSS exercise including time required for each activity can be seen in the office of Garrison engineer AF Halwara.contractor is deemed to have well known to it. | ||||||
| 7.01(V) Runway Rehabilition Scheme(RRS) Exercise can be under taken any time (day/night). (VI) In case of non supply of any item listed in sr no 7.02 to 7.07 a penality of double the quoted rate ( for that exercise) would be imposed. (VII) A penalty of 50% of quoted rate (of that exercise) would be imposed, if the contractor is failed to complete the RRS exercise within the stipulated time frame as per the satisfactin of engineer in charge and airforce authority. (VIII) All T&P shall be paid as per the actual use in the exercise subject to maximum of 10 hrs in each exercise including prepration / moblization time. In case of any break down in T&P during the exercise the same is to be replaced within one hour time faliing which a penalty of double the quoted rate would be imposed. (IX) The decision of GE for imposing the penalty shall be final and binding. (X) The contractor will give the name of the person to be employed in RRS Exercise within one month of placing the work order . No replacement of the approved person shall be allowed without the prior written permission of GE (AF) Halwara. (XI) All items 7.08 to 7.14 has included one driver /operator and fuel to run and work inside the technical area all as specified and directed by engineer in charge. (XII) the number of exercise is taken in each quarter and size of cretar is all as per AF requirment . (XIII) The IMD machine used in the excersie would be supplied by the MES. The contractor would traind his REP to operate the machine in consultation with MES. | ||||||
| 7.02 | Supply and stacking of crushed stone aggregate of size 150 mm near Runway inside Tech Area, complete all as specifeid and directed. | 150 | Cum | 999 ₹1,49,850 Lowest | 1,400 ₹2,10,000 | 1,000 ₹1,50,000 |
| 7.03 | Supply and stacking of crushed stone aggregate of size 63 mm near Runway inside Tech Area, complete all as specifeid and directed. | 220 | Cum | 1,199 ₹2,63,780 Lowest | 1,400 ₹3,08,000 | 1,200 ₹2,64,000 |
Tender Value
Refer Docs
EMD Value
₹80,000
Closing Date
2 Aug 2025, 6:00 pmClosed
GE (AF) Halwara
GE (AF) Halwara
PAINTING TO RUNWAY, TAXI TRACKS, LOOPS TO BPs, DISPERSAL ETC IN AIR FILED AND CONDUCT OF RRS EXERCISE ON QUARTELY BASIS OR AS PER REQUIRMENT OF STATION INCLUDING MATERIAL TOOLS AND PLANT IN TECH AREA AT AF STN HALWARA
2025_MES_718550_1
GE/HAL-28/2025-26
Open Tender
Civil Works
Item Rate
365 days
Halwara
MES ENLISTED CONTRACTORS CLASS D CATEGORY a(i)
8 documents required · 8 mandatory
₹500
GE (AF) Halwara
₹80,000
Yes
13 Sept 2025
4 Jul 2025
4 Aug 2025
4 Jul 2025
2 Aug 2025
19 Jul 2025
Amount
M&L for preparation of old treated horizontal concrete or bituminous surfaces exceeding 10cm width or girth with wire brushes etc and painting lines, dashes, strips, circles and other marking with one coat of water thinnable/matt finished road marking paint white/orange/yellow/black or any other colour using mechanical pavement marking machine as approved by GE, complete all as specified and directed.
M&L for preparation of old treated horizontal concrete or bituminous surfaces exceeding 10cm width or girth with wire brushes etc and painting lines, dashes, strips, circles and other marking with one coat of water thinnable/matt finished road marking paint white/orange/yellow/black or any other colour by brushing / rolling manually as approved by GE, complete all as specified and directed.
M&L for preparation of old treated horizontal concrete or bituminous surfaces not exceeding 10cm width or girth with wire brushes etc and painting lines, dashes, strips, circles and other marking with one coat of water thinnable/matt finished road marking paint white/orange/yellow/black or any other colour using mechanical pavement marking machine as approved by GE, complete all as specified and directed.
M&L for preparation of old treated horizontal concrete or bituminous surfaces not exceeding 10cm width or girth with wire brushes etc and painting lines, dashes, strips, circles and other marking with one coat of water thinnable/matt finished road marking paint white/orange/yellow/black or any other colour using manually pavement marking machine as approved by GE, complete alll as specified and directed.
M&L for one coat of white wash on old rigid / flexible surfaces including preparation of surfaces, complete alll as specified and directed.
Notes for SI item No 1 to 5 :- (i) Mechanical pavement marking machine & make of paint shall be approved by GE before commencement of work.
M&L for execution of Runway Rehabilition Scheme(RRS) within the time schedule, complete all as specified and directed. Note:- (i) The T&P,materials and manpower involved in the execution of RRS shall be measured and paid seperately in the respective items. (ii) Contractor will arrange tools,plants.labour and machinery as per CA for Runway Rehabilition Scheme(RRS) on short notice of within 03 Hrs, on receive of message / phone call or any other means of communication recepit from engineer in charge/ GE. The tools and plants should reach at given location in technical area within 3 hours. (III) Atlest 30% of Building material required in item no 7.02 to 7.07 is to be stacked by the contractor within one month of placing the work order at a place directed by the engneer in charge inside the technical area. No Claim of contractor whatsoever shall be considered if deployed tools, plants, labour and machinery remain idle/static and payment shall only be made, if exercise executed. However the contractor can remove the T&P, labour etc after 03 days, if excercise shall not take place due to any reason and quoted rate shall deemed to be included for this provision. The Air Force authority shall carried out field testing by their own T&P on completion of exercise, if any defect is found during testing, the same shall be rectified by the contractor without any extra cost to Govt. (IV) The RRS exercise (Runway Rehabilition Scheme) is to be completed within 7 hours after commencement in all respect . Flow chart of RSS exercise including time required for each activity can be seen in the office of Garrison engineer AF Halwara.contractor is deemed to have well known to it.
(V) Runway Rehabilition Scheme(RRS) Exercise can be under taken any time (day/night). (VI) In case of non supply of any item listed in sr no 7.02 to 7.07 a penality of double the quoted rate ( for that exercise) would be imposed. (VII) A penalty of 50% of quoted rate (of that exercise) would be imposed, if the contractor is failed to complete the RRS exercise within the stipulated time frame as per the satisfactin of engineer in charge and airforce authority. (VIII) All T&P shall be paid as per the actual use in the exercise subject to maximum of 10 hrs in each exercise including prepration / moblization time. In case of any break down in T&P during the exercise the same is to be replaced within one hour time faliing which a penalty of double the quoted rate would be imposed. (IX) The decision of GE for imposing the penalty shall be final and binding. (X) The contractor will give the name of the person to be employed in RRS Exercise within one month of placing the work order . No replacement of the approved person shall be allowed without the prior written permission of GE (AF) Halwara. (XI) All items 7.08 to 7.14 has included one driver /operator and fuel to run and work inside the technical area all as specified and directed by engineer in charge. (XII) the number of exercise is taken in each quarter and size of cretar is all as per AF requirment . (XIII) The IMD machine used in the excersie would be supplied by the MES. The contractor would traind his REP to operate the machine in consultation with MES.
Supply and stacking of crushed stone aggregate of size 150 mm near Runway inside Tech Area, complete all as specifeid and directed.
Supply and stacking of crushed stone aggregate of size 63 mm near Runway inside Tech Area, complete all as specifeid and directed.
Supply and stacking of crushed stone aggregate of size 40 mm near Runway inside Tech Area, complete all as specifeid and directed.
Supply and stacking of crushed stone aggregate of size 20 mm near Runway inside Tech Area, complete all as specifeid and directed.
Supply and stacking of fine aggregate(river sand) near Runway inside Tech Area, complete all as specifeid and directed.
Supply only Polyethylene film 400 micron thick near Runway inside Tech Area, complete all as specifeid and directed.
Supply only 02 x JCB Machine with rock breaker Heavy Duty including driver and fuel, complete all as specified and directed.
Supply only 01 x Road Roller Vibretion type including driver and fuel, complete all as specified and directed.
Supply only 01 x Front end Loader (min load carrying capacity 2.5 Ton) including driver and fuel, complete all as specified and directed.
Supply only 01 x Generator 5 KVA Trailer Mounted with pole light including operator and fuel, complete all as specified and directed.
Supply only 04 x Tipper/Tractor Trolly including driver and fuel, complete all as specified and directed.
Supply only 02 x Crane/Hydra 5/6 ton including driver and fuel, complete all as specified and directed.
Supply only 01x water brower with minimum capacity 5000 liter with pressure pump including driver and fuel, complete all as specified and directed.
Providing the services of unskilled manpower for 8 Hrs (Timming as intimated by the Engr-in-Charge) for loading & unloading materials and to execute the RRS, complete all as specified and directed.
Providing the services of Masons for 8 Hrs with all T&P (Timming as intimated by the Engr-in-Charge), complete all as specified and directed.
M/S SANGA SINGH AND CO (BID ID -3378136)
JINDAL AND COMPANY (BID ID -3380736)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .