Superintending Engineer(S.G.), GIDC, Vapi
Tender for Remaining Civil Works for Construction of Surat Regional Office Building at Ichchhapore Industrial Estate on Risk and Cost Basis (Inclusive of GST)
272921
E-TENDER NOTICE NO. 17 OF 2025-26 SR NO.04
Open
Civil Works
Works
Valsad
3 documents required · 3 mandatory
₹4,248
Yes
The Executive Engineer, GIDC, Surat
₹1.0 L
Yes
4 Feb 2026
4 Feb 2026
4 Feb 2026
12 Feb 2026
4 Feb 2026
Name of Work: - Tender for Remaining Civil
Works for Construction of Surat Regional Office
Building at Ichchhapore Industrial Estate on Risk
and Cost Basis (Inclusive of GST)
Parapred by, Checked by, Approved by,
AAE(PB) DEE Dy.CO XEN SE(CG)
GIDC,SURAT GIDC,SURAT GIDC, SURAT GIDC,SURAT GIDC,SURAT/VAPI
Signature of Bidder Executive Engineer, GIDC, Surat
Name of work: - Tender for Remaining Civil Works for Construction of Surat Regional
Office Building at Ichchhapore Industrial Estate on Risk and Cost Basis (Inclusive of
1 Estimated cost : Rs.
2 Tender fee : Rs.
4 Date on (or before) which the tender : From 03-02-2026 to 11/02/2026 up to
with DD / FDR for Tender fee & EMD 17.00 hours.
(by scanning) except required
documents must upload on the web
site of www.tender.nprocure.com and
www.statetenders.gujarat.gov.in
5 Date on (or before) which DD/FDR in : From 12-02-2026 to 13-02-2026 up to
original for Tender fee & EMD and 17.00 hours.
required documents must reach in the
office of THE EXECUTIVE ENGINEER,
GIDC, O/o Executive Engineer, GIDC,
Surat, Plot No. 326+327, Bhatpor,
GIDC, Surat -394510. By personally i.e.
by hand delivery, courier, RPAD,
Speed Post during office hours.
6 Opening of Technical Bid & PQ : On dtd. 16/02/2026 at 12.00 noon.
7 Eligible class of Registered : “B” Class or above and similar type of
work experience
Signature of Bidder Executive Engineer, GIDC, Surat
Name of work: -Tender for Remaining Civil Works for Construction
of Surat Regional Office Building at Ichchhapore Industrial Estate
on Risk and Cost Basis (Inclusive of GST)
SR. PARTICULARS PAGES FROM
1 Tender Notice. 4-9
2 Memorandum of work 10-12
3 Instructions prequalification& Instructions to bidder 13 -
4 Pre-Qualification Bid 18-25
5 Annexture – I & II 26-27
6 Self Evaluation Form C 28-30
7 Special Condition 31-25
8 General Specifications of Civil Work 37-62
9 Item Wise detailed Specification 63-118
10 Site Visit Certificate-Special Condition
10 Schedule-B 120-129
11 B1 – Agreements Attached
Signature of Bidder Executive Engineer, GIDC, Surat
www.tender.nprocure.com/GeM Portal ઉપરથી તા .
ઉપર અને જી.આઇ.ડી.સી.ની વેબસાઇટ www.gidc.gujarat.gov.in
www.tender.nprocure.com/GeM વેબ-સાઇટ પર ટેન્ડર ભરવાની
Signature of Bidder Executive Engineer, GIDC, Surat
GUJARAT NDUSTRIAL DEVELOPMENT CORPORATION
(A Govt of Gujarat Undertaking)
O/o the Superintending Engineer (SG)
Plot No. C5/101, Char Rasta,
GIDC, Vapi – 396
E-TENDER NOTICE No. 17 of 2025-26
The tender for the work having cost of Rs. 27.00 lakh
to 182.84 lakh is invited by office of the
Superintending Engineer (SG), G.I.D.C., Vapi under
jurisdiction of the Executive Engineer, GIDC, Surat.
Tender for total 05 work can be upload - download
online dt. 05/02/2026 to 03/03/2026 on website
www.tender.nprocure.com/ GeM. The detailed tender
notice can be seen in GIDC office notice board / GIDC
website www.gidc.gujarat.gov.in Right to reject the
tender without assigning any reasons thereof are
reserved by G.I.D.C., which will be binding to all
bidders. Please stay touring web site -
www.tender.nprocure.com/GeM for any corrigendum/
addendum / modification till last date of receipt.
Superintending Engineer (SG)
G.I.D.C., Vapi.
Signature of Bidder Executive Engineer,
GUJARAT INDUSTRIAL DEVELOPMENT CORPORATION
(A Govt. of Gujarat Undertaking)
Office of the Superintending Engineer (SG)
Plot No. C5/101, Char Rasta GIDC, Vapi -396195
Email: - [email protected], [email protected],
NOT FOR PUBLICATION
E-TENDER NOTICE NO. 17 OF 2025-26
E-tender for the following works of GIDC are publically invited from the intending bidders, by the
Superintending Engineer (S.G.), GIDC, “Vapi”, Plot No. C5/101, Char Rasta, GIDC, Vapi-396195 by E-
tendering only, on web site www.tender.nprocure.com, GEM Portal, www.statetenders.gujarat.gov.in (i)
whose names are borne on the approved list of registered contractors in the required class & category with
Gujarat State R&BD/W.R.D/GIDC & other State Governments equivalent AND (ii) and the intending bidders
who are registered in appropriate category of C.P.W.D., M.E.S., Railways and Indian State Governments, can
also bid provided the bidder produce such registration certificate at the time of bidding and obtain
registration in required class & category from the Gujarat State R&BD/W.R.D/GIDC before issuing work
order. Bidder will solely be responsible for obtaining the required registration.
The tender under Sr. No. 01 to 05 is invited in single bid system will be opened on schedule date, specified
under schedule of E-tender.
1. Estimated cost
2. Earnest Money
Name of work Deposit Class of registration
3. Non-refundable
Annual Rate Contract for Comprehensive (1) Rs. 27,37,959.50 E-1 class and Above
1 Maintenance and Repairing of the Water Supply (2) Rs. 27,380.00 Similar Type of work
Scheme at Bardoli-2 (Miyawadi-2) Industrial (3) Rs. 1,770.00 Experience
Cleaning work of Road & P.P. Areas of (1) Rs. 49,29,839.65 E-1 class and Above
2 Bardoli-2 Miyawadi on ARC Basis (2) Rs. 49,300.00 Similar Type of work
(3) Rs. 1,770.00 Experience
ARC for Water supply pipe line repairing (1) Rs. 30,76,269.20 E-1 class and Above
3 work at Apparel Park, Sachin on ARC Basis. (2) Rs. 30,763.00 Similar Type of work
(3) Rs. 1,770.00 Experience
Tender for Remaining Civil Works for (1) Rs. 1,02,41,631.03 C class and Above
Construction of Surat Regional Office (2) Rs. 1,02,416.00 Similar Type of work
Building at Ichchhapore Industrial Estate (3) Rs. 4,248.00 Experience
on Risk and Cost Basis (Inclusive of GST)
Tender for Remaining Electrical Works for (1) Rs. 1,82,84,857.00 B class and Above
Construction of Surat Regional Office (2) Rs. 1,82,848.00 Similar Type of work
Building at Ichchhapore Industrial Estate (3) Rs. 4,248.00 Experience
on Risk and Cost Basis (Inclusive of GST)
Signature of Bidder Executive Engineer, GIDC, Surat
(A) SCHEDULE OF E-TENDERING
(i) Downloading of Tender Documents from Web site of (i) From 05/02/2026 to
www.tender.nprocure.com/GeM. (The tender document for 03/03/2026 up to
these works are available only in Electronic format which hours for work at Sr. No.
Bidder can download free of cost)
From 03/02/2026 to
11/02/2026 up to 17.00 hours
for work at Sr. No. 4 &
(ii) SUBMISSION OF TENDER (ii) From 05/02/2026 to
(A) Online submission 03/03/2026 up to
I) Online submission of bid documents. hours for work at Sr. No.
II) Scanned copies of DD for tender fee & EMD in electronic to
format only through online
From 03/02/2026 to
hours for work at Sr. No. 4 &
(B) Online/Offline Submission in physical form (i) From 05/03/2026 to
I) D.D. / FDR in original (for Tender fee & EMD) Other 06/03/2026 up to
documents mentioned in para C, for the purpose of hours for work at Sr. No.
verification only (in physical form) by personally i.e. by to
Speed Post / Currier /Hand delivery. (Kindly refer C-1,
hours for work at Sr. No. 4 &
(iii) Pre-bid meeting (Offline / Online)
In the Office of Chief Engineer -GIDC, Block No 3&4, 3rd Floor,
Udyog Bhavan, Sector-11, Gandhinagar
(iv) Opening of Technical Bid documents. In the Office of Superintending
Engineer (SG), GIDC, “Vapi”, Plot
No. C5/101, Char Rasta, GIDC,
Vapi-396195 as under:
Approximate on dt.
for Sr. No. 1 to
Approximate on dt.
for Sr. No. 4 &
(B) On line Submission of Tender
Signature of Bidder Executive Engineer, GIDC, Surat
1) Bidders can prepare & edit their offers number of times before tender submission date & time. After
tender submission date & time, bidder cannot edit their offer submitted in any case. No written or
online request in this regard shall be granted.
2) Bidder shall submit their offer i.e. Pre-qualification document with Technical Bid & Price Bid in
Electronic format on above mentioned website & Date shown above after digitally signing the same.
3) For the purpose of verification, the original documents for Pre-qualification submitted in
electronic format should be submitted in physical form as under:
For Sr. No. 01 to 05 at O/o Executive Engineer, GIDC, Surat, Plot No. 326+327, Bhatpor, GIDC,
By personally i.e. by hand delivery, courier, RPAD, Speed Post during office hours.
4) Offers submitted without digitally signed will not be accepted.
5) Offers i.e. Pre-qualification document with Technical Bid & Price Bid in physical form will not be
accepted in any case.
6) It is Bidder’s responsibility to verify Online Corrigendum/Amendments until last submission date
and time as well as before Final Submission of Bid.
7) Required documents for pre Pre-qualification document received later than the time specified will
not be accepted in any case and the bid of that bidder shall be considered non-responsive.
(C) Submission of Tender Fees, EMD
1) Interested Bidders can view these tender documents online, but bidders who are interested in bidding
these tender can download tender documents from web site as mentioned above and bidder who wish
to submit their offer shall pay non-refundable tender fee in the form of Account Payee Demand
Draft payable respectively as under drawn on any Nationalized Bank in favor of
Executive Engineer, GIDC, Surat for the work at Sr. 01 to 05 (DD payable at Surat)
2) EMD in the form of Account Payee Demand Draft / F.D.R. payable at Vapi drawn on any Scheduled /
Nationalized Bank in favour of as mentioned as under. EMD in the form of Bank Guarantee of the
Scheduled Bank or Nationalized Bank also acceptable as per the manner set out in the prevailing Form
B1, Form B2 & Form C Agreement.
Executive Engineer, GIDC, Surat for the work at Sr. 01 to 05 Surat (DD payable at Surat)
3) Demand Draft for E.M.D. & Tender Fee shall be submitted in Electronic Format only through Online
(by scanning) while uploading the Bid. This submission shall mean that E.M.D. & Tender Fee are
received. Accordingly, offer of those shall be opened whose E.M.D. & Tender Fee is received
electronically. However, for the purpose of realization of D.D., Bidder shall send the D.D. in
original for the works in the manner set out in above point (C -1 &, 2) by personally i.e. by Speed
Post/ Currier /Hand delivery during office hours as per point No. B-3.
4) Required Documents mentioned as under (a), (b) & (c) are mandatory for submitting scanned
copies through ONLINE. Otherwise tender offer shall be treated as NON RESPONSIVE, without
any further intimation.
a) Scanned copy of tender fee and EMD
b) Required Class of registration, Latest Income Tax return filed, RPFC registration certificate with latest
challan, GST Registration & Pan Card.
c) Fresh Valid Bank Solvency- (Current Financial Year) - (20% value of the estimated cost put to tender)
and Experience certificate
5) For the purpose of verification, the original documents submitted in electronic format should be
submitted in physical form for the works in the manner set out in above point (C-3) by personally
i.e. by hand delivery, courier, RPAD, Speed Post during office hours.
Executive Engineer, GIDC, Surat for the work at Sr. 01 to
Signature of Bidder Executive Engineer, GIDC, Surat
Tender fee, EMD in original and other required documents for verification received before or later
than the time specified in (A) SCHEDULE OF E-TENDERING, (ii)(B) Submission in Physical
form as mentioned above, will not be accepted in any case and the bid of that bidder shall be
considered non-responsive. GIDC will not be responsible for delay in receipt of such documents
due to any reasons by the postal department or any other agencies.
If any clarification / query regarding these tenders are required, do not hesitate to contactor concern
Executive Engineers;
For the work at Sr. No. 01 to 05 - Shri P. H. Menat, Executive Engineer, GIDC, Surat - Mo.
Signature of Bidder Executive Engineer, GIDC, Surat
MEMORANDUM OF WORK IN BRIEF
1) Name of work Tender for Remaining Civil Works for
Construction of Surat Regional Office
Building at Ichchhapore Industrial
Estate on Risk and Cost Basis (Inclusive
2) Estimated cost Rs. 1,02,41,631.03/-
3) Joint Venture (J.V) Joint Venture (J.V) is not allowed.
4) Earnest Money Deposit (EMD) Rs. 1,02,416.00 in the form of D.D. / F.D.R
for the minimum period of 180 days in
favor of "Executive Engineer, GIDC, Surat”
from any Nationalized / Scheduled Bank
only except Co-Operative Bank.
Rs. 50,000.00 in the form of D.D. / F.D.R for
the minimum period of 180 days in favor
of "Executive Engineer, GIDC, Surat” from
any Nationalized / Scheduled Bank only
except Co-Operative Bank.
Remaining Rs. 52,416/- in form of Bank
Guaranty of the Schedule or Nationalized
Bank Only valid up to minimum 180 days
5) Validity period of tender offer. 120 days from the date of opening the bids.
6) Security Deposit / Performance Bond
(i) In the form of Small Saving Scheme or
Security of SardarSarovar Nigam of
minimum 18 (Eighteen) months
period.- Performance Bond (05%)
(ii) Intial Security Deposit Rs.2,56,041.00 (2.50%)
(ii) To be deducted from Rs. 2,56,041.00(2.50%)
Current R.A. bills. Percentage to be deducted from bills so as
to make up the total amount of required S.
to make up the total amount of required S.
D. by the time half the work, as measured
by the cost is done 50%
TOTAL (i + ii ) Rs.
7) Liquidated Damages As per clause No.2 of B1 Form attached
8) Defect liability The defect liability period shall be Three
years from the certified date of completion
of work or three monsoons whichever is
later.( Clause 17A of B1)
9) Free Maintenance guarantee period 5 (Five) Years Free Maintenance
under clause no.17B of form B1 (but Guarantee with effect from the certified
with change for FIVE years instead of date of completion.
Signature of Bidder Executive Engineer, GIDC, Surat
10) Workers Welfare Cess Under the 1% of the value of work done shall be
Building & Other Construction Workers deducted from the all bills payable to the
Cess Act 1996 (LabourCess) contractor.
11) Testing Charges 1% Testing charges of the Estimated Cost
will be deducted from each Running
Account Bill of agency.
12) Time limit for completion of work from 2.0 Months.
the date of written order to commence.
13) Submission date & time of tender
i) Date on (or before) which the tender As per Tender Notice
with DD / FDR for Tender fee & EMD
(by scanning) except required
documents must upload on the web site
of www.gidc.nprocure.com
b) Date on (or before) which DD/FDR in
original for Tender fee & EMD and
required documents must reach in the
Office of the Executive Engineer, GIDC,
1PstP floor, Vikas Building, Dutch
Garden Road, Nanpura, Surat-395001.
ii) Mode of sending the tender documents.
The tender with DD / FDR for Tender
fee & EMD (by scanning) except
required documents
DD/FDR in original for Tender fee &
EMD and required documents
15) Opening of Technical bid
16) Tender to be opened by
17) Description essential to be made on (1) Name of Work: - Tender for Remaining
sealed cover for documents to be Civil Works for Construction of Surat
submitted by Regional Office Building at Ichchhapore
personally/HandDelivery/Speed Industrial Estate on Risk and Cost Basis
post/courier (Inclusive of GST)
18) Mode of quoting the rate in Schedule “B” In figures as well as in words. Any missed-
attached with Tender document. outs, discrepancies it may attract rejection
Signature of Bidder Executive Engineer, GIDC, Surat
19) Important Note: Self Evaluation Form Placed (Technical
Bid) as an Annexure-C is mandatory and
required details as per Performa with page
number must be field-up. If such detail is
not submitted with the bid documents, the
bid shall be liable for disqualification.
For any technical descripancy, the latest
version of MORT&H / IRC shall be
Prospective bidders are requested to join
the site visit.
GIDC reserves the right, without any
obligation or liability, to accept or reject
any or all the bid at any stage of the
process, to cancel or modify the process or
any part thereof or to vary any of the terms
and conditions at any time, without
assigning any reason whatsoever.
Registration required “B” Class
Submite the required documents online
duly named and page numbered in proper
manner for simplicity.
20) RISK & COST CONDITIONS: RISK & COST CONDITIONS:
• Balance work only after default of earlier
• No extra claim for old / incomplete
21) GST CLARIFICATION The rates quoted by the bidder shall be
deemed to be inclusive of GST and all
statutory taxes. No separate or additional
payment towards GST shall be admissible
or payable by GIDC.
22) Site visit Certificate Submite the required Site visit Certificate
23) Site Visit - For Civil Work Contact Person:
1 Shri P H Menant- XEN GIDC, Surat
2 Shri K S Gamit – DEE,GIDC, Surat
Signature of Bidder Executive Engineer, GIDC, Surat
INSTRUCTION FOR PRE - QUALIFICATION APPLICATION
1) The tender document: Pre-Qualification Document - Volume I, Technical Bid -Volume II, and
Price Bid Volume – III, B1 agreement and drawing Vol -V shall be prepared by e- tendering
process marked as technical bid with Pre-qualification application & price bid.
2) The Bidder shall submit documentary evidence in support of tender evaluation Criteria in the
electronic format, failing which the tender will be rejected. Earnest money as mentioned in the
Memorandum of work in brief attached herewith & tender fee shall be paid in the form of D.D. /
F.D.R for the minimum period of 6 (Six) Months. Scanned copies of DD / F.D.R for tender fee &
EMD should be submitted in electronic at through online, while original documents of tender fee
& EMD should be submitted by hand delivery in the office of the Executive Engineer, (SG), GIDC,
1PstP floor, Vikas Building, Dutch Garden Road, Nanpura, Surat-395001 on or before date
specified in the tender notice.
3) Submission of application for pre-qualification in prescribed format attached with the Pre-
Qualification Document (Volume – I) must be through e-tendering i.e. Electronic form.
4) Submission of following documents to be required for pre-qualification must be through e-
tendering i.e. electronic form.
I. Pre-qualification application
II. CA Certified copy of Annual turnover certificate for last five financial years.
III. copy of Form 3A issued by employer to substantiate successful experience of similar work.
IV. Existing commitments and ongoing works as per Schedule – E.
V. Details as per Litigation hitory (As per para 2.5) and Affidavit regarding termination /
Blacklisting / Ban / Registration kept in Abeyance on Rs.300/- stamp paper (As per pera 2.6)
VI. Prescribed notarized undertaking on Rs.300/- stamp paper for Proof of assured availability of
required minimum Machinery / equipment mentioned in APPENDIX – B herein below.
VII. An undertaking for truthfulness of information furnished
5) Submission of following other documents must be through e-tendering i.e. electronic form.
I. Registration Certificate of Approved contractor/Special Category.
II. Latest Bank Solvency certificate. (20% value of estimated cost put to tender).
III. Partnership deed/Power of Attorney with certificate of registration of firm (In case of
Partnership firm)
IV. Latest Income Tax Return filed & PAN Card details.
V. Details of one similar nature of work completed in last five years.
VI. Details of work on Hand.
VII. Turnover of last 5 (Five years).
VIII. GST Registration certificate.
IX. R.P.F.C. registration certificate with latest challan paid.
Signature of Bidder Executive Engineer, GIDC, Surat
X. Prescribed self-evaluation form attached with tender documents dully signed by agency.
6) Bidders shall have to submit the pre-qualification bid in E-tendering form only.
7) Pre-qualification Bid of those bidders who have submitted all information, statistical details as
required in the bid documents through E-tendering will only be considered,
8) GIDC reserves the rights to reject or accept any bid, and cancel the pre-qualification process and
reject all bids. The GIDC shall neither be liable for any such actions nor be under any obligation to
inform the applicant of the grounds for them. The GIDC's decision shall be final and binding.
p The price bid will be opened only of those tenderers pre-qualified by the GIDC.
Signature of Bidder Executive Engineer, GIDC, Surat
INSTRUCTIONS TO BIDDERS
Bids i.e., Bid and Bid with Prequalification for Construction of Surat region office building at
Ichchhapore Industrial Estate.is invited from contractors on e-tendering process. The contractors,
wish to this contract, should also apply for prequalification in the manner set out in this document.
The opened only of those tenderers pre-qualified by the G.I.D.C as having necessary qualification,
suitability to perform the satisfactorily and also opened Bid with Prequalification will be
considered. Technical Bid with Prequalification Application of dis-qualified s will not be
The GIDC has already developed industrial estate at surat and at initial stage all the infrastructure
facilities already been provided. However, it has been decided to provide office Building in the
estate & for which the tenders invited for the Construction of Surat region office building at
Ichchhapore Industrial Estate.
2. LOCATION OF WORK AND SITE INFORMATION:
The work site is located at Ichhapor Industrial Estate.
3. SCOPE OF WORKS:
1. The contractor shall co-operate with local people & plot & shed's holders to maintain co-cordial
working environment and shall take full care to minimize hassles to the local people & plot &
shed's holders while working
2. (a)Submission of structural design in software using STAAD
b. The structural design of the industrial building is in accordance with the following codes and
standards with latest revision of IS 456, IS 875, part I to V, IS 1893 part I to part V, IS 13920, SP16,
SP34, & other relevant latest IS codes
4. The structural design and drawings including structural analysis, design preparing all details of
structural drawing etc...to be prepared by the contractor and submitted to the design branch of GIDC
at HO, Gandhinagar, for scrutiny and final approval of structural drawing and design for execution
considering medium duty industrial building having floor slab impact load of 7 KN/sqmt and top
roof slab as 3KN/sqmtor as directed.
5. The contractor shall, upon the completion of works, hand over the site of works in neat & clean
6. The proposed works are as under.
PART-1:FRAME STRUCTURE BUILDING (GF+FF+SF)
ABOVE PLINTH LEVEL As per Drawing
SANITARY ITEM As per Drawing
PARKING ITEM As per Drawing
Signature of Bidder Executive Engineer, GIDC, Surat
7. BIDDER'S RESPONSIBILITY:
The intending Bidders shall be deemed to have visited the site and familiarized themselves
thoroughly with the site conditions and all other aspects affecting the work under this Contract
before submitting the tender. No claim / extension of time whatsoever shall be entertained on
account of prevailing site conditions.
Interested Bidders may obtain further information at the following address:
Office of the the Executive Engineer, GIDC,
EARNEST MONEY DEPOSIT (EMD)
EMD is payable in the manner set out in the Technical Bid with Prequalification Application.
8. SECURITY DEPOSIT (SD)
SD is payable in the manner set out in the Technical Bid with Prequalification Application by the
successful tenderer.
9. PERFORMANCE BOND / BANK GUARANTEE OF NATIONALIZED BANK
Performance Bond / Bank guarantee of Nationalized Bank is payable in the manner set out in the
Technical Bid with Prequalification Application.
10. DEPOSIT / BANK GUARANTEE OF NATIONALIZED BANK TOWARDS FREE MAINTENANCE
GUARANTEE PERIOD
Deposit / Bank guarantee of Nationalized Banktowards free maintenance guarantee period is
payable in the manner set out in the Technical Bid with prequalification Application by the
successful tenderer.
11. PROGRAMME OF WORK:
The program of work for this contract is as under.
Online Submission of Bid
Period for Validity of offer Period of completion
120 days from the date of
As per Tender Notice 2.0 Months
opening the bids.
The time is essence of the contract. The contractor shall have to ensure progress of the work
proportionately as per Schedule-C of B1 agreement.
12. SUPERVISION OF WORK:
G.I.D.C reserves the rights to get check of the quality of works through Third Party Inspectors in
addition to the Engineer-in-charge, Quality Control Units of the G.I.D.C.
FREE MAINTENANCE GUARANTEE PERIOD:
The contractor shall have to give Five years free maintenance guarantee period from the date of
actual completion of work. During this period contractor shall have to maintain and if so required
repair the damaged portion of all the components of Shed under this contract etc. at his risk and cost
as directed by the Engineer-in-charge.
For details, please refer Special conditions and Clause No. 17B of Form B1 attached with the
Technical Bid with Prequalification Application.
13. DEFECTLIABLITY PERIOD:
Signature of Bidder Executive Engineer, GIDC, Surat
The defect liability period shall be Three years from the certified date of completion of work.For
details, please refer memorandum of work in brief and Clause NO. 17A of Form B1.
14. PRICE VARIATION :
The Price variation shall be paid as per clause no 60-A of B1 Aggrement.
15. MOBILIZATION ADVANCE: - Not applicable.
Mobilization advance shall not be payable as per GIDC circular.
16. POWER SUPPLY
The Contractor will make his own arrangement at his cost for power supply and arrangements for
temporary distribution. All the works will be done as per IEA regulations. The Contractor shall
ensure at his cost that all electrical lines and equipment & all installations are approved by the state
electricity inspector before power can be supplied by State Electricity Board.
17. CONDITIONS OF CONTRACT:
Condition of contract will be as per Form B1 (CONTRCT AGREEMENT TO BE EXECUTED) attached
with Technical Bid with Prequalification Application, or modified as needed for local conditions,
price adjustment for bitumen, three years maintenance guarantee period & others documents will
be governed as per the documents and conditions of contract finaliz ed for the work. All works will
confirm to the Indian Standards, specifications for road & Bridge works of Ministry of Road
Transport and Highway or other equivalent standard mentioned in the contract document as
approved by the Engineer-in-charge.
BIDDER’S SIGNATURE Executive Engineer
Signature of Bidder Executive Engineer, GIDC, Surat
PRE-QUALIFICATION APPLICATION
(1) Following constitution of Pre-Qualification evaluation committees is finalized.
Sr. No. Constitution of Committee
1. Committee of the Superintending Engineer as under.
Superintending Engineer (FO) – Chairmen
Executive Engineer (FO) – Member
Executive Engineer (M&E) – Member
Account Officer/Divisional Accountant- (FO) – Member
(2) Prequalification criteria for the Civil / Mechanical / Electrical works.
(2.1) Eligibility: -
(2.1.1) Bidder's registration: -
(i) Only those bidders shall bid whose names are borne on the approval list of
registered contractors in the required class “B” and above with Gujarat state R&BD
/ W.R.D. / GIDC.
(2.1.1.2) If the Contractor’s registration in the required class “B” class and above with
Gujarat state R&BD / W.R.D. / GIDC is expired on or before the last date of online
bidding period of the tender, the bidder must submit through online in
electronic form the application for renewal of the same with the concerned
department along with receipt of fees paid for it. In such cases, the bidder at his
own responsibility must produce valid renewed registration certificate in the
required class & category with Gujarat state R&BD / W.R.D. / GIDC before
issuance of the work order. Bidder will solely be responsible for obtaining the
required registration.
(2.1.1.3) In context to above Para (2.1.1.2), it is clarified that the bidder who is having
registration in class & category below than the minimum required class &
category and the bidder have applied for up-gradation in required class and
category with Gujarat state R&BD / W.R.D. / GIDC shall not be considered valid.
In such cases the bidder shall not be considered eligible for bidding.
(2.1.1.4) The contractor, who are registered in appropriate category of C.P.W.D., M.E.S.,
Railways and Indian state government, can also bid provided the bidder
Signature of Bidder Executive Engineer, GIDC, Surat
produce such registration certificate at the time of bidding and obtain
registration in required class & category from the Gujarat state R&BD / W.R.D.
/ GIDC before issuing work order. Bidder will solely be responsible for obtaining
the required registration.
Note :- Joint Venture (JV) is not allowed.
(2.2) Annual Turn Over:
(2.2.1) Average Updated Annual Financial Turnover during the last three years, i.e. 01/04/2025
to 31/03/2022 financial year shall be at least 30 % of the estimated cost, i.e. Rs.
(2.2.2) For arriving at update value, total amount of Turn Over of any one financial year shall be
(2.2.2) For arriving at update value, total amount of Turn Over of any one financial year shall be
multiplied by the enhancement factor corresponding to that financial year. Following
enhancement factor will be applied to total amount of Turn Over in any one financial year
enhancement factor will be applied to total amount of Turn Over in any one financial year
and to bring them to the base year.
Year Financial year Enhancement factor
Base (year of inviting 2025 to 2026
(2.3) Successful experience:
(2.3.1) Bidder must have experience of successfully completed similar works during last seven
years ending last day of month previous to one in which applications are invited be
either of the following.
“Three similar completed works updated costing not less than the amount equal
to 40% of the estimated cost.”
“Two similar completed works updated costing not less than the amount equal to
50% of the estimated cost.”
“One similar completed work updated costing not less than the amount equal to 80%
of the estimated cost.”
(2.3.2) For arriving at update value, final amount of the work, completed in any one financial
year shall be multiplied by the enhancement factor corresponding to that financial year.
Following enhancement factors will be applied to final amount of work, completed in
any one financial year and to bring them to the base year. The current financial year in
which bid is invited shall be considered as the base year.
Signature of Bidder Executive Engineer, GIDC, Surat
Year Financial year Enhancement factor
Base (Year of inviting 2025 to 2026
A work would qualify as similar work only if it meets with definitions given in below Appendix-A.
(2.3.1) Bidder must have experience of successfully completed similar works during last
seven years ending last day of month previous to one in which applications are invited
be either of the following.
The Bidder must have completed three works of R.C.C. frame structure building
work having completion cost not less than Rs.40.97 lakh. (40% of the estimated cost
The Bidder must have completed two works of R.C.C. frame structure building work
having completion cost not less than Rs.51.21 lakh. (50% of the estimated cost of
The Bidder must have completed one work of R.C.C. frame structure building work
having completion cost not less than Rs.81.93 lakh. (80% of the estimated cost of
(2.3.1.1) A work would qualify as similar work only if it meets with definitions given in
below Appendix-A.
(2.3.1.2) For updating completion cost of the work to the current financial year, procedure
narrated in Para (2.2.2) shall mutatis mutandis apply.
(2.4) Bid Capacity:
(2.4.1) The bidder must have available bid capacity (ABC) more than the amount put
to tender. (Rs. 1,02,41,631.03).
Signature of Bidder Executive Engineer, GIDC, Surat
A is the maximum of updated total amount of works executed in any one year of the
A is the maximum of updated total amount of works executed in any one year of the
last five financial years i.e. from Dt.01/04/2025 to Dt.31/03/2021.
N is the number of years prescribed for completion of the proposed work.
B is the amount of the exiting commitments and on-going works to be discharged
during time interval of N years from the bid due date. As per following schedule-E.
“EXPERIENCE ALL PROJECTS IN PROGRESS”
Give information about all projects which are in progress including the company has received a letter of
intent / acceptance but a formal contract has not yet been awarded.
Emplo Engine Location Value Cost of Remain Percent Dat Stipulat Likely Reaso
yer er & of work ing age of e of ed date date of ns for
respon descripti contr execut work to practica wor of complet slow
sible on of act ed as be l k complet ion progre
for works on execute complet ord ion of ss, if
superv date of d as on ion er work any.
ision this date of
Note: - Non-disclosure of any information in the schedule will result in disqualification of the bidder.
(Signature of bidder)
2.4.2) For the purpose of updating amount of works executed in any year, procedure
narrated as under shall be applied.
(2.4.3) For arriving at update value, total amount of works executed in any one year shall
(2.4.3) For arriving at update value, total amount of works executed in any one year shall
be multiplied by the enhancement factor corresponding to that year. Following
enhancement factors will be applied to total amount of works executed in any one
enhancement factors will be applied to total amount of works executed in any one
year and to bring them to the base year. The current financial year in which bid is
invited shall be considered as the base year.
Year Financial year Enhancement factor
Base (Year of inviting 2025 to 2026
Signature of Bidder Executive Engineer, GIDC, Surat
(2.4.4) Existing commitments shall include all such works for which letters of acceptance
of the tenders have been received by bidder till the date on which bidder has
submitted his bid for the proposed work.
2.5. Litigation history:
(2.5.1) The applicant should provide accurate information on litigation and/or
arbitration resulting from contracts completed or under execution by him over
the last five financial years. A consistent history of arbitration
awards/judgements against the applicant or any partner of a joint venture may
result in disqualification for proposed work. If the details of litigation history is
hidden by the applicant and later on it comes to knowledge of the employer the
bidder shall be disqualified for the proposed work and other appropriate action
shall be taken against the bidder.
(2.5.2) Information of litigation history in following statement to be submitted, if any
other wise Nil / Not Applicable statement to be submitted.
LITIGATIONHISTORY
Sr. Name of Work Financial Brief Departm Whether Details of Whether
No. Contract Completed Year Detail of ent in awards / result of Judgement
or Under the Oppositi Judgements Arbitration in Favour
Execution arbitration on is pending / Judgement or in
/ or made? Against
(Signature of bidder)
(2.6) Affidavit regarding Termination / Blacklisting / Ban / Registration kept in Abeyance. :-
(2.6.1) The bidders shall be disqualified for opening of his price bid if he is under blacklist
and / or under ban and /or his registration is under abeyance by any Central /
State Government Department, Board, Corporation, Municipal Corporation,
Municipality, Government Local Bodies, University etc.
(2.6.2) The bidder shall have to submit prescribed notarized affidavit on appropriate
stamp paper as under, failing to which the bidder shall be disqualified for opening
of his price bid.
Affidavit regarding Termination / Blacklisting / Ban / Registration kept in Abeyance.
(To be submitted on Rs.300/- stamp paper & notarized.)
Name of work :-
of _________________Do hereby solemnly affirm and declare as under.
We are not under blacklist and / or under ban and /or our registration has not been
kept under abeyance by any Central / State Government Department, Board, Corporation,
Signature of Bidder Executive Engineer, GIDC, Surat
Municipal Corporation, Municipality, Government Local Bodies, University etc. as on date of
participating for this bid.
Date :- Authorised signatory
(2.7) Machinery / Equipment: -
Bidder shall have to submit a prescribed notarized undertaking on Rs.300/- stamp paper for deploying
machinery/equipment for the work under tender as per below.
Undertaking for deploying Machineries/Equipments/Tools & Plants
(To be submitted on Rs.300/- stamp paper & notarized.)
Name of Work: -
Indicative List of minimum Plant & Equipment to be deployed on Contract Work.
Sr. No. Type of Equipment equipment
For Civil Works
1 Concrete mixer machine 1 No.
2 Tipper Trucks 1 No.
3 Water Tanker 1 No.
4 Needle Vibrator 3 No.
5 Excavator 1 No.
6 3 phase DG SET 1 No.
7 Welding Machine 1 No.
8 Levelling instruments (including Square level ) 1 No.
9 Tractor 2 No.
I/We hereby undertake that if i/we awarded the above said work then i/we shall deploy all
Machineries/Equipments/Tools and Plants etc. as shown in the Appendix-B in fully working condition and
utilize the same while execution of the work.
We also undertake that i/we shall deploy other Machineries/Equipments/Tools and Plants etc. over and
above shown in Appendix-B in working condition and utilize the same as per instruction of Engineer-In-
Failing to above we shall not object any action taken against us within the tender provision.
In case of any dispute, Superintendent Engineer’s decision shall be final.
Date :- Authorised signatory
Signature of Bidder Executive Engineer, GIDC, Surat
2.8) Bidding in E-tendering:-
(2.8.1) Submission of documents must be through e-tendering i.e. electronic form, unless specified
(2.8.2) All of the online submitted documents must be clearly readable, failing to which the same
shall be considered as void.
(2.8.3) Bids of those bidders who have submitted all information, statistical details as required in
the bid documents through E-Tendering will only be considered. If the employer desires any
clarification, for verification/clarification, ambiguity of difference found in the
documents/statistical details submitted online (by e-tendering) by the bidder the same shall
be furnished within stipulated time otherwise further processing will be carried out in
absence of above and the bidders shall be liable for any consequence.
(2.8.4) No bidder can participate in more than one bid for proposed work.
(2.9) Submission of documents: -
(2.9.1) Following documents/papers shall form part of the bid & must be submitted through online
in electronic form unless specified separately, failing to which the bidder shall be dis-qualified
for opening of his price bid.
(2.9.1.1) D.D. of require tender fee. (To be submitted in electronic form at the time of online submission
of the bid & the same to be submitted in original during prescribed time period for submission
of documents in physical form.)
(2.9.1.2) DD/FDR & BG of required EMD. (To be submitted in electronic form at the time of online
submission of the bid & the same to be submitted in original during prescribed time period
for submission of documents in physical form.)
(2.9.1.3) Copy of valid bank solvency certificate of minimum 20 % amount of the estimated cost put to
the tender of the work. (Bank Solvency certificate issued during current calendar year is
considered as valid up to end of the December of the current calendar year. 31PstP march of
the next calendar year. In case, where solvency certificate is not obtained in time, the
certificate of previous year will be considered valid up to the end of March of current calendar
year. In some certificates date of validity is stated. In such cases the same stated date is
considered for validation instead of end of December of the current calendar year.)
(2.9.1.4) Copy of relevant required Registration Certificate / Certificates. (In case of renewal, copy of
application & receipt of fee paid.)
(2.9.1.5) Copy of annual turnover certificate issued by charted accountant for last three financial years.
(If turnover of any of the last three financial years is not shown in the certificate then the same
shall be considered as NIL and accordingly average annual turnover of last three financial
year/years shall be calculated.)
(2.9.1.6) Copy of form-3A / Experience certificate issued by employer (Government / Semi
Government) showing all details as required as per Pre-Qualification criteria of successful
experience of similar work and copy of letter of permission given by employer (Government
/ Semi Government) for subletting the work, if case may be of.
(2.9.1.7) when employer is not a government, following need also to be furnished.
(2.9.1.7.1) Copy of work order.
(2.9.1.7.2) Copy of agreement.
(2.9.1.7.3) Copy of Form-3A / Experience certificate showing all relevant details issued by employer &
certified by Charted Accountant.
(2.9.1.7.4) Copy of final bill.
(2.9.1.7.5) Copy of TDS certificates.
(2.9.1.7.6) Copy of letter of permission given by employer for subletting the work.
(2.9.1.8) Copy of annual total amount of works executed certificate issued by charted accountant for
(2.9.1.8) Copy of annual total amount of works executed certificate issued by charted accountant for
last five financial years. (If annual total amount of works executed of any or some of the last
last five financial years. (If annual total amount of works executed of any or some of the last
five financial years is not shown in the certificate then annual total amount of works executed
five financial years is not shown in the certificate then annual total amount of works executed
of financial year/years which has been shown in the certificate shall only be considered.)
Signature of Bidder Executive Engineer, GIDC, Surat
(2.9.1.9) Schedule-E “Experience all projects in progress” as under in prescribed format as Per Para
(2.9.1.10) Litigation history as per Para (2.5).
(2.9.1.11) Affidavit regarding Termination / Blacklisting / Ban / Registration kept in Abeyance as per
(2.1.1.12) The undertaking for deploying machinery/equipment for the work under tender as per Para
(2.9.2) Following documents/papers shall also form part of the bid, but these documents are not
mandatory to be submitted through online in electronic form. However, the same shall be
submitted in physical form, if not submitted through online in electronic form, within time
period given by authority holding the digital key, failing to which the bidder shall be dis-
qualified for opening of his price bid.
(2.9.2.1) Copy of registration certificate of firm / documents of public limited / private limited /
partnership firm / proprietor firm, whichever is applicable. For example, Partnership Deed,
Certificate of incorporation, Memorandum of association, Article of Association etc.
(2.9.2.2) Copy of Power of Attorney, if any.
(2.9.2.3) Copy of PAN Card.
(2.9.2.4) Copy of latest income tax return certificate. (Note :- latest income tax return certificate means
the income tax return certificate of the last completed financial year for which pre-
determined/extended time period by the Income Tax Department for filing income tax return
is over on or before last date of online submission.
(2.9.2.5) Copy of Goods & Services (G.S.T.) registration certificate.
(2.9.2.6) Copy of RPFC registration certificate.
(2.9.2.7) Copy of RPFC Challan of any of the completed last three months from the month of last date
of online submission of the tender.
(2.9.3) Following Undertaking / Declaration to be incorporated on (n) Procure website in such a
manner that without attending this undertaking / declaration the tender cannot be uploaded.
UNDERTAKING / DECLARATRION
“I hereby declare that I have after thoroughly understand the Pre-Qualification criteria / conditions and
the details filed & documents submitted are true and correct to the best of my knowledge and
belief. I shall not have any objection against any action taken by GIDC if any of the information
submitted is found to be incorrect / false.”
(2.9.4) Any information, data, statistics etc. which are not related to bid document will not be
considered in evaluation even through furnished by the applicant.
(2.9.5) In accordance with stipulated of Para (2.8), employer reserves the right to call any
information/documents which is mandatory, essential and critical for the purpose of
evaluation. Any information provided by the applicant after last date of electronic submission
will not be considered in evaluation, unless except the employer has specially asked for any
information/document, which is mandatory, essential and critical for evaluation of PQ
document. If required information is not furnished within stipulated time, proposal will be
liable for rejection.
(2.9.6) If any of the information provided by the bidder is found false during scrutiny or at the later
stage, his EMD shall be forfeited and he shall be disqualified for the proposed work. In case
when bidder has furnished exemption certificate in lieu of EMD, an amount equal to EMD shall
be appropriated from his FDR pledged to avail of exemption certificate. If any of the
information provided by the bidder is found false after award of work, the performance
security of the bidder shall be forfeited and the contract shall be terminated.
(2.9.7) Authority holding the digital key ((n) code solution), respective Executive Engineer of Civil
branch, respective Executive Engineer of M&E branch and Account Officer / Divisional
Signature of Bidder Executive Engineer, GIDC, Surat
Accountant of the respective Division office shall be jointly liable to download, evaluate, verify
all online documents submitted by the bidder with respect to Pre-Qualification criteria.
(2.9.8) In case of committee of Chief Engineer, concerned field Superintending Engineer and
Concerned field Executive Engineers (Civil) & (M&E), after carried out all above procedures
and verifying all print outs of the online documents submitted by the bidders, shall submit the
same documents (Indicating page no. on each & every documents submitted by the bidder
through online in electronic form.) along with evaluation sheet (Details against each P.Q.
Criteria along with page No., remarks etc. Note :- To be prepared by respective Executive
Engineer of Civil branch, respective Executive Engineer of M&E branch and Account Officer /
Divisional Accountant of the respective Division office jointly), duly signed by all the
concerned, to Chairman (i.e. Chief Engineer) of the Pre-Qualification committee and also shall
brief the other members of the Pre-Qualification committee on documents submitted by the
bidders through online in electronic form and evaluation done by his office, at the time of
meeting of the Pre-Qualification committee.
(2.9.9) In case of committee of Superintending Engineer, concerned field Executive Engineer (Civil)
& (M&E) and Account Officer/Divisional Account jointly, after carried out all above
procedures and verifying all print outs of the online documents submitted by the bidders, shall
submit the same documents (Indicating page no. on each & every documents submitted by the
bidder through online in electronic form.) along with evaluation sheet (Details against each
P.Q. Criteria along with page No., remarks etc.), duly signed by all the concerned, to Chairman,
(i.e. Superintending Engineer) of the Pre-Qualification committee and also shall jointly brief
the Chairman of the Pre-Qualification committee on documents submitted by the bidders
through online in electronic form and jointly evaluation done by them, at the time of meeting
of the Pre-Qualification committee.
(2.9.10) Accordingly, concerned Pre-Qualification committee shall decide to qualify / dis-qualify the
bidder & circulate / issue minutes of the meeting to concerned for further action.
MEMORANDUM OF UNDERSTANDING
(To be notarized on stamp paper of Rs. 300)
THIS MEMORANDUM OF UNDERSTANDING (hereinafter referred to as MOU)
made on ____ day ________ ______, at __________ by and between.
represent by _____________, Authorized Signatory, which expression shall unlessrepugnant to the subject or
context include its administrators, successors andassings.
__________________________________________________ represented by ____________ which expression shall unless
repugnant to the subject or context includes itsadministrators, successors and assigns.
Hereinafter referred to as “Parties” in the collective sense and each of which is referred to as “_______”
“________” in the individual sense.
WHEREAS Gujarat Industrial Development Corporation (hereinafter referredto as Employer), has invited
tender (hereinafter referred to as the (“Project”) for the following work:
Signature of Bidder Executive Engineer, GIDC, Surat
Name of Project: Construction of Surat region office building at Ichchhapore Industrial
Estate.(Reinvited)
WHEREAS if the said project is awarded “______” to execute the said project_____ needs _______________________
and we _____ hereby enter into this MOU with __________ for timely execution of _________________ and/or as
per the tender conditions, and further we mutually agreed to execute the said project jointly and both the
parties would be equally responsible for execution of the said project as per the bidding terms IN WITNESS
WHEREOF all the parties mentioned herein above have signed this MOU on the day, month and year first
above mentioned.
No change shall made in this agreement without prior consent of employer and other party. However, if
the employer direct the parties to make changes in MOU agreement so as to fulfill the tender conditions /
requirement, the parties discuss with employer and mutual agreed such changes required to bemade in
(AUTHORIZED SIGNATORY) (AUTHORIZED SIGNATORY)
Form of Bank Guarantee
(Earnest Money Deposit)
Whereas M/s. ………………………………………………………… (Hereinafter called Bidder) is desirous and
prepared to tender for work in accordance with terms and conditions of Tender No. ......................................
dated …………....And whereas we …………………Bank, agree to give the Bidder a Guarantee for the Earnest
1. Therefore, we here by affirm that we are Guarantors on behalf of the Bidder upto a total of
Rupees ………………………………… (i.e. Rs. …………………………) and we undertake to pay the Executive
Engineer, Gujarat Industrial Development Corporation, Surat, upon his first written demand and
without demur, without delay and without necessity of previous notice of individual or
administrative procedure and without necessity to prove the bank the defects or short coming or
debit of the bidder any sum within the limit of Rupees………………………………….
2. We further agree that the guarantee here in contained shall remain in full force and effect during
the period that would be taken for the acceptance of tender. However, unless a demand or claim
under this guarantee is made only in writing on or before the ……………………………… We shall be
discharged from all liabilities under the guarantee there after.
3. We undertake not to revoke the guarantee during its currency except with the previous consent of
the Executive Engineer, Gujarat Industrial Development Corporation, Surat,in writing.
4. We lastly undertake not to revoke the guarantee for any change in constitution of the Bidder or
Signature and Seal of Guarantor
Signature of Bidder Executive Engineer, GIDC, Surat
SELF EVALUATION FORM
Sr. Requirement M/s. …………………………………………………… Page
Component Remarks
No. as per tender DETAILS FURNISHED BY BIDDER No.
Rs. Name of Bank
Tender Fees including
1 4,248.00/- by D.D. No. and Date
DD Amount in Rs.
D.D. / F.D.R. No. and
EMD (Rs (573750.00/- (B) Rs. Name of Bank
) 52,416.00 by B.G. No. and Date
Valid up to Date.
Nationalized Amount in Rs.
20% amount Name of Bank
of Estimated Amount in Rs.
Bank Solvency Cost i.e. Rs.
3 Date of Issue
Certificate 20,48,326.00)
(Refer Para Valid up to Date.
Registration certificate Name of Department
4a & special category (A) “B” Class Valid up to Date.
(Civil) Authority
Average Financial
Year Enhancement Turn
Financial Bae (year of 2025 to
Turnover inviting 2026
C.A. Certified and copy during the tender)
of Annual Turnover last three 2024 to
5 -1 1.10 Copy must
for Last Three year shall be 2025 be
Financial Years at least Rs. 2023 to
-2 1.21 submitted.
cost.) (Refer -3
Successful Experience
Date of Completion
of Similar Work:
copy of completion As per
6 Amount of Work (Rs.
work. (Form 3A) must Appendix-A
submit by the bidder.
(As per Appendix - A)
Enhencement Factor
Signature of Bidder Executive Engineer, GIDC, Surat
Updated Amount (Rs.
Name of Department
Private work details
Copy of work order
2 Copy of aggrement NA
3 Copy of form 3A NA
4 Copy of final bill NA
5 Copy of TDS NA
Copy of letter of
permission given by
subletting the work
Experience all projects in progress"- (Refer Para 2.4)
Litigation History (Refer Para 2.5)
Affidavit regarding Termination /
9 Blacklisting / Ban / Registration kept (Refer Para 2.6)
Machinery/Equipment: Proof of given on
deployment of required minimum Rs. 300/-
10 (Refer Para 2.7)
machinery / equipments mentioned in stamp
Appendix – B paper
11 Registration certificate / Documents of To be furnished
/public Limited / Private Limited/ whichever is applicable
Partnership deed / Proprietor Firm.
12 Power of Attorney
13 Bid Capacity
A = Maximum updated total amount
A = Maximum updated total amount
executed in any one year from 2021-
N = 0.15 (Time Limit 2 Months ) is the N=
number of years prescribed for B=
completion of the proposed work.
B is the amount of the existing
commitments and ongoing works to be
Signature of Bidder Executive Engineer, GIDC, Surat
discharged during time interval of N
years from the bid due date. As per
following schedule E.
The bidder must have Available Bid
Capacity (ABC) more than the tender
amount i.e. Rs.
14 C.A. Certified copy of Annual work Year Updated
execution amount for Last Seven value of
Financial Years (For Bid capacity ) Enh. Factor turn
Base (Year 2025 to
15 Latest Income tax (A) Year of Assessment Year
return filed and PAN Income tax Name
Card Details Return filed
(B) PAN Card PAN Card No.
16 Goods and Service Tax GST No. GST No.
(GST) Number Name
(A) RPFC Registration Certificate No.
RPFC Registration (B) RPFC Challen of any of the
17 certificate & RPFC completed last three months from the
Challen monthh of last date of submission of the
18 Truth fullness certificate
19 Other Remarks
20 Site visit certificate Site visit certificate issue by authority
Whether Qualified or
Signature of Bidder Executive Engineer, GIDC, Surat
SPECIAL CONDITIONS
1) JOINT VENTURE (J.V.)
1.1) Joint Venture (J.V.) is not allowed.
1.2) For any technical discrepancy, the latest version of MORT&H / IRC shall be applicable.
2) Free Maintenance guarantee period:
The contractor shall also undertake five years comprehensive free maintenance contract starting from the
date of completion of the work.
2.1.) The contractor shall have to give Five years maintenance guarantee period from the certified date of
completion of work as per clause No. 17B of B1 agreement attached herewith. During this period
contractor shall have to maintain & repair the damaged portion of Box type road Bridge, Roads including
its components & other works done under this contract by him at his risk and cost as per direction of the
Engineer-in-charge of GIDC.
The requirement and nature of repair work will be decided by Engineer-in-charge and will be binding to
contractor. If any discrepancy regarding maintenance work, final decision to be taken by Superintending
2.2) The maintenance work shall be carried out by the contractor as and where required and asked by the
Engineer-in-charge without fail & within the period given by Engineer-in-charge.
The contractor shall attend the complaint in maximum 48 hours and rectify it to the satisfaction of
Engineer-in-Charge.
The contractor should have to take the insurance policy against Damages due to accident and theft by
antisocial elements. The premium of the insurance policy will be paid by the contractor.
2.3) Maintenance works for all works done under this contract:
During the maintenance guarantee period as described under Para 2.1, Contractor shall be responsible for
maintaining the Box type road Bridge, Roads including its components & other works done under this
contract in best of condition by carrying out the routine maintenance works as decided by the Engineer-
in-charge. The routine maintenance work shall be carried out as per direction of Engineer-in-charge.
Special repairs shall be carried our for keeping the road surface in perfect riding condition with required
camber and gradient as may be required, from time to time. Action shall be taken for repairing of all the
pot holes, depressions, cuts in riding surface, as well as in the side shoulders of the road & other works so
that the crust as well as other components of the work does not get damaged due to any reasons
During the maintenance guarantee period, contractor shall have to repair the damage portion of surface
of road at his risk and cost as per direction of the Engineer-in-charge of GIDC. Where ever, roughness value
of surface during the free maintenance period of 5 years is above 3500 MM / KM, the contractor will have
to provide renewal layer overlay
as per requirement of that portion in full width of surface for relevant length as directed by the Engineer-
in- charge of GIDC. The roughness value of surface shall be measured by rough meter or suitable means as
approved by the Engineer –in- charge of GIDC and said test shall be carried only through GERI or any other
as approved by the GIDC. The entire cost of testing shall be borne by the contractor. Contractor will
perform such test periodically (minimum once in a year) during the free maintenance guarantee period
or as directed by the Engineer-in-charge of GIDC.
2.4) GIDC reserve the right to withdraw the maintenance work at any stage. The decision of GIDC will be
final and binding to the contractor.
2.5) NO PAYMENT TOWARDS MAINTENANCE WORK: -
If the contractor does not maintain the Structure of Box type road Bridge and BT roads including its
components & other works done under this contract to the entire satisfaction of GIDC / Engineer-in-
charge, GIDC will undertake repairs of structure of Box type road Bridge and roads & its components by
Signature of Bidder Executive Engineer, GIDC, Surat
themselves and the expenditure so incurred shall be recovered from Maintenance Guarantee Bond. GIDC
reserves right to en-cash Maintenance Guarantee Bond.
2.6) The maintenance guarantee amount shall be given for 5% of the estimated cost / 5% of Approved
tender cost which ever is more and in the form of Bank Guarantee of Nationalized Bank / Schedule Bank
for the period of minimum 5 (Five) years and shall only be released after satisfactory complition of
maintanance guarantee period of 5 (Five) years. The maintenance guarantee bond shall have to be
executed on non judicial stamp paper in standard Performa.
3) Setting up of adequate laboratory & deployment of quality engineer.
The contractor shall have to set up the laboratory with adequate equipment. Till the setting up of adequate
laboratory is completed & reported of this to the engineer (subject to due verification by engineer’s
representative) by contractor in writing, Rs.2,00,000 shall be withheld. The qualified quality engineer shall
be deployed exclusive for this contract by the contractors. If quality engineer is not deployed by contractor
within one month after the date of work order, the amount equivalent to Rs. 15,000 per month shall be
recovered till the actual deployment of quality, engineer. The amount so recovered towards the
deployment of quality engineer shall not be refunded.
4) SUPERVISION OF WORK:
G.I.D.C. reserves rights to get check the quality of works through THIRD PARTY INSPECTION also in
addition to the Engineer-in-charge & Quality Control Units of the Corporation.
5) PRICE VARIATION CLAUSE & STAR RATE FOR CEMENT, STEEL & ASPHALT:
Please read the clause No. Clause No. 60A of B1 form (Contract agreement to be executed) attached
herewith for price variation for cement & Steel.
SR NO MATERIAL QUANTITY STAR RATE DTP PREPATED
6) SURVEYING & MEASURING EQUIPMENTS:
Equipments for surveying & measurement on the work shall be procured by the contractor for his use. The
same also be made available to the Engineer at site or any work connected with the contract without any
additional charges.
7) UNITS RATES UNDER SCHEDULE "B":
The Unit rates specified for various items to be executed as per Schedule "B" attached with the Price Bid
are inclusive all labours, materials, testing charges, equipments, all incidental charges involving in the
work and as specified in the Mode of measurement & payment of detailed specifications of items incl. all
taxes, royalty, octori, transportation cost etc. all as applicable presently as to be enforced for future by any
/ all including Central/State Government & Statutory bodies from time to time.
8) The tenders are invited by GIDC as implementing agency (i.e. Client) and hence agreement is to be
executed between GIDC and successful agency.
9) GIDC will deduct 1% of the Estimated Cost from each Running Account Bill against the testing
charges of materials.
10) IMPORTANT NOTE: -
Signature of Bidder Executive Engineer, GIDC, Surat
Self-Evaluation form Placed in Pre-Qualification (Technical Bid - (Part-II)) as a Annexure-C is mandatory
and required details as per Performa with page number must be field-up. If such detail is not submitted
with the bid documents, the bid shall be liable for disqualification.
For any technical discrepancy, the latest version of MORT&H / IRC shall be applicable.
The bidder shall have to give their queries regarding the said tenders in writing one day before the Pre-
Bid meeting to the office of the Executive Engineer, GIDC, Surat. No queries shall be accepted after the due
date or during the Pre-Bid meeting.
A site visit programmer has been arranged after the Pre-Bid meeting. Prospective bidders are requested
to join the site visit.
GIDC reserves the right, without any obligation or liability, to accept or reject any or all the bid at any
stage of the process, to cancel or modify the process or any part thereof or to vary any of the terms and
conditions at any time, without assigning any reason whatsoever.
These specifications apply to all such Stroam Water Drainage, its related works and other
development works, as are required to be executed under the contract or otherwise directed by
the Engineer-in-charge. In every case, the work shall be carried out to the satisfaction to the
Engineer and confirm to the location, lines, dimensions, grades, & cross section shown on the
drawing or as indicated by the Engineer. The quantity of materials, processing of materials as may
be needed at the site, silent feature of the construction work and quality of finished work shall
comply with the requirements set forth in succeeding section, where the drawing and specification
describe a portion of the work in only general terms and not in complete detail it shall be
understood that only the best general practice to prevail, materials and workmanship of the best
quality are to be employed and instruction of the Engineer are to be fully complied with.
A list of Indian Road Congress Specifications, recommended code of practice and specification of
Road and Bridge works (Ministry of Road Transport & Highways) published by I.R.C. etc., which
have been made use of in the preparation of these specifications. The latest edition of all
specifications / standards till 30 (thirty) days before the final date of submission of tender, shall
2) DEFENITIONS:
The words like contract, contractor, / binder, Engineer (Synonymous) with Engineer-in-charge,
drawings, employer, Government, G.I.D.C., Works, & work site used in this specification shall be
considered to have the meaning as understood from the definitions of these terms given in the
General condition of contract. The following abbreviations shall have the meaning as set forth
ASTM : American Society for Testing and Materials.
BS : British Standard published by the British Standards Institutions.
CBR California Bearing Ratio
IRC : Indian Road Congress.
IS : Indian Standard published by the Bureau of Indian Standards.
Signature of Bidder Executive Engineer, GIDC, Surat
MORT & H : Ministry of Road Transport & Highways – Specifications for road and bridge works
published by the I.R.C.
PWD : Public Works Department.
MATERIAL & TEST STANDARDS:
The relevant standard of material as well as the testing procedures, have been indicated at
appropriate place in the specification or standard books of I.R.C. / I.S code/MORT&H.
3) SIEVE DESIGNATION:
The sieve designation referred to the specification correspondence to those specified by Bureau
of Indian Standard in I.S.
4) SCOPE OF WORK:
The work to be carried out under the contract shall consist of the various items as generally
described in the tender documents as well as in the bill of quantities furnished in the tender
The work to be performed shall include all general works, preparatory to the construction of road
and all other related works. The work shall include work of any kind necessary for the due and
satisfactory construction, completion and maintenance of the works to the intent and meanings of
the drawings and these specification and further drawings and orders that may be issued by the
engineer from time to time.
The scope of work shall include compliance by the contractor with all general condition of contract,
whether specifically mentioned or not in the various clauses of these specifications, all materials,
apparatus, plant, equipment, tools, fuel, watering, strutting, timbering, transport, offices, stores,
workshop, staff, labour and provision of proper and sufficient protective work, diversions,
temporarily fencing & lighting. It shall also include : Safety of workers, first-aid equipments, suitable
accommodation staff and workman with adequate sanitary arrangement, the effecting and
maintenance of all insurance, the payment of all wages, salaries, fees, royalties, duties, or other
charges arising out of the erection of the work and the regular clearance of rubbish, reinstatement
and cleaning up of the site as may be required on completion of works, safety of the public and
protection of the works and adjoining land.
The contractor shall ensure that all actions are taken to built in quality insurance in the planning and
execution of the work. The quality insurance shall cover all stages of work, such as setting out,
selection of materials, selection of construction method, selection of equipment and plant,
deployment of personnel and supervisory staff, quality, control, testing etc. The work of building in
quality insurance shall be deemed to be covered in this scope of the work.
5) REFERENCE STANDARD BOOKS:
The work included in this contract, shall be carried out in accordance with the specifications, rules
and regulations as laid down in the books mentioned below:
i) Specifications for Road & Bridge Works, Ministry of Road Transport & Highway published by Indian
Road Congress - IVth revision or revised from time to time.
ii) For Hot mix plants and accessories to be used for the work shall be in conformity with the
specifications prescribed vide Govt. of India M.O.S.T. circular no. RW/24011/2/89-RMP, dtd.
29/09/1989. The plant shall be equipped with all units and accessories as per latest I.S.:3056-
Signature of Bidder Executive Engineer, GIDC, Surat
& as amended from time to time.
iii) For paver finisher: Requirement for essential features for paver finisher: (As per M.O.S.T.
specification-2PndP Revision February-1998 or as revised from time to time) and as specified in the
tender documents.
iv) Relevant I.S. and I.R.C. specified in specification of item.
v) P.W.D. Hand Book Vol. I and II.
If the reference books quoted above fall short for the items quoted in the schedule of this contract,
reference shall be made to Indian Standard Specification of the latest addition, if any of the items of
this contract are not covered by reference books quoted above, details and specifications directed by
the Supdt. Engineer, GIDC, shall be final.
This shall depend on the standard specifications followed in difference countries of the World for the
item concerned.
6) GENERAL CONDITION REGARDING USE OF EQUIPMENT ON WORKS:
In addition to the general conditions already indicated, the following conditions regarding use of
equipment in works shall be satisfied.
i) The contractor shall be required to give a trial run of the equipment(S) or establishing their
capability to achieve the laid down specifications and tolerance to the satisfaction of the Engineer
before commencement of the work.
ii) All equipments provided shall be of proved efficient and shall be operated and maintained at all
times in a manner acceptable to the Engineer.
iii) All the plant / equipment to be deployed on the work shall be got approved from the Engineer for
ensuring their fitness and efficiency before commencement of the work.
iv) Any material or equipment not meeting the approval of the Engineer shall be removed form the site
v) No equipment or personnel will be removed from site without permission of Engineer.
vi) The contractor shall also make available the equipment for site quality control work as directed by
7) CONTRACT DRAWINGS:
The contract drawings provided for tendering purpose shall be as content in the tender documents
and shall be use as a reference only.
The two copies of the drawings, on the basis of which actual execution of the work is to proceed,
shall be furnished free of cost to the contractor by the Engineer, progressively according to the
work programme submitted by the contractor and accepted by the Engineer.
Examination and / or approval by the Engineer of any drawings or other documents submitted by
the contractor shall not relieve the contractor of his responsibilities and liability under the
8) PROGRAMMING:
The Executive Engineer may at any time give directions as to the order & manner in which the
several parts of the work shall be carried out. The contractor shall strictly observe such directions.
The contractor shall at all time be responsible for any damage and trespass committed by his agent
and working people in earring out the work unless trespass is authorized by the Executive
Engineer is working.
9) PERMIT & LICENSE:
Signature of Bidder Executive Engineer, GIDC, Surat
The contractor shall procure at his sole expenses all permit & license & pay all charges and fee for
lawful execution of the work.
10) INSPECTION OF WORKS & MATERIALS:
For Site engineer, Agent & employees of the contractor shall provide safe and proper facilities.
i) The inspection of 'work shall not be relieved the contractor of his obligations to fulfill the terms of
the contract as herein prescribed by the plans and specifications.
ii) The Executive dates of work.
The contractor shall furnish written information to the Executive Engineer, carting the original
sources of supply and dates of manufacturing of all materials brought to site of the work.
iii) In order to ensure a proper time sequence for required inspection and approval,
this information shall be furnished at least two weeks or as directed by the Engineer-in-charge in
advance of use or incorporation in the work of any such materials and this shall be given in
written by the contractor.
iv) Failure to reject any defective work or materials at any time will not in any way prevent later
rejection when such defects is discovered or observed by the department to the final acceptance.
Signature of Bidder Executive Engineer, GIDC, Surat
(1) All materials to be used shall conform to the relevant specifications as per the latest edition of
Indian Standard, unless otherwise stated in the detailed specifications of items of work.
(2) Wherever a reference to any Indian Standard appears in the specification, it shall be taken to
mean as a reference to the latest version of the standard.
(3) The following specifications, standards, and codes are made a part of this specification\Tender
Indian Standards: specification for building materials, specification for equipment, method of
test, method of measurement of building works, code of practice for construction, safety code
for demolition of building, safety code for scaffolds etc. published by the Bureau of Indian
(4) The contractor shall invariably carry out Materials & work Tests as specified in the Schedule
“D” attached with tender documents and IS code. However, if the additional tests are required
as per the opinion of the Engineer-in-charge, the same shall also have to be carried out. All
such tests shall be got carried out in Government or as approved laboratories and cost thereof
shall be entirely borne by the contractor. No collection of materials shall be made before it is
got approved from the Engineer-in-charge.
(5) Collection of approved materials shall be done at site of work in a systematic manner. Materials
shall be stored in such a manner as to prevent deterioration or intrusion of foreign matter
and to ensure the preservation of their quality and fitness for the work.
(6) Materials, if rejected by the Engineer-in-charge, shall be immediately removed from the site of
work. If they are not removed within twenty-four hours of receiving such intimation,
Engineer-in-charge shall get the same removed at contractor’s cost.
The Engineer-in-charge shall dispose off such materials in a manner as he chooses and the
contractor shall not entitle to any compensation for the cost of such materials.
(7) Approval to the samples of various materials given by the Engineer-in-charge will not absolve
the contractor from the responsibility of replacing the defective material brought on site of
materials used in the work found defective at a later date. The contractor shall have no claim
to any payment or compensation whatsoever on account of any such materials being rejected
by the Engineer-in-charge.
(8) The contractor shall be responsible for observing the law, rules and regulations imposed under
the “Minor Minerals Act “ and such officer laws and rules prescribed by Government from
1.1 Water shall not be salty or brackish and shall be clean, reasonably clear and free from
objectionable quantities of silt and traces of oil and injurious alkalis, salts, organic matter and
other deleterious material which will either weaken the mortar or concrete or cause efflorescence
or attack the steel in R.C.C. Container for transport, storage and handling of water shall be clean.
Water shall conform to the standards specification in I.S. 456-1978
1.2 If required by Engineer-in-charge it shall be tested by comparison with distilled water.
Comparison shall be made by means of standard cement tests for soundness, time of setting and
mortar strength as specified in I.S. 269-1976. Any indication of unsoundness, change in time of
setting by 30 minutes or more or decrease of more than 10 percent in strength of mortar prepared
with water sample when compared with the results obtained with mortar prepared with distilled
water shall be sufficient cause for rejection of water under test.
1.3 Water for curing mortar, concrete or masonry should not be too acidic or too alkaline. It shall be
free of elements which significantly affect the hydration reaction or otherwise interface with the
hardening of concrete during curing or those which produce objectionable stains or other
unsightly deposits on concrete or mortar surfaces.
Signature of Bidder Executive Engineer, GIDC, Surat
1.4 Hard and bitter water shall be not used for curing
1.5 Potable water will be generally found suitable for curing mortar or concrete.
2.1 Lime shall be hydraulic lime as per I.S. 712-1973. Necessary test shall be carried out as per I.S.
6932 (Parts I to X),
2.2 The following field tests for limes are to be carried out.
2.2.1 A very rough idea can be formed about the type of lime by its visual examination i.e. fat lime bears
pure white colour, lime in form of porous lumps of dirty while colour indicates quick lime and solid
lumps are the unburnt lime stone.
2.2.2 Acid tests for determining the carbonate in lime. Excessive amount of impurities and rough
determination of class of lime
2.3 Storage shall comply with I.S. 712-1973. The slaked lime, shall be kept in a whether proof and
damp-proof shed with impervious floor and slides to protect it against rain, moisture, whether and
extraneous materials mixing with it, All lime that has been damaged in any shall be rejected and
all rejected materials shall be removed from site of work.
2.4 Field testing shall be done according to I.S. 1624-1974 to show the acceptability of materials
3.1 Cement shall be ordinary Portland slag cement as per I.S. 269-1976 or Portland slag cement as per
I.S. 455-1976.Cement shall be approved make like Siddhi, Ambuja, Elephant or L& T
M.4. White Cement:
4.1 The white cement shall conform to I.S. 80412-E
M.5 Coloured Cement:
5.1 Coloured cement shall be with white or gray Portland cement as specified in the item of the work.
5.2 The pigments used for coloured cement shall be of approved quality and shall not exceed 10% of
cement used in the Mix. The mixture of pigment shall be properly grounded to have a uniform
colour and shade. The pigments shall have such properties to provide for durability under
exposure to sunlight and weather.
5.3 The pigment shall have the property such that it is neither affected by the cement nor detrimental
6.1 Sand shall be natural sand, clean, well graded, hard strong curable and gritty particle free from
injurious amounts of dust clay, kankar nodules, soft or flaky particles shale, alkali, salts organic
matter, loam, mica or other deleterious substance and shall be got approved from the Engineer-
in-charge. The sand shall not contain more than 8 percent of silt as determined by field test. IF
necessary the sand shall be washed to make it clean.
6.2 Coarse Sand: The fineness modulus of coarse sand shall not be less than 2.5 and shall not exceed
6.3 Fine Sand: The fineness modulus shall not exceed 1.0. The sieve analysis of fine sand shall be as
M.7 Stone Dust:
7.1 This shall be obtained from crushing hard trap or equivalent. It shall not contain more than 8% of
silt as determined by field test with measuring cylinder. The method of determining silt contents
by fields test is given as under:
7.2 A sample of stone dust to be tested shall be placed without drying in 200 mm. measuring cylinder.
The quantity of the sample shall be such that it fills the cylinder unto 100 mm thick. The clean
Signature of Bidder Executive Engineer, GIDC, Surat
water shall be added up to 150 mm. mark. The mixture shall be striped vigorously and the content
allowed to settle for 3 hours.
7.3 The height of silt visible as settled layer above the stone dust shall be expressed as percentage of
the height of the stone dust below. The stone dust containing more than 8 % silt shall be washed
so as to bring the silt content within the allowable limit.
7.4 The fineness modulus of stone dust shall not be less than 1.80.
M.8 Stone Grit:
8.1 Grit shall consist of crushed or broken stone and be hard strong, dense, durable, clean of proper
gradation and free from skn or coating likely to prevent adhesion of mortar Grit shall generally be
cubical in shape and as far as possible flaky clongated pieces shall be mentioned, grt shall be
obtained from the best black trap or equivalent hard stone as approved by the Engineer-in-charge.
The grit shall have no deleterious reaction with cement.
8.2 The grit shall conform to the following gradation as per sieve analysis
8.3 The crushing strength of grit will be such as to allow the concrete in which it is used to build up
the specified strength of concrete.
8.4 The necessary tests for grit shall carried out as per the requirements of I.S. 2386 (Parts I to VII)
1963, as per instruction of the Engineer-in-charge. The necessity of test will be decided by the
Engineer-in-charge.
9.1 Cinder is well burnt furnace residue which has been fused or sintered into lumps of varying sizes.
9.2 Cinder aggregates shall be well burnt furnace residue obtained from furnace using coal fuel only.
I shall be sound clean free from clay, drt. ash or other deleterious matter.
9.3 The average grading for cinder aggregates shall be as mentioned below:
M.9 (a) FLY ASH
Fly ash for use in cement fly-ash concrete shall conform to IS: 3812-1966 “Specification for Fly-
Ash (Part-I) for use as soil stabilization layer, admixer in concrete and possess.
Specific Physical and Chemical requirements are as below.
A: Physical Requirements.
Sr. Characteristic. Grade – 1. Grade –
1. Fine ness specific surface area in cm/ mm2, 3200
by Blane air permeability method—Minimum.
2. Lime reactivity Ave. compressive strength in 40
Kg. / cm2 – Minimum.
3. 3. Compressive strength of pozolana cement Not less than 80 % of corresponding for
mortar at 28 days in Kg / cm 2. cement mortar value
4. Drying shrinkage. Maximum. 0.15
5. Soundness by Autoclave test, Expansion of 0.80
B: Chemical Requirements.
Sr.No Characteristic. Requirements % by Wt.
Minimum. Maximum.
Signature of Bidder Executive Engineer, GIDC, Surat
d. Sulpger as S03. --
e. Available alkalies as Na203. --
F Loss on ignition. --
MDD at OMC -- 1.12 gms / cc, Sp. Gr = 2.27, CBR = 4.3%
Fly ash shall be non plastic in nature.
M-10 Lime Mortar:
10.1 Lime shall conform to specification M-2 water shall conform to specification M-1.
Sand Sand shall conform to specification M-6
10.2 Proportion of Mix:
10.2.1 Mortar shall consist of such proportions of slaked lime and sand as may be specified in the item.
The slaked lime and sand be measured by volume.
10.3 Preparation of Mortar:
10.3.1 Lime mortar shall be prepared by wet process as per I.S. 1625-1971. Power driven mill shall be
used for preparation of lime mortar. The slaked lime shall be placed in the mill in an even layer
and ground for the 180 revolutions with sufficient water. Water shall be added as required during
grinding (care being taken not to add more water) that will bring the mixed material to a
consistency of stiff paste. Thoroughly wetted sand shall then be added evenly and the mixture
ground for another 180 revolutions.
10.4.1 Mortar shall always be kept damp, protected from sun and ran till used up, covering it by tarpaulin
10.5.1 All mortar shall be used as soon as possible after grinding. It should be used on the day on which
it is prepared. But it no case mortar made earlier than 36 hours shall be permitted for use.
M.11 Cement Mortar:
11.1 Water shall conform to specification M-1. Cement: Cement shall conform to specification M-3
Sand Sand shall conform to M-6
11.2 Proportion of Mix:
11.2.1 Cement and sand shall be mixed to specified proportion, sand being measured by measuring boxes.
The proportion of cement will be by volume on the basis of 50 Kg. / Bag of cement being equal to
0.0342 Cu.m. The mortar may be hand mixed or machine mixed as directed.
11.3 Preparation of Mortar:
11.3.1 In hand mixed mortar cement and sand in the specified proportions shall be thoroughly mixed dry
on a clean impervious platform by turning over at least 3 times or more till a homogenous mixture
of uniform colour is obtained. Mixing platform shall be so arranged that no deleterious extraneous
material shall get mixed with mortar or mortar shall flow out. While mixing, the water shall be
gradually added and thoroughly mixed to from a stiff plastic mass of uniform colour so that each
particle of sand shall be completely covered with a film of wet cement. The water cement ratio
shall be adopted as directed.
11.3.2 The mortar so prepared shall be used with in 30 minutes of adding water. Only such quantity of
mortar shall be prepared as can be used within 30 minutes.
M-12 Stone Coarse Aggregate for Nominal Mix concrete:
12.1 Coarse aggregate shall be machine crushed stone of black trap or equivalent and be hard strong,
dense, durable, clean and free from skin and coating likely to prevent proper adhesion of mortar.
Signature of Bidder Executive Engineer, GIDC, Surat
12.2 The aggregate shall generally be cubical in shape. Unless stones of particular quarries are
mentioned aggregates shall be machine crushed from the best black trap or equivalent hard stone
as approved. Aggregate shall have no deleterious reaction with cement. The size of the coarse
aggregate for plain cement concrete and ordinary reinforced cement concrete shall generally be
as per the table given below. However in case of reinforced cement concrete the maximum limit
may be restricted to 6 mm. less than the minimum lateral clear distance between bars or 6 mm.
less than the cover, whichever is smaller.
I.S. Sieve Designation Percentage Passing for Single sized aggregates of nominal Size.
Note This percentage may be varied some what by Engineer-in-charge when considered necessary for
obtaining better density and strength of concrete.
12.3 The grading test shall be taken in the binning and at the change of source of materials. The
necessary test indicated in S 383-1970 and I.S. 456-1978 shall have to be carried out to ensure the
acceptability. The aggregates shall be stored separately and handled in such a manner as to
prevent the intermixing of different aggregates. If the aggregates are covered with dust, they shall
be washed with water to make them clean.
M-13 Black Trap or Equivalent Hard Stone Coarse.
13.1 Aggregate for Design Mix Concrete: Coarse aggregate shall be of machine crushed stone of blanc
trap equivalent hard stone and be hard strong dense, durable clean and free from skin and coating
likely to prevent proper adhesion of mortar.
13.2 The aggregates shall generally be cubical in shape. Unless special stones of particular quarries are
mentioned, aggregates shall be machine crushed from the best, black trap or equivalent hard
stones as approved. Aggregate shall have no deleterious reaction with cement.
13.3 The necessary tests indicated in I.S. 383-1970 and .S. 456 - 1978 shall have to be carried out to
ensure the acceptability of the material.
13.4 If aggregate is covered with dust it shall be washed with water to make it clean.
M.14 Brick Bats Aggregate
14.1 Bricks bat aggregate shall be broken from well burnt or slightly over burnt and dense brick. It shall
be homogeneous in texture roughly cubical in shape, clean and free from dirt and any other foreign
material. The brick bats shall be of 40 mm to 50 mm. size unless otherwise specified in the item.
The under burnout of over burnout brick bats shall not be allowed.
14.2 The brick bats shall be measured by volume by suitable boxes or as directed.
15.1 The bricks shall be hand or machine moulded and made from suitable soils and kiln-burnt. They
shall be free from crack and modules of free lime. They shall have smooth rectangular faces with
sharps corners and shall be uniform colour.
The bricks shall be moulded with a frog of 100 mm. x 40mm. and 10mm. To 20 mm depth on one
of ts flat sides. The bricks shall not break when thrown on the ground from a height of 600 mm.
15.2 The size of modular bricks shall be 190mm x 90mm. X 90mm.
Signature of Bidder Executive Engineer, GIDC, Surat
15.3 The size of the conventional bricks shall be as under Equitation
15.4 Only bricks of one standard size shall be used on one work. The following tolerances shall be
permitted in the conventional size in a particular work.
15.5 The crushing strength of the bricks shall not be less than 35 Kg./Sq.Cm. The average absorption
shall not be more than 20 percent by weight. Necessary tests for crushing strength and water
absorption etc. shall be carried out as per I.S. 3495 (Part I to IV) 1976 Length +/- 1/8" (3.0mm)
width +/- (1.50 mm.) Height +/- 1/6" (1.50 mm)
16.1 The stone shall be of the specified variety such as Granite / Trap Stone / Quartzite or any other
type of good hard stones. The stones shall be obtained only from the approved quarry and shall be
hard sound, durable and free from defects like cavities cracks, sand holes, flaws, injurious vines,
patches of loose or soft materials etc and weathered portions and other structural defects or
imperfections tending to affect their soundness and strength. The stone with surface shall not be
used. The percentage of water absorption shall not be more than 5% of dry weight, when tested in
accordance with I.S. 1134-1974. The minimum crushing strength of the stone shall be
Kg/Sq.Cm. unless otherwise specified.
16.2 The samples of the stone to be used shall be got approved before the work is started.
16.3 The Khaki facing stone shall be dressed by chisel as specified in the item for khaki facing in
required shape and size. The face of stone shall be so dressed that the bushing on the exposed
face shall not projected by more than 40 mm. from the general wall surface and on face to be
plastered it shall not project by more than 19 mm nor shall it have depressions more than
mm. from the average wall surface.
M.17 Laterite Stone:
17.1 Late rites stone shall be obtained from the approved quarry. It shall be compacted in texture,
sound, durable and free from soft patches. It shall have a minimum crushing strength of 100 Kg. /
Sq.Cm. in its dry conditions. It shall not absorb water more than 20% of its own weight, when
immersed for 24 hours in water. After quarrying the stone shall be allowed to weather for some
time before using in work.
17.2 The stone shall be dressed into regular rectangular blocks so that all faces are free from waviness
and unevenness, edges true and square.
17.3 Those types of stone in which white clay occur, should not be used.
17.4 Special corner stones shall be provided where so directed.
M.18 Mild Steel Bars
18.1 Mild steel bars reinforcement for R.C.C. work shall conform to I.S. 432 (Part-II) 1966 and shall be
of tested quality. It shall also comply with relevant part of I.S. 456-1978.
18.2 All the reinforcement shall be clean and free from dirt, paint, grease, mill scale or loose or thick
rust at the time of placing.
18.3 For the purpose of payment, the bar shall be measured correct up to 100 mm. length and weight
payable worked out at the rate prescribed below:
M.19 High Yield Strength Steel Deformed Bars:
19.1 High yield strength steel deformed bars be either cold twister or hot rolled shall conform to I.S.
1739-1966 and I.S. 1139-1966 respectively.
19.2 Other provision and requirement shall conform to specification No. M-18 for Mild Steel bars.
M.20 High Tense Steel Wire
20.1 The high tensile wires for the use in prestress concrete work shall conform to I.S. 2090-1962
20.2 The tensile strength of the high tensile steel bars shall be as specified in the item. In absence of the
given strength the minimum strength shall be taken as per Para 6.1 of I.S. 1785-1962. Testing shall
be done as per I.S. requirements.
Signature of Bidder Executive Engineer, GIDC, Surat
20.3 The high tensile steel shall be free from loose mill scale, rust oil, grease, or any other harmful
matter. Cleaning of steel bars may be carried out by immersion n solvents solution wire brushing
or passing through a pressure box containing carborundum.
20.4 The high tensile wire shall be obtained from manufacturers in coil having diameter not less than
350 times the diameter of wire itself so that wire springs back straight on being uncoiled.
M.21 Mild Steel Binding Wire
21.1 The mild steel wire shall be of 1.63 mm. or 1.22 mm (16 to 18 gauge) diameter and shall conform
21.2 The use of black wire will be permitted for binding enforcement bars. It shall be free from rust, oil
paint, grease, loose mill scale or any other undesirable coating which may prevent adhesion of
M.22 Structural Steel:
22.1 All structural steel shall conform to I.S. 226-1965. The steel shall be free from the defects
mentioned in I.S. 226-1975 and shall have a smooth finish. The material shall be free from loose
mill scale, ruts pits or other defects affecting the strength and durability. Rivet arts shall conform
22.2 When the steel is supplied by the Contractor test certificates of the manufacturers shall be
obtained according to I.S. 226-1975 and other relevant Indian Standards.
M-23 T.M.T. Bars
23.1 T.M.T. shall conform to IS 1789-FE415
23.2 approved make for TMT bar shall be Tata, Shah Alloys, Malhotra, Rajury, Sirhind, and Thermax.
M.24 Shuttering:
24.1 The shuttering shall be either of wooden planking of 30 mm. minimum thickness with or without
steel lining of steel plates stiffed by steel angles. The shuttering shall be supported on battens and
beams and props of vertical bellies properly cross braced together so as make the centering rigid.
In places of bullie props bricks pillar of adequate section built in mud mortar may be used.
24.2 The form work shall be sufficient strong and shall have camber, so that it assumes correct shape
after deposition of the concrete and shall be able to resist forces caused by vibration of live load of
men working over t and other incidental loads associated with t. The shuttering shall have smooth
and even surface and its joints shall not permit leakage of cement grout.
24.3 If at any stage of work during of after placing concrete in the structure, the form work sags or
bugles out beyond the required shape of the structure, the concrete shall be removed and work
redone with fresh concrete and adequately rigid form work. The complete form work shall be got
inspected by and got approved from the Engineer-in-charge, before the reinforcement bars are
placed in position.
24.4 The props shall consist or bullies having 100 mm. minimum diameters measured at mix length
and 80 mm. at thin end shall be placed as per design requirement. These shall rest squarely on
wooden sole plates 40 mm. thick and minimum bearing area if 0-10 sq.mm laid on sufficiently hard
24.5 Double wedges shall further be provided between the sole plate and the wooden props so as to
facilitate tightening and casing of shuttering without perking concrete.
24.6 The timber used in shuttering shall not be so dry as to absorb water from concrete and swell or
bulge nor so green or wet as to shrink after erection. The timber shall be properly swan and planed
on the sides and surface coming in contact with concrete. Wooden form work with metal sheet
lining or steel plates stiffened by steel angles be permitted.
24.7 As far as practicable, clamps shall be used to hold the forms together and use of nails and spikes
24.8 The surface of timber shuttering that would come in contact with concrete shall be well wetted
and coated with soap solution before the concreting is done. Alternatively coat of raw linseed oil
or oil of approved manufacturer may be applied in place of soap solution. In case of steel shuttering
Signature of Bidder Executive Engineer, GIDC, Surat
either soap solution or raw linseed oil shall be applied after thoroughly cleaning the surface. Under
no circumstances black or burnt oil shall permitted.
24.9 The shuttering for beams and slabs shall have camber of 4 mm. per meter (1 in 250) or as directed
by the Engineer-in-charge so as to offset the subsequent deflection. For cantilevers, the camber at
free end shall be 1/50 of the projected length or as directed by the Engineer-in-charge
M.25 Teak Wood:
25.1 The teak wood shall be of good quality as required for the item to be executed. When the kind of
wood is not specifically mentioned, good Indian teak wood as approved shall be used.
25.2 Teak wood shall generally be free from large, loose, dead or cluster knots, flaws, shakes wraps, and
twists bends or any other defects. It shall generally be uniform in substance and of straight fibers
as far as possible. It shall be free from rot, decay, harmful fungi and other defects of harmful nature
which will affect the strength durability of its usefulness for the purpose for which it is required.
The colour shall be uniform as far as possible. Any effort like painting, using any adhesive or resins
materials made to hide the defects shall render the pieces liable to rejection by the Engineer - in -
25.3 All scantlings, planks etc. shall be sawn in straight lines and planes in the direction of grains and
of uniform thickness.
25.4 The tolerances in the dimensions shall be allowed at the rate of 1.5 mm per face to be planed.
25.5 First Class Teak Wood
25.5.1 First class teak wood shall have no individual hard and sound knots, more than 6 sq.cm. Size and
the aggregate area of such knots shall not be more than 1% of area of piece. The timber shall be
closed grained.
25.6 Second class Teak Wood:
25.6.1 No individual hard and sound knots shall be more than 15 sq. cms in size and aggregate area of
such knots shall not exceed 2% of the area of piece.
M.26 A. Non-Teak wood:
The non teak wood shall be chemically treated, seasoned as per IS specifications and of good
quality. The type of wood shall be got approved before collecting the same on site. Fabrication of
wooden member shall be started only after approval.
For this purpose wood of Bio, Kalali, Siras, Behda, Jamun, Sisoo will be used for door frames where
as only Kalali, Siras, Halda, Kalam etc. will be permitted for shutters after proper seasoning and
chemical treatment.
The non-teak wood shall be free from large, loose, dead of cluster knots, flow, shakes, wraps, bends
or any other defect. It shall be uniform in substance and of straight fibers as far as possible. It shall
be free from rots, decay harmful fungi and other defects of nature which effect the strength,
durability or its usefulness for purpose for which it is required. The colour of wood shall be
uniform as fas as possible. The scantlings planks etc. shall be sawn in straight lines and planes in
the direction of grain and uniform thickness.
The department will use the Agency to produce certificate from Forest Department in event of
Dispute and the decision of the Department shall be final and binding to the contractor.
The tolerance in the dimension shall be allowed as 1.5 mm per face to be planed.
M.27 Wooden flush door shutters (solid core):
27.1 The solid core type flush door shutters shall be decorative or non - decorative type as specified in
the drawing. The size and thickness of the shutter shall be as specified in drawing or as directed.
The timber species for core shall be used as per I.S. 2202-(Part - I) 1980. The timber shall be free
from decay and insect attack. Knots and knot holes less than half the width of cross-section of the
members in which they occur may be permitted. Pitch Pockets, Pitch streaks and harmless pin
holes shall be permissible except in the exposed edges of the core members. The commercial
plywood, cross bands shall conform to I.S. 303-1275.
Signature of Bidder Executive Engineer, GIDC, Surat
27.2 The face panel of the shutters shall be formed by gluing by the hot process on both faces of the
core with either plywood or cross-bands and face veneers. The hopping rebating opening of
glazing, venetion etc. shall be provided if specified in the drawing.
27.3 All edges of the door shutters shall be square. The shutters shall be free from twist or wrap in its
plane. Both faces of the shutters shall be sand papered to smooth even texture.
27.4 The shutters shall be tested for
-1 End immersion test: The test shall be carried out as per I.S. 2202 (part - I) 1980.0 There shall be
no delamination at the end of the test.
-2 Knfe Test: The face panel when tested in accordance with I.S. 1659-1979 shall pass the test.
-3 Glue adhesion test: The flush door shall be tested for glue adhesive test in accordance with I.S.
2202 (Part -) 1980.0 The shutters shall be considered to have passed the test if no delamination
occurs in the glue lines in the plywood and if no single delimitation more than 80 mm. in length
and more than 3 mm. in depth has occurred in the assembly glue lines between the plywood face
and the style and rail. Delamination at the corner shall be measured continuously around the
corner. Delamination at the knots, knot holes and other permissible wood defects shall not be
considered in assessing the sample.
27.5 The tolerance in size of solid core type flush door shall be as under:
In Normal thickness +/- 1.2 mm
In Normal height +/- 3 mm
27.6 The thick of the shutters shall be uniform thought with a permissible variation of not more than
0.8mm when measured at any two points.
28.1 The plywood for general purpose shall conform I.S. 303-1975. Plywood s made by cementing to
gather thin boards or sheets of wood into panels. There is always an odd number of layers
ply etc. The plies are placed so that grain of each layer is right angle to the grain in the adjacent
28.2 The chief advantages of plywood over a single board of the same thickness is the more uniform
strength of the plywood, along the length and width of the plywood and greater resistance to
cracking and splitting with change in moisture content.
28.3 Usually synthetic resins are used for gluing, pherolic resins are usually cured in a hot press which
compresses and simultaneously heats the plies between bet plates which maintain a temperature
of 90 degrees. C. to 140-degree C. and a pressure of 11 to 14 Kg. / Sq.cm. on the wood. The times
of heating may be anything from 2 to 60 minutes depending upon thickness
28.4 When water glue is used, the wood absorbs so much water that the finished plywood must be dried
carefully. When synthetic resins are used as adhesive finished plywood must be exposed to an
atmosphere of controlled humidity until the proper amount of moisture has been absorbed.
28.5 According to I.S. 303-1975 the plywood for general purpose shall be of three grades namely BWR,
WWR and CWR depending upon the adhesives used for bonding and veneers, and it will be further
classified into six types namely AA, AC, AC, BB, BC and CC based on the quality of the two faces,
each face being of three kinds namely, A, B, and C. After pressing the finished plywood should be
reconditioned to moisture content not less than 8 percent and not more than 16 percent.
28.6 Thickness of plywood Boards:
Board Thickness
Signature of Bidder Executive Engineer, GIDC, Surat
29.1 All glass shall be of the best quality, free from specks, bubbles, smokes veins, air holes blisters and
other defects. The kind of glass to be used shall be mentioned in the tem or specification or in the
special provisions or as shown in detailed drawings. Thickness of glass panes shall be uniform.
The specifications or different kinds of glass shall be as under:
29.2 Sheet Glass
29.2.1 In absence of any specified thickness or weight in the item or detailed specifications of the item of
work, sheet glass shall be weighing 7.5 KG/Sq.m for panes up to 600 mm x 600 mm
29.2.2 for panes larger than 600 mm. x 600mm. And up to 800 m. x 800 mm. the glass weighing not less
than 8.75 Kg. /Sq. m shall be used. For bigger panes up to 900 mm x 900 mm glass weighing not
less than 11.25 Kg. Sq.m. shall be used.
29.2.3 Sheet glass shall be patent flattened glass of best quality and for glazing and farming purpose shall
conform to I.S. 1761-1960. Sheet glass of the specified colours shall be used, if so shown no detailed
drawings or so specified. For important building and for panes with any dimension over 900 mm.
plate glass of specified thickness shall be used.
29.3 Plate Glass
29.3.1 When plate glass specified, it shall be 'Polished patent plate glass' of best quality. It shall have both
the surface ground flat and parallel and polished to obtain clear undisturbed vision and reflection.
The plate glass shall be of the thickness mentioned in the item or as shown in the detailed drawing
or as specified. In absence of any special thickness, the thickness of plate glass to be supplied shall
be 6 mm. and a tolerance of 0.20 mm shall be admissible.
29.4 Obscured Glass
29.4.1 This type of glass transmits light so that vision is partially or almost completely obscured. Glass
shall be plain rolled, figured, ribbed or fluted or frosted glass as may be specified as required. The
thickness and type of glass shall be as per details on drawings or as specified or as directed.
29.5 Wired Glass:
29.5.1 Glass shall be with wire netting embedded in a sheet of plate glass electrically welded 13 mm.
Georgian square mesh be used. Thickness of glass shall not be less than 6 mm. Wired glass shall be
of type and thickness as specified.
M.30 Fixture and Fastenings:
30.1.1 The fixture and fastenings, that is, butt, hinges tee and strap hinges, sliding door bolts, tower bolts,
door latch, bath room latch, handles, door stopper, casement window fasteners, casement stays
and ventilators catch shall be made of the metal as specified in the item or its specification.
30.1.2 They shall be of iron, brass, aluminum, chromium plated iron, and chromium plated brass, copper
oxidized iron, and copper oxidized brass or anodized aluminum as specified.
30.1.3 The fixture shall be heavy, medium or light type. The fixtures and fastening shall be smooth
finished and shall be such as will ensure ease of operation.
30.1.4 The samples of fixtures and fastenings shall be got approved as regards quality and shape before
providing them in position.
30.1.5 Brass and anodsed aluminum fixtures and fastenings shall be bright finished.
30.2 Holdfasts:
Signature of Bidder Executive Engineer, GIDC, Surat
30.2.1 Holdfasts shall be made from mild steel flat 30 cm. length and one of the holdfasts shall be bent at
right angle and two nos. of 6 mm. diameter holes shall be made in in for fixing it to the frame with
screws. At the other and the holdfast shall be forked and bent at right angles in opposite directions.
30.3 Butt hinges:
30.3.1 Railway standard heavy type butt hinges shall be used when no specified.
30.3.2 Tee and strap hinges shall be manufactured from M.S. sheet.
30.4 Siding door bolts (Aldrops)
30.4.1 The aldrops as specified in the item shall be used and shall be got approved.
30.5 Tower Bolts (Barrel Type)
30.5.1 Tower Bolts as specified in the item shall be used and shall be got approved.
30.6 Door latch:
30.6.1 The size of door latch shall be taken as the length of latch.
30.7 Bathroom Latch
30.7.1 Bathroom latch shall be similar to tower bolt.
30.8 Handle: The size of the handles shall be determined by the inside grip length of the handles,
Handles shall have a base plate of length 50 mm. more than the size of the handle.
30.9 Door Stoppers:
30.9.1 Door stoppers shall be either floor door stopper type or door catch type. Floor stopper shall be of
overall size as specified and shall have a rubber cushion.
30.10 Door latch:
30.10.1Door Catch shall be fixed at the height of about 900 mm. from the floor level so that one part of the
catch s fitted one the inside of the shutter and the other part is fixed in the wall with necessary
wooden plug arrangements for appropriate fixity. The catch shall be fixed 20 mm. inside the face
of the door for easy operation of catch.
30.11 Wooden Door Stop with hinges:
30.11.1Wooden door stop of size 100mm x 60 mm x 40 mm shall be fixed on the door frame with a hinge
of 75 mm size and at a height of 900 mm. from the floor level. The wooden door stop shall be
provided with 3 coats of approved oil paint.
30.12 Casement Window Fastener:
30.12.1Casement window fastener for single leaf window shutter shall be left or right handled as directed.
30.13 Casement stays (Straight Peg Stay)
30.13.1The stays shall be made from a channel section having three holes at appropriate position so that
the window can be opened either fully or partically as directed. Size of the stay shall be 250 mm.
to 300 mm as directed.
30.14 Ventilator Catch
30.14.1The pattern and shape of the catch shall be as approved.
30.15 Pivoted M.S. flats shall be 20 mm x 6 mm
30.15.1The base and socket plate shall be made from minimum 3 mm thick plate and projected pivot shall
not be less than 12 mm. diameters and 12 mm. length and shall be firmly riveted to the base plate
in case of iron pivot and in single piece base plate in the case of brass pivot.
30.1 (A) Oil Paints
30.1.1 Oil paints shall be of the specified colour and shade, and as approved. The ready mixed paints shall
only be used. However, if ready mixed paint or specific shade or tint is not available, white ready
mixed paint with approved stainer will be allowed. In such a case the contractor shall ensure that
the shade of the paint so alloyed shall be uniform.
30.1.2 All the paints meet with following general requirements:
(i) Paints shall not show excessive setting in a freshly opened full can and shall easily be redipressed
with a paddle to a smooth homogeneous state. The paint shall show no curdling, livering, caking
or colour separation and shall be free from lumps and skins.
(ii) The paint as received shall brush easily, possess good leveling properties and show no running or
sagging tendencies.
Signature of Bidder Executive Engineer, GIDC, Surat
(iii) The paint shall not skit within 48 hours in a three quarters filled closed container.
(iv) The paint shall dry to a smooth uniform finish free from roughness, grit unevenness and other
30.1.3 Ready mixed paint shall be used exactly as received from the manufacturers and generally
according to their instructions and without any admixtures whatsoever.
30.2 (B) Enamel Paints:
30.2.1 The enamel paint shall satisfy in general requirements as mentioned in specification of oil paints.
Enamel paints shall conform to I.S. 2933-1975.
M.32 French polish:
32.1 The French polish of required tint and shape shall be prepared with the below mentioned
ingredients and other necessary materials:
(i) Denatured sprt of approved quality
32.2 The French polish so prepared shall conform to I.S. 348-1968.
M-33 D.I. Pipes (Ductile Iron Pipes)
33.1 The general requirements relating to the supply of material shall be as per IS:
33.2 The material for DI fittings shall conform to IS:
33.3 Applicable codes
The manufacturing testing, supplying, jointing and testing at work sites of Ductile Iron pipes and
fittings shall comply with all currently applicable statutes, regulations, standards and codes.
In particular, the following standards unless specified herein shall be referred. In all cases, the
latest revision of the codes shall be referred to. If requirements of specifications conflict with the
requirements of the codes and standards, this specification shall govern.
IS: 8329 Specification for Centrifugally Cast (spun) Ductile Iron pressure pipes for water, gas and
sewage specification.
IS: 638 Sheet rubber jointing and rubber insertion jointing.
IS: 1387 General requirements for supply of metallurgical materials.
IS: 1500 Methods for Brinell hardness test for metallic materials.
IS: 9523 Ductile Iron fittings for pressure pipes for water, gas and sewage.
IS: 12820 Dimensional requirements. of rubber gaskets for mechanical Joints and push on joints for
use with cast Iron pipes and fittings for carrying water, gas and sewage.
ISO: 4179 Ductile iron pipes for pressure and non pressure-Centrifugal cement mortar lining -
General requirements.
ISO: 2531 Ductile iron pipes, fitting and accessories for pressure pipe lines.
Code of Practice
IS: 12288 Code of practice for use & laying of ductile iron pipes.
M-34 PVC Pipes (6 kg/esq)
34.1 The low-density polythene pipe of specified diameter with 6 kg/Esq. Working pressure shall
conform to IS 3076-1968.
Signature of Bidder Executive Engineer, GIDC, Surat
34.2 The specials and fitting required shall be only of Prince, Supreme, & Kisan.
M-35- CI double flanged sluice valve PN
35.1 The materials for the different component parts of the sluice valve shall confirm to requirements
given in Table-1.
Table 1 Materials for components parts of sluice valve
Component Material Ref. to
Body, bonnet wedge
1 unserviceable materializing box, Grey cast iron 210-FG 1978(1)
gland thrust plate, cap.
2 Steam High tensile brass 320-1962(2) Ally 1 of
3 Wedge nut Leaded tin bronze 318-1962(3)
4 Body seat ring, wedge facing ring Leaded tin bronze 318-1962(3)
5 Bolts Carbon steel 1367-1967(4) Class
6 Nuts Carbon steel 1367-1967(4) Class
Compressed fiber
7 Bonnet gasket 2712-1971(5) C
8 Gland packing Jute & hemp 5414-1969(6) --
35.2.1 The C.I. sluice valves to be manufactured, supplied and delivered under the scope of this contract
shall be manufactured in accordance with and conforming to Indian standard specifications as
given below : with ISI certification mark on each sluice valves.
IS: 27 - Pig Lead
IS: 210 - Grey Iron Castings
IS: 8329 - Specification for Centrifugally Cast (spun)
Ductile Iron pressure pipes for water, gas and
Sewage specification.
IS: 780 - Specification for sluice valve for water works
Purposes (50 to 300 mm size)
IS: 1537 - Vertically Cast Iron pressure pipes for water,
Gas and sewage.
IS: 1538 - Cast Iron fittings for pressure pipes for water,
Gas and sewage.
IS: 2906 - Specification for sluice valve for water works
Purposes (350 to 1200 mm size)
IS: 1364 - Specification for hexagonal head bolts (part –
Screws & nuts of product grades A & B to 5)
(1) Specification for gray iron castings (third revision).
(2) Specification for high tensile brass roads and sections (revised).
Signature of Bidder Executive Engineer, GIDC, Surat
(3) Specification for leaded tin bronze ingots and casting (revised).
(4) Specification for technical supply condition threaded fasteners
(First revision)
(5) Specification for compressed asbestos fiber jointing (first revision)
(6) Specification for gland packing, jute and hemp.
35.3 Manufacture
35.3.1 Sluice valve bodies for 80 mm to 900 mm size valves shall be provided with double flanged ends
35.3.2 Approved make for sluice Valve shall be of L & T, I.B.I., I.V.C., Kirlosker, & Balaji.
35.3.4 The flanges and their dimensions of drilling shall be in accordance with part IV and VI of I.S.
(Part I to XXII) 1976 (Specification for cast Iron fittings for pressure pipes for water gas and
sewage) or its latest revision.
(Size range M1.6 to M 64)
M-36- Airvalves single balled flange
36.1 The materials for the different component parts of the Air valve shall confirm to requirements
given in Table-1.
Table 1Materials for components parts of Air valve
Component Material Ref. to Is No.
Body, Cover, Valve Disk, Stuffing
1 Box, Valve Guide, Cowl, Gland, Cp, Grey cast iron 210 FG 1978(1)
Joint Support Ring.
2 Steam High tensile brass
3 Low Pressure Orifice Natural Rubber
4 Stem Nut Leaded tin bronze 318 LTB -
5 Body Seat Ring Leaded tin bronze 318 LTB -
6 Bolts Carbon steel 318 LTB -
7 Nuts Carbon steel 1363 Class 4 .6
8 Gasket Rubber 1363 Class
9 Gland Packing Jute/Hemp 638 Type B
Timber Core with
10 Float (Low Pressure Orifice) 5414 Type -III
Vucanite Coating
Timber Core with
11 Float (High Pressure Orifice)
12 Float Guide Leaded tin bronze 318 LTB -
Valve Size B(Min) C. SQ.(Min) Suitable for Main Size
36.2. Manufacture
Signature of Bidder Executive Engineer, GIDC, Surat
36.2.1 Air valve bodies as specified size valves shall be provided with single flanged ends connection.
36.2.2 Approved make for air Valve shall be of L & T, I.B.I., I.V.C., Kirlosker, & Balaji.
M-37 Fire Hydrant:
37.1 The materials for the different component parts of the Fire Hydrant Valve shall confirm to
requirements given in Table-1.
37.2 Manufacture
37.2.1 Fire Hydrant Valve bodies as specified size valves shall be provided.
37.2.2 Approved make for sluice Valve shall be of L & T, I.B.I., I.V.C., Kirlosker, & Balaji.
Materials for components parts of Fire Hydrant Valve
Item No. Description Double No. off Material & Specification 100 MM
Gun Metal IS 318 LTB1/BS:1400 LG
1 Out let Coupling Two
Cast Iron IS 210,GR FG 200/BS
2 Stand Post One
3 Flange Riser One --Do--
4 Duck Foot bend One --Do--
5 Surface Box Two --Do--
6 Sluice Valve Two --Do—As Per IS 14846 PN
Cast ion IS 210,GR FG 200/BS :1452
7 Short Piese One
Size A Hydraulic Test Pressure Test Duration Min. Minutes
Body Seat Body Seat
The method of execution of the items shall conform to the relevant specifications as per the latest
version of the Indian Standard unless specified otherwise and as far as applicable.
Wherever a reference to ANY Indian Standard appears in the specification, it shall be taken to
mean as a reference to the latest version of the standard.
The following specifications, standards, and codes are made as a part of this specification.
Indian Standards : specification for building materials, specification for equipment, method of test,
method of measurement of building works ,code of practice for construction , safety code for
demolition of building, safety code for scaffolds etc. published by the Bureau of Indian Standards
The contractor shall invariably carry out Materials & work Tests as specified in the Schedule “D”
attached with tender documents and IS code. However, if the additional tests are required as per
the opinion of the Engineer-in-charge, the same shall also have to be carried out. All such tests
shall be got carried out in Government or as approved laboratories and cost thereof shall be
entirely borne by the contractor. No collection of materials shall be made before it is got approved
Signature of Bidder Executive Engineer, GIDC, Surat
from the Engineer-in-charge.
All moulds, equipments etc. required of preparing specimens for the test shall be kept in sufficient
numbers and in good state, as directed by the Engineer-in-charge on the site of work.
Specimen for tests shall sent to the laboratory along with representative of GIDC in time and the
results thereof shall be promptly obtained and reported to the Engineer-in-charge.
Satisfactory test results shall not observed the contractor from dismantling and re-doing any work
revealed to the defective at a later date. The contractor shall have no claim for any payment or
compensation whatsoever on account of replacement of such defective work. Contractor shall take
all precautions and care during dismantling and re-doing the work to ensure that any other work
so far executed does not get damage or affected.
The work shall be carried out in true line and level and in conformity with the detailed drawing
and specified patterns.
All the work shall be carried out in a workmanship like manner and as per the best techniques for
the particular item.
All tools, tempts equipments etc. for correct execution of the work as well as for checking lines,
levels, alignments of the works, during execution shall be kept in sufficient numbers on the side of
All installations pertaining to water supply and its fixtures as well as drainage lines and sanitary
fitting shall be deemed to be completed only after giving satisfactory tests by the contractor.
Scaffolding being provided by the contractor at his own cost for such of the items for the execution
of which it is essential.
In all sorts of soil, sand, gravel, soft murrum and other similar soft or loose material. The
excavation will generally refer to the open excavation for foundation.
Clearing the site:
The site on which the structure is to be built shall be cleared and all obstructions, loose stones,
material, and rubbish of all kind, bush, wood, and trees shall be removed as directed. The materials
so obtained shall be the property of the GIDC and shall be conveyed the stacked as directed by the
Engineer-in-charge.
After clearing the site the centre lines will be given by the Engineer. The contractor shall assume
full responsibility for alignment, elevation, and dimension of each and all parts of the work.
Contractors shall supply labour materials, etc. required for setting out the reference marks and
bench marks and shall maintain them as long as required.
It shall be all sorts of soil, sand, gravel, soft murrum, or other similar soft or loose materials.
Signature of Bidder Executive Engineer, GIDC, Surat
The excavating for foundation and for basement shall be carried out in true line and level and shall
have the width and depth as shown in the drawing or as directed by the Engineer-in-charge. The
contractor shall do the necessary shorting and shutting or slopes to a safe angel, if necessary
including bailing and pumping out water when separate provision does not exist for it in tender,
at his own cost. The bottom of the excavated area shall be leveled both longitudinally and
transversely as directed by the Engineer-in-charge. No earth filling will be allowed to bring it to
level if by mistake or any other reasons excavation is made deeper or wider than shown on the
plan or directed by the Engineer-in- charge. The extra depth or width shall be made up with
concrete or masonry of the foundation grade as directed by the Engineer-in- charge and at the cost
of the contractor.
Disposal of the excavated stuff:
The excavated stuff of the selected type shall be used in filling the trenches in layers including
ramming and watering etc.
The balance of the excavated quantity shall be removed by the contractor from site of work to a
place as directed by the Engineer-in-charge with all lead and lift but within the same estate.
C1/1 Excavation in Hard murrum:
Same as C-1/1 except that the excavation shall be in hard murrum.
C1/2 Excavation in Hard murrum and boulders.
Same as C-1/1 except that the excavation shall be in hard murrum and boulders.
C1/3 Excavation in soft rock:
Same as C-1/1 except that the excavation shall be in soft rock.
C1/4 Excavation in Hard rock.
Same as C-1/1 except that the excavation shall be in hard rock.
C-2 Plain Cement Concrete Laying in Foundation / for Floor Bedding :
Before starting concrete, the bed of the foundation trenches shall be cleared of all loose materials
and watered as directed.
Proportioning of Mix:
The proportion of the cement to sand and coarse aggregates shall be as specified in the item and
shall be measured by volume.
The concrete shall be mixed in a mechanical mixer at the site of work. Hand mixing may however
be allowed for smaller quantities of work if approved by the Engineer-in-charge. The mixing shall
be done for a period of 11/2 to 2 minutes. The quantity of water shall be just sufficient to produce
a dense concrete of required workability for the purpose.
All scaffolding, hoisting arrangement and ladders etc. required for the facility of concrete shall be
provided by the contractor and removed on completion of work. The scaffolding, hoisting
arrangement and ladders shall allow easy approach to the work and afford easy inspection.
The form work shall be provided if necessary as directed by the Engineer-in-charge and shall be
as per I.S. 461-1972 or revised from time to time.
Transporting & placing the concrete:
The concrete shall be handled from the place of mixing to the final position by not more than
minutes by the method as directed by the Engineer-in-charge and shall be placed into its final
position, compacted and finished within 30 minutes of mixing with water i.e. before the setting
Signature of Bidder Executive Engineer, GIDC, Surat
The concrete shall be laid in layers of 15 cms to 20 cms.
The concrete shall be thoroughly compacted by hammers immediately after depositing to get a
dense concrete. Concrete shall not be disturbed once it has set.
After the final set, the concrete shall be kept continuously wet, if required by pounding for a period
of not less than 7 days from the date of placement.
C-3 Lime Cinder Concrete Laying:
This shall be as per C-2 of code of practice. The coarse aggregate in this case shall cylinder.
C-4 Ordinary Cement Concrete Plain or Reinforce:
I.S. 466-1978 or as revised from time to time shall be followed in general cement sand by black
trap grit and coarse aggregate shall be measured by volume. For proportioning of cement by
volume one bag of cement shall be taken as 0.0342 cu.m. (1.2 cft)
Concrete shall be mixed in a mechanical mixer. Mixing shall be continued until there is a uniform
distribution of the materials and the mass is uniform in colour and consistency but in no case shall
mixing be done for less and 1.1/2 minutes. When hand mixing is permitted by the Engineer-in-
charge in case of small work or in case of break down of machineries and in the interest of the
work it shall be carried out on a water tight platform and care shall be taken to ensure that mixing
is continued until the mass is uniform in colour and consistency. However, in such cases 10% more
cement than otherwise required have to be used without any extra cost.
Concrete shall be handled from the place of mixing of the final position as quickly as practicable
by methods which will prevent segregation or loss of ingredients. In no case operation shall be
taken more than 15 minutes.
The concrete shall be placed into its final position and completed and finished within 30 minutes
of mixing the water and before setting commence. Method of placing shall be such as to avoid
segregation, approved by the Engineer-in-charge. Concreting shall be carried out continuously up
to construction joints, the position and arrangement of which, shall be pre-determined by the
When the work has to be resumed on a surface which has hardened, such surface shall be
roughened. It shall then be swept clean thoroughly wetted and covered with a thin layer or mortar
composed of cement and sand in the same proportion as the cement and sand in the concrete mix.
This layer of mortar shall be freshly mixed and placed immediately before the placing of the
When the concrete has not fully hardened, all laitance shall be removed by scrapping the wet
surface with wire or bristles care being taken to avoid dislodgement of particles or aggregates. The
surface shall be thoroughly wetted and all free water removed. The surface shall be coated with
neat cement grout. The first layer of concrete to be placed on this surface shall not exceed 150mm
in thickness and shall be well rammed against old work. Particular attention is paid no corners
Concrete shall be thoroughly compacted during the operation of placing and thoroughly worked
around the reinforcement, around embedded fixtures and into corners of the form work.
Compacting shall be done by mechanical vibrations, in such a way that a dense mix is obtained.
Signature of Bidder Executive Engineer, GIDC, Surat
The concrete shall be kept covered with a layer of sacking canvas or similar materials or by
pounding and kept constantly wet for twenty one days from the date of placing concrete. Curing
by pounding shall preferably be done by erecting suitable dykes of lean mortar.
The form work shall conform to the shape, lines and dimensions as on the plans and be so
constructed as to remain sufficiently rigid during the placing and compacting of the concrete, and
shall be sufficiently water tight to prevent loss of liquid from concrete. Adequate arrangements
shall be made by the contractor to safeguard against any settlement of the form work during the
course of concreting and after concreting. The design of the form work and centering shall be got
approved form Engineer-in-charge before erection.
Cleaning & Treatment of Forms:
All rubbish, particularly chipping shavings and saw dust shall be removed from the interior of the
forms before the concrete is placed and the form work in contact with concrete shall be cleaned
and thoroughly wetted or treatment with an approved composition. Care shall be taken that such
approved composition is kept out of contract with reinforcement.
Stripping Time:
In normal circumstances and where ordinary cement is used, forms may be struck after expiry of
following period
(a) Walls columns & vertical side of beams 24 to 48 hours as may be decided
by the Engineer-in-charge.
(b) Side of slabs 3 days
(c) Beam 7 days
(d) Removal of props to slabs.
(i) Slabs spanning up to 7 days.
(ii) Spanning over 14 days.
(e) Removal of props to beams & arches.
Spanning over 14 days
Procedure when removing the Form work:
All form shall be removed without such shock or vibrations as would damage the reinforced
concrete surface. Before the soffits and struts are removed and concrete surface shall be exposed
where necessary in order to ascertain that the concrete has sufficiently hardened. The form work
will be paid under the respective item if provided in the tender.
The centering to be provided shall be got approved form the Engineer-in-charge. It shall be
sufficiently strong to ensure absolute safety of the form work and concrete work before, during,
and after pouring concrete. Watch should be kept to see that behavior of centering and formwork
is satisfactory during concreting. Erection should also be such that it would allow removal of forms
in proper sequence without damaging either the concrete or the forms to be removed.
The props of centering shall be provided on firm foundation of base of sufficient strength to carry
the loads without settlement.
The centering and form work will be inspected and approved by the Engineer-in-charge before
concreting. But this will not relive the contractor or his responsibility for strength, adequacy, and
safety of form work and if there is a failure of form work or centering, contractor shall be
responsible for the damages to work, injury to life and damage to the property.
Signature of Bidder Executive Engineer, GIDC, Surat
All scaffolding, hoisting arrangements etc. required for the facility of concreting shall be provided
and removed on completion of work by the contractor at his own expenses. The scaffolding,
hoisting arrangement and ladders etc. shall be strong enough to withstand all live, dead and impact
loads expected to act and shall be subject to the approval of the Engineer-in-charge. However,
contractor shall be solely responsible for the safety of the scaffolding, hoisting arrangement,
ladders, work, and workmanship etc.
The scaffolding, hoisting arrangement and ladders shall allow easy approach to the work spot and
afford easy inspection.
Work sample of concrete 150mmx150mm x 150mm shall be taken as under:
Qty. of work in M3 No. of sample
51 & above 4+1 for each additional quantity of or part thereof.
The contractor shall make his own arrangement for taking sample and testing of the sample in the
Government or the approved laboratories. The test shall be carried out in accordance with IS 516-
1959 or as revised from time to time. A register of cubes shall be maintained the site of work in
the prescribed Performa. The result of the cubes shall be submitted to the Engineer-in-charge by
the contractor.
(1) At least one sample shall be taken from each shift
(2) Each sample consists of three test specimens for testing at 28 days.
Additional cubes may be required for various purposes. Such as to determine the strength of
concrete at 7 days or at the time of striking the form work or to determine the duration of curing
or to check the testing error.
Finishing unless otherwise specified in the item to keep the exposed concrete surface, the
concrete surface shall be finished with cement mortar 1:4 (1- cement: 4-sand) in true line level in
accordance with M-9 of specification of materials.
C-4 Controlled concrete :
The concrete shall be designed as M-150, M-200, M- -300 & M-400 as prescribed in I.S. 456-1978
or as revised from time to time.
Samples of the aggregates proposed to be used shall be got approved from the Engineer-in-charge
prior to collection of the materials at the site of work field test for determining the content of silt,
loam, clay etc. In fine aggregate and grading and moisture content in both fine and coarse
aggregate shall be carried out before commencing the concreting work and record of the test shall
be maintained till the completion of the work.
The grading of aggregate shall be controlled by obtaining the fine and coarse aggregate in different
size being stocked in separate stock piles. The grading of coarse and fine aggregate shall be
checked as frequently as possible. The frequency shall be as directed by the Engineer-in-charge, to
ensure that the uniform grading as per approved samples used in the preliminary tests is
As soon as possible, after receiving the order to commence the work the contractor shall design
the mix for different grades of concrete required in the work submit details in respect of
proportion of cement and aggregates water cement ration etc. and arrangement to make trial
mixes for preliminary tests to be carried out in the Government or any other approved laboratory
Signature of Bidder Executive Engineer, GIDC, Surat
to satisfy the Engineer-in-charge that the designed mix meets with the prescribed strength. The
maximum total quantity to aggregates by weight per . of cement shall not exceed . except where
otherwise specifically permitted by the Engineer-in-charge.
The minimum number of specimens for preliminary test and criteria for acceptance of test
strength shall conform to Table –V Acceptance criteria for concrete of I.S. 456-1978.
On the satisfactory results of the above tests, the mix actually to be used shall be got approved
from Engineer-in-charge. The approval of the Engineer-in-charge will not relieve the contractor of
his responsibility for obtaining the required minimum strength in the work test. Record of all tests
in support of mix design shall be maintained as a part of record of the contract.
Strength requirement of concrete.
The compressive strength requirements for various grades of concrete shall not be lower than the
figures given below:
Compressive strength of 15 cms cubes conducted in accordance with I.S.
Grade of concrete 516-1959.
After 28 days after At 7 days after mixing At 28 days after
mixing in preliminary in work test mixing in work test
test (Kg/cm2) (Kg/cm2)
Batching & Mixing:
Concrete materials shall be batched by weight, where combined batching and mixing plants are
not available, weight batches of adequate capacity shall be used for weighting or aggregates and
cement. In the later case the contractor shall have additional weight batches as stand by. The
contractor shall use power driven mechanical concrete mixers of adequate capacity in conjunction
with weight batches.
Dry weights per unit volume of fine and coarse aggregate shall be determined by experiments.
Water shall be either measured by volume in calibrated tanks or weighted.
Whereas cement will be issued in bags and twenty bags will treated to weight one tone. Cement
shall be actually weighed during batching and any difference in standard weight and actual weight
of cement shall be contractor’s account and no extra payment shall be made for such a difference.
Water Cement Ration:
It is most important to maintain the water cement ratio at its correct value. To this enc,
determination of moisture content in both fine and coarse aggregate shall be made as frequently
as possible the frequency for a given job being determined by the Engineer-in-charge according to
weather and site conditions. The amount of the added water shall be adjusted to compensate for
any observed variations in the moisture contents. Determination of moisture content in aggregate
shall done as per I.S. 2386 (Part-III) Methods of test for aggregate for concrete Part-III (Specific
gravity, density, absorption, and bilking). To allow for the variation in weight of aggregate due to
variation in the moisture content, suitable adjustments in the weight of aggregates shall be done.
No substitution in materials used on the work or alteration in the established proportions except
as permitted in the previous paragraph is made without additional test to show that quality and
strength are satisfactory. Work ability of the concrete shall be checked at frequent intervals by the
Signature of Bidder Executive Engineer, GIDC, Surat
Compression Test: (Work Test)
Samples (consisting of cubes 150mm x 150mm x 150mm) shall be taken as under:
Qty. of work in m3 Nos. of samples
51 & above 4+1 for each additional quantity of of part
The test shall be carried out in accordance with I.S. 516- register of cubes shall be maintained at
the site of work. The cost of casting of cubes, concrete used for cubes and all other incidental
charges such as curing, and cost of testing, carriage to the testing laboratory etc. shall be borne by
the Corporation. The testing shall be got carried by the contractor in Government or any other
approved laboratory at his own cost.
Note: (1) At test one sample shall be taken from each shift.
(2) Each sample consists of three test specimens for testing at 28 days. Additional
cubes may be required for various purpose such as to determine strength of
concrete at 7 days or at the time of stacking the form work or to determine the
duration of curing or to check the testing error.
When defective or rejected work cannot be replaced because of operation or other reasons
(decision of the Engineer-in-charge) in this respect shall be final and binding on) payment shall be
made for such rejected work but cost of dismantling and removal shall be recovered from the
contractor when such defective work is subsequently replaced by the Corporation or not. The
decision of Engineer-in-charge shall be final as regards the cost of dismantling and removal.
Consumption of cement:
Co-efficient for cement consumption shall be determined by the Engineer-in- charge for various
mixes based on the accepted proportion for these mixes. The theoretical quantity of cement to be
used for the works shall be calculated on the basis of these co-efficient.
As regards form work, curing, stripping time, centering etc. not covered here shall be as per C-4
ordinary cement concrete for R.C.C.
C-5 Form work for “off the form exposed concrete surfaces having board marked pattern and time
Concrete surface, which are to be “form finish shall be cast in an approved form work and shall be
free from honey combined, fine, projections, and air holes. All external angles to form finish
concrete surfaces shall be chaffed if and as directed. All interesting flush surfaces, surfaces
horizontally or vertically between columns and beams of other structural members shall be
separated by grooves if and as directed by the Engineer-in-charge.
The pattern of the form boards, the disposition of construction joints and lifts, and the
incorporation of recessed or raised joints shall be carefully studied by the contractor for its proper
implementation.
The contractor shall submit shuttering drawings and details of pattern and the method of forming
joints in the exposed (form finish) concrete to the Engineer-in-charge. For his approval and all
changes and modification specified by the letter shall be appropriated by the former and final
approval whereof obtained from the Engineer-in-charge.
No work of form finished exposed concrete shall be carried out until the contractor has produced
acceptable sample of shuttering and concrete to the approval of the Engineer-in-charge.
Signature of Bidder Executive Engineer, GIDC, Surat
Utmost care shall be then be constantly exercised by the contractor in the:
a. Design workmanships and fixing of form work.
b. Control of concrete ingredients, mixing and placing.
c. Adequate technical supervision of all process involved.
Listed below are some form work specifications, for form finished exposed concrete to be used on
site as directed by the Engineer-in-charge.
i.Smooth Board Surfaces :
The smooth board marked surfaces are produced by new dressed tongued and
grooved boards of uniform thickness of not less than . These boards should be brought and
dressed on both faces as well as on all side.
ii. Rough Board Surfaces :
A rough texture is obtained by the use of new sawn boards with dressed square edges.
Steel Mould Surface:
Steel moulds must be rigid enough are perfectly plane and clean. They must be painted with a
protective point and absolutely free from rust or have a special section at their edges to prevent
cement leakage and produce a water tight joint.
This type of form work is to be entrusted to a skilled and specialized manufacture who has produce
satisfactorily similar form work and who must be approved by the Engineer-in-charge.
In all type of form work to form finished exposed concrete. Only non-staining mould oil supplied
by an approved manufacturer will be used.
The repetitive usages of the same form work to cast form finished exposed concrete shall be as
decided by the Engineer-in-charge and no case form work not guaranteed to produce the required
form finish to the satisfaction of the Engineer-in-charge shall be used.
The exposed concrete shall have uniform finish. The finish of the concrete when shuttering and
form work is removed will generally be without blemish and will be such as will not require touch
up. Slight touch up a small work or two if necessary shall be carried out immediately on removal
of form work by 1.1 proportions. This shall be carried out expertly on removal of form work with
entire surface.
C-6 Fabricating placing reinforcement in position:
The reinforcement bars shall be out to be required length including necessary bends hooks,
overlaps, etc. as shown on the plan or as directed by the Engineer-in-charge and shall conform to
I.S. 2502-1963 or as revised from time to time. Details of length and bending diagrams shall be got
approved from the Engineer-in-charge.
Placing and Binding:
All reinforcement shall be accurately placed in position with spacing as shown in the drawing and
firmly held so during placing and setting of concrete. The bars shall be tied diagonally both ways,
at all inter-sections with M.S. binding wire of 1.22mm or 1.63mm dia (16 or 18 gauge). Spot
welding instead of tying brass by wires will be permitted by the Engineer-in-charge, if required.
Spacing of bars shall be maintained by means of stays, blocks, tiles, spacers, hangers or other
approved supports or devices at sufficiently close intervals.
All bars protruding from concrete to which other bars are to be spliced and which are likely to be
exposed for indefinite period shall be protected from rusting by thin coat of cement wash.
Welding (instead of overlaps) by gas or electricity will be permitted under suitable conditions and
with suitable safe-guards. In case such permission is granted, relevant Indian Standards for
welding of steel reinforcement bars including carrying out necessary tests shall be followed.
Signature of Bidder Executive Engineer, GIDC, Surat
No concrete shall be deposited unless the Engineer-in-charge has inspected the reinforcement
work, recorded measurements, and given permission to place the concrete. After the approval of
the reinforcement by the Engineer-in-charge, it will be the contractor’s responsibility to see that
reinforcement is not disturbed from its position till the concreting is completed.
C-7 Fixing Expansion Joints :
The expansion joints shall be provided in R.C.C. structural members:
1. For the joints between twin internal beams of RCC frame structure, copper strip of 1.5mm
thickness and width and shape as shown in the detailed drawing shall be placed near the
bottom in the first beam such that one Kg. of the specified width is embedded in the beam and
“U” fold of 80mm depth unless otherwise specified) will come in the joint.
The “U” shape gap of the copper strip shall be filled with poured bituminous joint filler and
nearly finished on top. Before casting of the jointing member pre-moulded bitumen joint filler
or required thickness shall be placed in position as directed and concrete then cast, embedding
2. The joint between the twin terrace beam shall be prepared in a manner similar to (1) above
except that the raised concrete edge shall be provided and the copper plate shall be fixed in
the raised edge as directed. It shall be covered by lead flushing 1.5mm thick fixed to one seat
with copper screws to the wood blocks embedded in the concrete as shown in the detailed
3. For the joints between twin internal or external columns, white casting the first column, one
leg of each of the copper strips of 1.5mm thickness shall be embedded into the column and “U”
fold will come in the joints nearer the exterior faces of the column. The copper strips shall be
fixed with hold fast of copper rod as shown in the detailed drawing. Before casting the second
column pre-moulded bituminous joint filler shall be placed against the face of the first column
all along between the two steps as directed by the Engineer-in-charge.
C-8 Laying in Situ Cement Concrete Flooring (I.P.S.) :
The flooring shall be provided with ordinary cement concrete 1:2:4 (1- cement: 2- coarse sand &
4- graded stone aggregate nominal size). The work of plain cement concrete 1: 2: 4 shall be carried
out as per C-2 above. The thickness flooring shall be specified in the item of work.
The surface of the sub-grade shall be cleaned and all loose materials and moistened immediately
before laying flooring.
The concrete shall be laid immediately after mixing white being placed, the concrete shall be
vigorously sliced and spaced with suitable tools to prevent formation of voids or honey comp
pockets. The concrete shall be brought to the specified levels by means of heavy straight edge
resting on the side forms and drawn ahead with a sawing motion in combination with a series of
lifts and drops alternating with small lateral shifts immediately after laying concrete the surface
shall be checked for high or low sports and any needed corrections made up by adding or removing
the concrete. After striking off the surface it shall be compacted with wooden float. The blows shall
be fairly heavy in the beginning but as consolidation takes place light rapid strokes shall be given
to complete the ramming. The floating shall be followed by steel traveling after concrete has
hardened sufficiently to prevent excess of fine material from working to the surface. The finish
shall be brought to a smooth and even surface free from defects and blemishes and tested with a
straight edges. Dry cement or mixture of dry cement and sand shall not be sprinkled directly on
the surface to absorb moisture or to stiffen the mix. After the concrete has dried, sufficiently to
allow rendering to a thin floating coat of neat cement slurry uniformly floated.
If so specified in the item of a work approved mineral colour, pigment shall be added to cement
mortar to give mortar rendering is sufficiently stiff lines may be marked on it so specified or
Signature of Bidder Executive Engineer, GIDC, Surat
directed. With strings or any other devices to give the appearance of x 250mm tiles of any other
size diagonally or square as directed. The junctions of floor with the walls shall be rounded off, if
Curing shall start on the next day after finishing and shall be continued for fourteen days.
C-9 Cement pointing :
The joints shall be brushed clean of dust and loose particles with a stiff brush. The area shall be
washed and the joints thoroughly wetted before pointing is commenced. The racking out of joint
shall be 20mm deep. The surface shall be applied with two coats of Geru wash.
The racked out joints shall be filled with cement mortar as specified in the item. The mortar shall
be of required consistency & well pressed and rubbed smooth. The pointing shall be flush or as
directed by the Engineer-in-charge.
C-10 Application of cement plaster finish :
Preparatory work:
The smooth surface of concrete / masonry shall be suitable roughened to provide
necessary bond. All dirt, swat, oil, or any others material that might interfere with satisfactory be
shall be removed. The surface shall be cleaned and scrubbed with fresh water and kept wet for
hours prior to plastering. It shall be kept damp during the progress of the work.
Patches of plaster 150mm x 150mm shall be put on above 3 mtr. Apart as gauges to ensure
even plastering in one plane.
Plastering: (a) BASE COAT:
In all plaster work, the mortar shall be firmly applied with some what more than required
thickness and well pressed into the joints and the surface rubbed and leveled with a flat wooden
rule to give required thickness. Long straight edges shall be freely used to ensure a perfectly plane
and even surface. All corners shall be finished their true angles or founded as directed by the
Engineer-in-charge. The surface shall be finished to plane or curved surface as shown on the plan
or as directed by the Engineer-in-charge and shall present a neat appearance. The mortar shall
adhere to the concrete surface firmly when set and there shall be no hollow when struck. Cement
plastering shall be done in squares or strips as directed. Plastering shall be done from top down
wards. All exposed angles and junctions with door frame etc. shall be carefully finished.
(b) FINISHING COAT:
Finishing coat shall be provided to the plaster as specified. A coat of cement slurry shall be applied
to the plaster surface with a trowel to provide uniform texture while the base coat is still plastic.
In any continuous faced of a wall, finishing treatment should be carried out continuously and day
to day breaks made to coincide with architectural breaks in order to avoid unsightly injunction.
All tools and accessories used in plaster work shall be cleaned by scraping and washing at the end
of each day's works after use. Metal tools shall be cleaned after operation.
(c) Watering & Curing:
All plaster work shall be kept damp continuously for a period of fourteen days.
C-11 Application of Water proof cement plaster :
The cement plaster of specified thickness shall be provided in cement mortar with integral cement
water proofing compound of approved quality.
The plastering work of specified thickness shall be done as per C-11 of Code of practice. Except
that while preparing the cement mortar, the approved water proofing compound at the rate /
bag as per manufacturers specifications of cement shall be added while mixing the mortar. The
contractor shall bring the water proof materials to site of work in their original packing the water
proofing material shall be mixed in dry cement and sufficient care shall be taken while mixing to
Signature of Bidder Executive Engineer, GIDC, Surat
see that the water proofing materials gets integrally mixed with the cement and does not run out
separately when water is added.
C-12 Application of sand faced plaster:
The base coat plaster shall be of cement mortar of specified properties and thickness. The base
coat shall be laid in a similar manner of laying plaster as per C-11 of code of practice. However,
instead of finishing the top surface smooth keys shall be formed on the surface by thoroughly
combing it with way horizontal lines about 12mm apart and about deep when the mortar is still
plastics. The base coat shall be cured for minimum 2 days.
Second coat shall be cement mortar with specified kind of cement and specified preparation of
thickness. The coat shall be applied evenly in true lines and level by using approved quality of
coarse and the surface shall be finished with a wooden float. The necessary rubber sponge as
approved by the Engineer-in-charge shall be applied over this coat to obtain the surface textures
as per previously approved sample.
When the finishing coat has hardened, the surface shall be kept watered continuously for 14 days.
C-13 Application of coloured cement plaster:
The plaster shall be applied in two coats namely base coat and finishing coat. The base coat of
thickness specified in the item shall be applied as per that under C-11 of Code of Practice. The
finishing coat shall be thickness as specified in the item and shall be carried out as per that under
C-11 of Code of Practice except that cement of colour and shade as approved by the Engineer-in-
charge shall be used.
C-14 Filling of plinth with selected sand:
The code provides, for filling in plinth with sand of approved quality, laying in layers of uniform
thickness, watering ramming etc. The ground over which the filling is to be done shall be cleared
of all grass, loose stones, rubbish of all kind, as well as trees, roots of trees etc. The approved
quality of sand shall be cleared of all rubbish and shall be conveyed to site of work of filling the
sand shall be laid in layers, of about 200mm as directed by the Engineer-in-charge. Each layers
shall be watered and compacted with heavy rammer before of the upper layers is laid, till the final
level is reached, so as to form a thoroughly compacted base.
The process of filling in plinth, watering and compaction shall be carried out in such a way as not
to endanger the foundation columns, plinth walls etc. already built up.
Signature of Bidder Executive Engineer, GIDC, Surat
CIVIL WORK (BUILDING)
DETAILED SPECIFICATION OF THE ITEMS OF WORK TO BE CARRIED OUT.
Providing & fitting toughed 12 mm clear float glass of modi or equivalent makes as per approved
design shall br provide for any height with wooden moulding on both sides finished with malamine
polish by using glass brackets including laying silicone sealent at all sides as required and directed
by engineer in charge.
12mm thick toughened glass partition shall be used as per approved make and sample by owner/
interior designer/ PMC.
Aluminium section shall be used as per approved make list and confirming to relevant IS codes
and approved by owner / interior designer / PMC.
All type of material shall be used as per approved make list and confirming to relevant IS codes
and approved by owner/ interior designer / PMC.
2. Workmanship:
Work complete as per above specification.
Use aluminium c channel at top and bottom as per detailed drawing.
EPDM quality rubber for aluminium section / filling transparent neutral cure glazed & metal
silicon sealant of approved make on the periphery of the glass & wood etc each glass panel secured
to the ply box at top and C- Channel at floor.
All the partition should be fitted to ensure accurate positioning & level of the ceiling, flooring, and
wall system as per the site/EIC requirements.
3. Measurements:
The work done shall be measured in square meter for area of work done. The rate shall be for a
unit of one square meter.
Partition height will be measured from finish floor to false ceiling level only.
Providing & Fixing Fully glazed Door as mention & shown in drawing 12mm thick modi guard make
clean float glass shall be provide, all edges of the glass shall be machined polished, including
Godrej mortice lock, S.S. handle matt finish size 30 cm of ASIS 304 grade, heavy duty floor spring,
pivot etc. misc. hardware etc. complete.
12 mm thick toughened glass shall be used as per sample approved by owner / interior
designer / PMC.
Hardware shall be used as per approved sample.
2. Workmanship:
12mm thick customized clear toughened glass, edge polished prepared with stainless steel
patch fitting with locking arrangement / fixing Each glass panel secured to the floor by
stainless steel patch fitting.
Signature of Bidder Executive Engineer, GIDC, Surat
Item includes all necessary fitting / fixing, fixtures- as per approved hardware system with
double action floor spring, handle with lock, door stop complete as per drawing.
All doors should be properly levelled without any sagging and with smooth opening and
closing. There should be no variation or deviation of any kinds.
The whole work is to be complete as per design; including necessary support of plywood in
ceiling etc. To be provided without any extra cost. Sample material & any other requirement
shall be as per instruction of owner/ interior designer / PMC.
Sample mock shall be approved from owner/ interior designer / PMC.
3. Measurements:
Clear opening area shall be measured & paid in square meter.
Providing & fixing 35mm thick Flush Door shutter with frame of Indian teak wood size 12 cm X
cm and Flush door shutter of first class hard wood with cross band and face veneer or plywood
face panel or laminates including bright finished M,S.piano hinges of Nickel plated Piano hinges
and S.S. handle, Stopper size 200 mm (ASIS 304 grade), Aldrop size 20 mm (ASIS 304 grade), Locks
Godrej Mortice lock cover including Providing & fixing 4mm thick wood figure veneer /Laminted
sheet with screw on shutter etc complete including applying french polish on frame.
Flush door shall conform to M-24 plywood shall conform to M-26. Anodised aluminum butt hinges
shall conform to M-29.
2.0 Workmanship
2.1 The relevant specifications of shall be followed except that the shutters be non-decorative type and
block board core with face veneer or plywood with 35 mm. thickness.
2.2 Readymade shutters shall be of correct size and shall fit into the door or other opening without
excessive scraping of edges. Adding of battens etc., to make upto the size shall be allowed.
3.0 Mode of measurement & payment
3.1 The work done shall be measured in square meter for area of work done. The rate shall
be for a unit of one square meter .
Providing & fixing plywood frame of 150mm x 38mm thick , fitting & fixing as per drawing 1.5 mm
laminate of approved colour & shade as per instructions of Engineer Incharge
12mm thick ply IS 710 shall be used for partition work as per approved make and sample by
Wood used inside frames shall conform to M-22
Laminate used as per approved make.
All type of material shall be used as per approved make list and confirming to relevant IS codes
and approved by authority.
2. Workmanship:
Work complete as per above specification.
The whole work is to be complete as per design; sample material & any other requirement
shall be as per instruction of Engineer-in-charge.
All the ply paneling should be fitted to ensure accurate positioning & level of the ceiling,
flooring, and wall system as per the site/EIC requirements.
Signature of Bidder Executive Engineer, GIDC, Surat
3. Measurements:
The work done shall be measured in square meter for area of work done. The rate shall be for a
unit of one square meter.
Item No. 5 and 54:
Providing and fixing standared extruded of alluminium section of size 63mm x 38.10mm x 1.2mm
(Jindal Section :2434, @ Wt. 0.643 Kg/mt) with colour anodized alluminium frame for ventilation
with 5 mm thick frosted glass as details etc complete for Ventilation (work for all the floors).
Providing and fixing window having extruded aluminum Colour anodized section frame main
outer size 95mm x 24mm x 1.17mm (of Jindal Section no:2459 @ wt.of 0.738 Kg/mt), horizontal
Three track member size 92mm x 31.75mm x 1.30mm (of Jindal Section no:8688,@ Wt.1.07
Kg/mt), vertical member of size 92mm x 31.75mm x 1.50mm (of Jindal Section no:8933,@ Wt.
Kg/mt) with sliding shutters of horizontal member size 40 mmx18mm x1.29mm (of Jindal Section
no:8947@ wt.of 0.456 Kg/mt), vertical member of size 40mm x 18mm x 1.29 mm (of Jindal Section
no:8949 @ wt.of 0.456Kg/mt/ with 5 mm thick transparent bronze colour tinted float glass with
powder coated aluminum fittings and fixtures and transparent silicon sealant glass fixing to frame
as per details etc of NCL make or equivalent or as approved by EIC.
These shall be obtained from approved and established manufacturers and shall be of aluminium alloy
conforming to IS: 733 and sections shall generally conform to IS: 1948. These shall be fabricated as per
the detailed drawings.
(i) The unit assemblies shall be as per drawing or as directed by the Architects.
(ii) The unit assemblies shall be anodised finished. Anodising shall be minimum 20 to 25 microns thick,
of matt non-directional and non-specular. Anodised surface shall be suitably protected during
transportation, storage and erection.
(iii)` Sub units shall be joined together by concealed screws, Jamb member shall be self mullioning type
obtaining use of separate mullions, thus increasing clear height of each unit.
(iv) Joints shall either be mitred or coped. All joints shall be neat, hair line, and sealed with epoxy to
make them water proof.
(v) Openable shutters shall have a single row continuous neoprene or PVC weather strip to prevent air
infilteration. Weather strips shall not be interrupted by any fittings.
(vi) All windows shall be glazed from inside with PVC rubber or approved "Shalimar" putty. Glazing
beads shall snap fit and shall be fitted without use of screws. No screws other than those on some
of the hardware shall be visible.
(vii) Glazing shall be approved and specially selected quality glass of thickness as specified in the Bills of
(viii) The rate shall include supplying and fixing with fittings and fixtures including approved locking
Signature of Bidder Executive Engineer, GIDC, Surat
(ix) Before handing over, the aluminium work shall be washed with mild solution of non-alkali soap and
4.4.2 The glazing units, doors, windows and ventilators shall not be built into the walls but shall be fixed
in the prepared opening with lugs in masonry or with screws and jute expansion plugs in holes
carefully drilled in RCC work. Mastic compound shall be provided all around the frame of the
glazing unit at the junction of the frame and opening to make the junction watertight.
Composite glazing units shall be supplied loose with necessary coupling transoms or mullions with
machine screws and mastic compound and shall be coupled with box mullions. The mullions shall
be embedded in mastic to make the joint watertight.
Measurements shall be in Sqmt. of net area fixed at site.
Item No. 06 & 55:-
Providing and fixing FRP FRAME size 125x 65 mm and 35 mm thick FRP shutter with wood grain
raised panel design finish shutter having extra reinforcement on sides and edges and in Gel coat
finish. The core of the shutter is to be filled up with injected fire retardant grade polyurethane
foam done in situ along with embedded wooden pieces for stiffening and also for taking hinges and
fixtures. The whole FRP frame and shutter is to be water proof, weather proof, termite proof and
resistance to mld acid/Alkali, Rates are to be inclusive of S.S. hinges with necessary screws and
alluminium fixtures and fastening. Product should have 3 years performance guarantee and
complete have ISO 9001-2000 certification.
28mm thick shutter in depressed panel design shall be having 1.5 to 2.0 mm thickness fire extinguishing
grade FRP skin, sandwich panel of 4mm plywood and embedded wooden pieces for stiffening as well
holding hinges and fixtures all molded into a one piece shutter core material shall be injected fire
extinguishing grade rigid polyurethane foam done in situ having density 32 to 36 Kg/m2 compressive
strength 1.8 to 2.0 Kg/cm2 flexural strength 3.5 to 4.5 Kg/m2 whole shutter shall be water proof
weather proof , termite proof and mild acid / alkali resistance.
28mm thick depressed panel FRP shutter shall be joint less. It shall be straight and smooth and of
standard shape finished in gel coat. All necessary fixture and fastening shall be fixed where wooden
pieces are provided.
3: WORKMANSHIP:
Shutter shall be fixed in true line level and proper manner having 2.0 to 3.0 mm play i.e., air space for
smooth and easy working. Three SS hinges shall fix properly with necessary screws.
4: FIXTURES AND FASTENING:
All other fixture like Aluminum aldrop tadi or baby – latch, stopper, handle shall be fixed with shutter in
± 1.5 tolerance will be allowed in thickness of shutter.
Signature of Bidder Executive Engineer, GIDC, Surat
6: MODE OF MEASUREMENT AND PAYMENT:
Rate of shutter includes the cost of aluminum fixtures & fastening with necessary screws for fixing in
position and payment shall be made on a unit of Smt. Basis.
Provinding and fixing Indian teak wood frame 100 x 75 mm size with 40 mm thick teak wood
shutter with TW Rails and styles with 19mm T.W panel including providing and fixing brass
fixtures and fastening with FRENCH POLISH both sides to give an even shade including Hinge’s size
7.5 cm, Aldrop Size 20 mm dia (ASIS 304 grade)., handle 15 cm, (ASIS 304 grade), stopper size
cm (ASIS 304 grade) & cleaning the surface etc. complete as per drawing and specification.
Work to be done as per design, drawing and as per instruction in charge.
Necessary testing is to be done and material to be used of standard quality duly approved by
engineer in charge.
Mode of Measurement shall be on sq.mt basis.
Steel work, welded in built up sections framed work including cutting, hoisting, fixing in position
and applying a priming coat of read lead paint. (A)In beams and joists, channels angles Tees, flats,
with connecting plates or angle cleats as in main and cross beams. Hip and jack rafters, purlins
conneted to common rafters and the like (upto 10 ton)
1.0 Workmanship:
1.1. The top of railing is 75 mm diameter SS. pipe. It shall be standard 304-L.
1.2. The railing shall be prepared as per detail drawings or as directed for fixing to RCC or B.B. masonry
of flooring or as directed.
1.3. Required tests of SS for shall be given by the agency.
1.4 Work shall be done as per design and as directed by the Engineer in charge.
2.0. Mode of Measurement and Payment:
2.1. Rate includes all materials, conveyance, labour, fabrication, fixing, oil paintings and cleaning the
surface neat and clean.
2.2. The payment shall be made on unit of Kg Basis for clean visible length for complete item.
Painting two coats (excluding priming coat) on new steel and other metal surface with enamel
paint, brushing, interior to give an even shade including cleaning the surface an even shade
including cleaning the surface of all dirt, dust and other foreign matter.
Water used for high-pressure water washing shall be clean and free from oil, acid, alkali, organic mater or
other deleterious substances. The water shall be equal to potable water in physical and chemical
characteristics.
1.2 Abrasive Media:
Signature of Bidder Executive Engineer, GIDC, Surat
Blast abrasive media shall be free of corrosion producing contaminants and oil. The type of blast abrasive
media, hardness and grit size shall be such so as to achieve a surface profile, onto which the paint system
is to be applied, which is compatible with the requirements of the paint system to be used.
Abrasive media when tested in accordance with ASTM D 4940 shall have a conductivity not exceeding
1,000 microsiemens. The abrasive media shall have a hardness of 6 or greater on the Moh’s scale. Fins,
slivers, burred or sharp edges, weld splatter and slag shall be removed by power grinding prior to surface
Testing for hardness and presence of oil shall be in accordance with SSPC-AB 1, Mineral and Slag abrasives.
The maximum moisture shall be 0.5% by weight when tested in accordance with ASTM C
1.3 Coating System:
Only coating systems contained in the original containers sealed by the Manufacturer shall be used. The
colour of the finish coat shall be as per architect’s / PMC’s selection. The Contractor shall supply a
dry colour sample for the proposed coating system, a minimum of 300 mm x 300 mm in size, to the
Engineer for verification and approval prior to commencing coating operations.
The prime coat of the coating system applied to faying surfaces at locations of bolted connections shall be
qualified by test as a Class A coating as per the AASHTO Design Specifications.
2.0. MODE OF MEASUREMENT AND PAYMENT:
2.1. Rate includes all materials, conveyance, labour, fabrication, fixing, oil paintings and cleaning the
surface neat and clean.
2.2. The payment shall be made on unit of Sq. mt. Basis for clean visible length for complete item.
Providing & Fixing 6 mm thick lexan Polycarbonate multi wall roofing sheet fixed with hilti screw
and rubber silicon sealer and alluminium strip of size 50 x 3 mm etc. complete and directed by
Enginner in charge.
It should have good physical properties in extreme weather conditions b. It should be able to withstand
temperature extremes from -40ºC to 120ºC c. It should allow 90% light transmission. d. It should have
good resistance to many chemicals (with the exception of solvents and alkalis) even for use in aggressive
environments. e. It should be 10-years light transmission warranty and a 3-years weather breakage
Characteristics:
It should have a good combination of physical, thermal and optical properties.
Physical Characteristics
Specific gravity - 1.20 Water absorption - (24hrs @ 23°C) 0.35% Water permeability (1mm thick) - 5m -
Profile as per BSI 146/48
Pitch-146mm; Depth-48mm; width trimmed-1050mm; net Net coverage-100mm Thickness -2.0mm
Thermal Properties
Softening point - Vicat - 145-150°C Deflection temperature under load - 135-140°C Thermal conductivity
- 0.21W/m°C Thermal transmittance @ 1mm - 5.7W/m2°C Coefficient of linear expansion -
0.068mm/m/°C Service temperature range (no loading) - continuous - 40 to +100°C short term -40 to
Signature of Bidder Executive Engineer, GIDC, Surat
Mechanical Properties
Tensile strength at yield - >60MPa Tensile strength at break - >70MPa Elongation at yield - 6-8%
Elongation at break - >100% Elastic modulus - >2300MPa Impact strength (Izod notched @ 23°C) -
J/m Resistance to impact 20mm diameter simulated hailstones impacting at 21m/s shall not cause
Solar Transmission Properties
ST (%) SHGC SC Clear 83 0.84 0.98 ST - Solar Transmission, SHGC - Solar Heat Gain Coefficient, SC -
Shading Coefficient.
Light Transmission
Chemical Resistance:
The Polycarbonate sheet should be excellent resistance to most chemicals, resistance to specific
compounds depends on concentration and temperature, duration of exposure and stress within the
sheet. Contact with plastic coated metal sheets, wet wood preservatives, solvents and alkali cleaners
should be avoided.
Impact Resistance:
The Polycarbonate sheet should be highly resistant to breakage due to impact. Simulated hail tests have
shown that 20mm diameter hailstones impacting the sheet at a speed of 21m/s will not cause breakage.
Cutting and drilling Cutting –
Polygal multiwall sheets can be cut easily and accurately with standard woodworking equipment. This
includes standard circular, jig, or table saw with a circular blade having 8-12 teeth per inch (fine toothed
blade). Saw dust should be blown out (or) vacuumed out of the flutes. If using compressed air, insure that
there is a moisture separator on the compressor to insure moisture is not introduced into the flutes.
Thinner gauges can be cut with a box knife. It is important that the knife is sharp. Drilling - Holes can be
drilled by a power drill using standard high speed steel twist drills or drills with an angular wedged bid.
When drilling, support should be given immediately beneath the drill to avoid vibration. Very clean holes
are easily obtained. The use of liquid cooling media is not recommended. Trimming – standard box cutting
Planning the Supporting Structure
• Install the sheets with the ribs parallel to rain flow and with a slope of at least 10º (1:12 pitch). In wall
and gable applications… always ensure that the ribs are positioned vertically. • Supporting beams must
be at least 30 mm (1.2”) wide to ensure good anchorage of sheets and fastening accessories. • In case of
arched structure, check the smallest permissible cold bending radius (R) according to the sheets
thickness. • Ensure that a qualified professional checks and approves the structure before execution.
Preparing the Supporting Structure
• Complete all the metalwork and painting before beginning sheet installation work. • Check the
dimensions on site, and plan the roofing requirements before ordering Polygal products for the project.
Preparing the Sheets
• Remove the grey protective film. • Fold back the printed sheet protection film 4” (inches) on each side.
• Attach Perforated Edge Tape to the upper and lower edges of the sheet.
Preparing the Edge Profiles
Signature of Bidder Executive Engineer, GIDC, Surat
• Use an Aluminum or Polycarbonate Edge Profiles to protect the lower edge of the sheets. For the upper
edge’s protection also a Polycarbonate Edge Profiles can be used. • Use a metal saw to cut the Aluminum
Edge Profiles into pieces matching the width of sheets to which they will be attached. • Drill drainage
channels to allow for the flow of condensed water along the profiles used for the bottom section of the
building’s roof. Drill holes 6”- 12” apart using a 5/16” drill bit. • Attach the edge profile to the sheet with
the short side on top of the sheet.
Sheets Installation
Step 1- Place the sheets with the side protected by the printed film upwards.
Step 2- Slide the base connecting profile underneath the sheet flank and use self drilling screws to
anchor them to the structure.
Step 3- Position the connecting profile cap in place. For a Polycarbonate Connection Profiles with a
shock-absorbing support under the sheet, use a rubber mallet to connect it to the base. For Aluminum
Glazing Systems, anchor the Cap Profile to the Base Profile with applicable screws (see Polygal
Accessories Catalog).
Step 4- Continue to add sheets, and profiles until reaching the end of the building. After completing
installation, remove all the protective film from the sheets as soon as possible.
Finish and Fixing Reinforcements
• Place fixing screws with fixing gaskets only in the support frame lines. • Do not over-tighten screws. For
best results always use Polygal screws and accessories, designed specifically for use with Polygal sheets.
Mode of Measurements:
The rates shall be included all materials and labor and it is measured on the basis of sqmt.
Provinding an I.S.I mark 7 levers three keys brass pad lock of NAVTAL (Goderej) make 75mm dia on
completion of project.
1.1 Agency should provide I.S.I. mark 7 lever three keys brass pad locks of Navtal (Godrej) make
2.0 Workmanship:
2.1 On completion of the project agency has to lock each units and require to paint mark on block / unit
number on lock and key.
2.2 Agency has to makes bunch of keys per unit properly tied with chain.
3.0 Mode of measurement and payment:
3.1 The rate shall be for one number of completed item.
Iteam No.11 Provinding a I.S.I mark 7 levers three keys brass pad lock of NAVTAL (Goderej)
make 75mm dia on completion of project.
Provinding a I.S.I mark 7 levers three keys brass pad lock of NAVTAL (Goderej) make 75mm dia on
completion of project.
The rate shall be for one number of completed item.
Providing and fixing single layer waterproof Gypsum board moisture resistant 12.5 mm thick of
the make Newgood Group Co. Ltd. or equivalent & Newgood Group Co. Ltd. company sections using
waterproof board of size 1220 mm x 1830 mm x 8.0 mm suspended by G.I suspender of size
mm x 3 mm with intermediate channel of size 18 mm x 40 mm x 0.80 mm at 1220 mm center to
center ceiling section of size 40 mm x 35 mm x 0.55 mm at 457 mm center to center and perimeter
channel A of size 20 mm x 27 mm x 30 mm x 0.50 mm at edges & drops including paper tap sand
soffit cleat, anchor fastener, scotch bolt connecting cleat joining compound top coat on ceiling
Signature of Bidder Executive Engineer, GIDC, Surat
including making necessary opening for light fitting, diffuser etc. complete as per detail drawing
Metal Surface (Gypsum Brand) suspended ceiling regular (Single layer) using 12mm thick gypsum board
Suspended ceiling which include G.I. periphery channels of size 0.55 mm thick heaving one flange of
20mm and other flange of 30mm and a web of 27mm along with perimeter of ceiling screw fixed to the
wall/ partition with help of nylon sleeves and screw at 610mm centre, then suspending G.I. intermediate
channels to size 40mm x 0.8mm thick with two flange of 80mm each from the slab at 1.220 centre to
soffits with G.I. cleat and steel expansion fasteners ceiling section of 0.55 mm thickness having knurled
web of 40mm and two flanges of 35mm each with lips of 10.5 mm are then fixed to the intermediate
channel at 457mm centers.
12mm thick gypsum calcium silicate tapered edge board is than screw fixing is done mechanically either
with screw driver of drilling machine with suitable attachment. The boarding is to be don keeping a gap
of 2mm from all sides of the boards and making a 3mm tapered edge on the two sides of the boards.
Jointing and finishing method: finally, the boards are to be jointed and finished so as to have a flush cock
which includes filling and finishing the square edges of the boards with lime and PVA based materials
with fiber tape.
Necessary gape for light diffuser fans and cut out shall have to be made.
Mode of Measurements and Payment
Measurement shall be taken for finished visible work and rate shall be for a unit of one sq. mt. basis. The
rate includes the cost of materials and labour etc. complete.
Providing and fixing 5 mm thick PVC sheets as signage and display of health signs/information of
required size having retro reflective letters/design as per requirement, fixing the same through
approved adhesive etc. complete work shall e carried out as per instruction of Engineer-in-charge
(Approved make PVC foamed sheet only) (25 x 6 cms.)
Material is used PVC Sheet of unbreakable and shatter proof light weight matt surface and advertising
grade sheet of rajshree or eq. make and vinyl is used of LG or max or equivalent.
Keep micro clean of PVC sheet with sprinckling water on it and then, pesting of self-adhesive vinyl sheet
over with uniform press.
Mode of Measurement:
Signature of Bidder Executive Engineer, GIDC, Surat
The rate shall be for a unit of one no. The rate includes the cost of labour, materials etc. complete.
Providing & Fixing Engraved letters, figures, logo etc. on 1 mm thick S. S. 304 grade plate (inching
plate) and fix on any surface, wall and at any height. Plates will be fix with Brass Pins and nuts in
proper line & level. (Stops, comas, hyphens and the like not to be measured and paid for
separeately (ii) Indian letters
Material is used S.S. 304 of Approved make. Front gauge is 19 and Side wall are of 20 gauge.
Cutting of 304 grade stainless steel on laser as per given details size, after that bending and shouldering
done by hand made, fitting fixing are as per given, and bolt, screw etc. as per given details. Etc. complete.
Mode of Measurement:
The rate shall be for a unit of one No. The rate includes the cost of labour, materials etc. complete.
Providing & Fixing estate maps on 5 mm PVC sheet inducding priting fixing etc. complete
Material is used PVC Sheet of unbreakable and shatter proof light weight matt surface and advertising
grade sheet of rajshree or eq. make and vinyl is used of LG or max or equivalent.
Keep micro clean of PVC sheet with sprinckling water on it and then, pesting of self adhesive vinyl sheet
over with uniform press.
Mode of Measurement:
The rate shall be for a unit of one Sqmt. The rate includes the cost of labour, materials etc. complete
Providing and fixing pre-cast concrete kerb stone of gray cement based concrete block 30cm
length, 30cm height and 15cm thick of M250 grade concrete as per approved design and including
excavation for fixing in proper line and level, filling the joint with C:M 1:3 (1cement:3fine sand) etc
complete. (Upto 10 ton)
Material shall be R.C.C. pre-cast M 250 grade concrete as per approved design mix and properties.
Signature of Bidder Executive Engineer, GIDC, Surat
Sr. No. Parameters Minimum Requirements
1. Percentage Water Absorption Not over 8%
2. Tolerance in size (Length + Breadth) ± 1.5 mm
3. Tolerance in thickness of block ± 4 mm
The face of the kerbs shall not exhibit defects such as cracking or flking when examined.
For kerbs if produced with facing layer, the facing shall have a minimum thickness of 4 mm over
that area claimed by manufacturer to be faced.
For faces described as flat and edges described as straight, the permissible deviations of flatness and
straightness is shown in the table below:
Permissible deviation in flatness and
Length of Guage
Bending characteristics of kerb shall be as per table mentioned below:
Characteristic bending strength Minimum bending strength
The kerb stone material must be compulsorily tested in accordance with EN 1340 at the
manufacturer’s laboratory before dispatch for:
1. Bending Strength
2. Water Absorption
3. Dimensional Accuracy.
Internal test reports shall be needed with every supply of kerb stone blocks.
Mode of Measurement:
Measurement shall be taken for finished visible work and rate shall be for a unit of one RMT basis. The
rate includes the cost of materials and labour etc. complete.
Signature of Bidder Executive Engineer, GIDC, Surat
Providing and fixing wash down water closet (European type, W.C. Pan) with integral P or S trap
including jointing the trap with soil pipe in Cement Mortar 1:1 (1-Cement : 1-fine sand) (Seat and
cover to be measured and paid for separately) (A) vitreous China Pattern :(i) in white colour.
European W.C. pan shall conform to M-39 of attached Specification of Materials.
25mm dia GI pipe shall conform to M-35 of attached specification of Materials.
25mm dia flush cock shall conform to M-41 of attached specification of Materials.
CI soil pipe shall conform to M-42 of attached specification of Materials.
Water shall conform to M-1 of attached specification of materials.
Cement shall conform to M-3 of attached specification of materials.
Sand shall conform to M-6 of attached specification of materials.
W.C. shall be provisioned with jet spray.
2. WORKMANSHIP :
Fixing of W.C. span with all required fittings shall be carried out as per C-44 of attached code of practice.
3. MODE OF MEASUREMENT & PAYMENT :
The measurement shall be taken on the Number basis of complete item.
The contract rate shall be for a unit of One Number.
Providing and fixing plastic seat and cover for wash down water closer with C.P. brass hinges and
rubber buffers. (B) Black plastic seal and cover.
The work is to be executed as directed by the Engineer in Charge and details specified or finalized by the
Engineer in charge
Measurement shall be on No. basis
Providing and fixing 12.5 Litres low level flushing cistern with a pair, of C.I. or Mild brackets,
complete with fittings such as lead valve less syphon, 15mm nom.nal size brass ball valve with
polythene float, C.P brass handle unions and couplings for connections, with inlet, outlet and
overflow pipes, 40mm dia. porcelain enamelled flush bend including cutting holes in walls and
making good the same connecting the flush bend with cistern and closet (overflow pipe to be
measured and paid for separately) (A) Vitreous China (I) In white colour.
Flushing arrangement:
The cistern under working conditions and with the float valve in closed position shall operate on
a single operation of the operating mechanism lever without calling for a sudden jerk in pulling. If a valve
is used instead of siphon for flushing purposes, the valve shall be completely leakproof.
Working Water Level:
The working water level shall be a minimum of 6' 5 em below the effective top edge of the cistern and shall
be legibly and permanently marked on the inside of the cistern.
Signature of Bidder Executive Engineer, GIDC, Surat
Freedom from Self Siphonage:
The siphonic system shall be capable of being rapidly brought into action when the water is at the working
water level, but shall not selfsiphon or leak into the flush pipe when the water is up to 1 em above the
invert of the overflow pipe.
Reduced Water Level:
The discharge shall operate satisfactorily when the cistern is filled to a level up to 1 em below the working
Discharge Capacity:
When tested in accordance with the procedure described in 9.1, cistern of 5 litres and 10 litres capacities,
when required to give a full flush, shall respectively discharge 5 litres and 10 litres with variation of ± 0'5
litres. Dual-flush cistern of 10 litres capacity shall discharge alternatively a short flush of 5 ± O'5 litres.
Discharge Rate:
When tested in accordance with the procedure described in 9.2. the discharge rate shall be 10 ± 0·5 litres
in 6 seconds and 5 ± 0.5 litres in 3 seconds for cistern of capacities 10 litres and 5 litres respectively. The
cistern shall be so designed that there is no appreciable variation in the force of the flush during the
discharge of the required quantity of water.' For dual-flush type cisterns. There is no specified rate of
discharge for the short flush, for coupled cisterns, this test shall not be applicable.
Installation & testing procedure shall be as per IS 7231:
Mode of measurements and payment:
The rate includes cost of all labours, materials, tools and plants, etc. required for satisfactory completion
The rate shall be for a unit of one number.
Providing and fixing urinal of approved quality including connecting the urinal with waste pipe,
trap etc. complete (A) White earthen ware flat back or corner type size 430 mm x 260 mm x
1.1 The white earthen ware flat pack or corner type urinal of size x x shall conform to M.64.
2.1 The urinals shall be fixed in position by using wooden plugs and screws and shall be at a height
cms from the floor level to the top of the lip or urinal, unless otherwise directed. The wooden plugs
shall be x at base lapping to x at top and in length shall be fixed in wall in cement mortar 1:3 (1
cement:3 coarse sand). The urinal shall be connected to diameter galvanized mild steel waste pipe,
which shall discharge in the channel or floor trap. The connection between the urinal and flush or
waste pipe shall be made by means of putty or white clad mixed with chopped hemp.
3 Mode of measurements and payment:
3.1 The rate includes cost of all labours, materials, tools and plants, etc. required for satisfactory
completion of this item.
Signature of Bidder Executive Engineer, GIDC, Surat
3.2 The rate shall be for a unit of one number.
Provinding and fixing WASH BASIN with single hole for pillar tap with C.I. Or M.S. brackets/inside
granite platform painted white including cutting holes and making good the same but including
fittings, (A) Vitereous china: (II) Flat back wash basin 550mm x 400mm size in white colour Incl.
provinding and fixing C.P. brass waste 32mm dia. angle stop cock 15mm dia, M.I. fisher union
32mm dia. and pillar cock of 15mm dia complete including PVC conncection pipe from stop cock
to plillar cock. Cromium plated bottle trap. Including PVC waste pipe of 32mm dia from wash basin
1.1 The white glazed earth ware washbasin shall be oval shape wash basin of 600 mm wide of 1st
quality and make as approved by the Engineer in charge. The washbasin shall conform to M.59.
2.1 The wash basin shall be fixed on the wall as and where directed. The wash basin shall be supported
on a pair of M.S. or C.I. brackets fixed in CM 1:3 (1 cement: 3 sand) The bracket shall conform to
I.S. 775-1962. The wall plaster on the rear shall be cut to rest the top edge of the wash basin. After
fixing the basin, plaster shall be made good and surface finished to match with the existing one.
2.2 The bracket shall be painted white with ready mixed paint.
2.3 The C.I. brass trap and union shall be connected to diameter waste pipe which shall be suitably
bent towards the wall and which shall discharge into an open drain leading to a gully trap or direct
into the gully-trap on the ground floor and shall be connected to a waste pipe through a floor trap
on the upper floors. C.P. brass trap and union may not be provided where the surface drain or a
floor trap is placed directly under the basin and the waste is discharged in to vertically.
2.4 The height of the front edge of the washbasin from the floor level shall be 80 cms.
2.5 The necessary inlet, outlet connections and fittings such as pillar cocks. C.P. dress waste trap waste
pipe stopcock, chain with rubber plug etc. shall be fixed.
2.6 The payment of fittings shall be made separately under separate item.
3 Mode of measurements and payment:
3.1 The rate includes cost of all labour, materials, tools and plant, etc, required for satisfactory
completion of this item as specified in workmanship.
3.2 The rate shall before a unit of one number.
Provinding and fixing 600mm x 450mm bevelled edge MIRROR of superior glass mounted on 6mm
thick A.C. sheet or plywood sheet fixed to wooden plugs with C.P. brass screws & washers.
Signature of Bidder Executive Engineer, GIDC, Surat
1.1 The 600 mm. x 450 mm. size mirror shall be of superior glass with edge rounded offer bevelled as
1.2 It shall be free from flaws specks, or bubbles and its thickness shall not be less than 6 mm. The glass
for the mirror shall be uniformly silver plated at the back and shall be free from silvering defects.
Silvering shall have a protective uniform covering of red lead paint. The 6 mm. thick plywood shall
conform to M-37. The 6 mm. thick A.C. Sheets shall conform to M-24.
2.0 Workmanship
2.1 The mirror of 600 mm. x 450 mm. size mounted on A.C. Sheet or hard board plywood 6 mm. thick
with aluminium frame shall be fixed as directed, on wall. The work shall be carried out in best
workman like manner.
3.0 Mode of measurements & payment
3.1 The rate includes cost of all labour and materials, tools and plant etc. required for satisfactory
completion of this item. The rate shall be for a unit of one number.
Jet Spray heavy duty with S.S. Braided hose 60 cm long with all necessary fittings and fixtures as
per detailed drawings.
The work is to be executed as directed by the Engineer in Charge and details specified OR finalized by the
Engineer in charge
Measurement shall be on No. basis
Providing and fixing toilet paper holder. (A) C.P. Brass
Toilet Paper holder shall be of type 304 S.S. alloy. Wall flange shall be 12 guage and tubing shall be
guage. Tubing shall be welded to flat flange with concealed continuous bead. All exposed surface shall have
satin finish. Flat flange shall have 3 or 4 countersunk mounting holes to accommodate flat head screws or
¼” diameter pan head or button head screws.
For compliance with approve make and manufacturer’s guidelines, the angle stop cock shall be installed
in the presence of engineer in charge such that the stop cock shall have a minimum height of 19”
(minimum) to 48” (maximum) and centerline of post is between 7” and 9” from front of commode. One
roll of toilet paper is placed over the horn type holder for use as required. Toilet paper is replenished on
a cycle determined by maintenance needs.
Mode of Measurements:
The rate includes cost of all labours, materials, tools and paint etc. required for satisfactory completion
The rate shall be for a unit of one number.
Providing and fixing Kitchen sink with M.S. brackets, painted white including cutting holes in walls
and making good the same but excluding fittings. (C) Vitreous China Sink.(i) 600mm x 450mm x
150mm size, provinding and fixing C.P. brass waste 32mm dia. angle stop cock 15mm dia, M.I.
fisher union 32mm dia. and sink cock of 15mm dia complete including PVC conncection pipe from
Signature of Bidder Executive Engineer, GIDC, Surat
stop cock to plillar cock . Cromium plated bottle trap. Including PVC waste pipe of 32mm dia from
wash basin to N.T.
Kitchen sink shall be of 16 guage thickness of S.S. having 18/10 chromium/nickel content in 4 times silver
polished surface and finished with half round edges on all sides and shall be as per the approve make list
and architect / engineer in charge. Kitchen sink shall be of undermount single bowl with all necessary
fittings and fixtures as per the description.
Mode of measurements and payment:
The rate includes cost of all labours, materials, tools and paint etc. required for satisfactory completion
The rate shall be for a unit of one number.
Providing and fixing C.P. Angle stop cock 15 mm Heavy duty with cap including PVC conncection
pipe. (B) 15mm dia. For WC, JS, RO.
1.1 The C.P. angle stop cock of specified dia. shall conform to I.S. : 781-1977. The angle stop cock shall
be of tested quality.
2.0 Workmanship
The stop cock shall be fixed as directed the treated portions shall be smeared with white or red or
lead and turned around with few turns of fine spun yard threads. The cock shall than be screwed
and fixed to the water tight position.
3.0 Mode of measurements and payment
3.1 The rate includes cost of all labours, materials, tools and paint etc. required for satisfactory
completion of this item.
3.2 The rate shall be for a unit of one number.
Providing and fixing C.P. Bib cock 15 mm Heavy duty with cap.
1 Materials and workmanship:
1.1 The relevant specifications of item 15.27 shall be followed except that the bib taps of 15 mm dia shall
2 Mode of measurements and payment:
2.1 The relevant specifications of item 15.27 shall be followed.
2.2 The rate shall be for a unit of one number.
Item No.28 to 31:
P/F Concealed Gun metal check or non return full way wheel valve with all necessary required
material for fixing incl. Tools & plants as directed by engineer etc. complete at all floor levels
(A) 15 mm (B) 25 mm (C) 32 mm (D) 50 mm diameter
Signature of Bidder Executive Engineer, GIDC, Surat
1.1 The gunmetal check or non-return full way wheel valve of specified diameter shall conform to I.S.
778 1964. The non-return valve shall be of tested quality.
2.1 The gunmetal check or non-return valve shall be fully cleared of all foreign matter before fixing.
The fixing of valve shall be done by means of bolts nuts and3 mm rubber insertions with flanges of
spigot and socketed tailpieces, drilled to the same specification as in case of socket and spigot and
with flanges in case of flanged pipes. The jointing shall be done leak proof.
3 Mode of measurements and payment:
3.1 The rate includes all labours, materials, tools and plant etc. required for satisfactory completion of
3.2 The rate shall be for a unit of one number.
Providing and fixing in position cowel went to pipes.
(A) 100 mm dia.
1.1 The work shall be carried out in general as per the relevant specification as per the relevant I.S.S.
unless otherwise specified with the following additions:
2.1 The cast iron 75 mm dia. cowel shall be approved quality and make. It shall be got approved
before fixing in position.
3.0 Mode of work:
3.1 The C.I. cowel or P.V.C. shall be fixed as per the instructions of the Engineer-in-charge and the
joints shall be filled in with C.M. 1:1 and cured properly.
Providing and fixing SW gully trap with CI grating brick masonary chamber and water tight CI cover
with frame of 300*300mm size inside with standard weight (I) Square mouth traps
©150*100mm size P or R type:
(1) Water shall conform to M.1 (2) cement mortar of proportion 1:5 shall conform to M.11, (3) burnt
brick shall conform to M.15 (4) The S.W. gulley trap of x 100mm size shall conform to M.70
Signature of Bidder Executive Engineer, GIDC, Surat
2.1 Excavation for gulley trap shall be done true to dimensions and levels as indicated on plans or as
directed. The excavation work shall generally be done as per relevant specifications of item 4.0.0 of
2.2.1 The gulley trap shall be fixed over cement concrete 1:5:10 (1 cement: 5 sand; 10 graded brick bats
aggregate 40mm nominal size) foundation 650mm square and 100mm thick. The depth of top of bed
concrete upto ground level shall be . The jointing of gulley outlet to the branch drain shall bed one similar
to jointing of S.W. pipe as described in item no.16.05.
2.3 Bricks masonry chamber:
2.3.1 After fixing and testing gulley and branch drain, brick masonry 300 x inside width bricks in CM 1:5
(1 cement: 5 sand) shall be built with a bricks work round the gully trap from the top of bed concrete upto
ground level. The space between the chamber walls and the trap shall be filled with cement concrete
1:5:10 The upper portion of the chamber i.e. above the top level of the trap shall be plastered inside with
cement mortar 1:3(1cement: 3 sand) finished with floating coat of neat cement. The corners and bottom
of the chamber shall be rounded of so as to slope towards the grating.
2.4 C.I. cover with frame x (inside) size shall then be fixed on the top; of the brick masonry with CC
1:2:4 (1 cement: 2 coarse sand; 4 graded stone aggregate nominal size) thick and rendered smooth. The
finished top of the cover shall be left about above the adjoining ground level so as to exclude the surface
water from entering the gully trap.
3 Mode of measurements and payment:
3.1 The rate includes cost of all labour, materials, tools and plant, etc required for satisfactory
completion of this item as described above.
3.2 The rate shall be for a unit of one number basis.
Providing and fixing in positon ISI marked rotational moulded polyethlene double layer
cyclindrical vertical storage tank (IS: 12701 ) water tank size including making inlet and outlt,
Over flow and washout arrangement with GI connection including using necessary M.H For
connection etc complete with closed cover including applying two coats of oil painting outside the
tank etc complete.
1.1. Polyethylene water storage tanks shall be as per IS 12701this material should be light weight, non
toxic all fitting material shall be H.D.P.E. brass.
1.2. The PVC tank shall be of ISI mark and approved quality and brand like infra or sintex or equivalent.
Construction should provide tank of different of as per actual requirement at each portion of bldg.
Signature of Bidder Executive Engineer, GIDC, Surat
1.3. The thickness of PVC materials shall be as per company’s specification. The size of tank shall be
decided by Engineer- in –charge.
2.0. Mode of Measurement and Payment:
2.1. Water tank shall be installed on perfectly plained and smooth surface.
2.2. Outlet pipe shall be . Light then bottom surface.
2.3. Dia of overflow pipe shall be bigger than inlet pipe dia
2.4. Unions shall be based in inlet & outlet pipe.
2.5. For connection in water tank required washer and checknuts shall be used.
2.6. All joints shall be of leak proof.
3.0 Mode of Measurement and Payment:
3.1. The payment shall be made as litre basis.
Rate shall be inclusive of placing, lifting, storing and making connection for inlet, outlet, overflow pipe
with all necessary plumbing work and material for complete item.
Earthwork for embankment including breaking clods, dressing with all lead and lift and including
watering rolling and consolidation of subgrade in layers at O.M.C. to required dry density including
filling the depression which occur during the process using power roller 8T to 10T. (E) From
Borrow area for all lead and lift.
1.0 62TDefinition:62T
62TFor the purposes of these Specifications, the formation of earth embankments includes Earth
62Tfilling62T for foundations, formation of access road, area where earth will be filled, and the 62T
62Traising and widening of existing embankments (including around structures and lining) filling
62T 62Twithin the cross section of existing drains and construction of embankment by filling with
62T 62Tearth in all types of ground conditions.
1.1 62TPreparation of Surfaces for Embankment Formation: 62T
62TWhere ordered by the Employer’s Representative the base of the embankment shall be
62Tstripped62T in accordance with Clause 1.16.3 hereof. Where the surface material under the
embankment is unsuitable after stripping and the 62T 62TEmployer’s Representative requires it to
be removed before filling commences, it shall be 62T 62Texcavated to the depth and extent as
directed by the Employer’s Representative, and 62T 62Tdisposed of in accordance with Clause
62TWherever possible surfaces prepared for filling shall not have slopes steeper than 2 horizontal
62Tto 1 vertical across the line of the embankment. Immediately before filling recommences, the 62T
62Tsurface to be filled shall be scarified in an approved manner to a suitable depth to achieve a 62T
62Tgood bond with the embankment material including moisture conditioning. The costs of all the
above operations are deemed to be included in the rates for filling unless 62T
62Totherwise stated.
62TPlacing and Compacting Earth Filling 62TMaterials62T for Filling the embankment shall be
constructed with approved materials obtained from designated 62Tburrow62T areas and approved
excavations. Subject to all the other requirements of these Specifications, materials for embankment
Signature of Bidder Executive Engineer, GIDC, Surat
construction and filling shall be derived from such 62Tsources62T as to minimize the overall haulage
cost to the Employer. The fill shall be homogeneous as considered by the Employer’s Representative
throughout the 62Tembankment62T or within the different zones, and free from lenses, pockets,
streaks or layers of 62Tmaterial62T differing substantially in properties from the surrounding
materials. Where material 62Tarising62T from borrows areas or excavations vary in its properties
over short distances in plan or 62Tin62T depth, it shall be thoroughly mixed before placing. Where
high plasticity layers occur not 62Tcomplying62T with these Specifications, they may be used as fill
provided that they are 62T
62Tthoroughly mixed with low plasticity materials before placing, so that the mixed material 62T
62Tmeets the specified requirements. Fill materials shall be utilized from only one source at a time
for any particular reach of filling, 62Tunless62T specifically approved by the Employer’s
Representative. If the Employer’s 62TRepresentative62T so requires, the fill already placed and
compacted on the reach shall be 62Tmeasured62T for payment purposes before fill material is
brought from a new source. Materials suitable for filling shall be free from all roots, vegetable and
other deleterious 62Tmatter62T. Cobbles and rock fragments of maximum dimension larger than
mm shall not be placed in 62Tthe62T fill. Such cobbles and rock fragments found in otherwise
approved fill material shall be 62Tremoved62T by the Contractor. Placement of Fill in Embankments
Embankment material shall be placed in continuous rows/lanes approximately parallel to one
62Tof62T the axis of the building and in approximately horizontal layers of thickness between
and 200 mm before compaction by machinery. If hand operated mechanical compactors are used, the
thickness of each layer shall be between 100 and 150 mm. When compacting material against rock
abutments and/or the faces of concrete structures, each layer shall be sloped away from the
rock/concrete face for a distance of 200 mm to 300 mm at an inclination of 6 horizontal to 1 vertical.
Providing and laying cement concrete 1:3:6 (1-Cement :3-coarse sand :6-crushed stone aggregates
40 mm nominal size) M/C stone aggregates and curing complete including cost of formwork, but
excluding the cost of reinforcement for P.C.C. work, Dewatering etc. (In Foundation & plinth).
1.1 Water shall conform to M-1. Cement shall conform to M-3. Sand shall conform to M-6. Stones
aggregate 40 mm. nominal size shall conform to M-12.
2.0 Workmanship:
2.1.1 Before starting concrete the bed of foundation trenches shall be cleared of all loose materials,
levelled, watered and rammed as directed.
2.2 PROPORTION OF MIX:
2.2.1 The proportion of cement, sand and coarse aggregate shall be one part of cement,
parts of sand and 10 parts of stone aggregates and shall be measured by volume.
2.3.1 The concrete shall be mixed in a mechanical mixer at the site of work. Hand mixing may
however be allowed for smaller quantity of work if approved by Engineer in charge.
When hand mixing is permitted by the Engineer in charge in case of break-down of
machineries and in the interest of work it shall be carried out on a water-tight platform
and care shall be taken to ensure that mixing is continued until the mass is uniform in
colour and consistency. However in such cases 10 % more cement than otherwise
required shall have to be used without any extra cost. The mechanical mixer shall be
done for a period one and half to two minutes. The quantity of water shall be just
sufficient to produce a dense concrete of required workability to the purpose.
2.4 TRANSPORTING & PLACING THE CONCRETE:
2.4.1 The concrete shall be handed from the place of mixing to the final position in not more
Signature of Bidder Executive Engineer, GIDC, Surat
than 15 minutes by the method as directed and shall be placed into its final position,
compacted and finished within 30 minutes of mixing with water i.e. before the setting
2.4.2.1 The concrete shall be laid inlayers of 15 cm. to 20 cm.
2.5 COMPACTING:
2.5.1 The concrete shall be rammed with heavy iron-rammers to get the required compaction
and to allow the interstices to be filled with motor.
2.6.1 After the final set, the concrete shall be kept continuously wet if required by ponding
for a period of not less than 7 days from the date of placement.
2.7 MODE OF MEASUREMENTS & PAYMENTS:
2.7.1 The concrete shall be measured for its length, breadth and depth, limiting dimensions
to those specified on plan or as directed.
2.7.2 The rate shall be for a unit of one cubic meter.
Providing laying and construction of avrage 200 mm thick Wet Mix Macadam (WMM) in two layers
sub base / base course with graded aggregates confirming to gradings as per the MORT&H , graded
aggregate and granular material premixed with water to a dense mass, laid by Sensor Paver
finisher on a prepared sub-grade / sub-base / base in proper grade and camber and compated with
roller and plate compactor where use of roller is not possible (widening portions) as per MORT&H
(materials to be use only crushed in mechanical crushers).
This work shall consist of lying and compacting clean, machine crushed black stone graded
aggregate and granular materials, premixed with water to a dense mass on a prepared sub-
base/base for construction of base for widening & strengthening work in accordance with the
requirement of these specifications. The material shall be laid in two layers of 250/225 mm
compacted thickness to lines grades and cross sections shown on the approved drawing or as
directed by the Engineer-in-charge.
1.0) MATERIAL :
The machine crushed black stone coarse aggregates & granular materials of approved quality shall
be obtained from outside sources / area other than the DGIDCIEA land. The contractor will have
to make their own arrangement at his own cost to obtain the M.C. black stone dust & required
materials of approved quality from existing or new sources / Quarries.
The M.C. black stone aggregate, stone dust, and required materials shall be obtained only from
sources / Quarries approved by the Executive Engineer. The M.C. black stone aggregate, stone dust
and required materials shall be of approved quality and shall have to be brought on site from all
leads and lifts. The sample of aggregate shall be got approved from Engineer-in-charge, prior to
2.2.) GENERAL REQUIREMENTS:
The M.C. black stone aggregate, stone dust and required materials shall be obtained from hard,
tough, sound, durable, stone of close texture as is locally available and reasonably free from decay
and weathering. Pieces of the stone shall be angular and roughly cubical in shape and round.
Elongated or flaky aggregates shall be rejected. No round or oblong pebbles or angular chips large
Signature of Bidder Executive Engineer, GIDC, Surat
or smaller than specified size shall be allowed. All unsound, weathered or disintegrated stone
obtained from the upper surface layer of the quarry or other layers of boulders shall be rejected.
The screening material to be used for the work shall be machined crushed black stone aggregate
of specific size. The M.C. black stone aggregate shall be hard, durable, & free from excess flat,
elongated, soft and disintegrated particles, dirt and other deleterious materials.
The binding material to be used for the work shall be stone dust having PI value less than 5. The
stone dust shall be free from logs/ stumps, roots, rubbish or any other matter likely to deteriorate
or to affect the stability of base.
Inferior quality of M.C. black stone aggregate, stone dust and required materials and excess
quantity over the actual requirement at any place shall be rejected and shall have to be removed
from site of work by the contractor at his own cost.
Approval of the samples of materials given by the Executive Engineer shall not absolve the
contractor from the responsibility of replacing defective and materials brought on site. The
contractor shall have no claim to any payment or compensation whatsoever on account of any
such materials being rejected by the Engineer-in-charge.
2.3.) PHYSICAL REQUIREMENTS:
The samples of required materials/ machine crushed black stone aggregate collected from
approved sources/quarries shall be got tested at Govt. recognized laboratory as may be directed
to the contractor at his own cost. The test results of M.C. black Stone aggregates shall conform to
the physical requirement laid down in table below.
Physical requirement of M.C. stone aggregates for wet Mix Macadam
Sr. Test Test method Requirement
(A) MACHINE CRUSHED BLACK STONE
1 *Los angles Abrasion value. IS:2386(Part-4) 40% maximum.
*Aggregates impact value IS:2386(Part-4) OR 30% maximum
2 Combined flakiness & IS:2386 (Part-1) 30% maximum**
elongation indices (total)
* Aggregate may satisfy requirements of either of the two tests.
** To determine this combined proportion, the flaky stone from a representative sample should first be
separated out. Flakiness index is weigh of flaky stone metal divided by weight of stone sample. Only
the elongated particles be separated out from the remaining (non-flaky) stone metal. Elongation index
is weight of elongated particles divided by total non-flaky particles. The value of flakiness index and
elongation index so found are added up.
If the water absorption value of the coarse aggregate is greater than2% the soundness test shall be
carried out on the material delivered to site as per IS-2386 (Part-V).
2.4.) GRADING REQUIREMENTS:
The Machine crushed black stone coarse aggregate shall conform to the grading given in table
I.S. Sieve designation Percentage by weight passing the I.S. sieve.
Signature of Bidder Executive Engineer, GIDC, Surat
600 Micron 8-22
Wherever any doubt exists as to where the above requirements are satisfied, whole or any part of
the collection of aggregate shall be got screened by the contractor at his own cost, is so ordered by
the Engineer-in-charge.
Materials finer than 425 Micron shall have plastic index (P.I.) not exceeding
6. The final gradation approved within this limits shall be well graded from coarse to fine and shall
not vary from the low limit on one sieve to the high limit on the adjacent sieve or vice versa.
3) CONSTRUCTION OPERATION:
3.1.) PREPARATION OF BASE:
The surface of the sub-base/ base to receive wet mix macadam course shall be prepared to the
specified lines and cross fall (camber) & make free from dust & other extraneous materials. Any
roots or soft yielding place shall be corrected in an approved manner and rolled until firm surface
is obtained if necessary by sprinkling water. Any sub base/ base surface irregularities where
predominant, shall be made good by providing appropriate type of profile corrective course
(levelling course) to MoRTH clause No.
3.2.) SETTING OUT:
After completion of the sub-base/base the alignment of the road shall be properly set out true to
lines curves, slopes, grades and sections as shown in the plan or as directed by the Engineer-in-
charge. The contractors shall provide all labours and materials such as lime, string, pegs, nails,
bamboos, stones, mortar, concrete etc. required for setting out, establishing temporary &
permanent bench marks, centre line stone & other marks and giving profiles, alignments and other
marks, as longer they are required for the marks and long as opinion of theEngineer-in-charge.
3.3.) PREPARATION OF MIX:
Wet mix macadam shall be prepared in an approved mixing plant of suitable capacity having
provision for controlled addition of water and forced/positive mixing arrangement like pug mill
or pan type mixer of concrete batching plant, as approved by the Engineer-in-charge.
Optimum moisture for mixing shall be determined in accordance with I.S. 2720 (Part-8) after
replacing the aggregate fraction retained on sieve with material of to size. While adding water,
due allowance should be made for evaporation losses. However, at the time of compaction, water
in the wet mix should not vary from the optimum value by more than agreed limits. The mix
material should be uniformly wet and no segregation should be permitted.
3.4.) SPREADING OF MIX:
The work of spreading the mix shall be synchronized with the work of rolling and consolidation of
The mix shall not be spread without permission of the Engineer-in-charge.
Immediately after mixing, the aggregates shall be spread uniformly and evenly upon the prepared
sub-base / base in required quantities to achieve the compacted thickness. In no case should these
Signature of Bidder Executive Engineer, GIDC, Surat
be dumped in heaps directly on the area where these are to be laid nor shall their hauling over a
party compacted stretch be permitted.
The mix shall be spread by the paver finisher with electronic sensor device for automatic leveling
& profile control having at least screed as approved by Engineer-in-charge.
The paver finisher shall be self-propelled having the features mentioned in the special condition
for bitumen surface work with use of MOST D.M.P. and P.F. attached herewith.
The surface of the aggregates shall be carefully checked with templates and all high or low spots
remedied by removing or adding aggregate as may be required. The layer may be tested by depth
blocks during construction. No segregation of larger and fine particles should be allowed. The
aggregate as spread should be uniform gradation with no pockets of fine materials.
The surface shall be checked frequently with a straight edge while spreading and rolling so as to
ensure a finished surface as per approved drawing or as desired.
3.5.) COMPACTION :
The work of rolling and consolidating the mix shall be synchronized with the work of spreading
After the mix has been laid to the required thickness, grade & cross fall / camber the same shall be
uniformly compacted, to the full depth with help of vibratory roller. If the thickness of single
compacted layer does not exceed . a smooth wheel roller of 80 to 100 KN weight shall be used. For
a compacted single layer up-to , the compaction shall be done with the help of vibratory roller of
minimum static weight of 80 to 100 KN or equivalent capacity roller. The speed of the roller shall
exceed 5 km/hr.
In portion having unidirectional cross fall / super elevation, rolling shall commence from the lower
edge and progress gradually towards the upper edge. There after roller should progress parallel
to the centre of road, uniformly overlapping each preceding track by at least away from any
preceding stop.
In portions in camber, rolling should begin at the edge with the roller running forward and
backward until the edges have been firmly compacted. The roller shall then progress gradually
towards the centre parallel to the centre line of the road uniformly overlapping each of the
preceding tracks by at least one-third width until the entire surface had been rolled.
Any displacement occurring as a result of reversing of the direction of roller or from any other
cause shall be corrected at once as specified / or removed and made good.
Along forms, kerbs, walls or other places not assessable to the roller. The mixture shall be
thoroughly compacted with the mechanical tampers or a plate compactor as approved. Skin
patching of an area without scarifying the surface to permit proper bounding of the added material
shall not be permitted.
Rolling should not be done when the sub-grade is soft or yielding or when it causes a wave like
motion in the sub-base course or sub-grade. If irregularities develop during rolling which exceed
12mm when tested with a straight edge, the surface should be loosen and premixed material
added or removed as required before rolling again so as to achieve uniform surface confirming to
the desired grade and cross fall. In case the use of unmixed material be permitted to make up the
Rolling shall be continued till the density achieve is at least 98% of the maximum dry density for
material as determined by the method outlined in IS 2720 (Part-8)
After completion the surface of any finished layer shall be well closed, free from movement under
compaction equipment or any compaction planes, ridges, cracks & loose material. All loose
segregated or otherwise defective area shall be made good to the full thickness of the layer and re-
3.6.) SETTING AND DRYING :
Signature of Bidder Executive Engineer, GIDC, Surat
After the final compaction of W.M.M. course, the road shall be allowed to dry for 24 hrs.
4) ARRANGEMENT OF TRAFFIC:
No traffic shall be allowed on the finished wet mix macadam surface till it has dried and the
wearing coarse laid.
During the period of executing the work, flow of traffic shall be maintained in accordance with
MoRTH specification clause no.112 or as directed by Engineer-in-charge.
5) SURFACE FINISH AND QUALITY CONTROL ON WORK:
The relevant provision of general specification for quality control for works and materials attached
with the technical bid with pre-qualification application and under MoRTH specification close
number 900 shall be apply.
All tests shall be got carried out in Govt. or as approved laboratories and cost thereof shall be
entirely borne by the contractor. The general specification for Quality control on works and
materials attached herewith shall be also followed.
6) FINISHING OPERATIONS & SITE CLEARANCE:
The work shall be carried out as directed by the Engineer-in-charge. Relevant MoRTH clause made
also be applicable.
7) RECTIFICATION OF SURFACE IRREGULARITY:
Where the surface irregularity of the wet mix macadam course exceed the permissible or where
the course is otherwise defective due to sub grade soil getting mixed with the aggregates, the full
thickness of the layer shall be scarified over the affected area, re-shaped with added premix
material or removed and replaced with fresh premixed materials as applicable and re compacted
in accordance with MoRTH clause No. 406.3. The area treated in aforesaid manner shall not be less
than 5 mtr. Long and 2 mtr. Wide in no case shall depressions be filled up with the unmixed and
upgraded materials or fines.
8) MODE OF MEASUREMENT AND PAYMENT:
The work of providing, laying, spreading & compacting, specified graded M.C. stone aggregate of
specific size in two compacted layer (of 250/225 mm compacted thickness) for construction of
base for widening & strengthening work to W.M.M. specification shall be measured as compacted
and finished work in position in cubic meters. The finished and compacted thickness to be paid on
volume basis shall be computed in the following manner. Levels shall be taken before and after
construction at a grid of points 10 or centre to centre longitudinally in straight but at curves.
Normally on two lane roads, the levels shall be taken at four position transversely at 0.75 and from
either edge of the carriage way or as directed by the Engineer-in-charge and on single lane roads
these shall be taken at two positions transversely being at from either edge of the carriage way or
as directed by the Engineer-in-charge. The measurements may be taken at closer intervals also if
so desired by the Engineer-in-charge.
The average thickness of the layer of coarse aggregate in any area shall be the arithmetical mean
of the difference of levels before and after construction at all the grid points falling in that area,
provided that thickness of finished work shall be limited to those shown on the drawings or
approved by the Engineer-in-charge in writing.
The contractor shall sign day to day leveling work and also original cross section, longitudinal
section in token of his acceptance etc. The working sections both longitudinal and cross of the sub-
grade shall be taken by the Engineer-in- charge before the work is started. The contractor or his
authorized representative shall attend day to day leveling work and sign with date the field book
Signature of Bidder Executive Engineer, GIDC, Surat
daily in token of this acceptance. If there is any dis-agreement the contractor shall inform of it in
writing to the officer concerned with specific reference to the sections before starting further
work. Once the work is started no cognizance of any complaint taken, merely not signing of the
level book shall not be deemed as dis-agreement. The contractor shall maintain the finished work
to proper formation and grade till this item is finally measured and accepted by department. The
measurement shall be taken on compacted work.
The contract unit rate for the work of providing, Laying, & compacting of specified graded M.C.
stone aggregates of specific size having 250/225 mm compacted thickness ( of layers ), shall be
payment in full for carrying out the required operations including full compensation for :
i) Cost of arrangement of land as a source of supply of all materials of required quality for
ii) Furnishing of all material to be incorporated in the work including all royalty, fee, rent & all lead
iii) Setting out
iv) Compacting ground surrounding embankment prepared sub-base, base except where removal &
replacement of unsuitable material or loosening and re compacting is involved.
v) Cost of watering.
vi) Spreading in layers, compacting to specifications requirement.
vii) Shaping & dressing etc.
viii) All materials, labours, tools, equipments and incidental necessary to complete the work to the
specifications.
ix) Carrying out required tests for quality control on work and & materials.
x) Making arrangement for traffic as per MoRTH clause no
The contract unit rate shall be for a unit of one cubic meter of finished compacted work in position
at site of work.
Providing and laying approved quality and make Rubber moulded coloured 60 mm thick. Paver
Block duly approved by Engineer in charge and having required strength M-350. The blocks to be
laid between kerbs to get edge restrain. Rate incl. cost of all materials, labour, transportation,
equipments and all taxes etc. incl. sand of 60 mm layer with proper watering etc. below blocks as
Providing and laying approved quality and make interlocking rubber moulded coloured paver
block for path way having size 275mmx195mm or 272mmx190mm or 250mmx250mm and
having thickness 60mm and manufactured in automatic press machine in M-350 grade concrete.
The interlocking blocks to be laid as per details after completion of curb wall work to get edge
restrain. Paver blocks to be laid in interlocking pattern over a 65mm thick sand layer and to be
vibrated by plate compactor for proper interlocking. Excess sand over the interlocking blocks after
vibrating to be removed. Rate includes cost of all materials, labour, transportation, equipments
and all taxes etc.
The size of rubber moulded coloured paver block shall be 275mmx195mm or 272mmx190mm
or 250mmx 250mm of shape approved by the Engineer, manufactured in automatic press
Shape - Uniform unit shape
Tolerance in size ± in length and width all sides
Colour: Colour to be of approved shade with minimum colour layer on top to be 12mm to
15mm. The top surface should be a smooth shining surface.
Signature of Bidder Executive Engineer, GIDC, Surat
Compressive strength - Minimum 400 kg/cm² as specified
Testing norms - 5 blocks out of 10000 Nos. of paving blocks
(B) WORKMANSHIP
Laying of inter locking rubber moulded paver blocks to be started after completion of side curbing
work to restrain 75mm thick sand layer over compacted sub-base and PCC. After laying of 75mm
thick screen sand layer in required level, gradient and slope, laying of inter locking rubber
moulded paver blocks to be started over the sand bed. The joints between the block should not
exceed 3mm. The spacing shall be consistant so that uniform pattern can be maintained. After
laying paver blocks, plate vibrator to be used for proper inter locking of the paver blocks and to
bring the top surface in required grade and level. The excess sand coming on the top from the
joints, after completion of compaction to be removed and top surface of paver block paving to be
The sand shall consist of natural sand composed of fine granular materials resulting from
disintegration of rock and which has been deposited by rivers or produced by crushing gravel or
The sand shall not contain any harmful impurities, such as iron, pyrites, alkalies, salts, laminated
or any other injurious materials, which would adversely affect the hardening, the strength and the
durability or the appearance of mortar or concrete.
The sand also shall not contain the amount of any deleterious substances like clay, fine salt, silt,
dust etc. exceeding 4% (four) by weight, when tested in IS 386- case of excess of these substances
in sand then, the sand shall have to be properly washed prior to its use.
The sand shall not contain organic impurities in quantities to show a colour darker than the
standard, when subjected to calorimetric test as specified in I.S. 383-1963.
The sand to be used in road sub base should generally satisfy the following grading
I.S. Sieve Percentage by weight passing sieve
Sand to be used for concrete work shall or grades as specified in I.S. 383-1970 with
fineness modulus varying from 2.6 to 3.6 as per requirements.
The sand shall be stacked carefully on a clean hard surface. Sand of approved quality shall be
obtained from approved sources and be allowed to be used for work.
2.0 Sand beding in Footpath.
Sand beding in Footpath shall be carried out with local sand if directed by the Engineer -in -charge.
The sand used shall be clean, medium grained and free from impurities. The filled-in-sand shall be
kept flooded with water for 24 hours to ensure maximum consolidation. Any temporary work
required to contain sand under flooded condition shall be to the Contractor’s account. The surface
of the consolidated sand shall be dressed to required level or slope. Sand beding in Footpath shall
not be started until the Engineer -in -charge has inspected and approved.
Signature of Bidder Executive Engineer, GIDC, Surat
3.0 Mode of measurements & payment
3.1 The longitudinal length of paver block shall be measured under this item.
3.2 All the work shall be measured net in the decimal system as executed subject to the following limits
unless otherwise stated hereinafter.
(a) Dimensions shall be measured to the nearest 0.01 metre.
(b) Areas shall be worked out to the nearest 0.01 sq.metre.
3.3 The rate shall be for a unit of one sq.mt.
Excavation for foundation in Loose or soft soil, Dense or Hard Soil upto 1.5 m. depth including
sorting out and stacking of useful materials and disposing of the excavated stuff with all lead and
lift including dewatering as directed by Engineer in charge.
1.1 Any soil which generally yields to the application of pickaxes and shovels, phawaras rakes or any
such ordinary excavating implements or organic soil, gravel, silt, sand turf loam, clay, peat etc.,
fall under this category.
2.0 Clearing the site:
2.1 The site on which the structure is be build shall be cleared, and all obstructions, loose stone,
materials and rubbish of all kind, brush, wood and trees shall be removed as directed. The
materials so obtained shall be property of the Government and shall be conveyed and stacked
as directed within estate area. The roots of trees coming in the sides shall be cut and coated with
2.2 The rate of site clearance is deemed to be included in the rate of earth work for which no extra
3.0 Setting out:
After clearing the site, the centre lines will be given by the Engineer in charge. The contractor
shall assume full responsibility for alignment, elevation and dimension of each and all part of the
work. Contractor shall supply labours, materials, etc., required for setting out the reference
marks and bench marks and shall maintain them as long as required and dir ected.
4.0 Excavation:
The excavation in foundation shall be carried out in true line and level and shall have the width
and depth as shown in the drawings or as directed. If the water table of the excavation site is too
low, the contractor has to provide all necessary equipments for dewatering of the excavated
surface and to compact the soil in proper line and level after dewatering process. No extra
payment shall be made for the dewatering process for the excavated sites/surfaces. The
contractor shall do the necessary shoring and strutting of providing necessary slopes to a safe
angle at his own cost. The payment for such precautionary measures shall be paid separately if
not specified. The bottom of the excavated area shall be leveled both longitudinally and
transversely as directed by ramming and watering as required. No earth filling will be allowed
for bringing it to level, if by mistake or any other reason excavation is made deeper or wide then
that shown on the plan or directed. The extra depth or width shall be made up with concrete of
same proportion as specified for the foundation concrete at the cost of the contractor. The
excavation up to 1.5 m. depth shall be measured under this item.
5.0 Disposal of the excavated stuff:
Signature of Bidder Executive Engineer, GIDC, Surat
5.1 The excavated stuff of the selected type shall be used in filling the trenches and plinth or leveling
the ground in layers including ramming and watering etc.
5.2 The balance of the excavated quantity shall be removed by the contractor from the site of work
to a place as directed with all leads and lifts.
6.0 Mode of measurements & payment:
6.1 The measurement of excavation in trenches for foundation shall be made according to the sections
of trenches shown on the drawing or as per sections given by the Engineer in charge. No payment
shall be made for surplus excavation made in excess of above requirements or due to stopping
and sloping back as found necessary on account conditions of soil and requirements of safety.
6.2 The rate shall be for a unit of one cubic meter.
Excavation for foundation in Dense or Hard soil upto 1.50 m. to 3.00 m. depth including sorting
out and stacking of useful materials and disposing of the excavated stuff with all lead and lift
including dewatering as directed by Engineer in charge.
1.1 Any soil which generally yields to the application of pickaxes and shovels, phawaras rakes or any
such ordinary excavating implements or organic soil, gravel, silt, sand turf loam, clay, peat etc.,
fall under this category.
2.0 Clearing the site:
2.1 The site on which the structure is be build shall be cleared, and all obstructions, loose stone,
materials and rubbish of all kind, brush, wood and trees shall be removed as directed. The
materials so obtained shall be property of the Government and shall be conveyed and stacked
as directed within estate area. The roots of trees coming in the sides shall be cut and coated with
2.2 The rate of site clearance is deemed to be included in the rate of earth work for which no extra
3.0 Setting out:
After clearing the site, the centre lines will be given by the Engineer in charge. The contractor
shall assume full responsibility for alignment, elevation and dimension of each and all part of the
work. Contractor shall supply labours, materials, etc., required for setting out the reference
marks and bench marks and shall maintain them as long as required and directed.
4.0 Excavation:
The excavation in foundation shall be carried out in true line and level and shall have the width
and depth as shown in the drawings or as directed. If the water table of the excavation site is too
low, the contractor has to provide all necessary equipments for dewatering of the excavated
surface and to compact the soil in proper line and level after dewatering process. No extra
payment shall be made for the dewatering process for the excavated sites/surfaces. The
contractor shall do the necessary shoring and strutting of providing necessary slopes to a safe
angle at his own cost. The payment for such precautionary measures shall be paid separately if
not specified. The bottom of the excavated area shall be leveled both longitudinally and
transversely as directed by ramming and watering as required. No earth filling will be allowed
for bringing it to level, if by mistake or any other reason excavation is made deeper or wide then
Signature of Bidder Executive Engineer, GIDC, Surat
that shown on the plan or directed. The extra depth or width shall be made up with concrete of
same proportion as specified for the foundation concrete at the cost of the contractor. The
excavation from 1.5 m to 3.0 m depth shall be measured under this item.
5.0 Disposal of the excavated stuff:
5.1 The excavated stuff of the selected type shall be used in filling the trenches and plinth or leveling
the ground in layers including ramming and watering etc.
5.2 The balance of the excavated quantity shall be removed by the contractor from the site of work
to a place as directed with all leads and lifts.
6.0 Mode of measurements & payment:
6.1 The measurement of excavation in trenches for foundation shall be made according to the sections
of trenches shown on the drawing or as per sections given by the Engineer in charge. No payment
shall be made for surplus excavation made in excess of above requirements or due to stopping
and sloping back as found necessary on account conditions of soil and requirements of safety.
6.2 The rate shall be for a unit of one cubic meter.
Providing & laying sand lime mortar in 1:1 (1-lime putty/ equivalent dry hydrated lime: 1-fine
1.0 Materials : Lime shall be in the form of a fine dry powder produced by treating quick lime in any
suitable form with sufficient water so as to produce a completely hydrated but dry and sound product.
It shall be brought from approved manufacturers and it shall be used within 3 months of its date of
manufacture. It shall be supplied in suitable containers such as jute bags lined with polythene or high
density polythene woven bags. The hydrated lime shall bear the type of lime, brand, make of approved
manufacturer, net weight and date of manufacture. Sand: As described in cement concrete.
2.0 Workmanship : The ingredients in specified proportions shall be measured using boxes of suitable
sizes. Sand shall be measured on the basis of their dry volume. Mixing: The mixing of ingredients of
mortar shall be done in a mechanical mixer. However, project engineer can relax this condition at his
discretion, taking into account the nature, magnitude and location of the work, practicality of the use
of these machines etc. The ingredients of the mortar shall be fed into mechanical mixer Ref.:
NFL/PT/CIVIL/715 dated 05.03.2019 Page 27 of 233 mix dry before adding water. After dry mixing is
complete, just sufficient, quantity of mortar shall be added to bring it to a working consistency. The
mortar shall be mixed at least for three minutes after the addition of water. If the mortar is to be used
for padding below foundations or floor very litter water shall be added to dry mortar to make stiff
consistency and shall be laid in 100 mm thick layers thoroughly compacted. During compaction small
quantity of water shall be sprinkled according to requirements. Precautions: Lime mortar shall be used
as soon as possible after mixing or grinding. As a rule mortar shall be used on the day it is made. If
eminently hydraulic lime (ClassA) is present as an ingredient, the mortar shall be used within four
hours after mixing or grinding in mortar mill or mixture. Lime mortar made with semi-hydraulic lime
(Class-B) or fat lime (Class-C) and Pozzolana as ingredients shall be used within 36 hours of mixing of
grinding and lime sand mortar within 72 hours. After the close of each day's work, mixing trough pans
shall be thoroughly washed and cleaned. Lime mortar shall be keep damp with wet sack or by any
other suitable means and shall on no account be allowed to dry
3.0 Mode of measurement & payments:
3.1 The measuerement shall be carried out cubicmeter basis of actual work
3.2 The rate includes cost of collecting and carting of lime and sand with all lead and labour
required for mixing and placing.
3.3 Rate shall be for a unit of one cubic meter
Signature of Bidder Executive Engineer, GIDC, Surat
Providing and laying rubble for Rubble Soling below Footings including and packing and filing in
the interestices with quarry-spalls.
Rubble stone shall confirm to M –
The relevant specification item no 4.12 of tender specification shall be followed except the Rubble stone
shall be filled in foundation or plinth in 15cms. Layer including filling voids with sand including watering
ramming, consolidating etc. complete.
Mode of Measurement and payment:
The relevant specification of Item no 4.12 of tender specification shall be followed.
The rates includes cost of collecting and carting rubble stone sand with all lead, labour required for
filling in trenches and plinths.
The rate shall be for a unit of one cubic meter.
Filling available excavated earth (excluding rock) in trenches. Plinth, sides of foundations etc. in
layers not exceeding 20cm. In depth consolidating each disposited layer by ramming and watering.
1.0 Workmanship:
1.1 The earth to be used for filling shall be free from salts organic or other foreign matter. All clods of
earth shall be broken.
1.2 As soon as the work in foundation has been completed and measured the site of foundation shall
be cleared of all debris, brick bats, mortar dropping etc., and filled with earth in layers not
exceeding 20 cm. Each layer shall be adequately watered, rammed and consolidated before the
succeeding layer is laid. The earth shall be rammed with iron rammers where feasible and with
the butt ends of crow-bars, where rammer cannot be used.
1.3 The plinth shall be similarly filled with earth in layers not exceeding 20 cm. adequately watered
and consolidated by ramming with iron or wooden rammers. When filling reaches finished level,
the surface shall be flooded with water for at least 24 hours and allowed to dry and then rammed
and consolidated.
1.4 The finished level of filling shall be kept to shape intended to be given to floor.
1.5 In case of large heavy duty flooring like factory flooring, the consolidation may be done by power
rollers, where so specified. The extent of consolidation required shall also be as specified.
1.6 The excavated stuff of the selected type shall be allowed to be used in filling the trenches and
Under no circumstances black cotton soil be used for filling the plinth.
Signature of Bidder Executive Engineer, GIDC, Surat
2.0 Mode of Measurement & Payment:
2.1 The payment shall be made for filling in plinth and trenches. No deduction shall be made for
shrinkage or voids, if consolidated as instructed above.
2.2 The rate shall be for unit of one cubic meter.
Providing and laying cement concrete 1:3:6 (1-Cement :3-coarse sand :6-crushed stone aggregates
40 mm nominal size) M/C stone aggregates and curing complete including cost of formwork, but
excluding the cost of reinforcement for P.C.C. work, Dewatering etc. (In Foundation & plinth).
1.1 Water shall conform to M-1. Cement shall conform to M-3. Sand shall conform to M-6. Stones
aggregate 40 mm. nominal size shall conform to M-12.
2.0 Workmanship
2.1.1 Before starting concrete the bed of foundation trenches shall be cleared of all loose materials,
levelled, watered and rammed as directed.
2.2 Proportion of mix:
2.2.1 The proportion of cement, sand and coarse aggregate shall be one part of cement, 3 parts of
sand and 6 parts of stone aggregates and shall be measured by volume.
2.3.1 The concrete shall be mixed in a mechanical mixer at the site of work. Hand mixing may however
be allowed for smaller quantity of work if approved by Engineer in charge. When hand mixing is
permitted by the Engineer in charge in case of break-down of machineries and in the interest of
work it shall be carried out on a water-tight platform and care shall be taken to ensure that mixing
is continued until the mass is uniform in colour and consistency. However in such cases 10 %
more cement than otherwise required shall have to be used without any extra cost. The
mechanical mixer shall be done for a period one and half to two minutes. The quantity of water
shall be just sufficient to produce a dense concrete of required workability to the purpose.
2.4 Transporting & placing the concrete:
2.4.1 The concrete shall be handed from the place of mixing to the final position in not more than
minutes by the method as directed and shall be placed into its final position, compacted and
finished within 30 minutes of mixing with water i.e. before the setting commences.
2.4.2.1 The concrete shall be laid inlayers of 15 cm. to 20 cm.
2.5 Compacting:
2.5.1 The concrete shall be rammed with heavy iron-rammers to get the required compaction and to
allow the interstices to be filled with motor.
2.6.1 After the final set, the concrete shall be kept continuously wet if required by ponding for a
period of not less than 7 days from the date of placement.
2.7 Mode of measurements & payments:
Signature of Bidder Executive Engineer, GIDC, Surat
2.7.1 The concrete shall be measured for its length, breadth and depth, limiting dimensions to those
specified on plan or as directed.
2.7.2 The rate shall be for a unit of one cubic meter.
Providing and laying controlled cement concrete M-250 including finising smooth with curing
complete including the cost of form work but excluding the cost of reinforced concrete work in
foundation FOOTING and mass concrete, COLUMN UPTO PLINTH & PLINTH BEAM.
1.0. Materials:
1.1. Water shall conform to M-1. Cement shall conform to M-3. Sand shall conform to M-6. Grit shall
conform to M-8. Coarse aggregate shall conform M-12 B.
1.2. The shuttering to be provided shall be of ordinary timber planks and shall conform to M-26.
1.3. The dimensions of scantlings and battens shall conform to the design. The strength of the wood
shall not be less than that assumed in the design.
2.1. The designation ordinary M-100, M-150, M-200, M-250. specified as per I.S. Corresponding
approximately to 1:3:6, 1:2:4, 1:1/2:3 and 1:1:2 nominal mix of ordinary concrete by volume
2.2. The ingredients required for ordinary concrete containing one bag of cement of . By weight (.) for
different proportions of mix shall be as under:
Grade of concrete Total quantity of dry Proportion of fine aggregate Quantity of
aggregate by volume to coarse aggregate water per
per 50 Kgs. Of cement to 50 Kgs. Of
be taken as the sum of cement
individual volume of maximum.
fine and coarse
aggregates, maximum
M-100 (1:3:6) Generally 1:2 for fine
M-150 (1:2:4) 220 “ aggregate to coarse 32 “
M-200 (1:1 ½:3) 160 “ aggregate by volume but 30 “
M-250 (1:1:2) 100 “ subject to and upper limit of 27 “
1:1 ½ and lower limit 1:3
2.3. The water cement ratios shall not more than those specified in the above table. The cement content
of the mix specified in the Table shall be increased if the quantity of water in a mix has to be increased
to overcome the difficulties of placement and compaction so that the water-cement-ratio specified
in the Table is not exceeded.
2.4. Workability of the concrete shall be controlled by maintaining a water-cement-ratio that is bound
to give a concrete mix which is just sufficiently wet to be placed and compacted without difficulty
with the means available.
2.5. The maximum size of coarse aggregate shall be as large as possible with in the limits specified but
in no case greater than one fourth of the minimum thickness of the member, provided that the
Signature of Bidder Executive Engineer, GIDC, Surat
concrete can be placed without difficulty so as to surround all reinforcement thoroughly and to fill
corners of the form.
2.6. For reinforced concrete work, coarse aggregate having a nominal size of . are generally considered
2.7. For heavily reinforced concrete members as in the case of ribs of main beams, the nominal maximum
size of coarse aggregate should usually be restricted to . less than the minimum clear distance
between the main bars, or . less than the minimum cover to the reinforcement whichever is smaller.
2.8. Where the reinforcement is widely spaced as in solid slabs, limitations of size of the aggregate may
not be important and the nominal maximum size may sometimes be as great as or greater than the
2.9. Admixture may be used in concrete only with approval of Engineer-in-charge based upon the
evidence that with the passage of time, neither the compressive strength of concrete is reduced nor
are other requisite qualities of concrete and steel impaired by the use of such admixtures.
2.10. The form work shall conform to the shape lines and dimension as shown on the plans and be so
constructed as to remain sufficiently rigid during the placing and compacting of the concrete.
Adequate arrangements shall be made by the contractor to safe-guard against any settlement of the
form work during the course of concreting and after concreting. The form work of shuttering,
centering, scaffolding bracing etc. shall be as per design.
2.11. Cleaning & Treatment of forms:
2.11.1. All rubbish, particularly chippings shaving and saw dust shall be removed from the interior of the
form before the concrete is placed and the form work in contact with concrete shall be cleaned and
thoroughly wetted or treated. The surface shall be then coated with soap solution applied before
concreting is done, Soap solution for the purpose shall be prepared by dissolving yellow soap in
water to get consistency of paint. Alternatively, a coat of raw linseed oil or form oil of approved
manufacture may be applied in case steel shuttering is used. Soap solution or raw linseed oil shall
be applied after thoroughly cleaning the surface. Care shall be taken that the coating does not get on
construction joint surface and reinforcement bars.
2.12. Stripping time:
2.12.1. In normal circumstances and where ordinary cement is used forms may be struck after expiry of
following periods:
(a) Sides of walls columns and vertical faces of beam 24 to 48 hours.
(b) Beam soffits. (Props left under) 7 days.
(c) Removal of props slabs:
(i) Slabs spanning up to . 7 days.
(ii) Spanning over . 14 days.
(d) Removal of props to beams and Arches
(i) Spanning upto . 14 days.
(ii) Spanning over . 21 days.
2.13. Procedure when removing the form work: 2.4.1. All form work shall be removed without such shock
or vibrations as would damage the reinforced concrete surface. Before the soffit form work and
struts are removed, the soffits and the concrete surface shall be exposed where necessary in order
to ascertain that the concrete has sufficiently hardened.
Signature of Bidder Executive Engineer, GIDC, Surat
2.14. Centering:
2.14.1. The centering to be provided shall be got approved. It shall be sufficiently strong to ensure absolute
safely of the form work and concrete work before, during and after pouring concrete. Watch should
be kept to see that behavior of centering and form work is satisfactory during concreting. Erection
should also be such that it would allow removal of forms in proper sequence without damaging
either the concrete or the forms to be removed.
2.14.2. The props of centering shall be provided on firm foundation or base of sufficient strength to carry
the loads without any settlement.
2.14.3. The centering and form work shall be inspected and approved by the Engineer-in-charge before
concreting. But this will not relieve the contractor of his responsibility for strength, adequacy and
safety of form work and centering. If there is a failure of form work or centering, contractor shall
be responsible for the damages to the work, injury to life and damage to property.
2.15. Scaffolding:
2.15.1. All scaffolding, hoisting arrangements and ladders etc. required for the facilitating of concreting
shall be provided and removed on completion work by contractor at his own expense. The
scaffolding, hoisting arrangements and ladders etc. shall be strong enough to act and shall be
subject to the approval of the Engineer-in-charge. However, contractor shall be solely responsible
for the safety of the scaffolding, hoisting arrangement, ladders, work and workman etc.
2.15.2. The scaffolding, hoisting arrangements and ladders shall allow easy approach to the work spot and
afford easy inspection.
2.15.3. The rate is applicable to all conditions of working and height upto 4 mts. The rate shall include the
cost of materials and labour for various operations involved such as:
(a) Splayed edges, notching, allowance for overlaps and passing at angles, battens centering,
shuttering, strutting, propping bolting, nailing, wedging, easing, striking and removal.
(b) Filleting to form stop chamfered edges or splayed external angles not exceeding . widths to beams,
columns and the like.
(c) Temporary opening in the forms for pouring concrete, if required, removing rubbish etc.
(d) Dressing with oil to prevent adhesion of concrete with shuttering, and
(e) Raking or circular cutting.
2.16.1. Before-re-use, all forms shall be inspected by Engineer-in-charge and their suitability ascertained.
The forms shall be scarred, cleaned, and joints gone over, repaired where required. Inside surface
shall be retreated to prevent adhesion of concrete.
2.1. The relevant specifications of item No. 5.4.1. Of ordinary concrete shall be followed except that the
concrete mix shall be designed from preliminary tests, the proportioning of cement and aggregates
shall be done by weight and necessary precautions shall be taken in the production to ensure that
the required work cube strength is attained and maintained. The controlled concrete shall be in
grades of M-100, M-150, M-200, M-250, M-300, M-350, & M-400, with prefix controlled added to it.
Signature of Bidder Executive Engineer, GIDC, Surat
The letter ‘M’ refers to mix and numbers specify 28 days works cube compressive strength of . cubes
of the mix expressed in Kg. /Cmt.
2.2. The proportion of cement, sand and coarse aggregates shall be determined by weight the weight
batch machine shall be used for maintaining proper control over the proportion of aggregates as per
The strength requirements of different grade of concrete shall be as under:
Grade Of Concrete Compressive strength of 15 cms. Cubes in Kg. /Cmt. At
days, conducted in accordance with I.S. 516-1959.
Preliminary test Min. Work test Min.
In all cases, the 28 days compressive strength specified in above table above be the criteria for acceptance
or rejection of the concrete. Where the strength of a concrete mix as indicated by tests, lies in between the
strength of any two grades specified in the above table, such concrete shall be classified in for all purposes
as concrete belonging to the lower of the two grades between which its strength lies.
3.0 Workmanship:
3.1. The proportions for ingredients chosen shall be such that concrete has adequate workability for
conditions prevailing on the work in question and can be properly compacted with means available
except where it can be shown to the satisfaction of the Engineer-in-charge, that the supply of properly
graded aggregate of uniform quality can be maintained till the completion of work. Grading of
aggregate shall be controlled by obtaining the coarse aggregates, in different sizes and being in them
in the right proportions as required. Aggregate of different sizes shall be stocked in separate stock
piles. The required quantity of material shall be stock piled several hours, preferably a day before
use. The grading of coarse and fine aggregate shall be checked as frequently as possible, the frequency
for a given job being determined by the Engineer-in-charge to ensure that the suppliers are
maintaining the uniform grading as approved for samples used in the preliminary tests.
3.2. In proportioning concrete, the quantity of both cement and aggregate shall be determined by weight.
Where the weight of cement is determined by accepting the maker’s weight per bag a reasonable
number of bags shall be weighted separately to check the net weight. Where cement is weighted from
bulk stocks at site and not by bags, it shall be weighted separately from the aggregates. Water shall
either be measured by volume in calibrated tanks or weighed. All measuring equipments shall be
maintained in clean and serviceable condition. Their accuracy shall be periodically checked.
3.3. It is most important to keep the specified water cement ratio constant and at its correct value. To this
end, moisture content in both fine and coarse aggregates shall be determined by the Engineer-in-
charge, according to the weather conditions. The amount of mixing water shall then be adjusted to
compensate for variations in the moisture content. For the determination of moisture content in the
aggregates, I.S. 2389 (Part-III) shall be referred to. Suitable adjustments shall also be made in the
weights of aggregates due to variation in their moisture content. Minimum quantity of cement to be
used in concrete shall not be less than ./M plain concrete and not less than 250 Kg/M3 in reinforced
4.0. Mode of measurement and payment:
4.1 The rate shall be for a unit of one cubic meter.
Signature of Bidder Executive Engineer, GIDC, Surat
Providing & Laying Controlled Cement Concrete M-200 RCC works including the cost machine
mixing, vibrating, scaffolding, curing, the cost of form work but excluding reinforcement for
COLUMN, BEAMS, SLABS, LINTEL BENDS AND COPINGS, CHAJJAS, STAIRCASE, R.C.C. PARDI / WALLS
FOR ALL FLOOR LEVELS ETC.
1.0. Materials:
1.1. Water shall conform to M-1. Cement shall conform to M-3. Sand shall conform to M-6. Grit shall
conform to M-8. Coarse aggregate shall conform M-12 B.
1.2. The shuttering to be provided shall be of ordinary timber planks and shall conform to M-26.
1.3. The dimensions of scantlings and battens shall conform to the design. The strength of the wood
shall not be less than that assumed in the design.
2.1. The designation ordinary M-100, M-150, M-200, M-250. specified as per I.S. Corresponding
approximately to 1:3:6, 1:2:4, 1:1/2:3 and 1:1:2 nominal mix of ordinary concrete by volume
2.2. The ingredients required for ordinary concrete containing one beg of cement of 50Kg. By weight
(0.0342 Cu.M.) for different proportions of mix shall be as under:
Grade of concrete Total quantity of dry Proportion of fine aggregate Quantity of
aggregate by volume to coarse aggregate water per
per 50 Kgs. Of cement to 50 Kgs. Of
be taken as the sum of cement
individual volume of maximum.
fine and coarse
aggregates, maximum
M-100 (1:3:6) Generally 1:2 for fine
M-150 (1:2:4) 220 “ aggregate to coarse aggregate 32 “
M-200 (1:1 ½:3) 160 “ by volume but subject to and 30 “
M-250 (1:1:2) 100 “ upper limit of 1:1 ½ and 27 “
lower limit 1:3
2.3. The water cement ratios shall not more than those specified in the above table. The cement content
of the mix specified in the Table shall be increased if the quantity of water in a mix has to be increased
to overcome the difficulties of placement and compaction so that the water-cement-ratio specified in
the Table is not exceeded.
2.4. Workability of the concrete shall be controlled by maintaining a water-cement-ratio that is bound to
give a concrete mix which is just sufficiently wet to be placed and compacted without difficulty with
the means available.
2.5. The maximum size of coarse aggregate shall be as large as possible with in the limits specified but in
no case greater than one fourth of the minimum thickness of the member, provided that the concrete
can be placed without difficulty so as to surround all reinforcement thoroughly and to fill corners of
Signature of Bidder Executive Engineer, GIDC, Surat
2.6. For reinforced concrete work, coarse aggregate having a nominal size of . are generally considered
2.7. For heavily reinforced concrete members as in the case of ribs of main beams, the nominal maximum
size of coarse aggregate should usually be restricted to . less than the minimum clear distance
between the main bars, or . less than the minimum cover to the reinforcement whichever is smaller.
2.8. Where the reinforcement is widely spaced as in solid slabs, limitations of size of the aggregate may
not be important and the nominal maximum size may sometimes be as great as or greater than the
2.9. Admixture may be used in concrete only with approval of Engineer-in-charge based upon the
evidence that with the passage of time, neither the compressive strength of concrete is reduced nor
are other requisite qualities of concrete and steel impaired by the use of such admixtures.
2.10. The form work shall conform to the shape lines and dimension as shown on the plans and be so
constructed as to remain sufficiently rigid during the placing and compacting of the concrete.
Adequate arrangements shall be made by the contractor to safe-guard against any settlement of the
form work during the course of concreting and after concreting. The form work of shuttering,
centering, scaffolding bracing etc. shall be as per design.
2.11. Cleaning & Treatment of forms:
2.11.1. All rubbish, particularly chippings shaving and saw dust shall be removed from the interior of the
form before the concrete is placed and the form work in contact with concrete shall be cleaned and
thoroughly wetted or treated. The surface shall be then coated with soap solution applied before
concreting is done, Soap solution for the purpose shall be prepared by dissolving yellow soap in water
to get consistency of paint. Alternatively a coat of raw linseed oil or form oil of approved manufacture
may be applied in case steel shuttering is used. Soap solution or raw linseed oil shall be applied after
thoroughly cleaning the surface. Care shall be taken that the coating does not get on construction joint
surface and reinforcement bars.
2.12. Stripping time:
2.12.1. In normal circumstances and where ordinary cement is used forms may be struck after expiry of
following periods:
(a) Sides of walls columns and vertical faces of beam 24 to 48 hours.
(b) Beam soffits. (Props left under) 7 days.
(c) Removal of props slabs
(i) Slabs spanning up to . 7 days.
(ii) Spanning over . 14 days.
(d) Removal of props to beams and Arches
(i) Spanning upto . 14 days.
(ii) Spanning over . 21 days.
2.13. Procedure when removing the form work: 2.4.1. All form work shall be removed without such shock
or vibrations as would damage the reinforced concrete surface. Before the soffit form work and
struts are removed, the soffits and the concrete surface shall be exposed where necessary in order
to ascertain that the concrete has sufficiently hardened.
Signature of Bidder Executive Engineer, GIDC, Surat
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
New Risk and cost Tender Office Building Surat.pdf
B1 Agreement Part 1.pdf
B1 Agreement Part 2.pdf
Corrigumdem_1.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .