EXECUTIVE ENGINEER, RAMPUR CANAL DIVISION RAMPUR
RAMPUR CANAL DIVISION RAMPUR
Re-CONSTRUCTION OF V.R.B. ON BAHALLA CANAL AT KM 4.875 IN TEHSIL TANDA DISTRICT RAMPUR
2023_UPIDC_774829_1
08/EE/2022-23
Open Tender
Civil Works
Item Rate
90 days
RAMPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹354
₹30,000
26 Feb 2023
15 Feb 2023
20 Feb 2023
15 Feb 2023
20 Feb 2023
15 Feb 2023
Amount
Laying and Jointing PVC Pipe. Heading
Earth work in cutting or in embankment in ordinary soil, excavation to be in the form of private land and earth work in embankment to be in 20 cm. layers, including ramming and dressing the surface to the required levels and slopes and also including 1.50 m lift and 600m lead. The earth from cutting to be used in making embankment or to be deposited as spoil bank withen 30 m distance as directed by Engineer in charge & also including all cost of borrwed earth from pvt. land, material, labour & T&P etc. complete. (Diversion and strenthening of canal banks)
Dry brick on edge soiling including all cost of labour, material and T&P etc. complete.
Dismantling brick or stone masnory in lime or cement including stacking within 60m.
Dismantling C.C. work including stacking materials within 60m.
Dismantling R.C.C.work including stacking materials within 60m.
Collection, cleaning, and stacking of old bricks
Earth work in excavation of foundation including all lead, lift and manual compaction.
Laying a layer sand in foundation including cost of all material, labour etc. complete .
C.C. (1:3:6) in foundation with crushed aggregate & coarse sand with all cost of material, T&P and labour complete.
1st class Brick work in 1:4 cement and coarse sand mortar including cost of material, T&P and labour complete etc.
Two coat painting over abuetment cap with bitumen @0.85kg per Sqm. In each coat including supply of all materials,labour and T & P etc. required proper completion of work
Supply and laying two layer of tarfelt over abuetment cap as per direction of the Engineer in charge including necessary overlap including supply of all materials,labour and T & P etc. required proper completion of work.
Centering and shuttering for R.C.C. work including placing in position.
S/Fixing reinforcement for R.C.C. including bending, binding and placing in position with all cost of material, T&P and labour complete.
S/Fixing 25 mm thick thermocol sheet in joints.
Supplying & fixing of P.V.C. Pipe 75 mm dia and 0.50 mtr. longwith all cost of material, T&P and labour complete.
R.C.C. (1:1:2) in slab with crushed stone ballast and coarse sand including cost of material, T&P and labour complete.
C.C. (1:2:4) in slab wearing coatwith all cost of material, T&P and labour complete.
(1:6:12) Cement , sand and coarse aggregate filling in abutments along to road
Stuck pointing with cement morter consisting of 1 part cement and 2 part of fine sand including supply of all materials ,labour and completion of work.
Dry brick on edge soiling including labour only and T&P etc. complete.
S/Laying brick on edge soiling in 1:4 (CM) including all cost of labour, material and T&P etc. complete.
Painting one coat with ready mixed paint on slab face,parapet,land wings,abutments and retaining wall With superior synthetic enamel paint of standard make brushing to give an even shade and finished and i/c cleaning the surface all durt dust and other foreign matter sand papering and stripping i/c cost matter and scoured with wire brushes fine steel/wood scrappers sand papering and knotting i/c coat of all and supply of all materials,labour ,T&P etc. complete.
Earth work in cutting or in embankment in ordinary soil, excavation to be in the form of private land and earth work in embankment to be in 20 cm. layers, including ramming and dressing the surface to the required levels and slopes and also including 1.50 m lift and 600m lead. The earth from cutting to be used in making embankment or to be deposited as spoil bank withen 30 m distance as directed by Engineer in charge & also including all cost of borrwed earth from pvt. land, material, labour & T&P etc. complete. ( Removing Diversion)
SHRI SHAKTI CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .