Loading…
Loading…
Tender Value
₹1.6 Cr
EMD Value
₹2.3 L
Closing Date
2 Mar 2026, 3:30 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Revenue
Above/Below/Par
DRM/WORKS
14 conditions · 2 needing a document upload
10.2 - Financial Eligibility Criteria: The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees. N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, as provided at Page 41 of tender documents, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
10.1 Technical Eligibility Criteria: (a)The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii)One similar work costing not less than the amount equal to 60% of advertised value of the tender. (b) (1)In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or (iii)One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender. Note for b(1): Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components. (b)(2)In such cases, what constitutes a component in a composite work shall be clearly pre- defined with estimated tender cost of it, as part of the tender documents without any ambiguity. (b) (3) To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 7 of the Standard General Conditions of Contractor through subcontractor fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Engineer in writing. However, if required in tender documents by way of Special Conditions, a formal agreement duly notarised, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the offer for considering subletting of that scope of work towards fulfilment of technical eligibility. Such subcontractor must fulfill technical eligibility criteria as follows: The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be subletted, in last 5 years, ending last day of month previous to the one in which tender is invited through a works contract. Non-submission of the Completion certificate issued by the Competent Authority shall result into summarily rejection of the offer.
Defination of Similar Work :- 1.1 - Any P. Way works
24 conditions · 2 needing a document upload
"The said suppliers of goods and/or services would be subject to GST Act and Rules as applicable from time to time. Tenderers are requested to submit their offers as per GST Tax regime. All the bidders/tenderers should ensure that they are GST compliant and their quoted tax structure/rates are as per GST Law"
Successful tenderers are required to submit the number of labour to be employed for this particular work. Also the list showing names, along with all other details, of male and female workers employed in this work, should be submitted to office, at the time of submitting performance guarantee and before executing contract agreement. They should also ensure that 1) The payment to the contract labour should be made through bank/cheque. 2) Identity Cards should be issued to all contract workers. 3) Necessary steps should be taken to deduct provident fund from the payment made to contract labour and ensure that the same is credited to their Provident Fund account. 4)Medical facilities from ESI should be ensured, if applicable.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Tenderers are required to submit a copy of cancelled cheque in order to facilitate the payments regarding refund of EMD etc. in their proper accounts.
In addition to latest provisions of GCC, and all contents of tender documents, all other latest instructions of Railway Boards issued vide various letters received from time to time on concerned matters and related to tender, will also be applicable for the tenders as per necessity and tenderers have to co-operate with Railways and ensure the compliance
Indian Railways Standard General Conditions of Contract, April 2022 (GCC, April 2022) has been introduced and available on website with all correction slips issued up to date for inviting tender and same will be applicable for this tender. Advance Correction Slip No. 1, 2, 3, 4, 5, 6, 7, 8, 9 and 10 to Indian Railways Standard General Conditions of Contract, April - 2022 circulated by the Railway Board vide letter No. 2022/CE-I/ CT/GCC-2022/Policy dated 14.07.2022, 13.12.2022, 26.04.2023, 07.08.2023, 20.10.2023 , 21.12.2023, 25.09.2024, 20.12.2024, 09.01.2025 and 04.03.2025 are applicable to this tender. Tenderers are requested to download the same from the railways website and ensure the implementation of the latest provisions made in GCC while execution of work. After that, if any latest correction slip issued by Railway Board on any matter, will also be applicable with immediate effect, though not mentioned in original tender document.
I/We agree to carry out all works with use of modern equipments of required capacity for the work without extra payment. The decision of railway engineer shall be final and binding in this regard.
It is the responsibility of contractor to arrange the payment of the labour employed for the work through bank and to deduct PF as per the provisions of Minimum Wages Act.
The quantities shown above are approximate and to give a general guideline. Railway reserves a right to increase, decrease or to delete any of the items mentioned in schedule.
As per ACS 1 to GCC April 2022, issued vide Railway Board's letter dt. 14.07.2022, PVC Clause shall be applicable only in tenders having advertised value above Rs. 2 Crores provided to the provisions as per clause 46A-1. Tenderers should take a note and quote their rates accordingly.
In case Civil work tenders, the quantity of cement required in the items where necessary, will be used by the contractor on the same rates as accepted in tender, as per the quantity mentioned against each item in USSOR/DSR, though not mentioned in tender schedule.
Tenderers are advised to quote their rates including all type of taxes and levies etc. to be paid by them. Any extra payment will not be made on account of taxes/Levies etc., in excess of Contract Agreement Value,
In case of submission of Bid Security in the form of Bank Guarantee, a scanned copy of Original BG valid for a period of 90 days beyond the validity period of tender, and addressed in favour of Sr. DFM/WCR/BPL, shall be uploaded on IREPS portal while applying for tender. And As per ACS 2 to GCC April 2022, circulated vide Railway Board letter dt. 13.12.22, original BG should be delivered in person to the Concerned Official in Office before closing date for submission of bid (i.e. Excluding the last date of submission of bid) without fail. Any failure in this connection shall lead to summary rejection of bid.
The maintenance period for this work is NIL.
Part-A (i) Miscellaneous P. Way repairs and maintenance of track work under SSE/PW/South/Bina. (ii) Miscellaneous P. Way repairs and maintenance of track work under SSE/PW/North/Bina. Part-B (i) Jungle cleaning, Tree Trimming, Ballast Boxing/Profilling and other Miscellaneous work in section & yards under SSE/PW/South/Bina. (ii) Jungle cleaning, Tree Trimming, Ballast Boxing/Profilling and other Miscellaneous work in section & yards under SSE/PW/North/Bina, Under ADEN/BINA section.
WCR-BPL-W-25-26-N-31-149~WCR
WCR-BPL-W-25-26-N-31-149
Open
Works - General
18 Months
Bhopal, Madhya Pradesh
₹0
₹2.3 L
2 Mar 2026
6 Feb 2026
16 Feb 2026
95 items across 6 schedules · ₹2,16,15,708.49 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Up to 40 m long rail panel | RM | 500.00 | 9.6 | 4,800 |
| 2 | For Casual/Scattered Rail Renewal work | RM | 800.00 | 37.25 | 29,800 |
| 3 | For Casual/Scattered Rail Renewal work | RM | 800.00 | 39.44 | 31,552 |
| 4 | Locations other than Ballasted Deck Bridge | Each | 800.00 | 496.88 | 3,97,504 |
| 5 | For 1.00m long fishplates | Joint | 600.00 | 134.92 | 80,952 |
| 6 | For 610 mm long fish plates. | Joint | 200.00 | 94.54 | 18,908 |
| 7 | Opening and refixing of Joggled fish plates provided to weld joints/rail of any rail section under traffic to enable examination of weld/rail by departmental official nominated by Engineer In charge and lubrication of fishplates by applying departmental Grease graphite grade 'O' (IS:408) to fishing planes and bolts by departmental black oil as per procedure laid down in latest version of IRPWM, including all tools required and as directed by Engineer-in-charge. Note: 1. Grease Graphite, black oil, fish bolts, K.Oil, wire brush, required for work shall be given by department and issued at concerned SSE/PW Stores. 2.Jammed fish bolts shall be cut using chisel and hammer and replaced with new bolt. | Set | 2500.00 | 54.86 | 1,37,150 |
| 8 | Lubrication of ERCs and its liner contact area by removal of ERCs and Metal / GFN liners in rail panel, cleaning of rust / scale of ERC, Metal / GFN liners & SGCI insert by using wire brush, scrapper / sand emery paper etc supply and application of graphite grease, as prescribed by Railway for under side of liners & corresponding area of rail foot & SGCI insert with ERCs and re-fixing the same as per procedure prescribed in latest edition of IRPWM with contractors grease and all other tools & plants complete and as directed. Note: Each ERC in this item shall constitute 1 ERC and its Liner Contact area. | ERC | 210000.00 | 6.43 | 13,50,300 |
| 9 | By using Railway's Grease graphite | Each | 3000.00 | 32.35 | 97,050 |
| 10 | GRSP | Each | 6000.00 | 21.79 | 1,30,740 |
| 11 | Renewal of existing SEJ with improved SEJ with PSC sleepers under traffic block conditions as per approved drawing including fixing of special size bearing plate, rubber pad and other sleeper / rail fittings, greasing to the fittings, leading rails, sleepers & fittings to site, leading and stacking of released materials within a lead of 250m, cutting of Rails, drilling of holes, fixing of related fittings, providing temporary connection with fishplates till welding of SEJ is done and sleepers shall be given initial packing to make track fit for 20KMPH speed. Note: (1) Rail cutting and hole drilling shall be paid separately. (2) One set comprise complete SEJ on both rails at SEJ. | Set | 15.00 | 9,121.79 | 1,36,826.85 |
| 12 | Sleepers up to 2.85 m length | Each | 100.00 | 638.42 | 63,842 |
| 13 | Sleepers of length more than 2.85 m and up to 4.20 m | Each | 100.00 | 879.25 | 87,925 |
| 14 | Sleepers of more than 4.20 m length | Each | 100.00 | 1,385.21 | 1,38,521 |
| 15 | 1 in 12 Turnout | Set | 10.00 | 4,360.61 | 43,606.1 |
| 16 | 1 in 12 Switch Assembly | Set | 10.00 | 15,475.7 | 1,54,757 |
| 17 | For 1 in 12 Turnouts (Sleeper No 1 to 25 and 5 approach sleepers) | Set | 12.00 | 1,885.64 | 22,627.68 |
| 18 | For 1 in 8.5 Turnouts & Derailing switches (Sleeper No 1 to 22 and 5 approach sleepers) | Set | 12.00 | 1,508.52 | 18,102.24 |
| 19 | Renewal of corroded slide chairs duly removing the old slide chairs by heating using contractors gas and equipments or by any approved methods and inserting Railways new slide chairs and plate screws including crossing of tracks, leading all required materials to site, stacking all released materials, with all contractor's tools, consumables, labour, lead, lift and incidental charges etc complete as directed by the Engineer in charge. Note: 1. All the fittings will be supplied at nearest SSE/Stores. 2. In case of damage of PSC sleeper, penalty at the rate of 25% of the current cost of sleeper shall be levied. | Each | 300.00 | 369.72 | 1,10,916 |
| 20 | Turnout sleepers of length up to 2.85 m | Each | 100.00 | 144.56 | 14,456 |
| 21 | Sleepers of length more than 4.20 m | Each | 100.00 | 187.93 | 18,793 |
| 22 | Under Traffic Block Conditions: | cum | 10000.00 | 55.06 | 5,50,600 |
| 23 | For PSC sleeper Track with Sleeper Density of 1540 Sleepers/Km or more | TRM | 2500.00 | 109.42 | 2,73,550 |
| 24 | Packing of isolated loose PSC sleepers on plain track below the bottom of the sleepers and surrounding through out its length duly opening two galas on either side of the renewed sleepers and packing the sleeper to bring the track to normal speed including gauging, aligning, squaring of sleepers and sectioning of ballast to the required profile with all contractor's labour, tools and plant etc. including all lead and lift and crossing of tracks where ever necessary complete and as directed by the Engineer-in-charge. | Sleeper | 800.00 | 84.98 | 67,984 |
| 25 | Slack picking of joint sleepers and 3 approach sleepers on either sides giving required lift to make up general track level, packing and profiling as directed. | Each | 150.00 | 591.23 | 88,684.5 |
| 26 | One mobile Gang comprising of 15 physically fit labours plus 1 Mate. Note: (1) In case, contractor provides less no. of Labour/Mate or for non availability of vehicle, payment will be deducted for each such person or non- availability of vehicle @ 20% of the accepted item rate, separately for each shortfall. (2) The Contractor shall keep one pick up Truck of minimum 1.5T payload capacity with Driver all the time and all expenditures for running at an average of 80 kms per day shall be born by the Contractor. | Gang Day | 90.00 | 14,664.51 | 13,19,805.9 |
| 27 | Replacing existing glued joint rail with cut rails or with glued joint rail or insertion of glued joint by cutting existing track under traffic condition by cutting rails, refixing with all rail sleeper fastenings and providing required gaps for carrying out welding as an alternative to drilling holes or joining rails with fish plates duly drilling holes as required including stacking of released material and as directed by engineer in-charge. N o t e : (1) Drilling holes & rail cutting will be paid separately. (2) Transportation of materials to the site of work from supply points, if more than 250m, shall be paid separately. | Each | 120.00 | 1,884.92 | 2,26,190.4 |
| 28 | Anti-corrosive painting to weld collar for Thermit welded rail joints on track for old painted joints in normal corrosive prone area for any rail section with two coats of ready mixed bituminous black paint of reputed make confirming to IS:9862 latest version on welded area up to 10cm on either side including on the underside of rail foot by brush including surface preparation as per Railway's AT Weld Manual including lettering / weld numbering with approved enamel paint as directed Note: 1.Before painting, dust, dirt and flaked paint from the welded joint shall be removed thoroughly by scrapping with wire brush. Grease and oil shall be removed by use of appropriate solvent confirming to latest IS:1745. 2.Use of detergent followed by water washing should also be done to ensure removal of oil and grease apart from the greasing compound. 3.The paint should be procured along with the thinner recommended by the manufacturer of the paint. 4.No other thinner like kerosene oil should be used. | Each | 2000.00 | 25.17 | 50,340 |
| 29 | For day time block working | TRM | 30000.00 | 19.88 | 5,96,400 |
| 30 | Removing and refixing of guard Rails over slab bridges during machine packing with all contractor's men and materials duly removing fittings, leading guard rails to bridge approaches, lifting, dragging, positioning and crossing of track etc, and as directed by Engineer In charge. | TRM | 400.00 | 109.99 | 43,996 |
| 31 | 1 in 8½ Turnouts (Under Traffic Block Conditions) | Set | 10.00 | 9,768.62 | 97,686.2 |
| 32 | 1 in 12 Turnouts (Under Traffic Block Conditions) | Set | 40.00 | 11,372.8 | 4,54,912 |
| 33 | Derailing Switch (Under Traffic Block Conditions) | Set | 4.00 | 3,585.87 | 14,343.48 |
| 34 | Carrying out ancillary works required for UTV working under line block i.e., turning of rails/ Sleepers and keeping in position for fixing of UTV clamps to rail, keeping rails/PSC Sleepers in position while loading into BFR, removal of clamps on BFR for releasing loaded rail/Sleepers, adjusting of rails/Sleepers on BFR etc. by providing minimum of three men in a shift of 8 hours, with all contractor's tools, all lead, lift, crossing of tracks etc., complete and as directed by the engineer - in - charge. Note: In case, contractor provides less no. of Labour, payment will be deducted for each such person @ 2/3 rd of the accepted item rate. | Shift | 90.00 | 2,398.92 | 2,15,902.8 |
| 35 | For lead up to 500 metre. | MT | 100.00 | 403.67 | 40,367 |
| 36 | For lead up to 500 metres | MT | 500.00 | 314.3 | 1,57,150 |
| 37 | Rails, switches, crossings, SEJ, Glued Joints, Check Rails etc. | MT | 150.00 | 410.31 | 61,546.5 |
| 38 | P.Way fittings of all types and other similar loose items | MT | 150.00 | 406 | 60,900 |
| 39 | Level crossings with asphalted road surface | Sqm | 200.00 | 600.77 | 1,20,154 |
| 40 | JCB Backhoe Loaders 3DX Plus or similar with minimum 1.10 cum bucket capacity | Hour | 400.00 | 830.66 | 3,32,264 |
| Schedule total | ₹78,61,905.65 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .