Tender Value
₹10.0 L
EMD Value
₹9,983
Closing Date
7 Apr 2026, 6:00 pmClosed
Ahmedabad Municipal Corporation Central Zone
Repairing Toilet at Mahendikua Char Rasta, Littho Press, Mohanvikas Chawl, Dudheshwar Police Choki, Thakkar Chali, Ramdevpura chali in SBM in Shahpur ward.
292514
CENTRAL ZONE E-Tender Notice No.17/2025-2026 Tender No.527
Open
Civil Works - Others
Ahmedabad
₹900
Municipal Commissioner, Ahmedabad
₹9,983
1 Apr 2026
1 Apr 2026
1 Apr 2026
7 Apr 2026
1 Apr 2026
• Tender Fee, EMD, technical bid and other relevant PQ Documents
as per check list given in tender shall be submitted physically in
Signature of Bidder Page 3 of
two copies (Original & duplicate) in sealed envelope as per
Schedule mentioned in Notice inviting Tender.
10 Last date of receiving As per Notice inviting Tender / Addendum / Corrigendum.
Tenders. The tenders received after latest schedule date and time will not
be entertained under any circumstances.
11 Submission of Price Bid The Price bid shall be submitted online only. The bidder shall fill
percentage rate on amount of BOQ online only until specified.
Price Bid shall be submitted physically duly signed & seal without
mentioning quoted rated, else it shall be considered as rejected.
12 Opening of Technical bid As per Notice inviting Tender / Addendum / Corrigendum.
13 Tender validity period 120 days from the last date of submission of Tender.
14 Security Deposit 5 % of Contract Value to be submitted in the form of (Demand Draft /
pay order / Bank Guarantee in favour of Municipal Commissioner,
Ahmedabad. Bank Guarantee shall be from approved list of AMC of
banks as per attched ANNEXURE - 1 finance dept. latest circular.
and the issuing branch of bank guarantee shall be of Ahmedabad City
only. The validity of the Security Deposit shall be up to valid till
days beyond Date of completion of work.
The Security Deposit shall be payable in 10 days (for tenders upto
Rs.10.0 Lacs) or 15 days (for tenders of Rs.10.0 Lacs and above) from
date of receipt of LOI failing which interest @ 4% per annum will be
charged by AMC.
15 Deductions from Running
a. Retention Money 2 % amount of each Running Bill shall be deducted as a Retention
Money. Such retention money shall be released in the final bill of the
b. Labour welfare cess Labour welfare cess as per the Act, 1996 (non refundable) shall be
deducted from each running bill.
16 Defect & Liability Period Not applicable in this case. If applicable than refer condition of
contract attached over rule as per form B-1 published by Government.
17 Compansation for Delay 10 % of the actual balance work after Time limit expired.
• All the circulars which were published by Authorities of AMC time by time will be applicable on
said Tender and bound to bidder with out any condition.
• Conditional tenders will not be accepted in any case. Municipal Commissioner reserves the
rights to reject any or all the tenders without assigning any reasons thereof.
• The authorized signatory holding Power of Attorney shall only be the Digital Signatory. In case
authorized signatory holding Power of Attorney and Digital Signatory are not the same, the bid
shall be considered non-responsive.
Signature of Bidder Page 4 of
• Contractor should have to maintain the all toilet block and urinal block in well maintain
condition throughout the year for better public uses in all Civil aspect in standard manner
instructed by concern ward engineer in-charge.
Seal and Signature of the Bidder Additional City Engineer
Date: Ahmedabad Municipal Corporation
Signature of Bidder Page 5 of
(On contractor’s Letter Head / certified with Stamp and Sign with Contact Detail)
TENDER DECLARATION FORM
Additional City Engineer
Ahmedabad Municipal Corporation,
Name of Work:- - મ યઝોન શાહપુર વોડમાં મહદીકુવા ચાર ર તા પાસે, લીથો સ
I/We the undersigned have carefully gone through and clearly understood the Tender documents of
above mentioned project comprising of Notice Inviting tenders, Articles of
Agreement, Scope of work, Definition of terms, notes Instructions/Information to
Bidder, Condition of Contract, special condition of contract, Appendices,
Specifications, Bill of Quantities, furnished by AHMEDABAD MUNICIPAL
I/We do hereby offer to execute and complete the whole of the work within the time specified
all in accordance with the specification, designs, drawing and instruction in writing referred to in the
said document and with such materials as mentioned for, at the respective rates which I/we have
quoted in the Price Bid or at such other rates as may be fixed under the provisions of these conditions.
In the event of this tender being accepted I/We agree to enter into an agreement and when
required, execute the contract, according to your form 1 of agreement as or in default where of I/we
bound myself/ourselves to forfeit the "Earnest Money Deposit."
I/We understand that if I/We shall not enter in agreement within fifteen days or as decided by
AMC from the date of receipt of letter of acceptance, you will forfeit the earnest money paid by me/us
and take necessary action as deemed fit.
I/We have enclosed a Demand Draft / Bank Guarantee as an “Earnest Money Deposit", for the
sum as mentioned in NIT, the full value of which is to be absolutely forfeited to the Employer If I/We
fail to commence the work specified. Otherwise the Employer shall retain the said sum, as on account
of such Security Deposit as provided for in the aforesaid documents.
I/We agree not to employ sub-contractors other than those that may be approved in
accordance with conditions in the aforesaid documents.
I/We understand that Municipal Commissioner is not bound to accept the lowest or any
tender, which are received. I / We also understand & agree that Municipal Commissioner Reserves the
right to allot number of tenders to successful bidders at his sole discretion in case if I / We am/are
lowest in more than one tender.
Signature of Bidder Page 6 of
I/We am/are bound to execute the job if the work order is issued within 120 days from the
date of opening of the tender.
I am bound to execute the work by maintaining all Quality aspects/parameters mentioned in
the tender terms and conditions. I am also bound to submit all supporting Genuine Original documents
as and when asked and if any discrepancy found in such documents as well as in the executed Work
with respect to Quality/Quantity at any stage of work or even after completion of work, it will be solely
my Responsibility. I am bound to prove originality of all documents submitted by me and if any
Documents found false/fake then Municipal Commissioner/AMC has right to take any
action/penalty/punishment against me.
I am also bound that if I/we, indulged into any malpractice and/or used any inferior quality
and/or the construction of road is found to be of an inferior quality under this contract than in such
case Municipal Commissioner/AMC has right to debar/ blacklist permanently.
I/We agree to pay the Government income-Tax, GST/Sales-Tax (Central and State), Octroi
duties, Royalty on material (i.e. Aggregate, Sand etc.) And any other taxes prevailing and from time to
time on such items on which the same are leviable and the rates quoted by me/us are inclusive of the
Yours faithfully
Seal and Sign of Contractor
Signature of Bidder Page 7 of
INSTRUCTIONS TO BIDDERS
1. Scope of Bid
1.1 Competent authority on behalf of The Municipal Commissioner, Ahmedabad Municipal
Corporation (referred to as Employer in these documents) invites sealed bids for the
construction of works (as defined in these documents and referred to as “the work”) detailed in
the table given in the Invitation for Bid (hereinafter called as IFB.) from competent bidder. The
bidders may submit bids for the works detailed in the table given in IFB.
2.0 Source of Funds
Ahmedabad Municipal Corporation has arranged the fund for this project.
3.0 Eligible Bidders
3.1 The Invitation for Bids is open to all eligible bidders meeting the eligibility criteria as defined in
3.2 All bidders shall provide Qualification Information and Forms of Bid mentioned in the Clause-
14. An agency that has been engaged by the Employer to provide consulting services for the
preparation or supervision of the works, and any of its affiliates, shall not be eligible to bid.
3.3 Any entity which has been declared as non-performing by NHAI / GoG / AMC or the firms those
are blacklisted/ debarred for specified period by AMC, Governement of Gujarat, Government of
India or any other entity controlled by it, would not be eligible to submit the Bid.
4.0 Qualification of the Bidder
4.1 Requires registration:- Register as per Notice Inviting Tender having in Road Works in PWD in
Govt. R&B / CPWD / AMC or equivalent register with any other state Govt. or institutions.
5.0 DISQUALIFICATION
Even though the bidders meet the above mentioned qualifying criteria, they are subject to be
disqualified if they have,
• Made misleading or false representations in the forms, statements, affidavits and
attachments submitted in proof of the qualification requirements; and/or
• Record of poor performance such as abandoning the works, not properly completing the
contract, inordinate delays in completion, litigation history, or financial failures etc. or
debarring from AMC work etc.
• Tampered the bid document in any manner.
• Colluded with other prospective bidders for this work to arrive at quoted prices for the
purpose of restricting competition.
• Indulged in inducement of any official of AMC and/or their consulting engineer and other
advisors in any manner whatsoever.
• Proposal not submitted in accordance with this tender.
Signature of Bidder Page 8 of
• During validity of the proposal, or its extended period, if any, the bidder changes his
commercial terms.
• The bidder qualifies the proposal with his own conditions.
• Proposal is received after due date and time.
• Commercial proposal is enclosed with the same envelope as technical proposal
• The envelope does not show on the outside the reference of bid and thus gets opened
before the due date of opening.
• The E.M.D. is not deposited in full and in the manner as specified in the clause of
Earnest Money Deposit.
• The tender is in a language other than English or dose not contains its English
Translation in case of other language adopted for tender preparation.
• The tender documents received are not duly signed by authorized person.
• The validity of tender is less than what is stated in the tender.
• Any of the page or pages of tender is/are removed or replaced.
• Any condition which affect the cost.
• If it is joint venture.
5.1 Debarment / Black listing
Notwithstanding the above, the Employer may debar or blacklist any of the bidder(s) for
their misleading or false representations in the forms statements etc. for the period to
be decided by the Employer.
6.0 Cost of Bidding
The bidder shall bear all costs associated with the preparation and submission of his Bid.
Employer will in no case be responsible and liable for those costs.
The Bidder, at his own cost, responsibility and risk, is encouraged to visit, examine and
familiarize himself with the site of Works and its surroundings including source of earth, water,
road aggregates etc. and obtain all information that may be necessary for preparing the Bid
and entering into a contract for construction of the Works. The costs of visiting the Site shall be
at the Bidder's own expense.
8.0 Bidders shall not have any dispute or claim for any kind of compensation in case of,
• If the quantity stipulated in the tender items varies or the scope of work changes and thereby
total amount of work increases / decreases up to any extent.
total amount of work increases / decreases up to any extent.
• If the works gets delayed / postponed for some administrative / technical decision whatsoever.
• If the items stipulated in the tender shall not be executed as per site condition/ requirements.
No claim shall be entertained for the same.
• No idle charges shall be paid to contractor for machinery and man power if remain idle and no
claim shall be entertained for the same.
B. BIDDING DOCUMENTS
9.0 Content of Bidding Documents
9.1 The set of bidding documents comprises the documents listed below and addendum (if any)
Signature of Bidder Page 9 of
1. Notice inviting e-Tender
2. Special conditions of Contract
3. Instructions to Bidders
4. Qualification Information
5. Conditions of Contract
6. Technical Specifications
7. Forms of Bid
8. Bill of Quantities
• The bidder is expected to examine carefully all instructions, conditions of contract, contract
data, forms, terms, technical specifications, forms, Annexes in the bid document. Failure to
comply with the requirements of bid documents shall be at the bidder’s own risk. Bids which
are not substantially responsive to the requirements of the bid documents shall be rejected.
10.0 Amendment of Bidding Documents
10.1 Before the deadline for submission of bids, the Employer may modify the bidding documents
by issuing addendum.
10.2 Any addendum thus issued shall be part of the bidding documents and shall be placed on
website www.nprocure.com The prospective bidder shall refer to website to check any
addendum before 24 hours of opening of bids. AMC will not give any advertisement for the
10.3 To give prospective bidders reasonable time in which to take an addendum into account in
preparing their bids, the Employer may, at his desecration, extend as necessary the deadline
for submission of bids.
10.4 Prospective bidders should attach the addendum made for the work & if fails to do so than also
the changes made through such addendum shall be applicable & bound to the bidder.
C PREPARATION OF BIDS
11.0 Language of the Bid
All documents relating to the bid shall be in the English language only.
12.0 Documents comprising bid
The e bid submitted by the bidder shall be in two separate parts.
• Technical Bid
• Financial Bid
To qualify for award of the contract, each bidder must submit the following documents along
• Required Registration Certificate
• Other requested documents
• Any other material / information required to be submitted in accordance with these
Instructions to Bidders (ITB)
Signature of Bidder Page 10 of
Failure to submit these certificates/documents shall make the bid non-responsive.
Above original documents in physical form in two copies, one marked as “original” and other
marked as “Duplicate”, shall be submitted in a sealed envelope by 18:00 Hrs on the date of
physical submission of bid and addressed to the addressee given in the NIT duly super scribed
“Name of Work, Bid due date and time, Name and address of the bidder”
13.0 Bid Prices
• The contract shall be for the whole works as described in Bill of Quantity based on the
percentage rate in the Bill of Quantities submitted by the bidder..
• All duties, taxes, and other levies payable by the contractor under the contract, or for any other
cause shall be included in the rates, prices and total Bid Price submitted by the Bidder, except
otherwise stated in the Bid document. Employer will not compensate the bidder (contractor)
for any change in duties, taxes and other levies payable by the contractor under the contract
and any other reasons.
• The percentage rate and bid price quoted by the bidder shall be fixed up to the completion of
Work and shall not be subject to adjustment on any account, except where expressly specified,
otherwise, in the contract.
14.0 Currencies of Bid and Payment
The currency of bid and payment shall be in Indian Rupees. All payments shall be made in
15.0 Bid Validity
15.1 Bids shall remain valid for 120 days from last date of submission of tender. A bid valid for a
shorter period shall be rejected by the Employer as non-responsive.
15.2 In exceptional circumstances, prior to expiry of the bid validity (120 days), the Employer may
request that the bidders may extend the period of validity for a specified additional period. The
request and the bidders' responses shall be made in writing or by cable. A bidder may refuse
the request without forfeiting his bid security. A bidder agreeing to the request will not be
required or permitted to modify his bid, but will be required to extend the validity of his bid
security for a period of the extension.
16.0 Earnest Money / Bid Security
16.1 The Bidder shall furnish, a Bid Security of the amount as shown in the Table of IFB as part of his
bid, in the form of Demand Draft / pay order / Bank Guarantee in favour of Municipal
Commissioner, Ahmedabad valid for 120 days.
16.2 The issuing branch of the bank guarantee shall be of Ahmedabad City
Signature of Bidder Page 11 of
Signature of Bidder Page 12 of
16.3 Any bid not accompanied by an acceptable Bid Security shall be rejected by the Employer as
non-responsive.
16.4 Any bid having bid security for lesser value and shorter validity period shall be treated as non-
16.5 (a) The bid security of the unsuccessful bidders, except for L1, L2 and L3 bidders will be
returned as promptly as possible.
Signature of Bidder Page 13 of
(b) The bid security of the successful bidder, along with second and third lowest tenders, will be
returned when the successful bidder has furnished the required security deposit and
signed the agreement.
16.6 The Bid Security of the Successful Bidder will be discharged when the bidder has signed the
Agreement and furnished the required security deposit.
16.7 The Bid Security shall be forfeited,
a) if the Bidder withdraws the Bid after Bid opening during the period of Bid validity;
b) in the case of a successful Bidder, if the Bidder fails within the specified time limit to
(i) sign the Agreement; or
(ii) Furnish the required security deposit.
(iii) commence the work after signing the agreement within 15 days
16.8 No interest shall be paid by the owner on any tender guarantee. The issuing branch of the bank
guarantee shall be of Ahmedabad City only.
16.9 Bank Guarantee for Earnest Money Deposit should be executed on non-judicial Stamp papers
of requisite value in accordance with the stamp Act applicable to that particular state of Indian
Union, where executed.
16.10 The executing officers of the bank Guarantee for Earnest Money Bid Security shall clearly
indicate in (block letters) his name, designation, Power of Attorney No. / Signing Power No. etc.
16.11 Each page of the bank guarantee for Earnest Money Deposit shall be duly signed/initialed by
the executing officers and the last page shall be signed in full, indicating the particulars as
aforesaid under the seal of the Bank.
D. SUBMISSION OF BIDS
17.0 Sealing and Marking of Bids
17.1 The bidder shall submit the Technical Bid only. The Bid shall be sealed in separate envelopes
and the three sealed envelopes shall be sealed in an outer envelope. The Bid envelopes shall
be marked as follows:-
• Complete Tender Document with all necessary qualification related documents (in two
Above two envelopes shall be kept in one envelope and it should be marked as “Technical Bid”
and sealed. This Outer envelope should mention the name of firm of bidder, his address,
contact details & name of the work.
17.2 The inner and outer envelopes
a) Shall be addressed to the Employer at the following address:
Assistant Manager- Central Zone,
Signature of Bidder Page 14 of
3rd Floor, B – Wing, Sardar Patel Bhavan,
Danapith, Ahmedabad-380001.
c) Bear the following identification:
Indicate the name and address of the bidder.
• If the outer envelope is not sealed and marked as above, the Employer will assume no
responsibility for the misplacement or premature opening of the bid.
18.0 DEADLINE FOR SUBMISSION OF THE BID
18.1 Complete Bids (including Technical bid and necessary documents) must be received by the
Employer at the address specified in bid information not later than the date indicated on the
face sheet of the document. In the event of the specified date for the submission of bids
declared a holiday for the Employer, the Bids will be received up to the appointed time on the
next working day. The Bidder is further required to submit Documents in Physical Form on or
before the Bid Due Date and before the time of submission as specified in NIT, at the following
Assistant Manager- Central Zone,
3rd Floor, B – Wing, Sardar Patel Bhavan,
Danapith, Ahmedabad-380001.
18.2 AMC assumes no responsibility for inability of a bidder to submit bids through (n) procure e-
tendering portal on account of delay in submission at bidder's end. Bidder shall ensure that
they submit the bid well before the "Due Date & Time of Bid- Submission". AMC shall not be
responsible if bidder is not able to submit the bid on account of failure in network/internet
connection or any other technical reason.
18.3 The Employer may extend the deadline for submission of bids by issuing an amendment in
accordance with respective Clause, in which case all rights and obligations of the Employer and
the bidders previously subject to the original deadline will then be subject to the new deadline.
18.4 All bidders are requested to see the website of (n) procure for amendment / corrigendum if
18.5 Any Bid received by the Employer after the deadline prescribed in NIT will be rejected and
returned unopened to the bidder.
Any Bid received by the Employer after the deadline prescribed in NIT will be returned
unopened to the bidder.
20.0 NOTIFICATION OF AWARD & SIGNING OF AGREEMENT
The Bidder whose Bid has been accepted will be notified of the award by the Employer prior to
expiration of the Bid validity period by writing, facsimile or e-mail confirmed by registered
letter. This letter (hereinafter and in the Conditions of Contract called the “Letter of
Acceptance” will state the sum that the Employer will pay the Contractor in consideration of
the execution, completion, and maintenance of the Works by the Contractor as prescribed by
the Contract (hereinafter and in the Contract called the “Contract Price”).
Signature of Bidder Page 15 of
The notification of award will constitute the formation of the Contract, subject only to the
furnishing of a Security Deposit in accordance with the provisions of Clause.
The agreement will incorporate all correspondences between the Employer and the Successful
Bidder. It will be signed by the Employer and the Successful Bidder.
21.0 SIGNING OF CONTRACT AGREEMENT
21.1 The Employer and the successful bidder shall enter into a Contract Agreement within 28 days
after the successful bidder (hereinafter called the Contractor) receives the Letter of
Acceptance, unless they agree otherwise, subject to furnishing the security deposit before
signing the Agreement with the Employer.
21.2 Upon issue of ‘Letter of Acceptance’ to the successful Bidder, the Employer will promptly notify
the other Bidders that their Bids have been unsuccessful and release their Earnest Money
Deposit / Bid Security.
22.0 SECURITY DEPOSIT
22.1 Within 15 days of receipt of the Letter of Acceptance, the Successful Bidder shall deliver to the
Employer a security deposit in the form of Bank Guarantee for an amount equivalent to 3% of
the Contract Price valid for the period of valid till 90 days beyond Date of completion of work.
The Security Deposit shall be payable in 10 days (for tenders upto Rs.10.0 Lacs) or 15 days (for
tenders of Rs.10.0 Lacs and above)from date of receipt of LOA failing which interest @ 4% per
annum will be charged by AMC.
22.2 The security deposit shall be in the form of a Bank Guarantee in the name of the Employer,
from Ahmedabad branch of any Banks mentioned in the clause no. 16.2 of these tender
22.3 This security deposit shall be released only after the clearance of final bill including pre & post
22.3 Interest @ 4 % per annum shall be deducted from contractor in case of late submission of
security deposit or late renewal of bank guarantee for the number of days delayed for
submission or discontinuity of the bank guarantee.
22.4 Bank Guarantee to be submitted in the prescribed format enclosed and shall be same verbatim
as per the format. Bank Guarantee shall be submitted on right value of stamp paper and for
correct value of contract.
22.5 Failure of the Successful Bidder to comply with the requirements of Sub-Clause 22.1 shall
constitute sufficient grounds for cancellation of the award and forfeiture of the Bid Security.
22.6 In case of any contract amendment during execution of the contract enhancing value of the
contract the BG value shall be enhanced accordingly. Validity of BG shall be commercial terms
and conditions of the tender.
22.7 All compensation or other sums of money payable by the Contractor to the Employer under the
terms of this Contract or any other contract or on any other account whatsoever may be
deducted from Security Deposit. Also in the event of the Contractor's Security Deposit being
reduced by reasons of such deductions, as aforesaid, the Contractor shall, within 14 days of
receipt of notice of demand from the Engineer-in-Charge, make good the deficit in Security
Signature of Bidder Page 16 of
22.8 Should there arise any occasion under the Contract due to which the periods of validities of
Bank Guarantees as may have been furnished by the Contractor from time to time, are
required to be extended/renewed, the Contractor shall get the validity periods of such
guarantees extended/renewed, and furnish these to the Engineer-in- Charge one month before
the expiry date of the aforesaid Guarantees originally furnished failing which the existing Bank
Guarantees shall be invoked by the Engineer – in – charge. Also in case of any deficit in
securities on any account as might occur or is noticed, the Contractor shall forthwith
recoup/replace the same with acceptable Security Deposit.
22.9 The Bank Guarantee shall be extended within the expiry dates wherever activities as per
contract are not completed in all respects.
22.10 The Security Deposit less any amount due shall, on demand, be returned to the contractor after
45 days of completion date / Final Bill paid date which ever is later. No interest on the amount
of Security Deposit shall be paid to the Contractor at the time of release of Security Deposit as
22.11 The successful bidder to whom ‘LOA’ has been issued shall enter into an agreement at
Employer’s office within 15 days of LOA.
23.0 Advance Payment and Security
The Employer will not provide any advance payment.
24.0 Dispute Review Expert
In case of all the disputes, decision of the Municipal Commissioner, Ahmedabad shall be final
and binding to the bidder.
25.0 LITIGATION HISTORY
The applicant should provide accurate information on litigation and/or arbitration resulting
from Contractors completed or under execution by him over last five years. If the details of
Litigation History are hidden by the Bidder and later on it comes to the knowledge of the
Employer, the Bidder shall be disqualified for the proposed work and other appropriate actions
shall be taken against the bidder.
DETAILS OF COMPLETED / ONGOING LITIGATION / ARBITRATION
Employer Remarks showing
Year Name of Present Status
Project Value of the Reasons/Details for
Project (Rs.) litigation/arbitration
Signature of Bidder Page 17 of
The bidder shall furnish separate table for individual project.
The above information shall be supported with necessary documents otherwise the same shall
be treat as null and void.
A consistent history of arbitration awards? Judgments against the applicants or any partner of a
joint venture may result in disqualification for proposed work.
If the details of litigation History is hidden by the applicant and later on it comes to knowledge
of the employer the bidder shall be disqualified for the proposed work and other appropriate
actions shall be taken against the bidder.
Seal and Signature of the Bidder Additional City Engineer
Date: Ahmedabad Municipal Corporation
Signature of Bidder Page 18 of
GENERAL CONDITIONS OF CONTRACT
1.0 Liquidated Damages
1.1 If the Contractor fails to complete the works within the original or extended time limit, the
Contractor shall pay penalty of 10% of amount of actual remaining work. The amount of work
for which the scope of contractor is reduced shall not be considered for the calculation of
Liquidated Damages.
1.2 Conditions mentioned in the AMC Finance Department Circular AMC no. 18 Date: 23/05/2017
and all latest Circulars shall be applicable.
2.0 Retention Money
2 % amount of each Running Bill shall be deducted as a Retention Money. Such retention
money shall be released in the final bill of the said work. AMC reserves right to deduct any
amount to compensate the poor performance of the contractor i.e. poor quality or abandoned
/ incomplete work.
3.0 Subcontracting
3.1 Except where expressly specified in the Contract, the Contractor shall not subcontract any
portion of Work without the approval of the Employer’s Representative. Any subcontracting
shall not relieve the Contractor from any contractual obligations or responsibility under the
3.2 The Contractor shall not be required to obtain consent for a subcontract for which the name of
the subcontractor and scope of works activities to be performed by him is already stated in the
contract or supply of material or engagement of labour.
4.1 The Contractor shall employ the key personnel named in the Schedule of Key Personnel as
referred to in the Bid document to carry out the functions stated in the Schedule or other
personnel approved by the Engineer. The Engineer will approve any proposed replacement of
key personnel only if their qualifications, abilities, and relevant experience are substantially
equal to or better than those of the personnel listed in the Schedule.
4.2 If the Engineer asks the Contractor to remove a person, without assigning reasons thereof, for
his misconduct or inadequacy of technical skills and experience, who is a member of the
Contractor’s staff or his work force, the Contractor shall ensure that the person leaves the Site
within seven days and has no further connection with the work in the Contract.
4.3 No residential accommodation is allowed at the site of work. The labour huts shall not be erected
on the site of work and contractor shall make his own arrangements to provide such
accommodations as per the rules of the local bodies. He shall make his own arrangements for
housing, stores, field office etc. He shall submit a site layout plan indicating the location of
various site facilities to be created by him at his cost for the execution of work. The Owner shall
in no way be responsible for any delay on this account and no claim on this account
Signature of Bidder Page 19 of
whatsoever shall be entertained. All Basic amenities shall be provided by the Contractor to
Labours as per the prevailing labour Laws.
5.1 The Contractor shall have full regard throughout execution, completion and defects liability
period to following safety aspects and shall take all necessary steps to ensure that danger to
safety is avoided all the time in respect of,
Safety of the works
• Safety of the Contractor’s employees and all the persons directly or indirectly engaged
by him for the works
• Safety of all the employees including persons working on other contracts of Employer
at the same site of the Employer and Engineers employees engaged at work site.
• Any authorized third party persons on the site.
• Contractor’s plant and equipment
5.2 The Contractor shall provide and maintain at his costs all lights, guards, fencing, warning signs,
barricading, and cones; when and where necessary, or required by Engineer in Charge or by
any duly constituted authority for the protection of the works or for the safety and
convenience of the public or other.
5.3 The Contractor shall take all reasonable steps to protect the environment on and off the site
and avoid damage or nuisance to persons or property of the public and others arising as a
consequence of his method of operation.
5.4 The Contractor shall maintain in good condition all work throughout execution, completion,
and defects liability period. The contractor shall be responsible for and to make good all
injuries, damages and repairs, rendered necessary by fire, rain, traffic, floods or other causes.
5.5 All the scaffolding work, wherever required for the execution of work, shall be provided by the
contractor. Nothing extra shall be payable on this account. It shall be provided strictly with
double scaffolding system with all the accessories etc. with adjustable suitable working
platforms to access the areas, with ease for working and inspection. It shall be designed to take
all incidental loads. It should cater to the safety features for workmen. It shall be ensured that
no damage is caused to any structure due to scaffolding.
5.6 All temporary warning/ caution boards display shall be provided and displayed during day as
well as night time by the contractor, wherever required and as directed by the Engineer.
5.7 Arrangement of temporary water and electricity and telephone connection required, by him,
shall be made by the Contractor at his own cost and also necessary permissions directly from
relevant Owners shall be obtained by him under intimation to the Owner. Also all initial and
running charges and security deposit, if any in this regard shall be borne by him. The Contractor
shall abide by all the rules/ bye laws applicable in this regard and he shall be solely responsible
for any penalty on account of violation of any of the rules and byelaws in this regard.
5.8 In any case if any fatal accident (major or minor) occurs due to poor safety precautions, the
same shall be completely contractor’s responsibility. All the losses due to such accidents and
expenses of legal matters shall be borne by contractor.
Signature of Bidder Page 20 of
5.9 The Contractor shall be responsible for maintenance and watch and ward of the complete
installation and shall also be responsible for any pilferage, theft, damage, penalty etc. in this
regard. The Contractor shall indemnify the Owner against any claim arising out of pilferage /
theft, damage, penalty etc. whatsoever on this account.
5.10 The Contractor shall depute Site Engineer & skilled workers as required for the work. Necessary
protective and safety equipments shall be provided to them by the Contractor at his own cost
and used at site.
6.0 Contractor to keep site clean:
During the execution of the work, the Contractor shall keep the site clean. All wreckage
rubbish, excess materials, temporary works no longer required will be removed from site
7.0 Clearance of site on completion:
The Contractor shall clear away and remove all Contractors equipment, surplus materials,
rubbish, temporary works of every kind.
A. COST CONTROL
8.0 Bill of Quantities
a. The schedule-B shall contain Memorandum showing items for the construction,
installation, testing, and commissioning work to be done by the Contractor.
b. The quantities stated in the schedule B are estimated quantities. The Contractor shall be
paid only quantities calculated after taking measurements of executed work. The rate
stated in the schedule B for each item of work shall apply. The works shall be measured by
the Contractor jointly with the authorized representative of the Engineer and all particulars
required by the representative of the Engineer shall be supplied by the contractor.
c. The work shall be measured net. No allowance for general or local custom, working space
etc. is to be made.
9.1 The Engineer in Charge shall have power to make any variation of form, quality or quantity of
the works or any part thereof that may, in his opinion, be necessary and for that purpose, or if
for any other reason it shall, in his opinion, be appropriate, he shall have the authority to
instruct the Contractor to do and the Contractor shall do any of the following:
Increase or decrease the quantity of any work up to any extent included in the contract,
Omit any such work,
Change the character or quality or kind of any such work,
Execute additional work of any kind necessary for the completion of the Works or
Change any specified sequence or timing of construction of any part of work.
9.2 No such variation shall in any way vitiate or invalidate the contract, but the effects, if any, of all
such variations shall be valued in accordance with the following sub clauses. Provided that
where the issue of an instruction to vary the Works is necessitated by some default or breach
of contract by contractor or for which he is responsible, any additional cost attributable to such
default shall be borne by the Contractor.
Signature of Bidder Page 21 of
9.3 The Contractor shall not make any such variation without an instruction of the Engineer. No
instruction is required for quantities varying from those provided for the items in the contract
10.1 The basis for the valuation of variations for addition to the Contract Price shall be as follows in
the same order of priority.
a) Variations in the quantities of work in schedule of quantities shall not vitiate the contract.
b) The contractor shall be bound to execute extra items of work as directed by the Engineer-
c) Contract unit rates for individual items shall apply to varied quantities where there is a
quantity variation.
d) The price variations on extra item will not be given.
e) In case of other non tender items following procedure shall apply.
10.2 If any extra item crops up during the progress of work the same shall be carried out by the
Contractor and he shall be paid at the rate fixed by Employer which shall be fixed as lowest of
the rates derived by rate analysis based on the following three methods. , the priority of the
documents forming the Contract shall be as follows:
(i) If the extra item is included in the S.O.R. of Road & Building Department, Year 2013-14,
the rate of extra item shall be that rate and premium (above or below) quoted by
(ii) Rate analysis based on prevailing Govt. of Gujarat’s SOR rates.
(iii) Rate analysis based on current market rates. This shall be based on
The material costs, the labour costs, the cost of use of all plant, machinery and
equipment, the cost of all temporary and incidental works, the overheads and the
Contractors profit.
The overheads shall be taken at 5 % of the sum of material costs, the labour costs, the
cost of use of all plant, machinery, and equipment, the cost of all temporary and
incidental works.
10.3 In case of the rate is to be derived from prevailing market rate, the Contractors profit shall be
taken at 10 % of the final rate derived.
10.4 In the event of disagreement, the Engineer in Charge shall fix such rates and prices as are, in his
opinion appropriate and shall notify the Contractor accordingly with a copy to the Employer.
10.5 The Engineer shall determine provisional rates and prices to enable on account payments to be
included in the Interim Payment Certificates, until rates and prices are agreed as final by the
Employer, the Contractor, and the Engineer.
10.6 The Contractor shall not be entitled to additional payment for costs, which could have been
avoided by giving early warning.
11.1 Payments shall be adjusted for deductions for advance payments, retention, other recoveries in
terms of the contract and taxes at source, as applicable under the law. The Employer shall pay
the Contractor the amounts certified by the Engineer.
Signature of Bidder Page 22 of
11.2 If an amount certified is increased in a later date certificate due to corrections in previous
certificates or as a result of an award from disputes review experts, Contractor shall be paid
such amount only. The Contractor shall not be paid any interest upon such delayed payment.
11.3 Items of the work for which no rate or price has been entered in will not be paid for by the
Employer and shall be deemed covered by other rates and prices in the Contract.
11.4 All payments shall be made in Ahmedabad.
12 Taxes and duties
12.1 The rates are inclusive of all the prevailing taxes and duties of the Central, State and Local
Governing bodies prevailing on the date of award of the contract. The Contractor will have to
pay all such taxes and duties for the performance of this Contract. The Employer will deduct
from the Contractor’s monthly and other payments all taxes and duties, which he is bound to
recover in accordance with the applicable law.
12.2 The Contractor shall keep himself fully informed of all acts and laws of the Central & State and
local Governing bodies, all orders, decrees of bodies, tribunals having any jurisdiction or
authority which in any manner affect those engaged or employed, and anything related to
carrying out the work. All the bye-laws lay down by AMC/AUDA and any other local bodies
while executing the work shall be adhered to. All taxes of local bodies shall be borne by the
contractor. The Contractor shall arrange to give all notices required by any authority and to pay
to such authority all the fees that may have to be paid for the material, plants, equipments etc.
The Contractor shall also adhere to all traffic restrictions notified by the local authorities. He
shall protect and indemnify the Owner and its officials & employees against any claim or
liability arising out of violations of any such laws, ordinances, orders, decree, whether by
himself or by his employees or his authorized representatives. Nothing extra shall be payable
on these accounts.
13.0 Labour Welfare Cess
As per circular No. GHR/2005/04/CWA/2004/841/M-3 dt. 3/1/05 and G.R. No. CWA/2004-
1831-M(3) dt. 9/12/05 issued by G.O.G. (non-refundable) shall be deducted from every bills
which shall be deposited to Govt. Labour Department for Labour welfare fund.
14.0 Currencies
All payments shall be made in Indian Rupees.
15.0 Advance Payment
No Advance Payment shall be made.
16.0 Cost of Repairs
Loss or damage to the Works or Materials to be incorporated in the Works between the Start
Date and the end of the Defects Correction periods shall be remedied by the Contractor at the
Contractor's cost if the loss or damage arises from the Contractor's acts or omissions.
Signature of Bidder Page 23 of
B. FINISHING THE CONTRACT
17.0 Completion
The Contractor shall request the Engineer to issue a Certificate of Completion of the Works and
the Engineer will do so upon deciding that the Work is completed.
18.0 Termination
18.1 The Employer shall be entitled to terminate the contract if the contractor:
(a) Fails to carry out any obligation under the contract.
(b) Without reasonable excuse fails –
1. To commence the works on site within the period stated in the Appendix to Bid after
receipt by him of a Notice to this effect from the Engineer/Employer after signing the
2. To proceed with the works, or any section thereof, within 28 days after received notice
3. Has failed to comply with a notice issued or an instruction issued within 28 days after
having received.
4. Abandons the works or otherwise plainly demonstrates the intention not to continue
performance of his obligation under the contract.
5. Sub-contracts the works or assigns the contract without the specific prior written
permission of the engineer.
6. Has failed to furnish the required securities or extension thereof in terms of the
7. Becomes bankrupt or insolvent, goes into liquidation, has a receiving or administration
order made against him, compounds with his creditors, or carries on business under
receive, trustee or manager for the benefit of his creditors, or if any act is done or
event occurs which (under applicable Laws) has a similar effect to any of these acts of
18.2 In any of these events or circumstances, the Employer may, upon giving 14 days notice to the
contractor, terminate the contract and expel the contractor from the site. However, in the case
of sub-paragraphs (h), the Employer may be notice terminate the contract immediately.
18.3 The Employer’s decision to terminate the contract shall not prejudice any other rights of the
Employer, under the contract or otherwise.
18.4 After termination, the Employer may complete the works and/or arrange for any other entities
to do so. The Employer and these entities may then use any goods, contractor’s documents and
other design documents made by or on behalf of the contractor.
18.5 The Employer or the Contractor may terminate the Contract if the other party causes a
fundamental breach of the Contract.
18.6 Fundamental breaches of Contract include, but shall not be limited to the following:
(a) the Contractor stops work for 14 days when no stoppage of work is shown on the current
Program and the stoppage has not been authorized by the Engineer;
(b) the Employer or the Contractor is made bankrupt or goes into liquidation other than for a
reconstruction or amalgamation;
(c) The contractor fails to fulfill requirements;
(d) the Engineer gives Notice that failure to correct a particular Defect is a fundamental breach
of Contract and the Contractor fails to correct it within a reasonable period of time
determined by the Engineer;
Signature of Bidder Page 24 of
(e) the Contractor does not maintain a security which is required;
(f) the Contractor has delayed the completion of works by the number of days for which the
maximum amount of liquidated damages becomes payable as defined in the Contract data;
(g) if the Contractor, in the judgment of the Employer has engaged in corrupt or fraudulent
practices in competing for or in the executing the Contract.
(h) For the purpose of this paragraph: “corrupt practice” means the offering, giving, receiving
or soliciting of anything of value to influence the action of a public official in the
procurement process or in contract execution. “Fraudulent practice” means a
misrepresentation of facts in order to influence a procurement process or the execution of
a contract to the detriment of the Borrower, and includes collusive practice among Bidders
(prior to or after bid submission) designed to establish bid prices at artificial non-
competitive levels and to deprive the Borrower of the benefits of free and open
18.7 When either party to the Contract gives notice of a breach of contract to the Engineer for a
cause other than those listed above, the Engineer shall decide whether the breach is
fundamental or not.
18.8 Notwithstanding the above, the Employer may terminate the Contract for convenience.
18.9 If the Contract is terminated the Contractor shall stop work immediately, make the Site safe
and secure and leave the Site as soon as reasonably possible and handover the site to the
Employer including all materials and plant and equipment existing there upon.
19.0 Contractor's own responsibility
The contractor is to set out and level the works and will be responsible for the accuracy of the
same. He shall also be responsible for the correctness of the positions, levels, dimensions, and
alignment of all parts of the structures as per instructions given to him. If at any time any error
shall appear during the progress of any part of the work, the contractor shall at his own expense
rectify such error if called upon to the satisfaction of the Engineer in charge.
20.0 Overpayment & Underpayment
20.1 Whenever any claim Fifths payment of a sum to the Municipal Corporation arises out of or
under this Contract against the contractor the same may be deducted by the Municipal
Corporation from any sum then due or which at any time thereafter may become due to the
contractor under this contract and failing that under any other contract with the Municipal
Corporation or from any sum due to the contractor with the Municipal Corporation (which may
be available with Municipal Corporation), or from his retention money, or he shall pay the claim
on demand. The Municipal Corporation reserves the right to carry out post payment audit and
technical examination of the final bill including all supporting vouchers, abstracts, etc.
20.2 The Municipal Corporation further reserves the right to enforce recovery of any over payment
when detected notwithstanding the fact that the amount of the final bill may be included by the
20.3 If as a result of such audit and technical examination any over payment is discovered in respect
of any work done by the Contractor or alleged to have been done by him under the contract, it
shall be recovered by the Municipal Corporation from the contractor by way of all the means
prescribed above or if any under payment is discovered by the Municipal Corporation, any
Signature of Bidder Page 25 of
amount due to the contractor under this contract or under payment may be adjusted against
any amount then due or which may at any time thereafter become due before payment is made
to the contractor from him to the Municipal Corporation on any other contract account
21.0 Materials obtain from dismantling
If the contractor, in the course of execution of work is called upon to dismantle any part for
reasons other than on account of bad or imperfect work, the materials obtained from
dismantling will be the property of the A.M.C. and will be disposed of as per instruction of
Engineer-in-charge in the best interest of the A.M.C.
22.0 Dispute to be referred to Arbitrator
The disputes relating to this contract, so far as they relate to any of the following matters,
whether such disputes arise during the progress of the work or after the completion or
abandonment thereof, shall be referred an independent Arbitrator appointed by AMC as far
possible in consultation with the agency if it is necessary and such disputes shall be settled in
accordance with the arbitration and conciliation Act.
(i) The rates of payment under clause 5 for any tools, materials and stores, in or upon the
works of the site thereof or belonging to the contractor or procured by him and
intended to be used for execution of the work or any part thereof possession of which
may have been taken by the Engineer-in-charge under the said clause –5.
(ii) The reduction in rates made by the Engineer-in-charge under clause 9 from the items
of works not accepted as completed fully in accordance with the sanctioned
specifications.
(iii) The rate of part of payment for any class of work which is included in the additional or
altered work carried out by the contractor in accordance with the instructions of the
Engineer-in-charge under clause 14 and the rates for which is to be determined under
the said clause
(iv) The rates of payment for materials already purchased or agreed to be purchased by the
contractor before receipt of notice given by the Engineer-in-charge under clause
and/or amount of compensation payable to the contractor under the said clause for
loss in respect of such materials.
(v) The amount of compensation which the contractor shall be liable to pay under clause
17 in the event of this failure to rectify, remove or reconstruct the work within the
period specified in the written intimation or the amount of expenses incurred by the
Engineer-in-charge under the said clause17 in rectifying, removing or re-executing the
work or in removing and replacing the materials or articles complained of.
(vi) The reduction of rates as may be fixed by the Engineer-in-charge under clause 17 for
the inferior work or materials as accepted or made use of.
(vii) The amount of compensation payable by the contractor for damages as estimates and
assessed under clause
(viii) The amount payable to the contractor for the work carried out under clause 33 in
accordance with the instructions and the requirement of the Engineer-in-charge in case
where there are no specifications.
Signature of Bidder Page 26 of
(ix) The awards declared by the arbitrator shall be speaking award giving reasons and
calculations to every item of claims. The decision will have to be implemented by all
(x) In case of dispute leading to the contractor or Ahmedabad Municipal Corporation
approaching on Court of Law. It shall be within the jurisdiction where the site of work is
The reference to arbitration proceeding under this clause shall not:
i) Entitle the contractor to stop the Affect the right of the Engineer-in-charge under clause 5 to
take possession of all or any tools, plants, materials and stores in or upon the works of site
thereof belonging to the contractor or procured by him and intended to be used for the
execution of the work or any part thereof.
ii) Preclude the Engineer-in-charge from utilizing the materials purchased by the contractor in
any work or from removing such materials to other places, during the period the work is
stopped or suspended in pursuance, of notice given to the contractor under clause
iii) Progress of the work or the carrying out the additional or altered work in accordance with
the provisions of clause 14 or as the case may be, of clause
23.0 Drawings and Photographs of the Works
23.1 The contractor shall do photography/ videography of the site as and when asked by AMC. No
separate payment will be made to the contractor for this. . The contractor shall have to submit
the same in hard copy as well as soft copy as and when demanded by the AMC.
23.2 No photograph of the works or any part thereof or plant employed thereon, except those
permitted under clause 59.1, shall be taken, or permitted to be taken by the Contractor or by
any of his employees or any employees of his sub-Contractors without the prior approval of the
Engineer in writing. No photographs/ videography shall be published or otherwise circulated
without the approval of the Engineer in writing.
Seal and Signature of the Bidder Additional City Engineer
Date: Ahmedabad Municipal Corporation
Signature of Bidder Page 27 of
ybœtJtœ BGþrlrmvj ftuvtuohuNl
ftb btxuLþk xftJthe >hJt¤wk xuLzh ylu ftuLx[tfx
xuLzh btxule Nh<tu
(1) y:- yt xuLzh su <u Jdolt yb>tJt> BGþrl.ftuvtuohuNl y&Jt fuLî{ y&Jt htsg mhfthle btLg
gt>elt ftuLx[fxhtu Che NfNu. dJobuLxlt btLg ftuLx[tfxhu yb>tJt> BGþrl.ftuvtuohuNlbtk btLg
ftuLx[tfxhtule gt>ebtk hSMxuNl fhtJJtlwk hnuNu.
c:- btLg ©uKelt ftuLx[tfxh <hefu ltuk^Kelwk «btKvºtle MJ «btKe< fhuj lfj xuLzh mt&u
stuzJtle hnuNu.
f:- xuLzhhle jtgft<
ftb sJtc>th xuLzhh <ubs su xuLzhh mwaJuj ftuLx[tfxhle ©uKe ytJ<t ntug <ubs ftb fhJt
mûtb ntug <ublu s ytvJtbtk ytJNu. ftb ytv<t vnujt ftuLx[tfxhu ftb mk<tu»tfthf <ubs
xtRb jebexbtk ÃþY fhJt sYhe mJj<,ylwCJ, ûtb<t ylu VtgltLmegj hemtumo hsw
z:- yb>tJt> Bgwrlrmvj ctuzo XhtJ lk - 3836,<t.25/11/2011 &e b¤uj bkswhe ylwmth
<&t mexe.Rsluh mh¾gwjh,lk -17,<t.09/12/2012 bwsc yb>tJt> Bgwrlrmvj
ftuvtuohuNlbtk ftuLx[t¾xh hSMxuNl Ve, heLgwyj Ve <&t yvd{uzuNl Ve ylu btv>kztu ægtlbtk
htFe <u bwsc ybj fhJtltu hnuNu.
E. xuLzh Ch<t vnujt xuLzhhu mtRx rlheûtK fhe juJwk. xuLzhh ftblt «fth, ngt< hM<t, vtKe
btdo, mkath ylu JvhtNlt ceò hM<tytu&e mk<wÐ ntuJtlwk btle juJtbtk ytJNu. xuLzhhu ftblu
mtRx ylu rcÕzekd(fu su ftb fhJt, ftb ÃþY fhJt <&t ftblt buRxulLm btxu cltJuj
ntug).<ubs xuLzhhu yt mtRxlt ftb btxu, rcÕzekd btxu, gtzo, zevtu btxule søgt vtu<tle he<u
bu¤Je juJtle hnuNu. (xuLzhlwk ftb fhJt, ftb vwhwk fhJt <&t ftblt buRxulLm btxule søgt)
(h) yt ftble mbg bgto>t bubtuhuLzb (ltuxem RLJtRxuz xuLzh) btk sKtJuj «btKu le hnuNu.
(3) xuLzh Jujezexe rvhegz bubtuhuLzb (ltuxem RLJtRxuz xuLzh) btk sKtJuj «btKu le hnuNu.
(4) xuLzh Ch<e JF<u yluoMxble ChJtle hnuNu.
(5) xuLzh Vtubo
xuLzh Vtubo ylu ylwmwrabtkle >hufu >huf Ftje søgt xuLzh Chlthu Chuje yt mt&u btufjujt >M<tJus
vh< fhJtlt hnuNu.
Signature of Bidder Page 28 of
(6) ftuLx[tfxhtuyu leaule ctc<tu ft¤SÃËJof JtkaJt rJlk<e Au.
(1) ftuR fkvlelu ltbu xuLzh juJtbkt ytÔgwk ntug <tu fkvle J<e xuLzh vh mne fhlth Ôgrf<lu
yr^f]< fh<wk bwFðgthltbwk xuLzh mt&u hsw fhJtlwk hnuNu.
(2) Bgwrl.ftuvtuohuNllt «Joðbtl rlgbtu ylwmth yluMxble ChJtle hnuNu.ylu xuLzh mt&u
(3) ftuLx[tfxhu RLfbxuût mkckr^< vtl lkch <&t cukf zexuRj ytvJtle hnuNu.
(4) ftuLx[tfxh vtmu ydtWlt ylwCJt ykdult «btKvºttule lfj xuLzh mt&u hsw fhe NfNu.
(5) xuLzh Nh<tu ylu MvuNeVefuNl <&t CtJ vºtflt >huf vtlt ylu rJd<tu vh ftuLx[tfxhu mne
(6) <btb mw^tht, AufAtf ylu Dwkxujt jFtK vh ftuLx[tfxhu xwkfe mne fhJe.
xuLzh Chlthlu sKtJJtbtk ytJu Au fu xuLzh >eM<tJustult jFtKbtk ftuR AufAtf fu VhuVth
fhJt >uuJtNu lrn ylu ytJe ftuR AufAtf fu VuhVth juJtNu lrn, <ultk jFtKbtk ftuR Cwj ntug
<tu <ult vh l Dwkx<t Ftuxt jFtK fu ytkfzt vh Auftu bthelu <ult mtawk jFtK fu ytkfzt MvÐ
Wfju <u he<u jFJt. «ðguf mw^tht vh xwkfe mne fhJe.
(8) y:- xuLzh hsw fh<tk vnujt Ftm fhelu xuLzhbtk >NtoJuj mwaltytulwk vtjl fhJtbtk ytÔgw lrn
ntug <tu xuLzh ybtLg dKJtbkt ytJNu <ule ltuk^ juJt rJlk<e Au. J¤e yt Vtubolwk bwFv]ƒ
ylu ftuLx[tfxhtult btdo>Nol btxu mtbtLg rlgbtu ylu mwaltytu vK ft¤SvwJof JtkaJt
(1) ftuEvK fthK >NtoÔgt rmJtg ftuEvK fu c^t xuLzhtu yMJefthJtltu n¬ yctr^< hnu Au.
(h) xuLzhhu ctujvtuELx vullt c>ju NtneJt¤e vul&e Chujt xuLzhtu ðþkh< s ybtLg dKJtbtk
c:- Wvhle ctc<tu Wvhtk< xuLzh leault mkstudtubtk <h< ybtLg XhJtlu vtºt &Nu.
(1) xuLzh Chlth, rlg< ftb y&Jt ftb btxu bkswh fhuj y&Jt CtJ vºtflt ftuR ftuz y&Jt
vîr< y&Jt rJd<tubtk bwfuj Nh< y&Jt mw^thtbtk ftuR VuhVth mwaJ<t ntug.
(h) xuLzhlwk ftuR vtlwk fu vtlt ftZe ltkÏgwk/ltkÏgt ntug fu c>ÕGþ / c>Õgt ntug.
(3) c^t mw^tht J^tht y&Jt atukxtzuje ftvjeytu Wvh xuLzh Chlthu xwkfe mne l fhe ntug.
(4) xuLzhbtk <ubKu ftuR AufAtf fhe ntug, ylu
Signature of Bidder Page 29 of
(5) xuLzh Chlth y&Jt vuZele ctc<btk >huf Ctde>th y&Jt <u ykdulwk bwFðgthltbwk ^htJlth
Ôgrf< mne l fhu y&Jt xuLzhbt <u btxu htFJtbtk ytJuje søgtbtk mne/mneytu Wvh ftuR
mtûteyu mtF fhe l ntug.
f:- Nh<e xuLzh MJefthJtbtk ytJNu lne.
z:- xuLzh MJefthJw, h> fhJw, ftulu ytvJw ylu fgt CtJ&e ytvJw <u ykdu Bgwrl. frb§h©eltu
rlKog ytFhe hnuNu. ftuR fthKmh stu ftuLx[tfxhlu ftb l ytve Nftg <tu <u ykdu ftuLx[tfxh
ftuRvK «fthltu lwfNtle fu J¤<hltu nff>tJtuu fhe NfNu lrn fu ftg>tfeg ftgoJtne yt
ykdu &R NfNu lrn. xuLzh bkswh >ltu y&o ftb ytve >uJtLþk Au <uJtu &R NfNu lrn.Nh<e
xuLzh MJefthJtbtk ytJNu lne.
(9) rJmkdr< ylu rnmtc stud:
nt& ^hJtlt ftbtule ctc< >NtoJ<t CtJ vºtfbtklt sÚ&t ylu hfble ftuRvK
Cwjawf leault rlgbtu ylwmth mhCh fhJtbtk ytJNu.
(1) xuLzh Chlthu >hlt Ftltbtk sKtJuj Nç>tu ylu ytkfzt Jåau ftuR ymkdr<lt fumbtk Nç>tuubtk
sKtJuj hfb btLg htFJtbtk ytJNu.
(2) yufb >h ylu sÚ&tlt Ftuxt dwKtfthlt fthKu ftble ctc<tu >NtoJ<e CtJ vºtflt
Ftltbtk&e hfbbtk Cwj sKtg <tu yufb >h btLg htFJtbkt ytJNu ylu >hlt yt^thu
dwKtfth mw^thJtbkt ytJNu.
(3) yufblt Ftltbtk&e <ubs ytd¤ Fuka<t mhJt¤tle <btb Cwjtu mw^thJtbkt ytJNu.
(4) ctc<tu y&Jt mhJt¤t mtbu vwhu ytkfzu fhuj ftuR vK ctc< ægtlbtk juJtbtk ytJNu lrn.
(10) y:- ftbltu «tud{um mbgbgto>t bwsc fhJtltu hnuNu. yt mbgbgot>t 10 jtF mw^elt ftb btxu
yuj.ytu.ytR. ytÃgt <theF&e 10 r>Jm <&t 10 jtF &e Wvhltk ftb btxu yuj.ytu.ytR. ytÃg
<theF&e 15 r>Jm&e NY &guj dKJtbt ytJNu. <&t <u >hBgtl ftble 5% juFu zevtuÍex Che
fhthvºt fhJtltu hnuNu.
xuLzhbtk ftuLx[t¾xh îtht Chujt CtJ <btb «fthlt su <u «J<o<t mhfthe xuût
mrn<lt CtJ dKJtbtk ytJNu. ylu <ubtk atjw ftb >hBgtl su ftuR VuhVth &Nu <ultu J^thtu
awfJJtbtk ytJNu lrnk.
c:- mûtb m•tt îtht Yt.10,00,000.00 (>m jtF) mw^elt xuLzhle bkswheltu XhtJ vtzgt
ct> (LOI) ytvJtbtk ytJNu ðgth ct> r>l - 10 btk rm¾gtuhexe zevtuÍex sbt fhtJJtle
hnuNu. rm¾gtuhexe zevtuÍex btuze ChJtlt rfMmtbtk Bgwrl.ftuvtuohuNlbtk «Joðbtl rlgb
ylwmth ftgoJtne fhJtbtk ytJNu.
Signature of Bidder Page 30 of
f:- bkswh &guj xuLzhle mbgbgto>tbtk ftbdehe vqKo l &tg <tu bubtuhuLzb (ltuxem RLJtRxuz
xuLzh) btk sKtJuj «btKu bkswh &guj mbgbgto>t ct>lt FhuFh ctfe ftble hfblt
bn•tb 10% juFu (jefJezexe zubuSm) vulÕxe Jmwj fhJtbtk ytJNu.
(11) y:- awfJKe:-
xuLzh Chlthu yu Jt< mbS juJtle hnuNu fu <uKu xtkfujt >h vwhtk &gujt ftb btxult Au ylu
<ubtk bswhe, vtjF, ÃjtLx, >uFhuF, mhJem-ftbdehe, Jes¤e, htugÕxe ylu ytufx[tug Jduhu
ykNu <btb Faoltu <&t sYh sKtg <tu ylu ðgthu ht<vt¤elt ftblu juJt c^t J^thtlt
Faoltu mbtJuN &Nu ylu xtkfujt CtJ fu >h fh<t J^thtle ftuR awfJKe ykdult <ublt ftuR
>tJt ægtlbtk juJtNu lnek ylu xuLzh Chlth Ftuxe hswyt<lu fthKu y&Jt ftuR Ôgrf<yu
(vAe<u ctk^ftb rJCtdltu fboathe ntug fu l ntug) <ublu ytvuje btne<elu yt^thu vtA¤&e
ftuR >tJt> hsw fhJt nf>th hnuNu lnek. <ublw xuLzh ChJt <&t <ubtk sw>t sw>t CtJ ylu >h
ChJt btxu sYhe yuJe <btb btne<e vtu<tlt vûtu l bu¤Je NfJtlu fthKu vtu<u xuLzh hsw
fhJtlu je^u y&Jt <ubtk&e WCt &<t ftuR stuFb fu sJtc>thebtk&e Axfe NfNu lnek. m>h
ftbbtk ftuR vK ò<lt ctk^ftblt bxehegj Wvh CtJ J^thtu ytvJtbtk ytJNu lrnk.
c:- ftuLx[tfxhtulu vubuLx / hlekd cej Bgwrl. frb§h©elt su <u «J<obtl rlgb bwsc fhJtbt
ytJNu. <&t Bgwrl. frb§h©e/mexe Rsluh©e lt su <u JF<ltk mh¾gwjh «btKu
ftbdehe/ybj fhJt rcl Nh<e ckDlf<ot hnuNu.
f:- ftuLx[t¾xhlt >huf hlekd cejbtk&e ftuLx[t¾xhlu awfJJtle &<e fwj hfb Wvh (xuLzh bwsclwk
vubuLx + yu¾x[t ytRxb) 2 % juFu hexulNl ble ftvJtbtk ytJNu su VtRlj cejbtk vh<
ytvJtbtk ytJNu.
z:- htsg / fuL÷ mhfth©elt JF<tuJF<lt ftg>t bwsc su ftuR hfble fvt< fhJtle &Nu <u
bwsc ftuLx[tfxhlt cejbtk&e fvt< fhJtbt ytJNu.
(12) yu:- fhth mkc^e >M<tJustu fhthlt ydðglt Ctd dKtNu ylu <u mD¤t mne<lt fhth mbd{
ftblu jtdw vzNu.
ce:- xuLzhbtk >NtoJuj ftb mkck^e >M<tJusbtk >NtoJuj rJd<btk rJmkd<<tlt rfMmtbtk leau >NotJuj
¢btlwmth >M<tJusbtk >NtoJuj rJd< d{tng htFJtbkt ytJNu.fhth mkc^e >M<tJustu fhthlt
ydðglt Ctd dKtNu ylu <u mD¤t mne<lt fhth mbd{ ftblu jtdw vzNu.
(yu) yufb ylu f>:-
(2) xuLzh VtuboLþk CtJvºtf
(3) MvuNeVefuNl
Signature of Bidder Page 31 of
z[tu#dbtk f>, ytfth, ytkfzt f>ta Ftuxt ntug <tu btvujt f>, ytfthlu yLþmhÔþk
(2) xuLzh Vtubole yLþMþra-ce
(3) MvuNeVefuNl
Cwj Chujt fu Ftuxt JKollt rfMmtbtk yt mkck^e Wvhefûttyu rJmkd<<t ykdule ltuk^
bwfe yuze.mexe yuLSlegh / zu.BGþrl.frbNlh©ele bkswhe bu¤JJtbtk ytJNu ylu <u bwsc
fhJtbkt ytJuj rlKog ykr<b dKJtbkt ytJNu.
(13) xuLzhhu z[tuRkd fu MvuNeVefuNlbtk hnuje ftuR ûtr< fu Ftbeltu duhjtC juJtle fturNN l fhJe
ylu Rsluh Rlatsuo Ãjtl <&t MvuNeVefuNlle ûtr<ytu mw^thJe <&t <ulwk mtawk y&oDxl
(14) yt Wvhtk< y.Bgw. ftuvtuo. lt slhj ftuLx[tfx fLzeNl vK btLg htFJle hnuNu.
(15) yufe JF<u yuf fh<t J^w søgtytuyu ftb NY fhJtltu Jfo ytuzoh b¤u <tu ftb yuf mt&u s c^u
(16) atjw ftbu mrJom jtRllu lwfNtl l &tg <u he<u ftb fhJtlw hnuNu. stu ftuR mrJom jtRllu
lwfNtl &Nu <tu <ule mkvwKo sJtc>the (òlbtj) ftuLx[tfxhle vtu<tle hnuNu. mtRx Wvh
ftb >hBgtl bswhtu fu sl<tlt ftuR btKmlt òlbtj lu lwfNtl &tg <ule sJtc>the
ftuLx[tfxhle hnuNu. vtujem Vrhgt> &tg <tu <ule sJtc>the vK ftuLxtfxhle hnuNu. CuFz
Dme l vzu <ule sJtc>the vK vtujem Vrhgt>bt ftuLx[tfxhle hnuNu. CuFz Dme l vzu <u
btxu mjtb<elt vdjt (suJt fu >tuhzwk ctk^e bswh Ftztbtk W<thJt, mtuhekd ylu Mx[xekd fhJt
rJduhu) je^t Jdh bsqhlu Ftztbtk W<thNu <tu ftuLx[tfxh s vtujem Vrhgt>bt sJtc>th hnuNu
ylu Bgwrl.ftuvtuohuNlltu ftuRvK MxtV ytlt btxu sJtc>th hnuNu lrn. ytxjwk mbSlu s
xuLzh ChJwk. bswhtultu rJbtu vK W<thJtu.
(17) bxehegÕm fu ceò xuMxed hevtuxo ftuLx[tfxhu vtu<tlt Fauo ftuvtuohuNl sKtJu <u søgtyu
fhtJJtlt hnuNu. bxehegÕm jtJJt fu jR sJtltu mkvwKo Fao ftuLx[tfxhu CtudJJtltu hnuNu.
(18) M&¤ vrhrM&r< / sYhegt< bwsc ftb fhtJ<t xuLzhlt ytRxblt sÚ&tbtk J^ ^x &tg <tu
rlgb ylwmth <u ykdu ftb fhJt ftuLx[tfxh ck^tgujt Au.
(19) mtRx vh jtJJtbtk ytJuj btj mtbtl hesufx fhJtbt ytJu <tu <whk< r>l 1btk vh< jR
sJtltu hnuNu. yLg&t <ule lwfNtlle sJtc>the ftuLx[tfxhle hnuNu.
(20) ftuLx[tfxhlu su ftuLx[tfx ytvJtbtk ytJu Au. <ubt mhfth©elt «Joðbtl rlgb bwsc
ve.yuV/juch yufx <&t bswhtu <&t MxtVle Jebt vtujeme jElu <ult ftg>tlw vtjl fhJtlwk
Signature of Bidder Page 32 of
hnuNu <&t yt ykdu Bgwrl.ftuvtuohuNl îtht su btne<e btkdJtbtk ytJu <u ytvJtle hnuNu.
bu.BGþrl.frbNlh©elt mh¾âwjh Bþsc sYhe ctknu^he vºtf ytvJtLþk hnuNu.
(21) ftuRvK ftg>tfeg jexeduNl yb>tJt> Nnuhle ftuxobt hnuNu.
(22) btj su <u Mxtumo Wvh y&Jt mtRx Wvh jtuftulu lz<h l &tg <u he<u mwalt bwsc W<thJtltu
<ubs dtuXJJtltu hnuNu.
(23) ftuR vK mhfthe fhJuht ChJtle <btb sJtc>the ftuLx[tfxhle hnuNu.
(24) ftuLx[tfxh îtht xuLzhbt >NtoJuj MveNeVefuNl bwsc MxtLzzo bxehegÕm MvuNeVefuNl bwsc
jtJJtlt hnuNu.<&t xuMxekd fhtJJtlwk hnuNu.<&t y ykdu «Joðbtl Bgwrl.ftuvtuohuNlt rlgbtulw
vtjl fhJtlw hnuNu.
(25) yt xuLzhbtk stu ftuR ytRxb hne dR ntug <tu <u y&Jt M&¤ M&e<e bwsc xuLzhbtk mbtJuN l
ntug <uJe J^thtle ftbdehe fhJtle &tg <uJt rfMmbtk Bgwrl.ftuvtuohuNlt «Joðbtl rlgb
ylwmth J^thtle ytRxblt CtJ lffe fhJtbtk ytJNu ylu <u bwsc awkfJKe fhJtbtk
(26) atjw ftb >hBgtl «tuxufNlle mkvwKo sJtc>the ftuLx[tfxhle hnuNu. subtk vevzt, >tuhzt
Cgmwaf ctuzo, ÃjtMxef vèe, rJ. ftuLx[tfxhu jtJJtlwk ylu mtaJJtlwk hnuNu. ylu ftuRvK
yfMbt< &Nu <tu <ule mkvwKo sJtc>the ftuLx[tfxhle hnuNu.
(27) M&¤ Wvh atjw ftbdehe >hBgtl ftb fhlth ftuLx[tfxhlt bswh / fboathe y&Jt yLg
Ôgrf<lt yfMbt<lt rfMmbtk juch yufx bwsc fhJtle &<e ftgoJtne <&t vtujem
ftgoJtnele sJtc>the ftuLx[tfxhle hnuNu.
(28) stu MxtV mqalt ytvu <u bwsc mwalt vtu&e ftuLx[tfxhu htFJtle hnuNu. <ubtk >hhtus fhuj
ftbdehe <&t yr^ftheytuyu ftb mw^thJt fu «tud{um J^thJtlt ltuk^ fhuj ntug <tu <ulwk
ftuBÃjtgLm ytvJtlwk hnuNu ytJe ltu^lt sJtc l &gu fu <u «btKu M&¤ Wvh ybj l &gu
ftuLx[tfxhlu vulÕxe fhJtle m•ttt yuze.mexe yuLSlehgh©elu hnuNu.
(29) >huf ytRxblt MvuNeVefuNl yb>tJt> Bgwrlrmvj ftuvtuohuNlltk bkswh &guj <&t btLg
htFuj MvuNeVefuNl Nh<tu bwsc hnuNu su ytRxbbtk MvuNeVefuNl l ntug <uJt mkstudtubtk
yuze.mexe.yuLSlegh©eltu rlKog ytFhe hnuNu.Jtuxhekd fhJtbtk lrn ytJu fu >hhtus
J^thtltu zucheÍ WvtzJtbtk lrn ytJu <tu ftuLx[tfxhlt Fauo ylu sutFbu Jdh ltuxemu Jtuxhekd
fhtJJtbtk <&t zucheÍ WvtzJtbtk ytJNu ylu cejbtk&e hfb ftve juJtbtk ytJNu.
(30) juch JuÕVuh Vkz btxu ntjbtk htsg mhfth©eyu fhuj nwfb bwscle hfb cejbtk&e ftve
Signature of Bidder Page 33 of
(31) atubtmtltu vehegz <t.15 swl &e 14 ytufxtuch Mþ^eltu dKJtbtk ytJNu. yt mbg
>hBgtl ftuLx[tfxh îtht ftbdehe fhe Nftg <ub l ntug <tu <u Bþscle xtEb jebex J^the
ytvJtbtk ytJNu.
(32) muÕm xuût / Jux lkch / ve.yuV. ftuz lkch / vtl lkch / S.yum.xe. lkch rJduhu ftuLx[t¾xhu
VhSgt< ytvJtlt hnuNu.
(33) ltbœth ftuxo îtht fhuj nwfb <ubs rlœuo»ttulwk awM<vKu vtjl fhJtlwk hnuNu. subtk z[ulus lu
jd<tk ftb btk ftuRvK mkkstudtubtk bNel ntuj / dxh btk btKmlu W<thJtu lnek <ubs
buLgwyj M¾{uJSkd ykdule btdoœrNoft lwk vtjl fhJwk.
(34) mœh xuLzhle ytRxbtult CtJtu ltKt Ft<t lt mhfgwjh lk.38, <t.21/11/22 <&t mûtb m•ttle b¤uj bkswhe bwsc
GST rmJtg dKºtebtk juJtbt ytJuj <&t «Jo<btl rlgb bwsc GST awfJJt vtºt &Nu su&e <btb cezomu <u bwsc
dK<he fhe xuLzhtu ChJtlt hnuNu.
(35) mœh xuLzh yk<od<lt ftb mkjøl y.Bgw.ftu.btk vJo<btl <btb rlgbtu/mhfgwjhtu jtdw vzNu <ubs JF<tu JF< <h
mw^thtytu vK jtdw vzNu. sule ltuk^ jR xuLzhtu ChJtlt hnuNu.
Signature of Bidder Page 34 of
yufhthlwk Vtubo
(1) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt xuLzh hsw fh<tk vnujtk buk/ybu M&¤le
bwjtft< je^e Au ylu ftblu jd<t btjmtbtl, bswhe ylu ceS ctc<tulu jd<e
M&trlf vrhrM&r<le ò<-btne<e bu¤Je Au.
(2) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt ftuLx[tfxhtule Nh<tu rJd<tu ylu
xuLzhlu jd<t >M<tJustu ft¤SvwJof yÇgtm fgtuo Au ylu <u bwsc <ultu ybj fhJt
ftuLx[tfxhle mne ylu rmfft
Signature of Bidder Page 35 of
TECHNICAL SPECIFICATIONS:
Name of Work: - મ યઝોન શાહપુર વોડમાં મહદીકુવા ચાર ર તા પાસે, લીથો સ
Excavation for foundation upto 1.5 M depth including sorting out and stacking useful
materials disposing of the excavated stuff upto 50 meter lead in loose or soft soil.
Any soil which generally yields to the application of ackaxes and shoves, phawaras rakes or any such
ordinary excavating implement or organic soil, gravel silt, sand turfloam, clay, peat etc., fall under this
Clearing the site :
The site on which the structure is to be built shall be cleared and all obstructions, loose stone, materials
and rubbish of all kind, bush, wood and trees shall be removed as directed. The materials so obtained
shall be property of the Government and be conveyed and stacked as directed. within 50 M. lead. The
roots of the trees coming in the sides shall be cut and coated with a hot asphalt.
The rate of site clearance is deemed to be included in the rate of earth work for which no extra will be
After clearing the site, the center lines will be given by the Engineer-in-charge. The contractor shall
assume full responsibility for alignment, elevation and dimension of each and all parts of the work.
Contractor shall supply laborers, materials, etc. required for setting out the reference marks and bench
marks and shall maintain them as long as required and directed.
The excavation in foundation shall be carried out in true line and level and shall have the width and
depth as shown in the drawings or as directed. The contractor shall do the necessary shoring and shutting
or providing necessary slopes to a safe angle, at his own-cost. The payment for such precautionary
measures shall be paid separately if not specified. The bottom of the excavated area shall be 1 evened
both longitudinally and transversely. as directed by removing and watering as required. No earth filling
will be allowed for bringing it to level, if mistake or any other reason excavation is made. deeper or
Signature of Bidder Page 36 of
wider that shown on the plan or directed. The extra depth or width shall be made up with concrete of
same proportion as specified for the foundation concrete at the cost of the contractor. The excavation up
to 1.5 m. depth shall be measured under this item.
Disposal of the excavated stud :
The excavated stuff of the selected type shall be used in filling the trenches and plinth or leveling the
ground in layer including ramming and watering etc.
The balance of the excavated quantity shall be removed by the contractor from the site of work to a place
as directed with lead upped 50 M. and all lift.
Mode of measurement and payment :
The measurement of excavation in trenches for foundation shall be made according to the sections of
trenches shown on the drawing or as per sections given by the Engineer-in-charge. No payment shall be
made for surplus excavation made in excess of above requirements or due to slopping and sloping back
as found necessary on account of conditions of soil , and requirements of safety.
The rate shall be for a unit of one cubic meter.
Excavation for foundation for depth from 1.5 m to 3.0 m including sorting out and stacking of
useful materials and disposing off the excavated stuff upto 50 Meter lead.(C) Hard Murrum
The rate shall be for a unit of one cubic meter.
Filling available excavated earth in trenches, plinth, sides of foundation etc. incl. watering
The earth obtained from excavation shall be filled in layers not exceeding 20 cms. in depth and water
thoroughly after each layer and shall be properly consolidated with rammers so that no hollow voids
remain there. In general the work shall be carried out in the best manner so that no hollow voids remain
after work. Workmanship in general confirm to C –2.
Mode of Measurement shall be on cubic meter basis.
Providing and laying cement concrete1:5:10 (1-Cement: 5-coarses sand and:10-hand broken stone
aggregates 40mm nominal size) and curing complete excluding cost of formworkin (A) Foundation
and Plinth (upto 10 ton)
Providing and laying cement concrete1:4:8 (1-Cement: 4-coarses and:8-hand broken stone
Signature of Bidder Page 37 of
aggregates 40mm nominal size) and curing complete excluding cost of formworkin (A) Foundation
and Plinth (upto 10 ton)
Brick work using common burnt clay building bricks having crushing strength not
less than 35kg./Sq.Cm.in foundation and plinth in Cement Mortar1:6 (1-Cement :6 -
fine sand) B) Modular
Extra for brickwork in super structure above plinth level upto floor two level (B) Conventional
Materials: Water shall conform to M-1 Cement shall conform to M-3 Sand shall conform to M-6. Brick
shall conform to M-15 Cement mortar shall conform to M-11.
The proportion of the cement mortar shall be 1:6 (1 cement : 5 fine sand) by volume.
Wetting of bricks:
The bricks required for masonry shall be thoroughly wetted with clean water for about two hours before
use or as directed. The cessation of bubbles, when the bricks are wetted with water is an indication of
through wetting of bricks.
Bricks shall be laid in English bond unless directed otherwise. Half or cut bricks shall not be used except
when necessary to complete to bond; closer in such case shall be cut to required size and used near the
A layer of mortar shall be spread on full width for suitable length of the lower course. Each brick shall
first be properly bedded and set home by gently tapping with handle of trowel or wooden mallet. It side
face shall be flushed with mortar before the next brick is laid and pressed against it. On copletion of
course, the vertical joints shall be fully filled form the top with mortar.
The walls shall be taken up truly in plumb. All courses shall be laid truly horizontal and all vertical joint
shall be truly vertical. Vertical joints in alternate course shall generally be directly one over the other.
The thickness of brick course shall be kept uniform.
Signature of Bidder Page 38 of
The brick shall be laid with frog upwards. A set of tools comprising of wooden straight edges, mason’s
sprit level, square half meter rub, and pins, string and plumb shall be kept on the site of work for
frequent checking during the progress of work.
Both the faces of walls of thickness greater than 23 cms shall be kept in proper place. All the connected
brick work shall be kept not more than one meter over the rest of the work. Where this is not possible, the
work shall be raked back according to bond (and not left toothed) at an angle not steeper than 45 degrees.
All fixtures, pipes, outlets of water, hold fasts of doors and windows etc. which are required to be built in
wall shall be embedded in cement mortar.
Bricks shall be so laid that all joints are quite flush with mortar. Thickness of joins shall not exceed
mm. The face joints shall be raked out as directed by taking tools daily during the progress of work,
when the mortar is still green so as to provide key for plaster or pointing to done.
The face of brick shall be cleaned the very day on which the brick work is laid and all mortar dropping
Green work shall be protected from rain suitably. Masonry work shall be kept moist on all the faces for a
period seven days. The top of masonry work shall be kept well wetted at the close of the day
Preparation of foundation bed:
If the foundation is to be laid directly on the excavated bed, the bed shall be leveled, cleared of all loose
materials, cleaned and wetted before starting masonry. If masonry is to be laid on concrete footing, the
top of concrete shall be cleaned and moistened. The contractor shall obtain the engineer'’ approval for
the foundation bed, before foundation masonry is started. When puccas flooring is to be provided flush
with the top to plinth, the inside plinth offset shall be kept lower than the outside plinth top by the
thickness of the flooring.
Mode of measurements and payment:
The measurements of this item shall be taken for the brick masonry fully completed in foundation up to
plinth. The limiting dimensions not exceeding those shown on the plans or as directed shall be final.
Battered, tapered and curved portions shall be measured net.
No deduction shall be made from the quantity of brick work nor any extra payment made for embedding
in masonry or making holes in respect of following items:
Signature of Bidder Page 39 of
Ends of joints, beams, posts, girders, rafters, purlins, trusses, corbel steps etc. where cross sectional area
does not exceed 500 Sq. cm.
Opening not exceeding 1000 Sq. cm.
Wall plates and bed plates, bearing of slabs, chhajas an the like whose thickness does not exceed
Cms. and the bearing does not extend to the full thickness of wall.
Drainage holes, and recesses for cement concrete blocks to embed hold fasts for doors, windows etc.
Iron fixtures, pipes up to 300 mm dia hold fasts and doors and windows built into masonry and pipes etc.
for concealed wiring.
Forming chases of section not exceeding 350 Sq. Cm. in masonry.
Apertures for fire places shall not be deducted nor shall extra labour required to make splaying of jambs,
throating and making Arches over the aperture be paid for separately.
The rate shall be for a unit of one cubic meter.
Half brick masonry in common brunt clay building bricks having crushing strength not less than
35 Kg/Sq.Cm. in Cement mortar 1:5 ( 1-Cement : 5 coarse sand ) in foundation and Plinth
conventional brickwork (up to 10 ton)
The rate shall be for a unit of Sq. Mt.
Extra for half brick masonry in super structure above plinth level upto floor two level (B)
Materials: Brick shall conform to M-15. Water shall conform to M-1. Cement shall conform to M-3.
Sand shall conform to M-6. Cement mortar shall conform to M-11.
Relevant specifications of bricks, wetting and laying of bricks, joints, curing etc. shall conform to item
No. 7 except the brick work of half bricks shall be carried out.
Cement mortar used in masonry work shall be in proportion of 1 part of cement and 5 part of sand by
Signature of Bidder Page 40 of
All bricks shall be laid strecher wise, breaking joints with those in the upper and lower courses. The wall
shall be taken truly plumb. All courses shall be laid truly horizontal and all vertical joints shall be truly
vertical. The bricks shall be laid with frogs upwards. A set of masons tools shall be maintained on work
as required for frequent checking.
Mode of measurement and payment:
The half brick masonry work in foundation and plinth shall be measured under this item, the limiting
dimensions shall not exceed those shown in the plan or as directed. Any work done extra over the
specified dimensions shall be ignored.
The relevant specifications of item No. 7 shall be followed. The length shall be measured nearest to one
The rate shall be for a unit of Sq. Mt.
Providing form work of ordinary timber planking so as to give a rough finish including centering
shuttering, strutting and propping etc. height of propping and centering below supporting floor to
celling not exceeding 4 m. and removal of the same for in site reinforced concrete and plain
concrete work in foundations, footing, bases of columns, and mass concrete. ( up a to h)
The shuttering to be provided shall be of ordinary timber planks and shall conform to M-26.
The dimensions of scantlings and battens shall conform to the design. The strength of the wood shall not
be less than that assumed in the design.
The form work shall conform to the shape lines and dimension as shown on the plans and be so
constructed as to remain sufficiently rigid during the placing and compacting of the concrete. Adequate
arrangements shall be made by the contractor to safe guard against any settlement of the form work
during the course of concreting and after concreting. The form work of shuttering, centering, scaffolding
bracing etc shall be as per design.
Cleaning & Treatment of forms:
Signature of Bidder Page 41 of
All rubbish, particularly chippings shaving and saw dust shall be removed from the interior of the form
before the concrete is placed and the form work in contact with concrete shall be cleaned and thoroughly
wetted or treated. The surface shall be then coated with soap solution applied before concreting is done.
Soap solution for the purpose shall be prepared by dissolving yellow soap in water to get consistency of
paint. Alternatively a coat of raw linseed oil or form oil of approved manufacture may be applied in case
steel shuttering is used. Soap solution or raw linseed oil shall be applied after thoroughly cleaning the
surface. Care shall be taken that the coating does not get on construction joint surface and reinforcement
Stripping time:
In normal circumstances and where ordinary cement is used forms may be struck after expiry of
following periods:
Sides of walls columns and vertical faces of beam 24 to 48 hours.
Beams soffits (Props left under) 7 days.
Removal of props slabs
(i) Slabs spanning up to 4.5 m – 7 days (ii) Spanning over 4.5 mm 14 days
Removal of props to beams and arches
(i) Spanning up to 6 m – 14 days (ii) Spanning over 6 m 21 days
Procedure when removing the form work:
All form work shall be removed without such shock or vibration as would damage the reinforced
concrete surface. Before the soffits form work and struts are removed, the soffits and the concrete
surface shall be exposed where necessary in order to ascertain that the concrete has sufficiently
The centering to be provided shall be got approved. It shall be sufficiently strong to ensure absolute
safely of the form work and concrete work before, during and after pouring concrete. Watch should be
kept to see that behavior of centering and form work is satisfactory during concreting. Erection should
Signature of Bidder Page 42 of
also be such that it would allow removal of forms in proper sequence without damaging either the
concrete or the forms to be removed.
The props of centering shall be provided on firm foundation or base of sufficient strength to carry the
loads without any settlement.
The centering and form work shall be inspected and approved by the Engineer-in-charge before
concreting. But this will not relieve the contractor of his responsibility for strength, adequacy and safety
of form work and centering. If there is a failure of form work or centering, contractor shall be
responsible for the damages to the work, injury to life and damage to property.
All scaffolding, hoisting arrangements and ladders etc required for the facilitating of concreting shall be
provided and removed on completion work by contractor at his own expense. The scaffolding, hoisting
arrangements and ladders etc. shall be strong enough to with stand all live, dead and impact loads
expected to act and shall be subject to the approval of the Engineer-in-charge. However, contractor shall
be solely responsible for the safety of the scaffolding, hoisting arrangement, ladders, work and workman
The scaffolding hoisting arrangements and ladders shall allow easy approach to the work spot and afford
easy inspection.
The rate is applicable to all conditions of working and height up to 4 mts. The rate shall include the cost
of materials and labour for various operations involved such as:
Splayed edges, notching, allowance for overlaps and passing at angles, battens centering, shuttering
propping, bolting, nailing, wedging, easing, striking and removal.
Filleting to form stop chamfered edges or splayed external angles not exceeding 20 mm width to beams,
columns and the like.
Temporary openings in the forms for pouring concrete, if required, removing rubbish etc.
Dressing with oil to prevent adhesion of concrete with shuttering, and
Raking or circular cutting.
Rate shall be paid in Sq.m
Signature of Bidder Page 43 of
Item No. 10 :- Providing & fixing Steel door with Shutter for steel sheet 18 Gauge, and angel and
40 x 40 x 3mm and steel doors frame of size 40 x 40 x 5 mm incl. anodised Iron butt
hinges and nece.fitting and fastening with necessary screws.Rate also incl. two coats
of oil paint etc comp.
Providing & fixing Steel door with Shutter for steel sheet 18 Gauge, and angel and 40 x40 x 3mm and
steel doors frame of size 40 x 40 x 5 mm incl. anodised Iron butt hinges and nece.fitting and fastening
with necessary screws.Rate also incl. two coats of oil paint etc comp.
The item covers the requirement of frames for doors, windows, clerstory windows their supply and
The item covers the requirement of preparation of shutters for doors,
windows, clerestory windows, their supply and fixing.
All members of the frames shall be exactly at right angles. The right angle shall be checked from inside
surface of the respective members.
All member of frames shall straight without any warp or bow and shall have smooth surface well planed
on the three sides exposed at right angles to each other. The surface touching the wall may not be planed
unless it is required in order to straighten up the member or to obtain the overall size within the
tolerances specified.
Frame shall have dovetail joints. When clerestory windows are included, it shall be provided by having
full length one piece post for door or windows and clerestory window extending the frame on top at the
head to the required extent. Horns shall not be provided in the head of the frame. When No. still are
provided the vertical posts of the frame in the ground floor shall be embedded in the sill masonry for
cm in upper floors, their vertical posts shall be fixed in the floor or masonry by forming notches 10 mm
deep. Slight adjustment spacing as necessary shall be done to have the hold fasts in the joints of masonry
course. The frame shall be created in position and held plumb with strong support from both sides and
built in masonry as it is being built. The transom shall be through tenoned in to the mortices of the jamb
post to the full width of the jamb post and the thickness of the tenon shall be not less than 15 mm.
Panelled shutters shall be constructed in the form of timber frame work of styles and rails with panel,
inserted of type as specified in the detailed drawings. Panel shall be fixed by providing grooves in the
style and rails. The styles and rails shall be joined to each other by mortise and tenon joints at right
Signature of Bidder Page 44 of
All members of the shutters shall be straight without any warp or how and shall have smooth, well
planed faces at right angles to angles to each other.
The size of styles and rails shall be as per drawing or as directed. Styles and rails of shutters shall be
made of one piece only.
Fixtures & Fastenings:
The rate shall include anodised aluminium butt hinges including fixing with iron screws. The size and
number of hinges shall b as per table given in annexure-1.
Mode of measurements and payment:
The rate for shutter includes cost of providing block and clear for keeping the shutter in open position as
The dimension of the shutter shall be measured clear size of the shutter in close position between the
grooves of the frame.
The rate shall be for a unit of one sq. meter.
Providing and fixing M.S. round or square bars with M.S. flats at required spacing in wooden
frames of windows and clerestory windows.(upto10 ton)
Providing and fixing M.S. round or square bars with M.S. flats at required spacing in wooden frames of
windows and clerestory windows.(upto10 ton)
Item should be executed as per site requirements amd instructions given by Engg-In-Charge.
Mode of payment shall be in Kg.
Providing and fixing M.S. grills of required pattern to wooden frames of windows etc. with M.S.
flats at required spacings and frame alround, square or round bars with round headed bolts and
nuts or by screws (A) Plain Grill. (upto 10 ton)
Providing and fixing M.S. grills of required pattern to wooden frames of windows etc. with M.S. flats at
required spacings and frame alround, square or round bars with round headed bolts and nuts or by screws
(A) Plain Grill. (upto 10 ton)
Signature of Bidder Page 45 of
Item should be executed as per site requirements amd instructions given by Engg-In-Charge.
Mode of payment shall be in Kg.
Providing and fixing glazed louvered glass windows and ventilators with teak wood frame 10 cm. x
7 cm. size including 3 coats of oil painting to wood work etc.complete. (upto 10 ton)
Providing and fixing glazed louvered glass windows and ventilators with teak wood frame 10 cm. x
cm. size including 3 coats of oil pa inting to wood work etc.complete. (upto 10 ton)
Item should be executed as per site requirements amd instructions given by Engg-In-Charge.
Mode of payment shall be in Sq.m
Providing and fixing 30 mm thick FACTORY MADE SOLID PANEL PVC DOOR SHUTTER
consisting of frame made out of M.S.tubes of 19 gauge thickness and size of 19 mm x 19 mm for
stiles and 15 mm x 15 mm for to p and bottom rails. M.S. frames hall have a coat of steel primers
of approved make and manufacture, M.S. frames hall be covered with 5 mm thick heat moulded
PVC ‘C’ channel of size 30 x 50 mm formings tiles, and 5 mm thick 75 mm wide PVC sheets for to
prail, lock rail and bottom rail on either side, and 10 mm (5 mm x 2) thick, 20 mm wide cross PVC
sheet as gap insert for to p rail and bottom rail, Panelling of 5 stiles and rails with 30 mm wide x
mm thick PVC sheet beading on eighter side, and joined together with solventcement adhesive,. An
additional 5 mm thick PVC strip of 20 mm width is to be stculkon the interiors ide of the ‘c’
channel using PVC solventcement adhesive etc. complete as per direction of Engineer incharge,
manufacture’s specification and drawing.
PVC doors shall be provided with EZ-7 section doorframe as mentioned in the item description. The
size of the door shall be as per the drawing. The overall thickness of PVC doors shall be 24 mm. The
aluminium fixtures and fastenings shall be fixed to the shutters as directed by the engineer-in-charge.
The doors shall be of Sintex or any other approved make.
The holes for the hardware to be fitted shall be marked first on the door (for hinges, handle, tower
bolt, aldrop etc.); pilot holes of 3 mm shall be pre-drilled and then hinges is to be fitted on door.
Screws shall not hammered on the door but fastened by hand/electric screw driver.
Signature of Bidder Page 46 of
Mode of measurement:
The rates of the PVC doors shall be on the basis of area in sq.mt. of PVC doors procured and fixed
by the contractor. No separate payment for the aluminum fixtures and fastenings shall be payable.
Providing and fixing in position collapsible shutters with vertical channels 20 x 10 x 2 mm braced
with flat iron diagonal 20 x 6 mm size with top and bottom rails T iron 40 x 40 x 6 mm with 38 mm
dia steel pulleys complete with bolts, units, locking arrangements, stoppers, handles, including a
priming coat of red lead paint & approved make.
Materials: The collapsible steel gate shall conform to M-33.
T-rails shall be fixed to the floor and to the lintel at top by means of anchor bolts, embedded in cement
concrete on floor and lintel. The anchor bolts shall be placed approximately at 45 mm centers
alternatively in the two flanges of the T iron. In the bottom runner (T-iron) shall be embedded in the
floor and proper groove shall be formed along the runner for the purpose. The collapsible gate shall be
fixed at the sites by fixing the end double channels in the T-Iron rail and also by hold fasts bolted to the
end double channel and fixed in the masonry of the side walls or the otherwise.
In case where the collapsible gate is not required to the lintel beams or slop above, a tee iron
suitably designed may be fixed at the top embedded in masonry and provided with necessary clamps and
roller arrangement at the top.
All the adjoining work damaged while fixing of gate shall be made good to match the existing
work without any extra payment.
All the members of the collapsible gate including T-Iron shall be thoroughly cleaned of rust,
scales, dust etc. and given a priming coat of red lead before fixing them in position.
Mode of measurements and payment:
The collapsible gate shall be measured in sq. meter. The height of the gate shall be measured as
the length of double channels and breadth from outside to outside of the end fixed double channels in
open position of the gate. The rate includes providing handles, locking arrangements, stoppers etc.
The rate shall be for unit of one sq. meter.
Signature of Bidder Page 47 of
Providing and laying 40 mm thick marble chips flooring rubbed and polished (I.E.terrazo) to
granolithic finish with under layer 30 mm thick cement concrete1:2:4 (1-Cement: 2-coarse sand: 4-
graded stone aggregate 10 mm and down gauge) and to player 10 mm thick with white, black or
white and blak marble cihps of required sizes from 1 mm to 4 mm nominal size laid in cement
marble powder mix 3:1 (3-Cement:1-Marble powder by weight) in proportion of 4:7 (4-Cement: 7-
marble chips by volume) (C) Medium Shade pigment with approx 50% white cement and 50%
ordinary cement (In top layer only) (upto 10 ton)
Providing and laying 40 mm thick marble chips flooring rubbed and polished (I.E.terrazo) to
granolithic finish with under layer 30 mm thick cement concrete1:2:4 (1-Cement: 2-coarse sand: 4-
graded stone aggregate 10 mm and down gauge) and to player 10 mm thick with white, black or white
and blak marble cihps of required sizes from 1 mm to 4 mm nominal size laid in cement marble powder
mix 3:1 (3-Cement:1-Marble powder by weight) in proportion of 4:7 (4-Cement: 7-marble chips by
volume) (C) Medium Shade pigment with approx 50% white cement and 50% ordinary cement (In top
layer only) (upto 10 ton)
Item should be executed as per site conditions and instructions given by Engg-In-Charge.
The rate shall be for a unit Sq.m.
Providing and laying marble chips skirting (Terrazo) or dedo rubbed, and polished to Granolithic
finish to player 6 mm white, black or white and black marble chips of size from smallest to 4 mm
nominal size laid in cement marble powder mix 3:1 (3-Cement: 1 marble powder by weight) in
proportion of 4:7 (4-cement marble powder mix: 7-marble chips by volume) 20 mm thick with
under 14 mm thick layer cement plaster 1:3 (1-cement: 3-coarse sand) (C) Medium shade pigment
with appox 50% white cement and 50% ordinary cement (In top layer only) (upto 10 ton)
Providing and laying marble chips skirting (Terrazo) or dedo rubbed, and polished to Granolithic
finish to player 6 mm white, black or white and black marble chips of size from smallest to 4 mm
nominal size laid in cement marble powder mix 3:1 (3-Cement: 1 marble powder by weight) in
proportion of 4:7 (4-cement marble powder mix: 7-marble chips by volume) 20 mm thick with under
mm thick layer cement plaster 1:3 (1-cement: 3-coarse sand) (C) Medium shade pigment with appox
50% white cement and 50% ordinary cement (In top layer only) (upto 10 ton)
Item should be executed as per site conditions and instructions given by Engg-In-Charge.
The rate shall be for a unit Sq.m.
Signature of Bidder Page 48 of
Providing and laying white glazed tiles 6 mm thick in flooring treads of steps and landing laid on a
bed of 12 mm thick cement mortar 1:3 (1- cement:3-coarses and) finishing with flush pointing in
white cement. (upto 10 ton)
Workmanship : The work shall be carried out for skirting as dedo. Before fixing glazed tiles of shade and size as
specified, the surface shall be prepared by heavy scarping, making joints etc. to the required line, level and plumb.
The surface shall be thoroughly wetted before commencing the laying work. Thereafter about 10 mm. thick
backing of cement mortar in specified proportion shall be applied on the surface in true like and level generally as
per specifications of plaster item.
Fixing : The black of each tile to be fixed shall be smeared with cement paste of matching colour and the glazed
tiles shall then be gently tapped against the surface, with a wooden mallet. The skirting shall be done only after the
flooring is competed. Any pipes coming out of the wall through the dedo or skirting shall only beat at the
intersections of the horizontal and vertical joints. The tiles shall not have staggered joints. The joints shall be true
to entire line both ways and vertical joints shall be in line with joints of flooring. Tiles shall be fixed as close as
possible to the adjoining tiles and any difference in the thickness of the glazed tiles shall be evened out in the
cement paste so that all the tiles faces are set in conformly with one another. The skirting shall project uniformly
and not more than 6 mm. thickness beyond the finished surface above. Top of skirting of dedo shall be truly
horizontal. The rises of steps, skirting or dedo shall rest on top of treads of flooring wherever required. The tiles
shall be cut (sawn) and thin edges smoothened before use.
Curing : Curing shall be done for 7 days continuously.
Finishing : Skirting and dedo shall be hand polished to have an even smooth and shining surface. In case of
skirting only 10 mm. x 10 mm. grove shall be provided at the junction of cement plaster and cement tilesThe white
glazed tiles shall be laid on cement mortar bedding of 12 mm thick in C.M. 1 :3 . The mortar shall have sufficient
plasticity for laying and there shall be no hard lumps that would interfere with the evenness of bedding the base
shall be cleared with well wetted. The mortar shall then be spread in thickness not less than 10 mm at any place
and average 12 mm thickness. The proportion of the cement mortar shall be as specified in the item.
The tiles before laying shall be soaked in water for atleast two hours Neat Gracie cement grout at 3.3 Kg/Cement
/Sq. mt. Of honey like consistency shall be separated over the mortar bedding as directed. The edges of the tiles be
smeared with neat cement slurry. The tiles shall be well pressed and gently tapped with a wooden mallet till they
are properly bedded and in level with the adjoining tiles. There shall be no hollows in bed or joints. The joints
between the tiles shall be as thin as possible in straight line or as per pattern.
Signature of Bidder Page 49 of
The tiles shall not have staggered joints. The joints shall be true to centre line both ways. The Nehni trap coming
in the flooring shall be so positioned that its grating shall replace only one tile as far as possible. Where full size
tiles cannot be fixed, they shall be cut (swan0 to be required size and the edges rubbed smooth to ensure straight
and true joints. The joints shall be filled with grey cement grout with wire brush of trowel to a depth of 5 mm. and
loose material removed. White cement shall be used for pointing the joints., After fixing the tile finally in an even
the flooring shall be kept wet and allowed to nature undisturbed for 7 days.
The surplus cement grout that may have come out of the joints shall be cleared off before it sets. Once the floor
has set, it shall be carefully washed, cleared by dilute acid and dried. Proper precaution and measures shall be
taken to ensure that the tiles are not damaged inany way till the completion of the construction.
Mode of measurement & payment
The work done shall be measured in sq. mt. For visible area of work done, The length and width of the flooring
shall be measured not between the faces of skirting or dedos or plastered face of wall as the case may be. The
paving under dedo or skirting shall not be measured. No deduction shall be made not extra paid for any opening in
the floor of area upto 0.1 sq. mt. Nothing extra shall be paid for laying the floors at different levels in the same
The rate shall be for a unit of one sq. metre.
Providing and laying polished Kota stone slab flooring over 20 mm (Average) thick base of cement
mortar 1:6 (1-cement:6-coarses and) or L.M.1.1.5 (1-Lime putty:1.5-coarses and) laid over and
jointed with grey cement slurry mixed with pigment to match the shade of slab including rubbing
and polishing etc. complete. (A) 25 mm thick (upto 10 ton)
Water shall conform to M-1. Lime mortar shall conform to M-10. Cement mortar shall conform to M-11.
Marble stone slab 20 mm. thick.
Dressing of slab : Every stone shall be cur to required size and fine chisel dressed to give a smooth and
even surface on all sides to the full depth. A straight edge laid along the sides of the stone shall be fully
in contact with it. Chisel dressing shall also be done on top surface to remove any waviness. The sides
and top surface to granite slabs shall be machine polished and molding etc. complete before using. All
angles and edges of slabs shall be true square and free form chippings.
The thickness of stone shall be 18 mm. The allowable tolerance shall be 1 mm. allowable. The tolerance
shall be 15 mm. in length and breath.
Signature of Bidder Page 50 of
Bedding : Bedding of granite slabs shall be lime mortar 1:1.5 (1 Lime putty : 1.5 coarse sand) or cement
mortar 1:6 (1 cement : 6 coarse sand) of average thickness 20 mm. thick as given in description of item.
Minimum thickness at any place shall not be less than 10 mm.
Laying : The surface of sub grade shall be cleared wetted and mopped. Mortar of specified mix and
thickness shall then be spread on an are sufficient to receive one granite slab, The slab shall be washed
clean before laying. It shall be laid on top pressed and tapped gently to bring it in level with other slabs.
It shall then be lifted and laid a side. The top surface of the mortar shall then be corrected by adding
fresh mortar at hollows, or depressions. The mortar shall then be allowed to harden it over this surface
cement slurry of honey like consistency at 4.4 Kg. Of cement per sq. metre. The edges of slabs already
paved shall be buttered with grey cement. The slab shall then be gently placed in position and tapped
with wooden mallet till it is properly bedded in level with and close to the adjoining slab. The joints shall
be as fine as possible : Surplus cement on the surface of the slabs shall be removed. The slab fixed in the
floor adjoining the walls shall enter not less 10 mm. under the plaster skirting or dado. The junction
between the walls and floors shall be finished neatly. The finished surface shall be true to level and
slopes as directed.
Curing : The floor shall be cured for minimum period of seven days.
Mode measurements & payment :
marble stone flooring with various kinds of marble shall measured in sq. metre. The length and breadth
shall be measured between the finished face of skirting or dado or wall plaster. No deduction shall be
made not extra shall be paid for any openings in the floor or area upto 0.05 sq. mt. Nothing extra shall be
paid for laying stone at different levels in the same room. Treads and steps of stairs paved with granite
stone slabs shall also be measured under flooring.
The rate shall be for a unit of one sq. metre.
ITEM NO - 20 ( Consider Marble Stone Instead of Kota stone for Item No. 59)
Providing and laying polished Kota stone slab flooring over 20 mm (Average) thick base of cement
mortar 1:6 (1-cement:6-coarses and) or L.M.1.1.5 laid over and jointed with grey cement slurry
including rubbing and polishing etc.complete. (B) 30 mm thick (upto 10 ton)
Water shall conform to M-1. Lime mortar shall conform to M-10. Cement mortar shall conform to M-11.
Marble stone slab 20 mm. thick.
Dressing of slab : Every stone shall be cur to required size and fine chisel dressed to give a smooth and
even surface on all sides to the full depth. A straight edge laid along the sides of the stone shall be fully
in contact with it. Chisel dressing shall also be done on top surface to remove any waviness. The sides
and top surface to granite slabs shall be machine polished and molding etc. complete before using. All
angles and edges of slabs shall be true square and free form chippings.
The thickness of stone shall be 18 mm. The allowable tolerance shall be 1 mm. allowable. The tolerance
shall be 15 mm. in length and breath.
Signature of Bidder Page 51 of
Bedding : Bedding of granite slabs shall be lime mortar 1:1.5 (1 Lime putty : 1.5 coarse sand) or cement
mortar 1:6 (1 cement : 6 coarse sand) of average thickness 20 mm. thick as given in description of item.
Minimum thickness at any place shall not be less than 10 mm.
Laying : The surface of sub grade shall be cleared wetted and mopped. Mortar of specified mix and
thickness shall then be spread on an are sufficient to receive one granite slab, The slab shall be washed
clean before laying. It shall be laid on top pressed and tapped gently to bring it in level with other slabs.
It shall then be lifted and laid a side. The top surface of the mortar shall then be corrected by adding
fresh mortar at hollows, or depressions. The mortar shall then be allowed to harden it over this surface
cement slurry of honey like consistency at 4.4 Kg. Of cement per sq. metre. The edges of slabs already
paved shall be buttered with grey cement. The slab shall then be gently placed in position and tapped
with wooden mallet till it is properly bedded in level with and close to the adjoining slab. The joints shall
be as fine as possible : Surplus cement on the surface of the slabs shall be removed. The slab fixed in the
floor adjoining the walls shall enter not less 10 mm. under the plaster skirting or dado. The junction
between the walls and floors shall be finished neatly. The finished surface shall be true to level and
slopes as directed.
Curing : The floor shall be cured for minimum period of seven days.
Mode measurements & payment :
marble stone flooring with various kinds of marble shall measured in sq. metre. The length and breadth
shall be measured between the finished face of skirting or dado or wall plaster. No deduction shall be
made not extra shall be paid for any openings in the floor or area upto 0.05 sq. mt. Nothing extra shall be
paid for laying stone at different levels in the same room. Treads and steps of stairs paved with granite
stone slabs shall also be measured under flooring.
The rate shall be for a unit of one sq. metre.
Providing and laying cement concrete flooring 1:2:4 (1-cement: 2-coarses and:4-graded stone
aggregate 20mm nominal size) laid in one layer and finished with a floating coat of neat
cement. (A) 40mm thick. (upto 10 ton)
Water shall conform to M-1. Cement shall conform to M-3. Sand shall conform to M-6. Stone
aggregate 20 mm. nominal size shall conform to M-12.Cement concrete 1:2:4 proportion measured
by volume shall conform to relevant specification or ordinary grade 1:2:4 concrete.
The cement concrete flooring of 40 mm. thick (average) is to be laid as per the site condition. The
concrete shall be mixed in a mechanical mixer at the work. Hand mixer may however be allowed for
smaller quantities of work and in case of failure of machines or as permitted by the engineer-in-
charge. It shall carried out on a water tight platform and care shall be taken to ensure that mixing is
continued until the mass is uniform in colour and consistency. However in such cases 10% more
cement than otherwise required shall have to be used without any cost. The mechanical mixing shall
be done for a period of 1/2 to 2 minutes. The quantity of water shall be thus sufficient of produce a
dense concrete required workability for the purpose. Flooring of specified thickness shall be laid in
accordance with approved pattern or as directed. Finishing operation shall start shortly after the
Signature of Bidder Page 52 of
cessation of beating and shall be spread over a period of one to six hours depending upon the
temperature and atmospheric conditions. The surface shall be left for some time till moisture
disappears from it. Fresh quantity of cement shall be mixed with water to form a thick slurry and
spread over the surface while the concrete is still green. Use of dry cement or cement and sand
mixture sprinkled on this surface to stiffen the concrete or absorb excessive moisture shall not be
permitted. The cement slurry shall than be properly paste twice by means of iron flats, once, when
the slurry is applied and the second time when cement starts setting and finished smooth. The surface
shall be marked with string or B.R.C. fabric jali to make the surface non slippery as and when
directed. The junction of floors with wall plaster dado or skirting shall be rounded where so required
upto 25 mm. radius. Flooring in lavatories and bath rooms shall be laid after fixing of water closet
and squatting pans and floor traps, which shall be plugged while laying the floors and opened after
the floors, are completed. Any damage, done to water supply sanitary fittings during the execution of
work shall be mage good.
After the final set, the concrete shall be kept continuously wet, if required ponding for a period of
not less than 7 days from the date of placement.
The form work shall be provided if necessary as directed by the engineer in charge. Concreting shall
be done as per alternate bay method with necessary centering wither by mastic or cement mortar as
Mode of measurement & payment :
The rate shall include the cost of all material and labour involved in all the operations described
above. No deduction shall be made or extra paid for any opening upto 0.1 sq. meter in area in the
floor, nothing extra shall be paid for laying the floor at different levels in the same room or the court
The rate shall be for unit of one sq. meter.
Providing and laying broken china mosaic flooring for terrace using 12 mm to 20 mm broken
pieces of glazed tiles to be laid over cement mortar 1:3 to plain or slope and to be tempered to
bring mortar creme out upto surface using white cement including rounding off junctions and
extending them up to15 cm along the wall, clearing with water and oxalic acid etc.asdirected.
Providing and laying China Mosaic finishing over flat or curved surface, including laying to approved
patterns, with precies leveling and setting curvatures with necessary tools and templates, using
white/coloured broken ceramic tile chips, set in pigmented cement mortar 1:4, as directed, finishing in
line, level and to required slope, flushing with appropriate pigimented cement grout, curing and finishing
with mild acid wash etc. complete.
(1) China Chips in required colours specially broken from full tiles in required size
(2) Cement (3) Sand (4) White Cement (5) Steiner
Signature of Bidder Page 53 of
Before laying a final layer of China Chips prepare the surface to the required slope and level
with a backing coat in C.M (1:3). While laying a backing coat, spread a layer of thick cement slurry and
scrub the same vigorously to seal all pores in concrete below.
For the required designs prepare templates for different patterns from steel flats or plywood and mark out
total design on the designated area. Estimate the quantity of Chips of different colous and ensure its
uninterrupted supply before starting the work. Lay the chips flat on the bedding coat and fix tightly be
light hammering. Remove grey cement from the joints by scrapping before final set of cement.
Finish the joints neatly with white cement and harmonious colour Steiner. All design and pattern shall be
finished with first class workmanship. The surface should finally cleaned, given a mild acid wash for
gain the luster of China Chips.
Cost of China Chips, White cement, OPC, Sand, Steiner and all labour for leveling, laying by specialist
artisan, preparing templates, testing etc are included.
MODE OF MEASUREMENT :
Dimensions of total finished area as laid are recorded and area is computed in sq.m., rounded to two
places of decimal.
Providing and laying coloured glazed tiles of the size 300 mmx200 mmx8 mm/300 mmx450 mmx8
mm in skirting, risers of steps and dedo on 10 mm. thick cement plaster 1:3 (1cement: 3 coarse
sand) & jointed with white cement slurry.
Workmanship : The work shall be carried out for skirting as dedo. Before fixing glazed tiles of shade and size
as specified, the surface shall be prepared by heavy scarping, making joints etc. to the required line, level and
plumb. The surface shall be thoroughly wetted before commencing the laying work. Thereafter about 10 mm. thick
backing of cement mortar in specified proportion shall be applied on the surface in true like and level generally as
per specifications of plaster item.
Fixing : The black of each tile to be fixed shall be smeared with cement paste of matching colour and the glazed
tiles shall then be gently tapped against the surface, with a wooden mallet. The skirting shall be done only after the
flooring is competed. Any pipes coming out of the wall through the dedo or skirting shall only beat at the
intersections of the horizontal and vertical joints. The tiles shall not have staggered joints. The joints shall be true
to entire line both ways and vertical joints shall be in line with joints of flooring. Tiles shall be fixed as close as
possible to the adjoining tiles and any difference in the thickness of the glazed tiles shall be evened out in the
cement paste so that all the tiles faces are set in conformly with one another. The skirting shall project uniformly
and not more than 6 mm. thickness beyond the finished surface above. Top of skirting of dedo shall be truly
horizontal. The rises of steps, skirting or dedo shall rest on top of treads of flooring wherever required. The tiles
shall be cut (sawn) and thin edges smoothened before use.
Curing : Curing shall be done for 7 days continuously.
Signature of Bidder Page 54 of
Finishing : Skirting and dedo shall be hand polished to have an even smooth and shining surface. In case of
skirting only 10 mm. x 10 mm. grove shall be provided at the junction of cement plaster and cement tilesThe white
glazed tiles shall be laid on cement mortar bedding of 12 mm thick in C.M. 1 :3 . The mortar shall have sufficient
plasticity for laying and there shall be no hard lumps that would interfere with the evenness of bedding the base
shall be cleared with well wetted. The mortar shall then be spread in thickness not less than 10 mm at any place
and average 12 mm thickness. The proportion of the cement mortar shall be as specified in the item.
The tiles before laying shall be soaked in water for atleast two hours Neat Gracie cement grout at 3.3 Kg/Cement
/Sq. mt. Of honey like consistency shall be separated over the mortar bedding as directed. The edges of the tiles be
smeared with neat cement slurry. The tiles shall be well pressed and gently tapped with a wooden mallet till they
are properly bedded and in level with the adjoining tiles. There shall be no hollows in bed or joints. The joints
between the tiles shall be as thin as possible in straight line or as per pattern.
The tiles shall not have staggered joints. The joints shall be true to centre line both ways. The Nehni trap coming
in the flooring shall be so positioned that its grating shall replace only one tile as far as possible. Where full size
tiles cannot be fixed, they shall be cut (swan0 to be required size and the edges rubbed smooth to ensure straight
and true joints. The joints shall be filled with grey cement grout with wire brush of trowel to a depth of 5 mm. and
loose material removed. White cement shall be used for pointing the joints., After fixing the tile finally in an even
the flooring shall be kept wet and allowed to nature undisturbed for 7 days.
The surplus cement grout that may have come out of the joints shall be cleared off before it sets. Once the floor
has set, it shall be carefully washed, cleared by dilute acid and dried. Proper precaution and measures shall be
taken to ensure that the tiles are not damaged inany way till the completion of the construction.
Mode of measurement & payment
The work done shall be measured in sq. mt. For visible area of work done, The length and width of the flooring
shall be measured not between the faces of skirting or dedos or plastered face of wall as the case may be. The
paving under dedo or skirting shall not be measured. No deduction shall be made not extra paid for any opening in
the floor of area upto 0.1 sq. mt. Nothing extra shall be paid for laying the floors at different levels in the same
The rate shall be for a unit of one sq. metre.
Signature of Bidder Page 55 of
Providing and fixing on wall face C.I. Rain water pipe including filling the joints with spun yarn
soaked in neat cement slurry and cement mortar 1:2(1- Cement : 2-fine sand) (A) 75 mm dia.
Mode of payment shall be in Rmt
Providing 15 mm thick cement plaster in single coat on Rough (Similar) side of single or half brick
walls for interior plastering up to floor two level and finished even and smooth in (i) Cement
mortar 1:3 (1-cement :3-sand)
Mode of payment shall be in Sqm
Providing 20mm thick sand faced cement plaster on walls upto height 10 metres above ground
level consisting of 12mm thick backing coat of C.M. 1:3 (1-cement : 3-sand) and 8mm thick
finishing coat of C.M. 1:1 (1-cement : 1-sand) etc. complete.
The specification is as per above Item except thickness of the plaster is 20 mm sand faced and
mm th. Backing coat in C.M. (1:3) and 8 mm thick finishing coat no machine paster will be allowed for
spray od sand for plastering etc comp as directed by Engg i charge.
Mode of measurements & payment : The rate shall be for a unit of one Square Meter.
Water M-1. The Cement mortar of proportion 1:3 shall conform to M-13.
Scaffolding : Wooden ballies, bamboos, planks, treatles and other scaffolding shall be sound. These shall
be properly examined before erection and use Stage scaffolding shall be provided for ceiling plaster,
which shall be independent of the walls.
Preparation of back-ground :
The surface shall be cleaned of all dust, loose mortar droppings, traces of algae, afflorescence and other
foreign matter by water or by brushing. Smooth surface shall be roughened by wire brushing if it is not
hard and by racking if it is hard. In case of concrete surface, if a chemical retarder has been applied to the
Signature of Bidder Page 56 of
form work, the surface shall be roughened by wire brushing and all the resulting dust and loose particles
cleaned off and care shall be taken that none of the retarder is left on the surface. Trimming of projections
on brick/concrete surface where necessary shall be carried out to get an even surface.
Raking of joints in case of masonry where necessary shall be allowed to dry out for sufficient period
before carrying out the plaster work.
The work shall not be soaked but only damped evenly before applying the plaster. If the surface becomes
dry such area shall be moistened again.
For external plaster, the plastering operation shall be started from top floor and carried downwards. For
internal plaster, the plastering operations may be started wherever the building frame and cladding work
are ready and the temporary supporting ceiling resting on the wall of the floor have been removed, Ceiling
plaster shall be completed before starting plaster to walls.
Applications of Plaster :
The plaster about 15 x 15 cms. Shall be first applied horizontally and vertically at not more than 2 metre
intervals over the entire surface to serve as gauge. The surfaces of these gauges shall be truly inplane of
the finished plastered surface. The mortar shall then be applied in uniform surface slightly more than the
specified thickness, then brought to a true surface by working a wooden straight edge reaching across the
gauges with small upward and sideways movement at a time. Finally, the surface shall be finished off true
with a trowel or wooden float according as a smooth or a sandy granular texture is required. Excessive
trowelling or overworking the float shall be avoided. All corners, arrises, angles and junctions be truly
vertical or horizontal as the case may be and shall be carefully finished. Rounding or chamfering corners,
arrises junctions etc. shall be carried out with proper templates to the size required.
Cement plaster shall be used within half an hour after addition of water. Any mortar or plaster which is
partially set shall be rejected and removed forthwith from the site :
In suspending the work at the end of the day, the plaster shall be left out clean to the line both horizontally and
vertically. When recommending the plaster, the edges of the old work shall be scraped clean and wetted with
cement putty before plaster is applied to the adjacent area to enable the two to properly joint together. Plastering
work shall be closed at the end of the day on the body of the wall and nearer than 15 cm. To any corners or
arrises. Horizontal joints in plasterwork shall not also occur on parapet tops and copings as these invariably lead
to leakage. No portion of the surface shall be left out initially to be packed up later on.
Each coat shall be kept dam continuously till the next coat is applied or for a minimum period of 7 days.
Moistening shall commence as soon as plaster is hardened sufficiently. Soaking of walls shall be avoided
Signature of Bidder Page 57 of
and only as much water as can be readily absorbed shall be used excessive evaporation on the sunny or
windward side of building in hot air or dry weather shall be prevented by handling mattings or gunny bags
on the outside of the plaster and keeping them wet.
Mode of measurement & payment :
The rate shall include the cost of all materials, labour and scaffolding etc, involved in the operations
described under workmanship.
All plastering shall be measured in square metres unless, otherwise specified length, breadth or height
shall be measured correct to a centimeter.
Thickness of the plaster shall be exclusive of the thickness of the key i.e. grooves or open joints in brick
work, stone work etc. or space between laths. Thickness of plaster shall be average thickness with
minimum 10 mm. at any point on this surface.
This item includes plastering upto floor two level.
The measurement of wall plastering shall be taken between the walls or partition (dimensions before
plastering being taken) for length and from the top of floor or skirting to ceiling for height. Depth of cover
of cornices if any shall be deducted.
Soffits of stairs shall be measured as plastering on ceilings, Flowing soffits shall be measured separately.
For jambs, soffits, sills etc. for openings not exceeding 0.5 sq. mt. each in area for ends of joints, beams,
posts, girders, steps etc. not exceeding 0.5 sq. mt. each in area and for openings exceeding 0.5 sq.mt. and
not exceeding 3.0 sq. mt. in each area deductions and additions shall be made in the following manner :
No deductions shall be made for ends joints, beams posts etc. and openings not exceeding 0.5 sq. mt. each
and no addition shall be made for reveals, jambs, soffits, sills etc. of these opening for finish to plaster
around ends of joints, beams, posts etc.
Deduction for openings exceeding 0.5 sq. mt. but not exceeding 3 sq. mt. each shall be made as
follows and no addition shall be made for reveals, jambs, soffits etc. sills etc. of these openings.
When both faces of all wall are plastered with same plaster, deduction shall be made for one face only
Signature of Bidder Page 58 of
When two faces of wall are plastered with different types of plasters or if one faces is plastered and
the other pointed, deductions shall be made from the plaster or pointing on the side of frame for door,
window etc. on which width or reveals is less than that on the other side but no deductions shall be
made on the other side. Where width of reveals on both faces of all are equal, deductions of 50% of
area of opening on each face shall be made from area of plaster and/or pointing as the case may be.
For openings having door frames equal to projecting beyond the thickness of wall, full deduction for
opening shall be made from each plastered face of the wall.
In case of openings of area above 3 sq. mt. each, deduction shall be made for opening but jambs, soffits
and sills shall be measured.
The rate shall be for a unit of one sq. metre.
White washing with lime on undecorated wall surfaces (TWO coats) to give an even shade
including thoroughly brooming the surface to remove all dirt, dust mortar drops and other foreign
The calearcole shall be made from glue and boiling water by mixing 1 kg. Mixture shall be suitably
tinted where required for use under coloured distemper if required. Glue shall conform to I.S. 852-
1969 (Specifications for animal glue).
Lime used shall be freshly burnt class ‘C’ Lime (fat lime) and white in colour conforming to I.S.
712-1973. Water shall conform to M-1 Best quality of gum shall be sued in the preparation of white
wash. Ultramarine blue or Indigo: This shall conform to I.S. 55-1970 for points and shall be used for
preparation of white wash. Pigments: mineral colours, not affected by lime shall be sued in preparing
Preparation of white wash solution :
Surface already white or colour. The fat lime shall be slaked at site and shall be mixed and stirred
with about five litres of water for 1 kg. of unslaked lime to make a thin cream. This shall be allowed
to stand for a period of 24 hours and then shall be screened through a clean coarse cloth, 4 kg. of
gum dissolved in hot water shall be added to each cubic metre of lime cream. Small quantity of
ultramarine blut (Upto 3 gms. Per kg. of lime) shall also be added to the last two coats of white wash
solution and the whole solution shall be stirred thoroughly before use.
Preparation of surface :
Signature of Bidder Page 59 of
The surface shall be thoroughly cleaned of all dust, dirt, mortar cropping and other foreign matters
before white wash is to be applied.
The surface spoiled by smoke soot shall be scraped with steel wire brushes or steel scrappers or shall
be rubbed with over burnt surkhi or brick bats. The surface shall be then broomed to remove all dust,
dirt and shall be washed with clean water.
Oil or grease spots shall be removed by suitable chemical and smooth surface shall be rubbed wire
All unsound portion of the surface plaster shall be removed to full depth of plaster in rectangular
patches and plastered again after raking the masonry joints properly. Such portion shall be wetted
and allowed to dry. They shall then be given one coat of white wash.
All unnecessary nails shall be removed, the holes cracks patches etc. shall be made good with
materials similar in composition to the surface to be prepared.
Scaffolding : Wherever scaffolding is necessary it shall be erected in such a way that as far as
possible on part of scaffolding shall rest against the surface to be white or coloured washed. A
properly secured strong and well tied suspended platform (Zoola) may be used for white washing.
Where ladders are sued, pieces of old gunny bags shall be tied at top and bottom to prevent scratches
to the floors and walls. For white washing of ceilings proper stage scaffolding shall be erected where
Application of white wash :
On the surface so prepared the white wash shall be applied with ‘Moon’ brush. The first stroke of the
brush shall be from top downwards, another from bottom upwards over the first stroke and similarly
one stroke from the right another from the left, over the first stroke brush before the it dries. This
will from one coat. Each coat shall be allowed to dry before next coat is applied. Number coats as
specified in item shall be applied. It shall present smooth and uniform finish free from brush marks
and it should not come off easily when rubbed finger.
Splashing and dropping if any on the doors and windows, ventilators etc. shall be removed and the
surface cleaned.
Priming and Alkali resistant treatments, scrapping of surface washing etc. surface spoiled by smoke
soot removed of oil and grease spots treatment for infection with effloresces moulds moss, funji and
kitchen and patch repairs to plaster wherever done shall not be paid extra.
Mode of measurements & payment :
All the work shall be measured in the decimal system as under :
Dimensions shall be measured to the nearest 0.01 M.
Area in individual items shall be worked out to the nearest 0.01 Sq. M.
Signature of Bidder Page 60 of
All the work shall be measured in sq. mt. Deductions for jambs, soffits, stills etc. for opening not
exceeding 0.5 sq. mt. each in area for ends of joints, posts, beams, girders, steps etc. not exceeding
0.5 sq. mt. each in area and for opening exceeding 0.3 sq. mt. and not exceeding 3.0 sq. mt. each in
area deductions and additions shall be made as under :
No deductions shall be made for ends of joints beams, posts etc. and openings not exceeding 0.5 sq. mt.
each. No addition shall be made for reveals, jambs, soffits, sills etc. of these openings nor for finish
around ends of joints, beams, posts etc.
Deductions for openings exceeding 0.5 sq. mt. but not exceeding 3 sq. mt. each shall be made as follows
and no addition shall be made for reveals, jambs, soffits etc. of these openings :
When both the faces or walls are provided with finish, deduction shall be made for one face only.
When each face of wall is provided with different finish deduction shall be made for that side of frame
for door, windows etc. on which width of reveals is less than that of the other side, where width of
reveals on both faces of wall are equal, deduction of 50% of area of opening on each face shall be made
from total area of finish.
When only one face of wall is treated and the other face is not treated, full deduction shall be made if the
width of reveal on the treated side is less than that on the untreated side, but if the width of the reveal is
equal or more than on the untreated side neither deductions nor additions be made for reveals, jambs,
soffits, sills etc.
In case of area of opening exceeding 3 sq. mt. each, deduction shall be made for openings but jambs,
soffits, shall be measured.
No deduction shall be made for attachment such as casing, conducts, pipe, electric wiring and the like.
corrugated surfaces shall be measured flat as fixed and not girth. The quantities so measured shall be
increased by the following percentage and the resultant shall be included with the general areas.
Corrugated steel sheets 4%
Corrugated A. C. Sheets 20%
Semi corrugated A. C. Sheets 10%
Nainital pattern roof (Plain sheeting with rolls) 10%
Nainital pattern roof (with corrugated sheets) 25%
Cornices and other wall features, when they are not picked out in a different finish/colour shall be
girthed and included in the general area.
The rate shall include the cost of all materials, labour, scaffolding, protective measures etc. involved in
all the operations described above.
Signature of Bidder Page 61 of
The rate shall be for a unit of one sq. metre.
Removing dry or oil bound distemper by a washing and scraping and sand papering the wall
surface smooth including necessary repairs to scratches complete.
The rate shall be for a unit of one sq. metre.
Distempering with dry distemper of approved brand and manufacture (two coats) and of required
shade on wall surfaces of given an even shade, over and including a priming coat of whiting after
thoroughly brooming the surface free from mortar dropping and other foreign matter.
The rate shall be for a unit of one sq. metre.
Item no.83,84,85,86
Distempering with dry distemper of approved brand and manufacture (One coats) and of required shade
on wall surfaces of given an even shade, after thoroughly brushing the surface clean of all grease, dirt,
loose pieces of scales including preparing the surface even and sand papered smooth.
Distempering with dry distemper of approved brand and manufacture (One coats) and of
required shade on wall surfaces of given an even shade, after thoroughly brushing the surface clean of all
grease, dirt, loose pieces of scales including preparing the surface even and sand papered smooth.
The rate shall be for a unit of one sq. metre.
Distempering with dry distemper of approved brand and manufacture (One coats) and of required shade
on wall surfaces of given an even shade, after thoroughly brushing the surface clean of all grease, dirt,
loose pieces of scales including preparing the surface even and sand papered smooth.
Distempering with dry distemper of approved brand and manufacture (One coats) and of
required shade on wall surfaces of given an even shade, after thoroughly brushing the surface clean of all
grease, dirt, loose pieces of scales including preparing the surface even and sand papered smooth.
The rate shall be for a unit of one sq. metre.
Signature of Bidder Page 62 of
Item no.92,93,94
Finishing wall with water proofing cement paint of on wall surfaces (Two coats) to give an approved
brand and manufacture and of required shape even shade after thoroughly brushing the surface to remove
all dirt and remains of loose powered materials.
Finishing wall with water proofing cement paint of on wall surfaces (Two coats) to give an
approved brand and manufacture and of required shape even shade after thoroughly brushing the surface
to remove all dirt and remains of loose powered materials.
The rate shall be for a unit of one sq. metre.
Item no.96,97,98,99
Finishing wall with water proofing cement paint of on wall surfaces (Two coats) to give an approved
brand and manufacture and of required shape even shade after thoroughly brushing the surface to remove
all dirt and remains of loose powered materials.
Finishing wall with water proofing cement paint of on wall surfaces (Two coats) to give an
approved brand and manufacture and of required shape even shade after thoroughly brushing the surface
to remove all dirt and remains of loose powered materials.
The rate shall be for a unit of one sq. metre.
Wall painting (two coats) with plastic emulsion paint of approved brand and
manufacture on undecorated wall surface to give an even shade including throughly brushing
the surface free from mortar droppings and other foreign matter and sand papered smooth.
The rate shall be for a unit of one sq. metre.
Applying priming coat over new steel and other metel surface after and including
preparing the surface by throughly cleaning, oil, grease, dirt and other foreign matter
Signature of Bidder Page 63 of
and scoured with brushes fine steel wood, scrapers and sand paper with ready mixed
priming paint brushing red lead.
The rate shall be for a unit of one sq. metre.
Painting two coats (excluding priming coat) on new steel and other metal surface with synthetic
enamel paint, brushing to give an even shade including cleaning the surfaceofalldirt,dustandother
foreign matter.
The rate shall be for a unit of one sq. metre.
Painting one coats (excluding priming coat) on previously printed steel and other metal surface
with synthetic enamel paint, brushing to give an even shade including cleaning the surface of all
dirt, dust and other foreign matter.
The rate shall be for a unit of one sq. metre.
Painting one coats (excluding priming coat) on previously painted wood and wood based
surface with enamel paint, to give an even shade including cleaning the of all dirt, dust and other
foreign matter.(b) Ready mixed paintbrushing priming for enamel
The rate shall be for a unit of one sq. metre
Signature of Bidder Page 64 of
Finishing wall with weather proof exterior emulsion paint on wall surface (two coats) to give an
required shape even shade after thoroughly brushing the surface to remove all dirt, and remains
of loose powdered materials.etc complete
The rate shall be for a unit of one sq. metre
Applying two coats of Birla (white cement based) or Asian (acryliclapy-putty) or equivalent & two
coats of primer of approved brand and manufacture on new wall surface to give an even shade
including thoroughly brushing the surface free from mortar dropping and other foreign matter
and sand papered smooth.
The rate shall be for a unit of one sq. metre
Demolition including stacking of serviceable materilas and disposal of unserviceable materials
with all lead and lift. (i) R.C.C. work
The rate shall be for a unit of one Cum. The work should be done as specified in above item.
Demolition of Brick work and stone masonry including stacking of serviceable materil as and
disposal of unserviceable materials with all lead and lift.(ii) In Cement Mortar.
Demolition of Brick work and stone masonry including stacking of serviceable materil as and
disposal of unserviceable materials with all lead and lift.(ii) In Cement Mortar.
The rate shall be for a unit of one Cum
Dismentaling tiled of stone floors laid in mortar including stacking of serviceable materil as and
disposal of unserviceable materials with all lead and lift.
Dismentaling tiled of stone floors laid in mortar including stacking of serviceable materil as and
disposal of unserviceable materials with all lead and lift.
Signature of Bidder Page 65 of
The rate shall be for a unit of one Sqm. The work should be done as specified in above item.
Dismentaling of sheet roofing including ridges, Hips, Valleys, Gutters etc. stacking of serviceable
materil as and disposal of unserviceable materials with all lead and lift.(i) G.I.sheet roofing.
Dismentaling of sheet roofing including ridges, Hips, Valleys, Gutters etc. stacking of
serviceable materil as and disposal of unserviceable materials with all lead and lift.(i) G.I.sheet roofing.
The rate shall be for a unit of one Sqm
Dismentling doors, windows, ventilators etc. (wood or steel) shutters including chowkhats
architraves, hold fasts and other attachment etc. complete and stacking the material within all lead
and lift.(i) Not exceeding 3 Sq.M. in area.
Dismentling doors, windows, ventilators etc. (wood or steel) shutters including chowkhats
architraves, hold fasts and other attachment etc. complete and stacking the material within all lead and
lift.(i) Not exceeding 3 Sq.M. in area.
The rate shall be for a unit of Each. The work should be done as specified in above item.
Dismentling barbed wire in fencing including making rolls and also including dismentling fencing
posts including all earth work concrete in base and making good the disturbed ground stacking
useful materials as directed and disposing as directed and disposing of the unserviceable materials
with all lead and lift.
Dismentling barbed wire in fencing including making rolls and also including dismentling
fencing posts including all earth work concrete in base and making good the disturbed ground stacking
useful materials as directed and disposing as directed and disposing of the unserviceable materials with
all lead and lift.
The rate shall be for a unit of Rmt. The work should be done as specified in above item.
Signature of Bidder Page 66 of
Dismentling C.I. pipes G.S.W. pipes abd A.C. rain water pipes with fittings and clamps including
stacking the materials with all lead and lift (for any dia, of pipe)
Dismentling C.I. pipes G.S.W. pipes abd A.C. rain water pipes with fittings and clamps
including stacking the materials with all lead and lift (for any dia, of pipe)
The rate shall be for a unit of Rmt. The work should be done as specified in above item.
Dismantling santtary fittings like wash basin . W.C. pan Indian and Europe an type, flushing tank
etc. including stacking the materials with all lead and lift
Dismantling santtary fittings like wash basin . W.C. pan Indian and Europe an type, flushing
tank etc. including stacking the materials with all lead and lift
The rate shall be for a unit of Each. The work should be done as specified in above item.
Scraping oil paint from steel and other metal surface and making the surface even (with Hand
Scraping.) Scraping oil paint from steel and other metal surface and making the surface even
(with Hand Scraping.)
The rate shall be for a unit of Smt. The work should be done as specified in above item.
Removing and scraping of old deteriorated plaster of any thickness from wall / R.C.C member
including stacking of serviceable material and disposal of unserviceable from site of work with all
lead and lift Removing and scraping of old deteriorated plaster of any thickness from wall / R.C.C
member including stacking of serviceable material and disposal of unserviceable from site of work with
all lead and lift
The rate shall be for a unit of Smt. The work should be done as specified in above item.
Renovation and Repairing work in Chainlink fencing any size and also refixing work incl.
febrication work with all materails to be painted one coat of primer and twocoats of
paint as directed inline and level. (N.S.)
Signature of Bidder Page 67 of
The work should be done as described in Above Table. The
The rate shall be for a unit of Rmt
The work should be done as described in Table as Per Instruction of Engineer In Charge. The
Decision of Additional City Engineer Will be Final
Providing erecting and fixing double coated Syntex PVC.(ISI) water tank of required capacity
each with all necessary fittings and connection etc. complete on terrace.
Providing erecting and fixing double coated Syntex PVC.(ISI) water tank of required capacity each with
all necessary fittings and connection etc. complete on terrace.
The rate shall be for a unit of Litre
Providing and fixing cast iron (Spun) Nahni trap of the following nominal diameter of self cleaning
design with C.I. screaed down or higned grating including cost of cutting and making good the
walls and floor 100 mm inlet and 50 mm outlet.(C)100mm dia.
Item shall be executed AS PER SITE REQUIREMENTS AND CONDITIONS AND INSTRUCTIONS
GIVEN BY ENGG-IN CHARGE
The rate shall be for a unit of Each
roviding and fixing water closet squatting Pan (Indian type W.C.Pan) size 580 mm (Earth work,
bed concrete, foot rest and trap to be measured and paid for separately) (A) Vitreous China. (I)
Long pattern = White colour
Signature of Bidder Page 68 of
Item shall be executed AS PER SITE REQUIREMENTS AND CONDITIONS AND INSTRUCTIONS
GIVEN BY ENGG-IN CHARGE
The rate shall be for a unit of Each
Providing and fixing wsh down water closet (Europe an type, W.C.Pan) with integral P or S trap
including jointing the trap with soil pipe in Cement Mortar1:1 (1-Cement:1-fine sand) (Seal and
cover to be measured and paid for separately) (A) vitreous China Pattern :(i) in white colour
Item shall be executed AS PER SITE REQUIREMENTS AND CONDITIONS AND INSTRUCTIONS
GIVEN BY ENGG-IN CHARGE
The rate shall be for a unit of No
Provdg. & Fixing Flat Back Large Urinal of White/ colour of "Cera" or " Hindware" incl. C.P.
Brass waste coupline , waste pipe, pvcconnection etc. Complete.( size 635 x395x420
Item shall be executed AS PER SITE REQUIREMENTS AND CONDITIONS AND
INSTRUCTIONS GIVEN BY ENGG-IN CHARGE
The rate shall be for a unit of No
Providing & Fixing Angle cock of " Ess Ess" - Trend series or equivalent standard
make as approved by engg. in charge all complete. (N.S.)
Item shall be executed AS PER SITE REQUIREMENTS AND CONDITIONS AND INSTRUCTIONS
GIVEN BY ENGG-IN CHARGE
The rate shall be for a unit of No
Signature of Bidder Page 69 of
Providing and fixing 100 mm size P or S trap for water closet squatting pan including
jointing the trap with the pan and soil pipe in cement Mortar1:1 (1-Cement : 1-Fine
sand)(A) Vitreous China.Pattern in white colour
Item shall be executed AS PER SITE REQUIREMENTS AND CONDITIONS AND INSTRUCTIONS
GIVEN BY ENGG-IN CHARGE
The rate shall be for a unit of No
Providing and fixing wash basin with single hole for pillar tap with C.I.or M.S. brackets
painted white including sutting holes and making good the same but excluding fittings. (A)
Vitreous China: (ii) Flat Back wash basin 550 mm x v 400 mm size.(i) In white colour.
Item shall be executed AS PER SITE REQUIREMENTS AND CONDITIONS AND INSTRUCTIONS
GIVEN BY ENGG-IN CHARGE
The rate shall be for a unit of No
Item no.59 Providing and fixing chromium plated brass halftrun flush cock of approved quality
including fixing in pipe line etc. complete.(ii) 25mm dia.
Item shall be executed AS PER SITE REQUIREMENTS AND CONDITIONS AND INSTRUCTIONS
GIVEN BY ENGG-IN CHARGE
The rate shall be for a unit of No
Item no.60 Providing and fixing C.P. brass towel rail comlete with C.P.brass brackets
fixed to wooden plugs with C.P. brass scews.(B) 600mm x 20mm size.
Item shall be executed AS PER SITE REQUIREMENTS AND CONDITIONS AND INSTRUCTIONS
GIVEN BY ENGG-IN CHARGE
The rate shall be for a unit of No
Signature of Bidder Page 70 of
Item no.61 Providing and fixing 600 mmx120 mm glass shelf with C.P. brass bracket and
guard rail complete mixed to wooden plug with C.P.brass screws.
Item shall be executed AS PER SITE REQUIREMENTS AND CONDITIONS AND INSTRUCTIONS
GIVEN BY ENGG-IN CHARGE
The rate shall be for a unit of No
Item no.62 Providing and fixing toilet paper holder. (A) C.P.Brass
Item shall be executed AS PER SITE REQUIREMENTS AND CONDITIONS AND INSTRUCTIONS
GIVEN BY ENGG-IN CHARGE
The rate shall be for a unit of No
Item no.63 Providing and fixing screw down bib taps of following size. (A) Brass screw down
bib tap polished bright.
Item shall be executed AS PER SITE REQUIREMENTS AND CONDITIONS AND INSTRUCTIONS
GIVEN BY ENGG-IN CHARGE
The rate shall be for a unit of No
Signature of Bidder Page 71 of
Item no.64 Providing and fixing screw down bib taps of following size. (B) Brass chromium
plated screws down Bib Tap.
Item shall be executed AS PER SITE REQUIREMENTS AND CONDITIONS AND INSTRUCTIONS
GIVEN BY ENGG-IN CHARGE
The rate shall be for a unit of No
Item no.65 Providing and fixing pillar tap, capstan head, screw down high pressure with
screws, shanks and back nuts.
Item shall be executed AS PER SITE REQUIREMENTS AND CONDITIONS AND INSTRUCTIONS
GIVEN BY ENGG-IN CHARGE
The rate shall be for a unit of No
Item no.66 Providing and fixing ball cock ofapproved quality as directed. (A) Copper Metal
Item shall be executed AS PER SITE REQUIREMENTS AND CONDITIONS AND INSTRUCTIONS
GIVEN BY ENGG-IN CHARGE
The rate shall be for a unit of No
Item no.67 Providing and fixing ball cock of approved quality as directed. (B)Abonite (i)
Signature of Bidder Page 72 of
Item shall be executed AS PER SITE REQUIREMENTS AND CONDITIONS AND INSTRUCTIONS
GIVEN BY ENGG-IN CHARGE
The rate shall be for a unit of No
Item no..68 Providing laying and jointing in true line and level 15 mm dia. U.P.V.C. Pipe (SCH-
40) for cold water including fittings make PRINCE/ SUPREME/ ASTRAL/ FINOLEX or
equivalent as approved by Engineer In Charge. Pipe shall be fixed on the wall with the
help of clamp at every two metre C/C or shall be concelled as directed including
necessary fittings etc. including testing of pipe and joints and fixing the same with solvent,
including cost of all materials.adhesive
Item shall be executed AS PER SITE REQUIREMENTS AND CONDITIONS AND INSTRUCTIONS
GIVEN BY ENGG-IN CHARGE
The rate shall be for a unit of Rmt
Item no.69 Providing laying and jointing in true line and level 25 mm dia. U.P.V.C. Pipe (SCH-
40) for cold water including fittings make PRINCE/ SUPREME/ ASTRAL/ FINOLEX
orequivalent as approved by Engineer In Charge. Pipe shall be fixed on the wall with
the help of clamp at every two metre C/C or shall be concelled as directed including
necessary fittings etc. including testing of pipe and joints and fixing the same with adhesive
solvent, including cost of all materials.
Item shall be executed AS PER SITE REQUIREMENTS AND CONDITIONS AND INSTRUCTIONS
GIVEN BY ENGG-IN CHARGE
The rate shall be for a unit of Rmt
Signature of Bidder Page 73 of
Item no.70 Providing & Fixing 3 mm thick F.R.P.sheet of Approved Quality & Color /
Pattern as per Consultant's design also includes required fabrication structure in the grid
of 2'-0x2'-0 size using hollow pipe of16 gauge & size 2"x1" & 1"x1" ,G.I. & Bitumen
Washers, Silicon paste application for fixing the sheet . Rate also includesnecessary bending,
cutting, labor charges , Zinc Primer coat & Two coats of oil painting of color as approved by
consultants & making good the wall. (N.S.)
Item shall be executed AS PER SITE REQUIREMENTS AND CONDITIONS AND INSTRUCTIONS
GIVEN BY ENGG-IN CHARGE
The rate shall be for a unit of smt
Item no.71 Providing 2 mm thick F.R.P. Gutter with necessary M.S. Supporting Brackets.
Item shall be executed AS PER SITE REQUIREMENTS AND CONDITIONS AND INSTRUCTIONS
GIVEN BY ENGG-IN CHARGE
The rate shall be for a unit of rmt
Item no.72 Providing cement vata (10cm. x 10 cm. size) quarter round in cement mortar 1:1
including neat cement finishing, watering etc. complete.
Item shall be executed AS PER SITE REQUIREMENTS AND CONDITIONS AND INSTRUCTIONS
GIVEN BY ENGG-IN CHARGE
The rate shall be for a unit of Rmt
Item no.73 Making Water connection from exi.Muni. Water line (N.S.)
Item shall be executed AS PER SITE REQUIREMENTS AND CONDITIONS AND INSTRUCTIONS
GIVEN BY ENGG-IN CHARGE
Signature of Bidder Page 74 of
The rate shall be for a unit of Nos.
The rate shall be for a unit of Smt.
Item no.74 Providing and Fixing 1 H.P. Electrical monoblock or submarcible water pumps
withmotor and required cable and switch board of approved brand and make etc.comp.as
The rate shall be for a unit of Set
Item no.75 Providing TMT Bar FE 415 reinforcement for R.C.C. work including bending, binding
and placing in position complete up to floor two level (up to 10 ton)
The scope of work consists of providing and laying mild steel reinforcement and TMT CRS Fe-
500 reinforcement for RCC works of various components of the structure. This may be Tisco or any
other approved manufacturer branch and corrosion resistant steel bars approved by the Engineer
Incharge. This includes cuttings, bending, binding, placing, with all equipments and labour required for
the work as directed by the City Engineer, Ahmedabad and all operations covered within the intent and
purpose of the specification.
Being of Reinforcement
Reinforcing steel shall conform accurately to the dimensions shown on relevant drawings and
conforming to the relevant IS codes (latest revision).
Bars shall be bent cold to the specified shape and dimensions or as directed by the City Engineer, AMC,
Ahmedabad using a proper bar bender, operated by hand or power to attain proper radii of bends.
Bars shall not be bent or straightened in a manner that will cause injury to the material.
Bars bent during transport or handling shall be straightened before being used on work; they shall not be
heated to facilitate bending.
Signature of Bidder Page 75 of
The bending of the TMT bars shall be carried out as per the following:
S Operation Size TMT CRS-
1 Bend Upto 22 mm 3d
2 Rebend Upto 10mm 4d
Placing of Reinforcement:
All reinforcing bars shall be accurately placed in the exact position shown on the drawings, and shall be
securely held in position during placing of concrete by annealed binding wire not less than 1 mm in size
and conforming to IS:280 and by using stays blocks or metal chairs, spacer, metal hangers, supporting
wires or other approved devices at sufficiently close intervals. Bars will not be allowed to sag between
supports nor displaced during concreting or any other operation over the work. All devices used for
positioning shall be of non-corrodible material. Wooden and metal supports will not extend to the surface
of concrete, except where shown on the drawings, placing bars on layers of freshly laid concrete as the
work progresses for adjusting bar spacing will not be allowed. Pieces of broken stone, brick or wooden
blocks shall not be used. Layers of bars shall be separated by spacer bars, precast mortar blocks or other
approved devices.
Reinforcement after being placed in position shall be maintained in a clean condition until
completely embedded in concrete. Special care shall be exercised to prevent any displacement of
reinforcement in concrete already placed.
To protect reinforcement from corrosion, concrete cover shall be provided as indicated on the
drawings. All bars protruding from concrete to which other bars are to be spliced and which are
likely to be exposed for an indefinite period shall be protected by a thick coat of neat cement grout.
Signature of Bidder Page 76 of
In the case of columns and walls, vertical bars shall be kept in normal position with timber templates
having slots accurately cut in for bar position. Such templates shall be removed after the concreting
has progressed upto a level just below them.
Bars crossing each other, where required, shall be secured by binding wire (annealed) of size not
less than 1 mm and conforming to IS;280 in such a manner that they do not slip over each other at
the time of fixing and concreting. As far as possible, bars of full length shall be used. In case this is
not possible, overlapping of bars shall be done as directed by the City Engineer, AMC, Ahmedabad.
When practicable, overlapping bars shall not touch each other, but be kept apart by 25 mm or 1 ¼
times the maximum size of the coarse aggregates whichever is greater, by concrete between them.
Where this is not feasible, overlapping bars shall be bound with annealed steel wire, not less than [1
mm thickness twisted tight in eight shape around the lapped bars. The overlaps shall be staggered for
different bars and located at fixed locations only along the span where neither shear nor being
moment is maximum.
Welding of Bars
Welding of TMT bars can be permitted if specified on the drawings, joints of reinforcement bars
shall be butt welded so as to transit their full strength. Welded joints shall preferably be located at
points where steel will not be subject to more than 75 percent of the maximum permissible stresses
and welds so staggered that at any one section, not more than 33 per cent of the rods are welded. No
–pre-warning or post heat treatment is necessary. Interpass temperature should be limited to 200º C
with low heat input and equivalent strength low hydrogen type electrode. Suitable means shall be
provided for holding the bars securely in position during welding. It must be ensured that no voids
are left in welding and when welding is done in 2 or 3 stages, previous surface shall be cleaned
property. Ends of the bars shall be cleaned of all loose scale, rust, grease, paint and other foreign
matter before welding. Only competent welders shall be employed on the work.
Welded pieces of reinforcement shall be tested. Specimens shall be taken from the actual site
and their number and frequency of tests shall be as directed by the City Engineer, AMC,
The TMT bars shall be tested for any or all of the following tests as directed by the Engineer
Alternate immersion test
Salt spray test
Atmospheric exposure test
Sulphur dioxide test
Potentio dynamic test
Signature of Bidder Page 77 of
The Quantity Shall be Measured in Unit Kg.
Item no.76 Conveyance charge of Earth,Lime, Murrum, building rubbish earch manure or sludge
and excavated rock and fly ash,aggregate of any kind etc.comp.upto 5 km lead.(L.S.)
All the surplus earth etc. shall be carried away immediately from the site of work to a place within 5km.
distance or as directed and ordered by the Engineer, so as not to cause any inconvenience to the public
traffic finding which in view of public safety and traffic convenience. The corporation shall carry out the
work by any other agency at the contractor’s risk and cost. If the instructions are not completed within
days from the date of order to cart the surplus materials and clear the site, the said work shall be carried
out by the Municipal Corporation at the risk and cost of the contractor and no claim or dispute shall be
entertained in this respect.
If the filling in trenches after settlement of the earth filling in trenches is to be done and the same shall be
carried out by the contractor without asking any extra rate. The contractor shall have to cart the surplus
earth after the trenches we will watered and refilled with the sand. The rate of carting including carting
of brickbats, metal, rubble vegetable and garbage, if necessary to clear the road surface.
The rate shall be for a unit of one cubic meter.
Item no. 77 P/M/F chainlink jali 8'x4' size as per details sketch & instructionof engineer in charge
same as lal darwaja garden pattern consisting of 3'dia. M.S black pipe 'A' class 5'4" ht. fixed at
8'9" c/c in C.C 1:2:4 block of 9"x9"x9" size chain link jali of size 2"x2"x10 gauge fixed in 35x35x5
mm MS angle frame 8'x4' size with MS flat of size 25x3 mm welded jali etc.comp.The jali is to be
welded to MS pipe with MS flat as instruction given.The M.S pipe and the M.S angle frame are to
be painted one coat of primer and two coats of paint as directed in line and level. (N.S)
Item shall be executed AS PER SITE REQUIREMENTS AND CONDITIONS AND INSTRUCTIONS
GIVEN BY ENGG-IN CHARGE
The rate shall be for a unit of Rmt
Item no. 78 Supplying and fixing of 300 mm-L x 15 mm-B x 380 mm-H Kerb block for
Footpath in M-20 grade using 20 mm nominal size black trap aggregate of
Sevaliya/Timbaor equivalent quality for pre-cast blocks, reasonablyexposed
finish/ formwork , mould with well equippedwith vibratory system for kerb stones of
Signature of Bidder Page 78 of
approved design including curing, etc. complete, including thecost of formwork etc.
complete. The rate shall also include necessary cutting of asphalt, fixing the
Kerbstones in line and level on 5 cm thick sand bedding withnecessary
equipments and materials. The rate shall also include the flush pointing in CM (1:3) for all
joints of thekerbstones. Filling of zari alone the sides of the kerbstone fixed with
Bituminous concrete Bituminousconcrete / C.C. mixed in proper position to flush withthe
road surface as directed by Engineer in change to form a portable mixture.a) Laying
on 5 cm thick Sand Bedding
Item shall be executed AS PER SITE REQUIREMENTS AND CONDITIONS AND INSTRUCTIONS
GIVEN BY ENGG-IN CHARGE
The rate shall be for a unit of Rmt
Item no. 79 Providing and Laying of Rubber Moulded Paver Block Grey/Coloured 60 mm thick,
M-35 Grade of any size shape (Usually Uni-Paver Blocks) using black trap good quality aggragate
of 20 mm nominal size for footpath,parking areas, service lanes and other areas as mentioned in
the drawing / instruction of engineer in charge. Cost includes formworks using rubber mould,
Rate providing and laying paver blocks as per required grading and specification. The paver block
shall be mechanically compacted. The work of paving blocks shall be executed in line and level by
skill mason of flooring work only. It should be laid in such a way that the no cutting of the paver
block to be necessary. if cutting of paver block necessary then it should be cut by machine only and
carting. The finished surface of the paver block shall have resonably good, plain finished. Paver
blocks shall be compacted and shall be relaid if necessary. Gravel or such type of materials shall
not be allowed for production. Laying on 5 cms thick sand
Item shall be executed AS PER SITE REQUIREMENTS AND CONDITIONS AND INSTRUCTIONS
GIVEN BY ENGG-IN CHARGE
The rate shall be for a unit of Smt
Item no. 80 Provdg. & laying S.W. Gully trap with brick masonry chamber & water tight
G.T.Stone including fixing of covervSquare mouth trap 100 mm x100 mm size P-Trap
Signature of Bidder Page 79 of
Item shall be executed AS PER SITE REQUIREMENTS AND CONDITIONS AND INSTRUCTIONS
GIVEN BY ENGG-IN CHARGE
The rate shall be for a unit of Nos.
Item no. 81 CatchPit Jali Fixing P/F FRC catch pit jali with frame 600mm x 600mm clear opening
etc. comp. As directed by engineer in charge. (Based on Central Store Rate)
Item shall be executed AS PER SITE REQUIREMENTS AND CONDITIONS AND INSTRUCTIONS
GIVEN BY ENGG-IN CHARGE
The rate shall be for a unit of No.
Item no. 82 Constructing Slab type M.H. Chamber of the following size including excavation,
refilling, brick bats cement concrete (1:5:10) of thickness 15 C.M., CC Channel (1:2:4) of thickness
10 C.M., finished 15 mm thick cement plaster inside & outside (Only for shaft) in CM 1:3,
finishing with cement slurry, P/F 4 mm dia M.S.Steel HDPE coated steps 35 cm c/c at 35 cm
staggered in masonary CM 1:5, RCC Slab in CC 1:1.5:3 of thickness 23 C.M., including Cantering
& reinforcement (double jalli at 15 C.M. c/c bothway 12 mm dia.) but excluding the cost of
Manhole seat cover etc..completed. of Size 1.00 X 1.40 meter (Inside Clear, M.H. length should be
parallel to the flow, for pipe dia <= 800 mm)
1) 1.00 to 2.00 meter depth, (Slab at Ground level)
2) 2.00 to 3.00 meter depth, (Slab at below 0.6 mt. From G.L.)
3) 3.00 to 4.00 meter depth, (Slab at below 1.00 mt. From G.L.)
4) 5.00 to 6.00 meter depth, (Slab at below 1.00 mt. From G.L.)
5) 7.00 to 8.00 meter depth, (Slab at below 1.00 mt. From G.L.)
(a)Excavation : This be done as specification in Item No.
(b)Brick bats Cement Concrete:-
: Cement used shall be got approved by the enginre in charge be fore starting the work this shall
comply with specification in general.
Sand to be used should comply with specification of P.W.D. hand book in general.
Signature of Bidder Page 80 of
Brickbats to be used for concrete must be thoroughly well burnt and free fromany
impurities and size from 20 to 25 m.m.
The preparation of concrete shall be one part of cement 5 part of sand & 10 part broken
Brickbats must be perfectly clean from inprutes and shall be throughly wetered be for mixing
and mixed properly on wooden or specially propared platform until every part of the brockbats is
sufficently coated with mortar.
Concrete must always be used fresh it shall be laid in layers as directed never exceeding 20 kms.
in thickness and be well and quickly rammend with heavy rammers, until mortar creams up to
surface. The surface must be kept damp during and after consolidation & in laying consecutive layer
the lower coars should be well watered & mode lough be for the next is placed.
(c)Brick work with cement mortar .
Brick shall be table bricks of approved clean conforming with the specification as laid down in
P.W.D. hand book No.2 The brick shall be wellburnt and free from any defects shall be got approved by
the Enginur in charge be fore the work is started.
Cement to be used for mortar shall comply with I.S.S. & P.W.D. hand book specifications cement
mortar for the brick work shall be one parts of cement to six part of sand every brick well soaked in
water is required to be ladi in joints of cement mortar the thickness of which shall not exceed paints of
1.25 cm If after removal of centering any open joints are founed these shall be pointed immedately.
Special care shall be taken to make the faces of brick work smooth brick work mar be toothed or
shall be racked back in course.
All intrados of curse be worked from compete strickly made to dimensions and grade.
Brick work in general shall be of first class workmanship and shall be excuted according to plan
working to the proper dimension & as directing by the officer in charge from the time to time bricks
should be throughly in water be fore use. All bricks shall Ihave to be cleaned water be fore laying cement
mortar shall be prepared in special iron pans and mixed in quantites as required using measurs boxes for
sand and cement bag of 1.25 cft. or 1 cft. as measured the case may be all materials shall be stacked on
the site as not to obstruct tra fic in any way the masonary should be constructed in proper workmanship
like manner with joints plunb etc. to conform with general specification No.45 P.W.D hand book. The
face work should be neatly finished. The work shall be keptwaterd for work at least after date of
(d)C.C. channels.
Cement concrete for the inverts and channels of manholes shall consist of one parts of cement 2 parts
of sand 4 part of aggregates of black trap metalof other approved material of sizes from 0.6 to 2.5 cm.
well graded as per instructions.
Signature of Bidder Page 81 of
The work shall be as per P.W.D hand book specification No.20 as per general instructions. The rate
includes all necessary materuals mixing laying and remain and watering the exposed faces tobe finished
with neat cement as per instruction the channel shall be half round and as per drawing & instruction of
Engineer in charge. proper bunching shall be provided at both of the channel.
(e)Cement plaster.
Cement plaster 15 M.M. shall be done using cement mortar of 1 part cement and 3 parts of sand in
uniform thickness with surfaces truely in plumb. The work in general shall comply with general specifi
cations for )plaster no.64.P.W.D. hand book plastered surface shall kept damp at least for fortnight.
All internal surfaces of the manholes including soft to arch shall be provided with cement plaster.
Manhole shall be provided at every change of alignment, gradient or diameter of sewer/storm water
drains, Bends and junctions in the sewer/drain shall be grouped together in manhole as far as possoble.
The maximum distance between inspection chambers shall be about 25 meters. Where the diameter of
sewer/drain is increased, the soffit of the pipe shall be fixed at the same level and necessary slope given
to the channel of manhole/inspection chamber. The minimum internal sizes of manhole/inspection
chamber shall be as per the respective item of work. The manhole/inspection chamber shall be
constructed as per the detailed drawings and as directed by Engineer. The bed concrete and the brick
masonry shall be constructed of such thickness as shown on drawing. The brick masonry shall be
constructed in C.M. (1:5), plastered on both faces inside and out side with 15 mm cement plaster in C.M.
(1:3). The channel shall be semicircular in the bottom half and of diameter equal to the sewer/drain.
Above the horizontal diameter, the sides shall be extended vertically to the same level as the crown of
the outgoing pipe and the top edge shall be suitable rounded off. The branch channels shall also be
similarly constructed with respect to the benching out at their junction with the main channel as
appropriate fall suitable rounded off in the direction of flow in the main channel shall be given. The
channel at the bottom of manhole / inspection chamber shall be plastered with C.M. (1:3) and finished
smooth. Rungs shall be provided in all manholes/inspection chambers over 0.6 mtr in depth and shall be
of cast iron conforming to IS:5455. These rungs shall be fixed staggered in two vertical runs, 300 mm
apart horizontally and 300 mm c/c vertically. The top rung shall be 450 mm below the manhole/
inspection chamber cover and the lowest not more than 300 mm above the benching. The
manhole/inspection chamber frame and cover shall be of cast iron of specified weight and shall conform
to the requirements given in IS:1726. The covers and frames shall be cleanly cast and they shall be free
from air and sand holes and from clod shuts. They shall be neatly dressed and carefully trimmed. All
castings shall be free from voids whether due to shrinkage, gas inclusion or other causes. Covers shall
have a raised chequered design on the top surface to provide an adequered nonslip grip. Cover shall be
capable of easy opening and closing and it shall be fitted in the frame in workmanship like manner. The
cover shall be gas tight and water tight. The size of covers specified shall be considered as the clear
internal dimensions of the frame. Covers and frames shall be coated with a black bituminous
composition. The coating shall be smooth and tenaceous. The frame of manhole/inspection chamber
cover shall be firmly embeded to correct alignment and level in cement concrete on the top of the
masonry. The item shall be executed as per the detailed drawing and as directed by Engineer.
Signature of Bidder Page 82 of
Design and Details of Reinforcement for the slab shall be approved before casting work or as
directed by engineer in charge or Additional City Engineer (zone)
Mode of measurement:
The rate shall be for a unit of one number basis.
Item No : 83 Constructing Chamber of following size including excavation, refilling, BBCC (1:5:10) for
foundation, C.C.Channel (1:2:4), finished 15 mm thick cement plaster inside in CM 1:3,
finishing with cement slurry, Brick masonary in CM 1:5 & excluding the cost of chamber
seat cover etc.completed.
0.60 X 0.45 mt. size Inside Clear, Depth from 0.0 to 0.90 meter
0.60 X 0.75 mt. size Inside Clear, Depth from 0.0 to 0.90 meter.
0.75 X 0.75 mt. size (Inside Clear) Depth from 0.0 to 1.20 meter.
The sewet trench shall be excavated to the alignment and gradient shown on the plan
and section. In all storts soil including oil masonary asphalt roads and wet. excavation .
The sewer excavation shall be commenced at the down stream end of the sewer and be
continued upto the gradient as directed. The trench shall not open more than
meters in advace of the completed sewer only when directed by the Engineer in charge
looking to the progress of the work in obtaining the formation of the bottom of the
trenches the usual methods of suing sight rails and bonning roads shall be adopted
during the whole of the process. The center line of uniform height shall be carried
clearly on each rail. The depth of the excavation and invert of the sewer shall be
checked by means of bonning road of appropriate length and also straight edge.
The bed of the trench be shall well remmed before starting laying of sewer ines and
cement concrete and masonary work.
Where trenches are deep in bad grounds the sides shall be supported by suitable
imbering of shorting work looking to the nature of soil near big or important
structures, the sides of the trenches shall be closely and securely timbered. If any
settlement of the building is anticipated the timbering shall be left in the ground. The
various materials excavated shall be separately stacked so that in refilling the may be
relaid on the same order as before and least possible damage shall be done carpet on
the public roads and private properties. Surface covering consisting of asphalt carpet
shall be kept on one side and preserved for reinstatement. The excavated earth shall
not heaped near the trenchers so as to caused unnecessary obstruction along the
pulling inspection, trenches etc. shall be tunneled under only as necessary. The side of
the trenches shall be nearly vertical and plumb & red light shall be placed at each end
at intervals as instructed and further protested by rope fence. Necessary caution
boards shall also be erected and diaced as directed by the Engineer in charge.
Wherever possible material excavated from the trenches of whatever kind shall not
placed nearer than 3 meters from the outer edge of the excavated trench. The utmost
shall have to be taken in refilling the trenches so that no damage may be done no
Signature of Bidder Page 83 of
sewer no lump shall be allowed to be put around the sewer. The remming of the filling
shall be done and well watered. The surplus earth shall be removed directed within
meters lead. The measurement of the work shall be exact length and width of the
trench as specified or as per City Engineer instruction and depth shall be measured
vertical as per section upto invert or the pipe lind The City Engineer reserves the right
of extra excavation on either side if considers necessary for the safely of the work.
The bottom and sides of the trench shall be dressed in level and plumb in all directions
before any concrete in India. In case the excavation is done deeper than required no
filling shall be allowed to bring the formation to proper level but contractor shall have
to lay cement or lime be concrete of filling or other acceptable materials as directed by
C.E. at contractor won cost so as to come to proper information, in case bas formation
are met with the work shall have be done as per instruction of C.E. necessary
arrangements for watering trenches must be provided be contractor and without
proper watering trenches will not be allowed to be tilled to further. Contractor shall
have to make arrangement for acees to invert of the sewer and for inspection of the
ware as ordered by the Engineer. If is required to shired or after the alignment section
of diameter of the pip the contractor shall carry or altered the alignment section or
diameter of the pipe the contractor shall carry out the altered work at the rates quoted
by him for the original work for items and contractor shall not claim any expenses due
to the changes made.
In case no work shall be done at night or on Sundays & other holidays and during the
recess time except in and other holiday the case of bad grounds such as running sand
where the work must be executed various day night without intruption when so
ordered by the Engineer.
All existing water pipe storm drains sewer line railway tract, electric cables etc. which
do not in the opinion of Engineer required to be charged in location shall be supported
and protected from injury by the contractor. The contractor shall be liable to pay all
damages to water pipe, drains electric and telephone cables and to private property
during the execution of this contract and the same will be recovered from the running
bills or thedeposit of work whenever it becomes necessary in the opinion of the
Engineer in charge location of any existing sewers drains etc. not otherwise from in
these specification the contractor shall do the work of making such change and the
work shall be paid for as extra work. All places of public utility etc. shall be kept
accessible for use.
No extra payment shall be made for land sides and side slopes done without prior
approval of the Engineer in charge.
Wherever natural soil commends winder excavation the mentioned above the same
shall be given after approved C.E. The rate for excavation for easy jointing and caulking
nothing extra shall be paid for this.
Refilling of trenches shall be done only after the grade of line and hydraulic test
practicable of the lines are checked and approved of and order given by the Engineer in
charge. The refilling shall be accompanied by through watering the layers of 0.50 metrs.
Further refilling shall be done there after and process should be repeated till trenches
are completely refilled. Temping and ramming with rammers shall have to be done at
Signature of Bidder Page 84 of
all place of important work where ordered by Engineer in charge. After the trench is
give the trenches shall have to be refilled within 4 days with complete watering. If the
contractor fails to do watering satisfactory corporation shall get it done at the risk and
cost of the contractor with or without giving any notice and the expenses incurred in
doing so recovered from the contactor either in cost or from his payment through bills.
The brickbats shall be of new bricks, hared well burnt and broken to 40 mm nominal size.
These shall be free from earth and shall be got app. use. Sand shall be clear coarse, sharp
and free from earth and other impurities. Mixing shall be done on brick or stone platform
or of brickbats to mortar shall be measured in heaps by brick height irregular measure. If
ordered by C.E.
Concrete shall be laid in layers of 15 cms. and well consolidated maintained by the
contractor for before commencing the brick work. over boxes, concrete shall be well
watered. The mix shall be done in prop. of 1 : 5 :
Cement shall confirm to M-3, sand shall confirm to M-6, coarse agg. shall confirm to M-
13, water shall confirm M-1.
The prop. of the cement of sand coarse agg. shall be 1 : 5 : 10 i.e. 1 part of cement, 5 part
of sand and 10 parts of coarse agg. by volume. and the work shall be carried out as per
inst. of Engineer in charge and as per C.3.
Brick work cement mortar :
Bricks shall be table brick confirming of approved kiln specifications as laid sown n PWD
Hand book NO. 2. These shall be well burnt and free from all defects and shall be got
approved by the Engineer in charge before the work is started. Cement to be used for
mortar shall comply with PWD Hand book specifications, cement mortar in the brick
work shall be 1 part of cement, 5 parts of sand. Every brick well sacked in water is
required to be laid I full & closed joints of cement mortar the thickness of which shall not
exceed 1.25 cms. If on removal of centering any open joint shall be found, these shall be
pointed immediately. Special care shall taken to make the face of brick work smooth
brick work shall be toothed or shall racked back in coarse.
All intrades of curves shall be worked from temple strictly made to dimensions as per
1974-75 latest plan and section approved by C.E.
Signature of Bidder Page 85 of
Brick work in general shall be of first class workmanship & shall be executed according to
the plan working proper dimention & as directed by the Office in charge from time to
time. Brick should be thoroughly wetted in water before use. All brick work to be cleaned
& wetted before laying cement mortar shall be prepared in special iron pals. And mixed
bag of 1.25 cft. or 1 cft. as measured as the case may be. All materials shall be stacked in
one side so as not to obstruct traffic in any way. The masonry should be constructed in
proper workmanship like manner with jointing plumb etc. to confirm with the general
specification No. 45 PWD Hand Book. The face work should be nearly finished. The shall
be kept watered for a week at least three days after the date of completion.
Providing and laying cement concrete 1:2:4
(1 cement :2 coarse sand :4 graded stone aggregate 20 mm nominal size)
RCC Work :- In general, plain and reinforced concrete work for manholes shall be carried
out in accordance with latest version of IS 456 unless otherwise specified in this
specification. The slab of manhole shall be cast with shutters lined with plywood and
smooth finished. For avoiding surface cracks due to variation in atmospheric
temperature and exposure to direct sunlight, RCC slab of manholes after casting shall be
kept wet. M 15 grade of concrete used for construction of RCC manholes shall have
minimum cement content of 360 kg/cum of concrete. Bar bending schedule for
reinforcement shall be prepared by contractor and got approved from owner/ engineer
before proceeding with the work. Minimum cover to the reinforcement shall be 40 mm.
The rate includes cost of all labour, materials, tools and plant etc. required for
satisfactory completion of this item as described above.& the drawing as per A.M.C Dr.
S.O.R shall be final. The rate shall be for a unit of one number basis.
Providing TMT bar.
TMT bars shall conform to M-18. Mild steel binding wires shall conform to M-21
The work shall consist of furnishing and placing reinforcement to the shape and
dimensions shows as on the drawings or as directed.
Steel shall be clean and free from rust and loose mill scale at the time of fixing in
position and subsequent concreting.
Signature of Bidder Page 86 of
Reinforcing steel shall conform accurately to the dimensions given in the bar bending
schedules shown on relevant drawings. Bars shall be bent cold to specified shape and
dimensions or as directed using a proper bar bender, operated by hand or power to
attain proper radius of bends. Bars shall not be bent or straightened in a manner that will
injure the material. Bars bent during transport or handling shall be straightened before
being used on the work. They shall not be heated to facilitate bending. Unless otherwise
specified, a ‘U’ type hook at the end of each bar shall invariably be provided to main
reinforcement. The radius of the bend shall not be less than twice the diameter of the
round bar and the length of straight part of the bar beyond the end of the curve shall be
at least four times the diameter of the round bar. In case of bars which are not round and
in case of deformed bars, the diameter shall be taken as the diameter of circle having an
equivalent effective area. The hooks shall be suitably encased to prevent any splitting of
All the reinforcement bars shall be accurately placed in exact position shown on the
drawing and shall be securely held in position during, metal hangers, supporting wires or
other approved devices at sufficiently close intervals,. Bars shall not be allowed to sag
between supports nor displaced during concreting or any other operations of the work.
All devices used for positioning shall be of noncorrodible material. Wooden and metal
supports shall no extend to the surface of concrete, except where shown on drawings.
Placing of broken stone or brick and wooden blocks shall not be allowed. Pieces of
broken stone or brick and wooden blocks shall not be used. Layers of bars shall be
separated by spacer bars, precast mortar blocks or other approved devices.
reinforcement after being placed in position shall be maintained in a clean condition until
completely embedded in concrete. Special care shall be exercised to prevent any
displacement of reinforcement in concrete already placed. To prevent reinforcement
from corrosion, concrete cover shall be provided as indicated on drawings. All the bars
producing from concrete and to which other bars are to be spliced and which are likely to
be exposed for a period exceeding 10 days shall be protected by a thick coast of neat
Bars crossing each other where required shall be secured by binding wires (annealed) of
size not less than 1 mm in such manner that they do not slip over each other at the time
of fixing and concreting.
As far as possible, bars of full length shall be used. In case this is not possible,
overlapping of bars shall be done directed. When practicable, overlapping bars shall not
touch each other, but be kept apart by 25 mm or 1.25 mm times the maximum size of
the coarse aggregate whichever is greater by concrete between them. Where not
feasible, overlapping bars shall be bound with annealed wires not less than 1 mm thick
Signature of Bidder Page 87 of
twisted tight. The overlaps shall be staggered for different bears and located at points
along the span where neither shear nor bending movement is maximum.
Whenever indicated on the drawings or desired by the Engineer- in-charge, bars shall be
joined by coup lings which shall have a cross-section sufficient to transpit the full stresses
of bars. The ends of the bars that are joined by coupling shall be upset for sufficient
length so that the effective cross section at the base of threads is not less than norma l
cross-section of the bar. Threads shall be standard threads. Steel for coupling shall
conform to I.S.
When permitted or specified on the drawings, joints of reinforcement bars shall be butt-
welded so as to transmit their full stresses. Welded joints shall preferably be located at
points when steel will not be subject to more than 75 percent of the maximum
permissible stresses and welds so staggered that at any one section not more than
percent of the rods are welded. Only electric are welding using a process which excludes
air from the molten metal and conforms to any or all other special provisions for the
work shall be accepted. Suitable means shall be provided for holding bars securely in
position during welding. It shall be ensured that no voids are left in welding and when
welding is done in two or three stages, previous surface shall be cleaned properly. Ends
of the bars shall be cleaned of all loose scale, rust, grease, paint and other foreign matter
before welding. Only competent welders shall be employed on the work. the M.S.
electrodes used for welding shall conform to I.S. 814. Welded pieces of reinforcement
shall be tested. Specimen shall be taken from the actual site and their number and
frequency of test shall be as directed.
R.C.C. Bedding :
Cement concrete for the bottom portion of manhole shall consist of one part of cement
two parts of sand four parts of black trap metal of other approved material of 0.6 to
cms size from well graded as per instruction. The rate includes all necessary materials
mixing lifting placing ramming watering etc. the exposed faces to be neatly finished
smooth with cement as per instructions. The concrete work to kept constantly watered
for at least fortnight.
Cement Plaster :
Cement plaster 15 mm thick shall be done using cement mortar of 1 part of cement &
parts of sand in uniform thickness with surfaces trely in plums. The work in general shall
comply with general specifications for plaster No. 64 in PWD hand book. The plaster
surfaces to be kept damp at least for a fortnight. All internal sides of the manholes
including soffit of the arch shall be provided with cement plaster.
Signature of Bidder Page 88 of
FRC manhole cover with seat to be set in cement mortar with cement concrete of 1 : 2 :
prop. alround. FRC cover shall be marked with year mar AMC. etc. & arrow showing the
direction of flow.
Foot steps shall be of the best quality PVC as specified above true to dimensions. The
rate includes mixing the same in position as directed PVC foot steps of approved design
and quality shall have to be fixed if so ordered by C.E. without extra charges. PVC steps
shall be fixed at interval of 37 cm. vertically & 22 cm. horizontally starting from the invert
Mode Measurment
The mode of measurement shall be on Nos.
Item no. 84 Dismantling of existing Arch type manhole up to Arch and then Const. Slab type
manhole of following size incl. excavation, refilling and & finished 15 mm thick cement plaster
inside in CM 1:3, P/F 4 mm dia M.S.Steel HDPE coated steps 35 cm c/c at 35 cm staggered in
masonry CM 1:5, incl. cost of RCC Slab in CC 1:1.5:3, including Cantering & reinforcement as
directed by engineer in charge. Rate includes carting of debris and excavated soil
1) 1.00 x 0.75 mt (inside clear) RCC Slab of thickness 15 C.M& reinforcement (Single jalli at
15 C.M. c/c bothway 10 mm dia.) From 0 to 2 mt depth (Slab at Ground level)
(a)Excavation : This be done as specification in Item No.
(b)Brick bats Cement Concrete:-
: Cement used shall be got approved by the enginre in charge be fore starting the work this shall
comply with specification in general.
Sand to be used should comply with specification of P.W.D. hand book in general.
Brickbats to be used for concrete must be thoroughly well burnt and free fromany
impurities and size from 20 to 25 m.m.
The preparation of concrete shall be one part of cement 5 part of sand & 10 part broken
Brickbats must be perfectly clean from inprutes and shall be throughly wetered be for mixing
and mixed properly on wooden or specially propared platform until every part of the brockbats is
sufficently coated with mortar.
Concrete must always be used fresh it shall be laid in layers as directed never exceeding 20 kms.
in thickness and be well and quickly rammend with heavy rammers, until mortar creams up to
surface. The surface must be kept damp during and after consolidation & in laying consecutive layer
the lower coars should be well watered & mode lough be for the next is placed.
(c)Brick work with cement mortar .
Signature of Bidder Page 89 of
Brick shall be table bricks of approved clean conforming with the specification as laid down in
P.W.D. hand book No.2 The brick shall be wellburnt and free from any defects shall be got approved by
the Enginur in charge be fore the work is started.
Cement to be used for mortar shall comply with I.S.S. & P.W.D. hand book specifications cement
mortar for the brick work shall be one parts of cement to six part of sand every brick well soaked in
water is required to be ladi in joints of cement mortar the thickness of which shall not exceed paints of
1.25 cm If after removal of centering any open joints are founed these shall be pointed immedately.
Special care shall be taken to make the faces of brick work smooth brick work mar be toothed or
shall be racked back in course.
All intrados of curse be worked from compete strickly made to dimensions and grade.
Brick work in general shall be of first class workmanship and shall be excuted according to plan
working to the proper dimension & as directing by the officer in charge from the time to time bricks
should be throughly in water be fore use. All bricks shall Ihave to be cleaned water be fore laying cement
mortar shall be prepared in special iron pans and mixed in quantites as required using measurs boxes for
sand and cement bag of 1.25 cft. or 1 cft. as measured the case may be all materials shall be stacked on
the site as not to obstruct tra fic in any way the masonary should be constructed in proper workmanship
like manner with joints plunb etc. to conform with general specification No.45 P.W.D hand book. The
face work should be neatly finished. The work shall be keptwaterd for work at least after date of
(d)C.C. channels.
Cement concrete for the inverts and channels of manholes shall consist of one parts of cement 2 parts
of sand 4 part of aggregates of black trap metalof other approved material of sizes from 0.6 to 2.5 cm.
well graded as per instructions.
The work shall be as per P.W.D hand book specification No.20 as per general instructions. The rate
includes all necessary materuals mixing laying and remain and watering the exposed faces tobe finished
with neat cement as per instruction the channel shall be half round and as per drawing & instruction of
Engineer in charge. proper bunching shall be provided at both of the channel.
(e)Cement plaster.
Cement plaster 15 M.M. shall be done using cement mortar of 1 part cement and 3 parts of sand in
uniform thickness with surfaces truely in plumb. The work in general shall comply with general specifi
cations for )plaster no.64.P.W.D. hand book plastered surface shall kept damp at least for fortnight.
All internal surfaces of the manholes including soft to arch shall be provided with cement plaster.
Manhole shall be provided at every change of alignment, gradient or diameter of sewer/storm water
drains, Bends and junctions in the sewer/drain shall be grouped together in manhole as far as possoble.
The maximum distance between inspection chambers shall be about 25 meters. Where the diameter of
Signature of Bidder Page 90 of
sewer/drain is increased, the soffit of the pipe shall be fixed at the same level and necessary slope given
to the channel of manhole/inspection chamber. The minimum internal sizes of manhole/inspection
chamber shall be as per the respective item of work. The manhole/inspection chamber shall be
constructed as per the detailed drawings and as directed by Engineer. The bed concrete and the brick
masonry shall be constructed of such thickness as shown on drawing. The brick masonry shall be
constructed in C.M. (1:5), plastered on both faces inside and out side with 15 mm cement plaster in C.M.
(1:3). The channel shall be semicircular in the bottom half and of diameter equal to the sewer/drain.
Above the horizontal diameter, the sides shall be extended vertically to the same level as the crown of
the outgoing pipe and the top edge shall be suitable rounded off. The branch channels shall also be
similarly constructed with respect to the benching out at their junction with the main channel as
appropriate fall suitable rounded off in the direction of flow in the main channel shall be given. The
channel at the bottom of manhole / inspection chamber shall be plastered with C.M. (1:3) and finished
smooth. Rungs shall be provided in all manholes/inspection chambers over 0.6 mtr in depth and shall be
of cast iron conforming to IS:5455. These rungs shall be fixed staggered in two vertical runs, 300 mm
apart horizontally and 300 mm c/c vertically. The top rung shall be 450 mm below the manhole/
inspection chamber cover and the lowest not more than 300 mm above the benching. The
manhole/inspection chamber frame and cover shall be of cast iron of specified weight and shall conform
to the requirements given in IS:1726. The covers and frames shall be cleanly cast and they shall be free
from air and sand holes and from clod shuts. They shall be neatly dressed and carefully trimmed. All
castings shall be free from voids whether due to shrinkage, gas inclusion or other causes. Covers shall
have a raised chequered design on the top surface to provide an adequered nonslip grip. Cover shall be
capable of easy opening and closing and it shall be fitted in the frame in workmanship like manner. The
cover shall be gas tight and water tight. The size of covers specified shall be considered as the clear
internal dimensions of the frame. Covers and frames shall be coated with a black bituminous
composition. The coating shall be smooth and tenaceous. The frame of manhole/inspection chamber
cover shall be firmly embeded to correct alignment and level in cement concrete on the top of the
masonry. The item shall be executed as per the detailed drawing and as directed by Engineer.
Design and Details of Reinforcement for the slab shall be approved before casting work or as
directed by engineer in charge or Additional City Engineer (south zone)
Mode of measurement:he rate shall be for a unit of one number basis.
Item no. 85 Providing and jointing stoneware pipes incl. excavation upto 2 mt. refilling,
transporting pipes to work site, unloading lowering in trnch such as cementsand, hemp bitumen as
directed, incl. watering the trenches spreading and cartingaway of surplus.
Lowering, laying and jointing stone ware pipes of following diameters with cement joints in
C.M.1:1 proportion in proper position , grade and alignment at all level as directed by Engineer-
in- charge including conveyance from stone to site of work, Jointing material etc.comp.
Signature of Bidder Page 91 of
A)…………do…….(b)10 cm dia line
B)………do……….(c)15 cm dia line, 20cm line
C)……………do….(c)23 cm dia line
The pipe shall be of best quality stoneware pipes. The pipes shall be of approved quality make
and shall be brought on site after approval. (The pipes shall be laid in grade as per
instruction.)Contractor shall have to procure bills for standard pipes.
The joints shall be done in cement proportion 1:1 (1 part cement: 1 part sand) using spun yarn dipped in
hot asphalt and caulking tools. The hydraulic pressure test shall be given to the contractor for testing
pipes and jointing. No trenches shall be filled without the approval of the engineer in charge.
The rate of the pipe work are including of excavation and refilling. The excavation etc. shall be
done as follows:
Excavation: The sewer trench shall be excavated to the alignment and gradient shown on the plan and
section. In all sorts of soil including old masonary, asphalt roads and wet excavation. The sewer
excavation shall be commenced at the down stream end of the sewer and be continued up to the gradient
as directed. The trench shall not open more than 60 mts. in advance of the completed sewer only when
directed by the engineer in charge looking to the progress of the work in obtaining the formation of the
bottom of the trenches the usual methods of using sign rails and boning roads shall be adopted during the
whole of the process. The centre line of uniform height shall be carried clearly on each rail. The depth of
the excavation and invert of the sewer shall be checked by means of boning road of approved length and
also by straight edge. The bed of the trench shall be well rammed before starting laying of sewer lines
and cement concrete and masonary work.
Where trenches are deep in bad grounds the sides shall be supported by suitable timbering of
shorting work looking to the nature of the soil near big or important structure, the sides of the trenches
shall be closely and securely timbered, if any settlement of the buildings in anticipated the timbering
shall be left in the ground. The various materials excavated shall be separately stacked so that in refilling
that may be relayed on the same order as before and least possible damage shall be done carpet on the
public roads and private properties. Surface covering consisting of asphalt carpet shall be kept on side
and preserved for reinstatement. The excavated earth shall not be heaped near the trenches so as to
caused unnecessary obstruction along the trenches during inspection trenches etc. shall be tunneled under
only as necessary. The side of the trenches shall be nearly vertical and plumb and red light shall be
placed at each end at intervals and instructions and further protected by rope fence. Necessary caution
boards shall also be created and as directed by the engineer in charge.
Wherever possible material excavated from the trenches of whatever kind shall not be placed
nearer than three meters from the outer edge of the excavated trenches. The utmost shall have to be taken
in refilling the trenches so that no damage may be done no sewer, no lump shall be allowed to be put
around the sewer. The ramming of the filling shall be done and well watered.
Signature of Bidder Page 92 of
The surplus earth shall be removed directed within 30 meters lead. The measurements of the
work shall be exact length and width of the trenches as specified or as per City Engineer instruction and
depth shall be measured vertical as per section up to invert or the pipeline. The City Engineer reserves
the right of extra excavation on either side if considers necessary for the safety of the work.
The bottom and sides of the trench shall be dressed in level and plumb in all directed before any
concrete is in dia. In case the excavation is done deeper than required no filling shall be allowed to bring
the formation to proper level but contractor shall have to lay cement or lime concrete of filing or other
acceptable materials as directed by the City Engineer at contractor own cost so as to come to proper
formation. In case bad formations are met with the work shall have to be done as per instruction of City
Engineer. Necessary arrangements for watering trenches must be provided by contractor and without
proper watering trenches will not be allowed to be filed to further Contractor shall have to make
arrangement for access to invert of the sewer and for inspection of the work as ordered by the engineer.
If it is required to shift or after the alignment section of diameter of the pipe the contractor shall carry out
the altered work at the rates quoted by him for the original work for items and contractor shall not claim
any expenses due to the changes made.
In no case work shall be done at night or no Sundays & other holidays and during the recess time
except in and other holiday the case of bad grounds such as running sand where the work must be
executed vigorous day night without interruption when so ordered by the engineer. All existing water
pipe storm drains sewer line railway track, electric cables etc. which do not in the opinion of engineer
required to be changed in location shall be supported and protected from injury by the contractor. The
contractor shall be liable to pay all damages to water-pipe, drains electric and telephone cable and to
private property during the execution of this contract and the same will be recovered from the running
bills or the deposit of work change location of any existing sewers drains etc. not otherwise from in these
specification the contractor shall do the work of making such change and the work shall be paid for as
extra work. All places utility etc. shall be kept accessible for use.
No extra payment shall be made for land sides and side stops done without prior approval of the engineer
The excavation of trenches shall be done foot wider on each side of the pipe than the inside
diameter of the sewer in case of depth excavation exceeding 3 meters above invert, one feet wider
excavated on either side for the upper depth above 3 meters shall be allowed and paid for. Wherever
natural soil demands winder excavation the mentioned above the same shall be given after approval of
City Engineer. The rate for excavation for easy jointing and caulking nothing extra shall be paid for this.
Refilling of trenches shall be done only after the grade of line and hydraulic test practicable of the lines
are checked and approved of and order given by the Engineer in charge. The refilling shall be
accompanied by through watering for layers of 0.50 mtrs. Further refilling shall be done thereafter and
process should be repeated till trenches are completely refilled. Temping and ramming with rammers
shall have to be done at all place of important work where ordered by Engineer in charge. After order to
refill the trench is give the trenches shall have to be refilled within 4 days with complete watering. If the
contractor fails to do watering satisfactory corporation shall get it done at the risk and cost of the
Signature of Bidder Page 93 of
contractor with or without giving any notice and the expenses incurred in doing so recovered from the
contractor either in cost or from his payment through bills.
The rate shall be per meter basis.
The rate per Cmt. in this item shall be paid extra addition to the rate for excavation
Item no. 86 Providing & Fixing in position Alluminium doors with frame using approved
quality anodised extruded alluminium section as approved by Engg.in
charge(Jindal alluminium) (a) Frame sections 101.6x44.45 mm (b) Shutter bottom vertical &
top section 83.5x44.45 (wt.1.31 kg/mt.)(at 1.31 kg/mt) (c) Shutter bottom section at
114.3x44.45 mm at (1.37kg/mt) Shutter middle section at 100x44.3 wt.(1.37 kg/mt)
incl.providing & installing 5 mm thick approved color Acrylic sheet of standard
quality fixed with glazing chips on upper pannel & Laminated sheet on lower pannel
(wtt.0.13 kg/Rmt) etc.comp.as direction of engg.in charge.(N.S.)
Mode of measurement and rate shall be for a unit of SMT basis.
Item no. 87 Providing and laying Vitrified tiles 8 to 10 mm thick, 24'' x 24'' in skrting risers of
steps and dedo on 10mm thick cement plaster 1:3 (1-cement : 3-coarse sand) and jointed with
white cement slurry
Mode of measurement and rate shall be for a unit of SMT basis
Important Note:-
As well as Considered Item Specifications as Per Item Given, not by serial number, the specifications of
items which are not mentioned in BOQ Item, Specifications should be considered as per AMC Sor
Current Approved Rates for Civil and Electrical Works, as per Available on Site of
Ahmedabadcity.gov.in All the Specifications should be Considered as per Schedules Rates of R & B
Division of both civil and Electrical Works. Hence it an ARC Tender All the Quantity Would Vary as
per Instruction of Engineer in Charge. No Rate would be given Extra for Increase or Decrease in the
Quantity of The BOQ Scheduled Items.
Contractor signature Additional City Engineer
Signature of Bidder Page 94 of
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT-CENTRAL ZONE
Name of Work:- મ યઝોન શાહપુર વોડમાં મહદીકુવા ચાર ર તા પાસે, લીથો સે પાસે, મોહન િવકાસ
Sr. Qty Rate Per Amount
No. Items Rs. Rs.
Excavation for foundation upto 1.5 m depth
including sorting out and stacking of useful
materials and disposing off the excavated stuff
upto 50 Meter lead.(A) Loose or soft soil.
Item Code No. - 04B001A. (SOR 2023-24
AHMEDABAD CITY)
5 0 to 1.5 meter depth. 201.81 Cmt
Filling available excavated earth
(excluding rock) in trenches, plinth, sides of
foundations etc. in layers not exceeding
20 cm. in depth consolidation each
deposited layer by ramming and watering.
Providing and laying cement concrete
1:5:10 (1-Cement: 5- coarses sand
and:10-hand broken stone aggregates
40mm nominal size) and curing
complete excluding cost of formworkin (A)
Foundation and Plinth (upto 10 ton).
Item Code No. - 05006A, Sr. No.5.3.4
(SOR 2023-24 AHMEDABAD CITY)
Providing and laying cement
concrete1:4:8 (1-Cement: 4- coarses
and:8-hand broken stone aggregates 40mm
nominal size) and curing complete
excluding cost of formworkin (A) Foundation
and Plinth (upto 10 ton).
Brickworkusingcommonburntclaybuildingbricks
Signature of Bidder Page 95 of
having crushing strength not less than
kg./Sq.Cm. in foundation and plinth in Cement
Mortar 1:6 (1- Cement : 6-fine sand)(B)
Conventional. Item Code No. - 06002BA,
Sr. 6.13 (SOR 2023-24 AHMEDABAD CITY)
5 (A) Conventional (upto 10 ton) 3981.21 Cmt
6 Extra Rate for brickwork in Above Item
for super structure above plinth level upto
floor two level (B) Conventional
a 5 (A) Conventional (upto 10 ton) 272.25 Cmt
Half brick masonry in common brunt clay
building bricks having crushing strength not
less than 35 Kg/Sq.Cm. in Cement mortar 1:4
(1 Cement:4-coarsesand) in
foundationandplinth (B) Conventional. Item
Code No. - 06008A2A, Sr. No. 6.3 (SOR
2023-24 AHMEDABAD CITY)
8 10 Extra for half brick masonry in super 52.8 Smt
structure above plinth level upto floor
two level (B) conventional
Providing form work in ordinary timber
planking so as to give a rough finish
including centering, shuttering, strutting and
propping etc. height of propping and
centering below supporting floor to celling not
exceeding 4 M & removal of the same
for in situ reinforced or plain concrete work
upto floor four level
a 1 Foundation, footings, bases of columns 171.68 Smt
etc. and mass concrete.
(B) Flat surfaces such as soffits of supspened
floors slabs Landings and the like. (1) Floors
etc. upto 200 mm in thickness.
(B) Flat surfaces such as soffits of suspended
floor roof slabs Landings and the like. (2)
Floors etc. above 200mm in thickness.
d 1 Vertical surface such as walls (any thickness) 229.95 Smt
partitions and the like including attached
buttresses & string course & the like.
(ii) Sides And Soffits Of Beam,
Haunchings Cantilevers, Girders,
Bressumers And Lintels Not Exceeding
Signature of Bidder Page 96 of
f 0 (G) Columns PillarsPosts and struts. (1) 297.68 Smt
Square Rectangular Polygonal in plan.
g 0 (2) Circular or curved in plan. 422.1 Smt
(H) (2) Sides and soffits of Beams Beam
Haunchings canti-levers Girders Bressumers
and Lintels exceeding 1M.in Depth.
Providing & fixing Steel door with Shutter for
steel sheet 18 Gauge, and angel and 40 x
x 3mm and steel doors frame of size 40 x 40 x
5 mm incl. anodised Iron butt hinges and
nece.fitting and fastening with necessary
screws.Rate also incl. two coats of oil paint etc
Providing and fixing M. S. Grills of required
pattern to wooden frames of windows frames
of windows etc. with M. S. Flats at required
spacing and frame alround, square or round
bars with round headed bolts and nuts or by
screws : (A) Plain Grill. Iteam Code :
AHMEDABAD CITY)
Providing and fixing M.S. grills of required
pattern to wooden frames of windows etc.
with M.S. flats at required spacings and
frame alround, square or round bars with
round headed bolts and nuts or by screws (A)
Ornamental Grill. (upto 10 ton)
Providing and fixing glazed louvered
glass windows and ventilators with teak
wood frame 10 cm. x 7 cm. size including
3 coats of oil painting to wood work
etc.complete. (upto 10 ton)
Signature of Bidder Page 97 of
Providing and fixing 30 mm thick
FACTORY MADE SOLID PANEL PVC
DOOR SHUTTER consisting of frame made
out of M.S.tubes of 18 gauge thickness and
size of 19 mm x 19 mm for stiles and 15 mm x
15 mm for to p and bottom rails.M.S. frames
hall have a coat of steel primers of
approved make and manufacture, M.S.
frames hall be covered with 5 mm thick
heat moulded PVC ‘C’ channel of size 30 x
50 mm formings tiles, and 5 mm thick
mm wide PVC sheets for to prail, lock rail and
bottom rail on either side, and 10 mm (5 mm x
2) thick, 20 mm wide cross PVC sheet as
gap insert for to p rail and bottom rail,
Panelling of 5 stiles and rails with 30 mm
wide x 5 mm thick PVC sheet beading
on eighter side, and joined together with
solventcement adhesive,. An additional
mm thick PVC strip of 20 mm width is to be
stculkon the interiors ide of the ‘c’
channel using PVC solventcement
adhesive etc. complete as per direction
of Engineer incharge, manufacture’s
specification and drawing.
Providing and fixing in position collapsible
steel shutters with vertical channels 20 x 10 x
2 mm braced with flat iron diagonals 20 x
mm size with top and bottom rails of T_rin 40x
40 x 6 mm with 38mm dia, steel pulleys
complete with bolts, nuts, locking
arrangements, stoppers handles including
applying a priming coat of red lead paint.
(Based on Building SOR 2023-24, Iteam Code
: 11003A, I. No. As Per NBO. No.11.6)
Signature of Bidder Page 98 of
Providing and laying marble chips skirting
(Terrazo) or dedo rubbed, and polished to
Granolithic finish to player 6 mm white, black
or white and black marble chips of size
from smallest to 4 mm nominal size laid in
cement marble powder mix 3:1 (3-Cement:
1 marble powder by weight) in proportion of
4:7 (4-cement marble powder mix: 7-marble
chips by volume) (B) Light shade pigment with
white cement (In top layer only)
CatchPit Jali Fixing P/F FRC catch pit jali with
frame 600mm x 600mm clear opening etc.
comp. As directed by engineer in charge.
(Based on Central Store Rate)
Constructing Chamber of following size
including excavation, reffiling, BBCC (1:5:10)
for foundation, c.c. channel (1:2:4), finished
15mm thick cement plaster in side in cm 1:3,
finishing with cement slurry, Brick masonary in
cm 1:5 & excluding the cost of chamber sheet
cover etc. completed (AMC SOR)
5 0.60 X 0.45 mt. size inside clear, Depth from 2229 No
2 0.60 X 0.75 mt. size inside clear, Depth from 2833 No
2 0.75 X 0.75 mt. size inside clear, Depth from 3849 No
Dismantling of existing Arch type manhole up
to Arch and then Const. Slab type manhole of
following size incl. excavation, refilling and &
finished 15 mm thick cement plaster inside in
CM 1:3, P/F 4 mm dia M.S.Steel HDPE coated
steps 35 cm c/c at 35 cm staggered in
masonry CM 1:5, incl. cost of RCC Slab in CC
1:1.5:3, including Cantering & reinforcement
as directed by engineer in charge. Rate
includes carting of debris and excavated soil
1.00 x 0.75 mt (inside clear) RCC Slab of
thickness 15 C.M& reinforcement (Single jalli
at 15 C.M. c/c bothway 10 mm dia.) From 0 to
2 mt depth (Slab at Ground level)
Signature of Bidder Page 99 of
1.00 x 0.75 mt (inside clear) RCC Slab of
thickness 15 C.M& reinforcement (Single jalli
at 15 C.M. c/c bothway 10 mm dia.) From 2 to
3 mt depth (Slab at below 1.00 mt. From G.L.)
20 1 Providing and laying marble stone slab 1752.45 Sq.M.
flooring over 20mm (average)base of cement
mortar 1:6 (1-cement : 6 coarse sand) or L.M.
1:1.5(1- lime putty : 1.5 - coarse sand) laid and
jointed with gray cement slurry including
rubbing and polishing complete. (A) Marble
Providing and laying cement concrete flooring
1:2:4 (1-cement : 2-coarse sand : 4-graded
stone aggregate 20mm nominal size) laid in
one layer and finished with a floating coat of
neat cement. (B) 50mm thick. Item Code No. -
AHMEDABAD CITY)
Providing and laying broken china mosaic
flooring for terrace using 12 mm to 20 mm
broken pieces of glazed tiles to be laid over
cement mortar 1:3 to plain or slope and to be
tempered to bring mortar creme out upto
surface using white cement including
rounding off junctions and extending them
up to15 cm along the wall, clearing with
water and oxalic acid etc.asdirected.
(Based on Building SOR 2023-24, Iteam Code
Providing and laying coloured glazed
tiles of the size 300 mmx200 mmx8
mm/300 mmx450 mmx8 mm in skirting,
risers of steps and dedo on 10 mm. thick
cement plaster 1:3 (1cement: 3 coarse
sand) & jointed with white cement slurry.
Providing and fixing on wall face C.I. Rain
water pipe including filling the joints with spun
yarn soaked in neat cement slurry and
cement mortar 1:2(1- Cement : 2-fine
sand) (A) 75 mm dia.
Signature of Bidder Page 100 of