Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.7 LAccepted-Finance 20 C RAGHUVANSH ENCLAVE KALIDAS ROAD DEHRADUN | L1 | Accepted-Finance Accepted financial bid | |
| 2 | L2₹9.6 L+₹94,770 (10.9%)Accepted-Finance 11 CIVIL LINES ROORKEE 247667 DISTT HARDWAR UK | HARIDWAR | UTTARAKHAND | 247667 | L2 | Accepted-Finance Accepted financial bid | |
| 3 | L3₹12.9 L+₹4.2 L (48.1%)Accepted-Finance 264 2 GALI NO 7 RAM NAGAR ROORKEE DIST HARIDWAR UK | L3 | Accepted-Finance Accepted financial bid | |
| 4 | L4₹13.6 L+₹4.9 L (56.4%)Accepted-Finance D 502 SHIVILOK COLONY RAIPUR ROAD DEHRADUN | DEHRADUN | DEHRADUN | UTTARAKHAND | L4 | Accepted-Finance Accepted financial bid | |
| 5 | L5₹15.1 L+₹6.4 L (74.1%)Accepted-Finance | L5 | Accepted-Finance Accepted financial bid |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
7 Feb 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE (MES) ROORKEE
Garrison Engineer Military Engineer Services Roorkee
PERIODICAL SERVICES TO MD ACCN AND OTM ACCN AT MH MDC AND SHO ROORKEE IN THE AREA OF AGE BR I UNDER GE ROORKEE
2022_MES_500937_1
8392/125/E8
Open Tender
Civil Works
Item Rate
180 days
Roorkee
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE (MES) Roorkee
₹40,000
Yes
10 Feb 2022
11 Jan 2022
9 Feb 2022
11 Jan 2022
7 Feb 2022
25 Jan 2022
60 days
Amount
M&L for preparing old decorated surfaces of walls including cornices, pillasters etc by brooming down or steel wire brushing, scrapping down smoke soot, moulds, moss and efflorescent salts and trading oil and greasy spots and applying one coat of white wash complete all as specified and directed.
M&L for preparing old decorated surfaces of ceiling including cornices etc by brooming down or steel wire brushing scrapping down smoke soot, moulds, moss and efflorescent salts and trading oil and greasy spots and applying one coat of white wash complete all as specified and directed.
M&L for preparing old decorated surfaces of walls including cornices, pillasters etc by brooming down or steel wire brushing, scrapping down smoke soot, moulds, moss and efflorescent salts and trading oil and greasy spots and applying one coat of colour wash complete all as specified and directed.
M&L for preparing old decorated surfaces of walls including cornices, pillasters etc by brooming down or steel wire brushing, scrapping down smoke soot, moulds, moss and efflorescent salts and trading oil and greasy spots and applying one coat of cement base paint includin necessary curing complete all as specified and directed.
M&L for complete removal of existing decorative treatment of any description and applying two coats cement based paint over one coat of alkali resistant priming paint including necessary curing complete all as specified and directed.
M&L for preparing old painted surface of wood and wood based surfaces by knotting, stopping etc of any description over 10 cm width or girth and applying one coat of synthetic enamel paint complete all as specified and directed.
M&L for preparing old painted steel and iron surfaces of any description over 10 cm width or girth and applying one coat of synthetic enamel paint complete all as specified and directed.
M&L for preparing old decorated surfaces of walls including washing, rubbing down and stopping and applying one coat of distemper oil emulsion complete all as specified and directed.
M&L for complete removal of existing decorative treatment of any description on walls including washing, rubbing down and stopping and applying two coats of distemper oil emulsion (White or tinted) over a coat of chalk whiting complete all as specified and directed.
Taking down cement or cement lime plaster from brick or stone walls etc including racking out joints, hacking for keys, scrubbing down with water etc and M&L for 15 mm thick rendering in cement mortar (1:6), finished even and smooth without using extra cement complete all as specified and directed.
Taking down cement or cement lime plaster from brick or stone walls etc including racking out joints, hacking for keys, scrubbing down with water etc and M&L for 15 mm thick rendering in cement mortar (1:4), finished even and smooth without using extra cement complete all as specified and directed.
M&L for preparing newly plastered surfaces of walls and applying two coats of oil bound distemper over a coat of chalk whiting complete all as specified and directed.
M&L for preparing newly plastered surfaces on walls and applying two coats cement based paint over one coat of alkali resistant priming paint complete all as specified and directed.
M&L for writing letters or figures (in Block, Roman, Italic or Indian) n.exc 30 cm high with synthetic enamel paint to match existing work complete all as directed.
M&L for cutting of plant / tree girth n.exc 30cm from buildings and removing vegetation etc including digging out roots from floor/ roofs or walls and making good the dismantled portion in cement mortar (1:3) at any height and treating with treatment to match the existing surfaces complete all as specified and directed.
M&L for preparig old decorated surfaces of walls including cornies and applying one coat of plastic emulsion paint complete all as specified and directed.
M&L for preparing old decorated surfaces of RCC over head water reservoir of any capacity and 25.00 m height including all exposed surfaces of pillars, beams, walls, top & bottom domes, railings etc by scrapping with wire brushes, rubbing down with emery paper, washing down & applying one coat of cement base paint on plastered/unplastered / concrete surfaces and one coat of synthetic enamel paint over old painted steel surfaces of ladder & railing etc complete all as specified and directed. Note :- The cost of double scaffolding, ladders and necessary security / safety arrangements/measures as requiredshould be be deemed included in the rates quoted by the contractor.
M&L for preparation of old decorated surfaces of internal wall by removing existing decorative treatment of any description with mechanical sander (rpm 1500-2700) along with internal dust extraction system for clean environment certified by reputed paint manufacturers and applying two coats of acrylic distemper using roller prescribed by manufacturer of paint complete all as specified and directed at site by Engineer-in-Charge . Note: (i) The old surfaces must be prepared in a manner so that there should not be any impression of dent and it should be made even and smooth with approved putty 3mm thick all as per manufacture’s instructions before application of distemper. The cost of materials, labour & T&P required for preparation of surfaces are deemed to be included in the rates quoted. (ii) The work must be got executed through authorised applicator of manufacturer after concluding an MoU with manufacturer for company from the manufacturers as approved by GE before commencement of the work. (iii) All the materials to be incorporated in the work, shall be brought by the contractor to MES store yard which will be subsequently issued by deportment for incorporation in the work to ensure the quantity to be consumed all as per recommendations of the manufacturer. (iv). After carrying out preparation of surfaces, the same shall be got approved from GE /Engineer-in-Charge before application of distemper for each building. (v) The colour / shade will be approved by GE / Engineer-in-Charge (vi) The contractor shall furnish manufactirer's guarantee for 5 years and also submit guarantee money @ 2.50% at the time of RAR claim.
M&L for preparation of newly plastered surfaces of internal walls by application of 3mm thick approved wall care putty to remove the dent and to make the surface even and smooth by grinding or rubbing with sand paper and applying two coats of acrylic distemper over a coat of primer using roller as prescribed by the manufacturer of paint complete all as specified and drected by Engineer-in-Charge. Note:- (i) The new surfaces must be prepared in a manner so that there should not be any impression of dent and it should be made even and smooth all as per manufacture’s instructions before application of distemper. The cost of all materials, T&P and labour required for preparation of surfaces are deemed to be included in the rates quoted . (ii) The work must be got executed through authorised applicator of manufacturer after concluding an MoU with manufacturer for company from the manufacturer as approved by GE before commencement of the work. (iii) All the materials to be incorporated in the work, shall be brought by the contractor to MES store yard which will be subsequently issued by deportment for incorporation in the work to ensure the quantity to be consumed all as per recommendations of the manufacturer. (iv) After carrying out preparation of surfaces, the same shall be got approved from GE / Engineer-in-Charge before application of distemper for each building. (v) The colour / shade will be all as approved by GE / Engineer-in-Charge (vi) The contractor shall furnish manufactirer's guarantee for 5 years and also submit guarantee money @ 2.50% at the time of RAR claim.
M&L for preparation of old decorated surface of exterior wall by removing existing treatment with mechanical sander (rpm 1500-2700) along with internal dust extraction system for clean environment certified by reputed paint manufacturers, then washing the surface with Bleaching powder solution for treatment of fungal growth and applying two coats of exterior anti fungal acrylic emulsion paint (wallmista of Berger paint or equivalent in Asian paint, Nerolac etc having three years of performance warranty) over a coat of exterior water based primer of same make all as specified and prescribed by manufacturer and as directed at site by Engineer-in-Charge. Note: (i) The old surfaces must be prepared in a manner so that there should not be any impression of dent and it should be made even all as per manufacturer's instructions before application paint. The cost of materials, labour & T&P required for preparation of surfaces are deemed to be included in the rates quoted. (ii) The work must be got executed through authorised applicator of manufacturer after concluding an MoU with manufacturer for company from manufacturers as approved by GE before commencement of the work. (iii) All the materials to be incorporated in the work, shall be brought by the contractor to MES store yard which will be subsequently issued by deportment for incorporation in the work to ensure the quantity to be consumed all as per recommendations of manufacturer. (iv) After carrying out preparation of surfaces, the same shall be got approved from GE / Engineer-in-Charge before application of paint for each building. (v) The colour / shade will be all as approved by GE / Engineer-in-Charge (vi) The cost of scaffolding wherever required shall be deemed included in the rates quoted by the contractor (vii) The contractor shall furnish manufactirer's guarantee for 5 years and also submit guarantee money @ 2.50% at the time of RAR claim.
M&L for preparation of newly plastered surfaces of external wall all as prescribed by manufacturer of paint and applying two coats of exterior anti fungal acrylic emulsion paint (walmista of Berger paint or equivalent in Asian paint, Nerolac etc having three years of performance warranty) over a coat of exterior water based primer of same make all as specified and prescribed by manufacture of paint and as directed at site by Engineer-in-Charge. Note:- (i) The newly plastered surfaces must be prepared in a manner so that there should not be any impression of dent and it should be made even all as per manufacturer's instructions before application of emulsion paint. The cost of all materials, T&P and labour required for preparation of surface are deemed to be included in the rates quoted. (ii) The work must be got executed through authorised applicator of manufacturer after concluding an MoU with manufacturer for company from the manufacturers as approved by GE before commencement of the work. (iii) All the materials to be incorporated in the work, shall be brought by the contractor to MES store yard which will be subsequently issued by department for incorporation in the work to ensure the quantity to be consumed all as per recommendations of the manufacturer. (iv) After carrying out preparation of surfaces, the same shall be got approved from GE /Engineer-in-Charge before application of paint for each building. (v) The colour / shade will be all as approved by GE / Engineer-in-Charge (vi) The cost of scaffolding wherever required are deemed to be included in the rates quoted by the contractor (vii) The contractor shall furnish manufactirer's guarantee for 5 years and also submit guarantee money @ 2.50% at the time of RAR claim.
Alankar Traders
KISHORE CHAND DINESH CHAND
VINAYAK CONSTRUCTION COMPANY
Bharat Bhoomi Construction
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .