Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹86.1 LAccepted-Finance PARVATI COLONEY BITHORIA I BISHTDHARA HALDWANI NAINITAL | ₹86.1 L | L1 | Accepted-Finance Accepted |
| 2 | L2₹90.0 LRejected-Finance ABC OF VIJAYPUR SECTION UNDER EDD BAGESHWAR | ₹90.0 L | L2 | Rejected-Finance Rejected |
| 3 | L3₹92.9 LRejected-Finance DURGA CITY CENTER BHOTIYA PAARAW HALDWANI DISTT NAINITAL | NAINITAL | UTTARAKHAND | 244715 | ₹92.9 L | L3 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | L and T Electrical and Works L1 | GURUKRIPA ENGINEERS AND CONTRACTORS L2 | MAA JAGDAMBA TRADERS L3 |
|---|---|---|---|---|---|---|
| 1.00NON-CENTRALIZED MATERIAL (SUPPLY) | ||||||
| 2.00 | AKM-16 LT Clamp SP-21 with N&B | 390 | Nos | 199 ₹77,610 | 202 ₹78,780 | 205 ₹79,950 |
| 3.00 | Stay Clamp for SP-21 with Nut & Bolt | 85 | Nos | 299.5 ₹25,457.50 | 301.5 ₹25,627.50 | 305 ₹25,925 |
| 4.00 | Suspension Clamp Eye Hook LT ABC Cable | 752 | Nos | 253 ₹1.9 L | 254 ₹1.9 L | 260 ₹2.0 L |
| 5.00 | Dead End Clamp iwht I Hook | 288 | Nos | 253.3 ₹72,950.40 | 254.45 ₹73,281.60 | 260 ₹74,880 |
| 6.00 | Stay Insulator | 85 | Nos | 20.3 ₹1,725.50 | 22 ₹1,870 | 26 ₹2,210 |
| 7.00 | Insulated PRC (IPC 95-95 Sq.mm) | 768 | Nos | 199.15 ₹1.5 L | 202 ₹1.6 L | 210 ₹1.6 L |
| 8.00 | IPC for 120 Sq.mm to 120 Sq.mm | 714 | Nos | 199.15 ₹1.4 L | 202 ₹1.4 L | 210 ₹1.5 L |
| 9.00 | ACB Type Complete LT DB for 500/400/250 | 4 | Nos | 1,27,110 ₹5.1 L | 1,27,150 ₹5.1 L | 1,27,500 ₹5.1 L |
| 10.00 | Piercing Connector 70 Sq.mm- 70 Sq.mm | 312 | Nos | 199 ₹62,088 | 202 ₹63,024 | 210 ₹65,520 |
Tender Value
₹89.0 L
EMD Value
₹1.8 L
Closing Date
11 Aug 2025, 3:00 pmClosed
Superintending Engineer
Superintending Engineer EDC Ranikhet
Replacement of Bare Conductor to AB Cable in different 11 KV Feeder of Dwarahat Section under EDD Ranikhet
2025_UPCL9_85012_1
EDC(R)-41/2025-26
Open Tender
Electrical Works
90 days
Ranikhet
As per Tender Document
2 documents required · 2 mandatory
₹5,900
Executive Engineer
₹1.8 L
15 Jan 2026
23 Jun 2025
13 Aug 2025
23 Jun 2025
11 Aug 2025
23 Jun 2025
Amount
NON-CENTRALIZED MATERIAL (SUPPLY)
AKM-16 LT Clamp SP-21 with N&B
Stay Clamp for SP-21 with Nut & Bolt
Suspension Clamp Eye Hook LT ABC Cable
Dead End Clamp iwht I Hook
Stay Insulator
Insulated PRC (IPC 95-95 Sq.mm)
IPC for 120 Sq.mm to 120 Sq.mm
ACB Type Complete LT DB for 500/400/250
Piercing Connector 70 Sq.mm- 70 Sq.mm
LT Distrubution Box 1 Phase
LT Distrubiton Box 3 Phase
MS Half clamp for LT Distribution Box
LABOUR PART (WORK)
Erection of Earthing Rod
Excavation of pit for stay set
Erection of LT stay set
Grouting of Stay set
Excavation of pit for Pole
Erection of Single SP-21 Pole
Grouting of Pole
Muffing of Pole
Dismantling of LT line 1 P 2 W (WEASEL)
Dismantling of LT line 2 P 3 W (WEASEL)
Dismantling of LT line 3 P 4 W (WEASEL)
Dismantling of LT line 3 P 5 W (WEASEL)
Painting of SP-21/23 Pole
Laying of AB Cable of Size 120 Sq.mm
Cartage SP-21/23 Pole, 150-200 KM
Cartage of petty material, 21-50 Km
Cartage of petty material, 150-200 Km
Headload Cartage SP-21/23 pole (1-3 Km)
Headload Cartage of material (1-3 Km)
Straightning of Tilted Existing LT Pole
Laying of LT XLPE ABC 3x95 + 1x70 Sq.mm
Installation of LT DB 1 Ph for LT AB Cable
Installation of LT DB 3 Ph for LT AB Cable
Disconnection & Reconnection of Consumer
Erection of LT ACB 800 A CT with Panel
Erection of Dead end Clamp
Erection of Suspension Clamp
Chemical Earthing of ACB
Chemical Earthing of T/F
Fixing of Piercing connector 120-95 Sq.mm
GURUKRIPA ENGINEERS AND CONTRACTORS (BID ID -391727)
MAA JAGDAMBA TRADERS (BID ID -389346)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid