| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.0 LAccepted-AOC ELIKKATTIL HOUSE KUTTIN POST MALAPPURAM 676324 | MALAPPURAM | MALAPPURAM | KERALA | 676324 | 1 | Accepted-AOC lowest quoted | |
| 2 | 2₹5.2 L+₹28,870.13 (5.83%)Rejected-AOC | 2 | Rejected-AOC 2nd lowest quoted | |
| 3 | 3₹5.9 L+₹97,846.71 (19.8%)Rejected-AOC | 3 | Rejected-AOC 3rd lowest quoted | |
| 4 | 4₹6.1 L+₹1.2 L (23.8%)Rejected-AOC | 4 | Rejected-AOC 4th lowest quoted |
| Sl No | Description | Qty | Unit | MANZOOR BABU L1 | NIYAS E L4 | NOUFEL L3 | SHOUKATH ALI P L2 |
|---|---|---|---|---|---|---|---|
| 1.00first floor construction | |||||||
| 1.00 | 50.6.7.2:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc. | 13.15 | cum | 6,930.31 ₹91,154.37 Lowest | 9,299.77 ₹1,22,319.87 | 8,299.77 ₹1,09,166.87 | 7,334.5 ₹96,470.68 |
| 1.00 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size). | 0.87 | cum | 10,309.63 ₹8,969.38 Lowest | 12,346.86 ₹10,741.77 | 12,346.86 ₹10,741.77 | 10,910.92 ₹9,492.5 |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 69.6 | kilogram | 86.22 ₹6,000.91 Lowest | 103.26 ₹7,186.9 | 103.26 ₹7,186.9 | 91.25 ₹6,351 |
| 1.00 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 594.27 | kg | 136.85 ₹81,325.85 Lowest | 163.89 ₹97,394.91 | 163.89 ₹97,394.91 | 144.82 ₹86,062.18 |
| 1.00 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 167.51 | kg | 143.46 ₹24,031.27 Lowest | 171.81 ₹28,780.24 | 171.81 ₹28,780.24 | 151.82 ₹25,431.67 |
| 1.01 | OD48911/2025-2026:Providing and fixing percoated galvanised iron profile sheets(size , shapeand pitch of corrugation as approved by engineer in charge ) 0.35 mm9+0.05%), total coated thickness withzinc coating 120 gram per sq mas per IS 277, IN 240 mpa steel grade,5-7 microns epoxy primer on both side of sheet and polyester top coat 15-18 microns. sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single lengthup to 12 meter or as desired by engineer in charge . The shet should be fixed using self drilling/self trapping screwsof size (5.5*55mm) with EDPM seal, complete up to any pitch in horizontal/verticalor curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.
details of cost for 216.14 sq m( external dimensions of plinth)
Area of roof 20.2*10.7 m=216.14 sq m
sheets used+ 20 Nos*10.7 m*1.06 m=226.84 sq m
add 3% wastage=6.81 Toatal+233.65 sq m | 80.2 | sqm | 478.38 ₹38,366.08 Lowest | 572.91 ₹45,947.38 | 572.91 ₹45,947.38 | 506.28 ₹40,603.66 |
| 1.01 | OD48914/2025-2026:Providing and fixing 150 mm wide, square cut PVC 4 kkgf/cm2 rain water gutter pipewith iron brackets with 25*5 mm size flat, screws and washers etc.including making necessary connections with rain water pipes etc complete | 17.2 | metre | 349.66 ₹6,014.15 Lowest | 418.76 ₹7,202.67 | 418.76 ₹7,202.67 | 370.05 ₹6,364.86 |
| 1.01 | OD48912/2025-2026:(OD from DAR 10.5.1)-Steel work foe doors and windows , using MS Angles flats,sheets etc including all material , labour charges,necessary fittings etc complete, including appying a priming coat of approved steel primer | 54.75 | kg | 166.32 ₹9,106.02 Lowest | 199.18 ₹10,905.11 | 199.18 ₹10,905.11 | 176.01 ₹9,636.55 |
| 1.01 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 0.36 | cum | 275.89 ₹99.32 Lowest | 330.41 ₹118.95 | 330.41 ₹118.95 | 291.98 ₹105.11 |
Tender Value
₹5.9 L
EMD Value
₹14,825
Closing Date
15 Jul 2025, 6:00 pmClosed
Assistant Engineer
Office of the Assistant Executive Engineer, LID_EW Sub Division, Mankada Block Panchayat
Annual Plan-Annual Plan 2025-26 Mankada BP (Proj No. 162/26)-Construction of Women Empowerment Centre on Melepallippuram Anganwadi Building in Koottilangadi GP
2025_LSGD_774540_8
TN1/AEE/LSGD/MKD/2025-26
Open Tender
Civil Works - Buildings
Item Rate
360 days
Mankada BP
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,310
Yes
₹14,825
Yes
27 Jun 2026
7 Jul 2025
17 Jul 2025
7 Jul 2025
15 Jul 2025
7 Jul 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1265781.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .