Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.5 LAdmitted-Fee/PreQual/Technical/Finance KANJIRAPPALLI KANDATHIL VALLAKKADAVU PO VANDIPERIYAR GRAMA PANCHAYAT VANDIPERIYAR KANJIRAPPALLI KANDATHIL | KOTTAYAM | KERALA | 686001 | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹6.5 L+₹3,386.32 (0.52%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹7.0 L+₹48,432.12 (7.47%)Admitted-Fee/PreQual/Technical/Finance MUKALEL AMARAVATHY P O KUMILY | KUMILY | IDUKKI | KERALA | L3 | Admitted-Fee/PreQual/Technical/Finance | |
| 4 | L4₹7.6 L+₹1.1 L (17.6%)Admitted-Fee/PreQual/Technical/Finance BALALKRISHNAN MEDA PODIPACARICIANL AT ROAD SLE TARRING POJ NO 32 WARD2 CHALACUPALLAM | MADURAI | TAMIL NADU | 625001 | L4 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | Abraham Thomas L4 | Sini L1 | ABHI CONSTRUCTION L2 | MANOJ M.G L3 |
|---|---|---|---|---|---|---|---|
| 1.00Road Maintenance | |||||||
| 1.00 | OD55237/2026-2027:Surface dressing of the ground, including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, leads up to 50 m and lifts up to 1.5 m. All kinds of soil | 547.8 | sqm | 32.06 ₹17,562.47 | 27 ₹14,790.6 Lowest | 27.39 ₹15,004.24 | 29 ₹15,886.2 |
| 1.00 | 75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification
(i) Nominal mix (1:2:4) | 82.17 | cum | 8,607.38 ₹7,07,268.41 | 7,316 ₹6,01,155.72 Lowest | 7,354.52 ₹6,04,320.91 | 8,100 ₹6,65,577 |
| 1.00 | OD55238/2026-2027:Applying Curing compound on finished surface of concrete structure at rate specified by manufacturer including transportation, machinery and labour etc. complete. | 547.8 | sqm | 32.4 ₹17,748.72 | 28 ₹15,338.4 | 27.68 ₹15,163.1 | 20 ₹10,956 Lowest |
| 1.00 | 15.2.1:Maintenance of Earthen shoulder (filling with fresh selected soil) <br> Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903 | 146.08 | sqm | 120.11 ₹17,545.67 | 102 ₹14,900.16 | 102.62 ₹14,990.73 | 10 ₹1,460.8 Lowest |
| 1.00 | OD55239/2026-2027:Granite name board | 1 | each | 2,495.45 ₹2,495.45 | 2,040 ₹2,040 Lowest | 2,132.22 ₹2,132.22 | 2,777 ₹2,777 |
Tender Value
₹10 L
EMD Value
₹21,184
Closing Date
2 Jul 2026, 3:00 pmClosed
Assistant Engineer
Oo Assistant Engineer, LID EW, LSGD, Kumily
Renovation of Health centre Athamukk road second phase Pro. No. 21/27
2026_LSGD_857030_4
T2/4111659-2026
Open Tender
Civil Works - Roads
Item Rate
Kumily GP
Please refer Tender documents.
11 documents required · 11 mandatory
₹1,870
Yes
₹21,184
Yes
3 Jul 2026
23 Jun 2026
3 Jul 2026
23 Jun 2026
2 Jul 2026
24 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Road Maintenance | |||||
| 1.001 | OD55237/2026-2027:Surface dressing of the ground, including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, leads up to 50 m and lifts up to 1.5 m. All kinds of soil | 1 | sqm | - | - |
| 1.002 | 75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification
(i) Nominal mix (1:2:4) | - | cum | - | - |
| 1.003 | OD55238/2026-2027:Applying Curing compound on finished surface of concrete structure at rate specified by manufacturer including transportation, machinery and labour etc. complete. | 1 | sqm | - | - |
| 1.004 | 15.2.1:Maintenance of Earthen shoulder (filling with fresh selected soil) <br> Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903 | - | sqm | - | - |
| 1.005 | OD55239/2026-2027:Granite name board | - | each | - | - |
stage.html
html • 0.02 MB
finance_1448809.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
21sbd.pdf
Tender Documents • 1.80 MB
BOQ_1448809.xls
BOQ • 0.30 MB
NIT.pdf
Other Document • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .