Tender Value
₹8.2 L
EMD Value
₹8,240.40
Closing Date
7 Sept 2026, 6:30 pm
PRAVINBHAI HADIYAL
Regarding work related to the acoustical suspended ceiling at Kushabhau Thakre Hall, located in Indrapuri Ward, South Zone, under the Ahmedabad Municipal Corporation.
340167
E Tender Notice No.05-2026/27, T.No.355
Open
Civil - All
Works
Ahmedabad
₹900
MUNICIPAL COMMISSIONER, AHMEDABAD
₹8,240.40
29 Aug 2026
29 Aug 2026
29 Aug 2026
7 Sept 2026
29 Aug 2026
5 Estimated Cost put to Rs.8,24,040/-
6 Earnest Money Deposit Rs.8,240.00 /- Demand Draft Or Bank Guarantee in favour of
Municipal Commissioner, Ahmedabad to be submitted as prescribed
7 Security Deposit 5 % of the Tender Amount in form of Bank Guarantee / Demand
Draft in favour of Municipal Commissioner, Ahmedabad to be
submitted as prescribed in tender.
8 Tender fees Rs.900.00 Demand Draft in favour of Municipal Commissioner,
(Non refundable) Ahmedabad)
9 Submission of EMD and In separate sealed cover each for EMD and Tender Fees along with
Tender Fees Tender as described in the invitation of tender and submitted to
Assistant Manager(South zone), South zone office, Rambaug,
Maninagar Ahmedabad.
10 Tenders issue date Tenders from the amc.nprocure.com website shall be downloaded
from AS PER TENDER NOTICE INVITED
11 Last date of receiving As per Notice inviting Tender / Addendum / Corrigendum.The
Tenders. tenders received after latest schedule date and time will not be
entertained under any circumstances.
12 Date of Opening As per Notice inviting Tender / Addendum / Corrigendum to
Assistant Manager / Dy.C.E.(S/Z) office, 2nd Floor, South Zone
Office, Opp. Fire Station, Maninagar, Ahmedabad-380008
13 Mode of sending the Document shall be submitted in sealed envelope systems By
TenderDocuments RPAD/Speed post/ Hand Delivery in sealed covers in Duplicate (
One Original & One Duplicate) duly sign & seal by contractor .
14 Terms, Condition, & All general condition of contract mentioned in tender shall be
Specification applicable.
15 Defect &Liability Period The contractor shall be responsible to make good and remedy at this
own exppence any defect which may developed or may be noticed
before the period mentioned here under from the certified date of
complition, The within 15 days of recipts of the notice. In the case
of failure on the part of the contractor, the Engineer incharge may
rectfy or remove or reexecute the work at the risk & cost of the
contractore. The Engineer incharge shall be entitled to appropriate
the whole or any part of the amount of securitydeposit towards
theexpences, If any, incurred by him in rectification, removal or re-
execution. The defect liability period shall be as under (a) for all
works costing up to Rs. 50,000 (amount put to tender), the period
shall be three months from the cirtified date of complition. (b) for
all workscosting more than Rs. 50,000 and upto Rs. 1 crore
(Amount put to tender) ,the period shall be six (6) month from the
cirtified date of compition or one monsoon , which ever letter.(c)
the major project costing more than Rs. 1 crore , the period shall be
12 months from the cirtified date of complition which should
include one monsoon.(d) For building works , the period specified
in (a) ,(b) & (c) above or elapse of monsoon period following
cirtifide date of complition.,whichever is letter . For the purpose of
deciding the monsoon period, the 30 september may be treated as
16 Compansation for Delay 10 % of the balance work after Time limit expired as Peta Work
17 Deduction of Retention Retention @ 2% of the value of work done will be deducted from
Money from each RA each RA bill. It will be released along with release of payment of
Bill Final Bill.
18 Addendum/Corrigendum Addendum/Corrigendum If any Shall be Published 48 Hrs. Price To
the Final Submission Time And Date. The Same Shall From a part
Of Tender And The Same As to be Attached Along With The
Tender Document.
19 For E.P.F. Act. As per Account department cicular no.37, date-09/08/2018
20 GST As per AMC Finance Department Circular No. 38 dated 21-11-
2022. The Rates are Exclusive of GST. Prevailing GST will be paid
Conditional tenders will not be accepted in any case. Municipal Commissioner reserves the rights to reject any or
all the tenders without assigning any reasons thereof.
The authorized signatory holding Power of Attorney shall only be the Digital Signatory. In case authorized
signatory holding Power of Attorney and Digital Signatory are not the same, the bid shall be considered non-
In the event of the specified date of bid submission/opening being declared a holiday for the Employer, the bids shall be received
/opened on the next working day at the same place and the same time.
Seal and Signature of the Bidder Add.City.ENGINEER (South Zone)
Date: Ahmedabad Municipal Corporation
As per account department(A.M.C.) circular no. 03 Dt.28/04/2023 Bank guarantee of
said work must be of Ahmedabad city branch, which mentioned as bellow.
C. Guarantees issued by following banks will be accepted as SD/EMD on
permanent basis.
All nationalized Banks
D. Guarantees issued by following banks will be accepted as SD/EMD for the
period up to March-31, 2024. The validity cut-off date in the GR is with respect
to the date of issue of Bank Guarantee irrespective of the date of termination of
Bank Guarantee.
1Commercial Banks :-
1. A U Small Finance Bank
3. City Union Bank
4. DBS Bank India Limited
6. Equitas Small Finance Bank
7. Federal Bank
10.IndusInd Bank
11.Kotak Mahindra Bank
12.Standard Chartered Bank
13.Tamilnadu Mercantile Bank
14.Bandhan Bank
18.Karnataka Bank
19.Krur Vysya Bank
20.South Indian Bank
21.Utkarsh Small Finance Bank
2 Co-operative and Rural Banks Of Gujarat :-
1. The Ahmedabad Mercantile Co-operative Bank Limited
2. Kalupur Commerical Co-operative Bank Limited
3. Nutan nagrik Sahakari Bank Limited
4. Rajkot Nagarik Sahakari Bank Limited
5. Saraswat Co-operative Bank
6. Saurashtra Gramin Bank
7. The Gujarat State Co-Operative Bank
8. The Mehsana Urban Co-operative Bank Limited
9. The Surat District Co-operative Bank
10.The Surat Peoples Co-operative Bank
11.SVC Co-operative Bank LTD.
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
General terms & conditions
1. A booklet of FORM B-1 of Gujarat State Roads & Building Department / Water Resources
Department with the latest correction slips may be referred for quality of construction &
standard of Procedure (SOP). (only English version)
2. In the specification “as directed" / "approved" shall be taken to mean "as directed /
"approved" by the Engineering in charge.
3. Wherever a reference to any Indian standard appears in the specifications, it shall be taken
to mean as reference to the latest edition of the same of force on the date of agreement.
4. In "Mode of measurement" in the specifications wherever a dispute arises in the absence of
specific mention for a particulars point / aspect, the same in the relevant Indian Standards
shall be referred to.
5. All measurement and computations, unless otherwise specified shall be carried out nearest
to the following limits :-
i) Length, width and depth, Height 0.01 Meter
ii) Areas 0.01 Sq.mts.
iii) Cubic contents 0.01 Cu. mts.
In recording dimensions of work, the sequence of length, width and height (Depth) or
thickness shall be followed.
6. Definite particulars covered in the items of work, though not mentioned or elucidate in its
specifications shall be deemed to be included therein.
7. Approval of the samples of various materials given by the Engineer in charge or AMC's
Consultant shall not absolve the contractor from the responsibility of replacing defective
materials brought on site or materials used in the work found defective at a later date. The
contractor shall have no claim to any payment or compensation whatsoever on account of
any such materials being rejected by the Engineer in charge.
8. The contractor’s rate for the item of work shall be for the work completed in all respect.
9. All materials including those of electrical shall be got approved by the Engineer in charge/
Architect before using them in the work.
10. Materials as and when rejected by the Engineer in charge or AMC's Consultant shall be
removed from the site of work within 24 hours.
11. All work shall be carried out in a manner applying the best technique.
12. All tools, templates, machinery and equipment for correct execution of the work as well as
for checking lines, levels, alignment of the works & all precautionary measures during
execution shall have to be kept in sufficient numbers and in good working condition at the
site of the work.
13. Special modes of the construction not adopted in general Engineering practice, if proposed
to be adopted by the contractor shall be considered only if the contractor provided
satisfactory evidence that such special mode of construction and completion of work to the
required strength and quality. Acceptance of the same by the Engineer in charge shall not
however, absolve the contractor from the responsibility of any adverse effect and
concordance of adopting the same in the course of exaction or completion of the work.
14. The contractor shall be responsible for observing the rules and regulation imposed under
the "Minor Mineral Act", and such other laws and rules prescribed by the Government
from time to time.
15. All necessary safety measures and precautions (incl. those laid down in the various relevant
Indian Standard) shall be taken to engrave the safety of men, materials and machinery on
the work and also of the work itself.
16. Quantity measured in the tender is approximate. It may increase or decrease looking to the
quantum of actual work for which no any claim shall be entertained by A.M.C.
17. Contractor shall have to execute extra item if required only after necessary permission from
18. The work in general shall be carried out as per standard specifications of the relevant items
to be executed & as per the instruction of Engineer in charge & as per the guidance of
AMC's Consultant for this project.
19. The general terms & conditions of the contract shall be applicable & shall be binding on
the contractor. The contract agreement shall have to be executed between AMC & the
agency to which work is awarded for execution.
20. The time limit shall be reckoned after next day from the date of issue of the written work
order to the contractor after fullfillng the formality life SD & Agreement. No time
extension will be granted under any circumstances.
21. In case of any ambiguity in specifications mentioned in this tender, the interpretation given
by Additional City Engineer /Dy.M.C of A.M.C. will be final and binding to the
22. The contractor shall take no advantage of any apparent error or omission in drawing or
specification and the Engineer -in-charge shall make such corrections and interpretations as
necessary to fulfill the intent of the plants and specifications.
23. The quantities of items in BOQ (Bill of Quantities) may vary in case of necessity arises.
24. All prevailing taxes/duties chargeable by State Govt./Central Govt. and the Municipal
Corporation. will be payable by the contractor.
25. No any kind of price rise / price escalation / price variation for cement , steel or labour shall
26. Contractor is requested to see the site physically before tendering. He is also requested to
quote the rates keeping in view of all the points mentioned in relevant pages of tender
27. Water Supply: The contractor shall arrange at his own cost, a suitable supply of piped
water for the construction of the works and provide a satisfactory supply of potable water
for drinking, washing, sanitation and cleaning down. The contractor will be responsible for
all the costs where applicable of connection, meter installation, water consumed, water
required for testing purposes, disconnection and the laying, maintenances and ultimate
removal of any distribution system around the site.
28. Electricity: Electric supply will be made available at the site by the Contractor and the
contractor must make his own arrangements with the Corporation and Electricity Supply
Authorities and with other contractors to connect and to take a supply from such services,
paying all costs in connection therewith.
The Contractor shall be entitled to use supply Electricity as may be available on the site for
purpose of the work and shall pay such charges as is fixed by the appropriate supply
In case there is any delay in supply of power site of any interruption or fault in the power
during the work. No compensation shall be paid for idle labor staff, machineries and for use
of diesel operating sets etc. as the case may be.
29. Tenders shall submit all the valid/certified documents in support of their initial/eligibility
criteria mentioned above along with the bid. They shall have also to submit the income tax
clearance certificate and solvency certificate.
30. No advance such as secured advance machinery advance, mobilization advance or
materials advance will be given.
31. The contractor shall get the electrical works executed through the authorized Government
approved licensed electrical person or firm in appropriate category in accordance to
contractual provisions.
32. The electrical works shall be carried out strictly in accordance with the directives issued by
Engineer in charge.
33. Contractors shall not have any dispute or claim for any kind of compensations
(i) If the quantity stipulated in the tender items varies or the scope of work changes &
thereby total amount of work increases/ decreases.
thereby total amount of work increases/ decreases.
(ii) If the work gets delayed/ postponed for some administrative/ technical decision
34. In case of any dispute, decision of Municipal Commissioner shall be final and binding on
the contractors.
35. Tenders which do not fulfill all or any of conditions or are submitted incomplete in any
respect will be rejected. Municipal Commissioner reserves the right to increase/decrease
the scope of work. No any claim to that effect shall be entertained. The Municipal
Commissioner also reserves the right to reject any or all the tenders without assigning any
reason thereof.
36. The contractors are requested to quote their rates considering above tender conditions.
37. The contractor shall have to paid balance Security Deposit within 15 days from the date if
issue of Letter of Interest (LOI). And after paying the balance S.D. the time limit will be
started & Execution of Agreement to be done than after.
In case of delay in paying balance S.D. by more than 15 days penalty at the rate of
0.01% of sanction tender amount per day will be deducted from the Bill.
Eventhough in special case, If work is not started because of monsoon or any other
special reason (like site is not available), after evaluation of situation the actual date of
starting of work will be consider after approval of Dy.M.C. (South zone)
38. The Contractor shall not claim for increase or decrease in the quantity of the item or the
39. The payment shall be made as per the A.M.C policy for the work done by the contractor.
40. Conditional tenderes will not be accepted.
41. The Contractor must be followed the rules and regulations for COVID-19 as per guidelines
published by WHO/ Center government/State government /Ahmadabad municipal
Signature of contractor with seal Additional City Engineer (S.Z)
Date Ahmedabad Municipal Corporation
FORM OF BANK GUARANTEE
(hereinafter called the Tenderer) is desirous and preferred to tender for works in accordance with
the terms and conditions of tender for the work of
1 .Therefore. We hereby affirm that -we are guarantors on behalf of the Tenderer up to
(in figures) and we undertake to pay to Municipal Commissioner, Ahmedabad MunicipalCorporation,
A'bad specified up to his first written demand, without demur without delay andwithout the necessity
of a previous of judicial or administrative procedures and without thenecessity to prove to the Bank
the defects or short comings or debits of the contractor any sumwithin the limit of
2. We further agree that the Guarantee herein contemned shall remain in full force and effectduring the
period that would be taken for the acceptance of tender.
However unless a demand of claim under this guarantee is made on its in writing on or before the
(Date to be specified will not he less than 180 days from the stipulated date of receiving the tender)we
shall be discharge form all liabilities under the guarantee thereafter.
3. We undertake not to revoke the guarantee during it currency except with the previous consentof the
Municipal Commissioner, Ahmedabad Municipal Corporation, A'bad in writing.
4. We lastly undertake not to revoke the guarantee for any charge in constitution of the Tendereror of
Date: Signature & Seal of Guarantor...........................
5. The contractors shall have to furnish income tax clearance certificate before his tender isaccepted
and intimate assessment number and ward under which he is assessed.
6. Copies of certificate as regards previous experience, if any, must accompany the tender.
Signature of Contractor Add.C.E (S.Z) Dy. Municipal Commissioner (S.Z)
Date Ahmedabad Municipal Corporation
TENDER DECLARATION FORM
The Deputy Municipal Commissioner,
South Zone, Ahemedabad
Name of Works:- ઇ રુ વોડ, દ ણ ઝોન, અમદાવાદ િુ નિસપલ કોપ રશન હ તક આવેલ ુ શાભાઉ ઠાકર
I/We the undersigned have carefully gone through and clearly understood the Tender documentsfor the above
work. I/We have satisfied myself/ourselves as to the location of site, examined drawings.I/We have visited site
& fully acquainted with local situations regarding materials, labours & others factorspertaining to work before
submitting tenders.
I/We do hereby offer to execute and complete the whole of the work within the time specified all in
accordance with the specification, designs, drawing and instruction in writing referred to in the saiddocument
and with such materials as are provided for, at the respective rates which I/we have quoted in theschedule-B or
at such other rates as maybe fixed under the provisions of these conditions.In the event of this tender being
accepted I/We agree to enter into an agreement and when required andexecute the contract, according to your
fom1 of agreement as or in default where of I/we bindmyself/ourselves to forfeit the "Earnest Money Deposit."
I/We understand that if I/WE shall not enter in agreement within ten days or decided by AMC fromthe
date of receipt of letter of acceptance, you will forfeit the earnest money paid by me/us and takenecessary action
I/We have enclosed a DEMAND DRAFT or PAY ORDER as an “Earnest Money Deposit", for thesum
as mentioned in tender notice, the full value of which is to be absolutely forfeited to the Employer IfI/We fail to
commence the work specified. Otherwise the said sum shall be retained, by the Employer as onaccount of such.
Security)' Deposit'.' as provided for in the aforesaid documents.
I/We agree not to employ sub-contractors other then those that may be approved in accordance
withConditions in the aforesaid documents.
I/We understand that you are not bound to accept the lowest or any tender which you may receive.
I/We am/are bound to execute the job if the work order is issued within 120 days from the date
ofopening of the tender.
I/We agree to pay the Government income-Tax, Sales-Tax (Central and State) ,Sales Tax on work,
octroiduties and other prevailing Government taxes/charges on such items on which the same are leviable and
therates quoted by me/us are inclusive of the same.
Yours faithfully
Signature of the contractor
ybœtJtœ BGþrlrmvj ftuvotuhuNl
œÂûtK Ítul - Esluh Ftðþ
1. mbgbgto>t ykdu yuj.ytu.ytR. ytÃgt ctœ 10 rœJm mw^ebtk sÁhe me¾gtuhexe rzvtuÍex Che ðgth ctœ&e dKJtbtkk ytJNu. <ubs
ðgth ctœ Jfo ytuzoh R~gw &gu&e mbtg bgtoœt NY &guje dKtNu.<&t <u mt&u fhthvºt fhJtltu hnuNu. ylu <u bwsc ftb NÁ fhJtle
<theF dKJtbtk ytJNu. yuj.ytu.ytR. ytÃgt ctœ me¾gtuhexe rzvtuÍex ChJtbtkk rœl -15 fh<tk J^w rJjkc ltk rfMmt btk <ubs Jfo
ytuzoh ytvu&e ftb NY fhJtbtkk rJjkc &gu&e «r<rœl bkswh xuLzh hfbltk 0.01 % juFu vulÕxe cej btk&e ftvJtbtk ytJNu. <ub A<tk
rJrNÐ rfMmt btk atubtmt ltk fthKu y&Jt yrlJtgo fthKtumh ftb NÁ &R Nfu <ub l ntug <u rfMmt btk gtuøg<t aftme zu.Bgw.frb©h
(œ.Ítul) le bkswhe bu¤Je ftb NÁ fhJtle <theF dKJtbtk ytJNu.
2. xuLzh Jujezexe 120 r>Jm Mþ^ele hnuNu.
3. xuLzh Ch<e JF<u yluoMxble ChJtle hnuNu.
4. S.yum.xe. «J<obtl œh «btKu yjd&e awfJJtbtk ytJNu. xuût fu yLg ftuE vK mhfthe fhJuht ChJtle sJtc>the ftuLx[tfxhle
5. htsg / fuL÷ mhfth©elt JF<tuJF<lt ftg>t Bþsc su ftuE hfble fvt< fhJtle &Nu <u bwsc ftuLx[tfxlt cejbtk&e fvt< fhJtbtk
6. juch JuÕVuh Vkz btxu ntjbtk htsg mhfth©eyu fhuj nwfb Bþsc 1% (yuf xft) hfb cejbtk&e ftve juJtbtk ytJNu.
7. bxehegj xuMxekdltu xuMxekdltu FhuFh &guj Fao ftuLx[tfxh©e vtmu &e Jmwj fhJtbtk ytJNu.
8. ftb ytv<e JF<u su <u ftuLx[tfxhLþk hSMx[uNl ægtlbtk htFelu <ule bgto>tbtk ftb ytvJtbtk ytJNu.
9. yt xuLzh su <u Jdolt btLg gtœe lt ftuLx[tfxhtu Che NfNu. dJobuLxlt btLg ftuLx[tfxhu y.BGþ.ftuvotu.btk btLg ftuLx[tfxhtu le gtœebtk
hSMxuNl fhtJJtLþk hnuNu.
10. yt Wvhtk< y.BGþ.ftuvotu. lt slhj ftuLx[ufx fLzeNl ylu xuLzhle Nh<tu ck^lf<ot hnuNu. su BGþrl.ftuvtuohuNl Juc mtEx
www.ahmedabadcity.gov.inWvh Bþfuj Au.
11. ftuLx[tfxh lu vubuLx - hl´dcej BGþrl.ftuvotu.lt su <u atÕþ mbglt mhfGþjh Bþsc fhJtbtk ytJNu.
12. Nh<e xuLzh MJefthJtbtk ytJNu lrn.
13. xuLzh MJefthÔþ, h> fhÔþ, ftulu ytvÔþ ylu fgt CtJ&e ytvÔþ <u ykdu zu.BGþrl.frbNlh©eltu rlKog ytFhe hnuNu.
14. >huf ytExbltk MvuNeVefuNl ftuvtuohuNlltk bkswh &guj MvuNeVefuNl Bþsc <&t RLzegl MxtLzzo ftuz ytuV «ufxem ltkk btLg ^tht
^tuhKtu Bþsc hnuNu ylu zu.mexe yuLSlegh©eltu rlKog ytFhe hnuNu. Jtuxh´d fhJtbtk lrn ytJu fu >hhtus J^thtltu zucheÍ
WvtzJtbtk lrn ytJu <tu ftuLx[tfxhltk Fauo ylu òuFbu Jdh ltuxemu Jtuxh´d fhtJJtbtk <&t zucheÍ WvtzJtbtk ytJNu ylu cejbtk&e
hfb ftve juJtbtk ytJNu.
15. yufe JF<u yuf fh<tk Jæþ søgtytuyu ftbNY fhJtltu Jfoytuzoh b¤u <tu ftb yuf mt&u s yuf s c<tJuj søgtyu fhJwk vzNu. yuf ftb
ÃþÁ &tg vAe cesw ftb NY fheyu <uÔþk atjNu lrn.
16. atÕþ ftbu ftuEvK mrJom jtEllu LþfNtl l &tg <u he<u ftb fhÔþk vzNu, òu ftuE mrJom jtEl lu LþfNtl &Nu <tu <ule mkÃËKo
sJtcœthe (òlbtjle) ftuLx[tfxhle vtu<tle hnuNu. mtEx vh ftb œhBgtl bswh fu sl<t lt ftuE btKmlt òlbtjlu lwfNtl &tg
<ule sJtcœthe ftuLx[tfxhle hnuNu. vtujem Vhegt>&tg <tu <ule sJtc>the vK ftuLx[tfxhle hnuNu. CuFz ^me l vzu <ule sJtc>the
vK vtujem Vhegt>btk ftuLx[tfxhle hnuNu. CuFz ^me l vzu <u btxu mjtb<elt vdjtk (suJt fu >tuhzwk ctk^e bsqh Ftztbtk W<thJt,
mtuh´d ylu Mx[x´d fhJt rJduhu) je^t Jdh bsqhlu Ftztbtk W<thNu <tu ftuLx[tfxh s vtujem Vhegt>btk sJtct>h hnuNu ylu
BGþrl.ftuvtuohuNlltu ftuEvK MxtV ytlt btxu sJtc>th hnuNu lrn. ytxÕþk mbSlu s xuLzh ChÔþk. Btswhtultu rJbtu vK W<thtJJtu.
17. juch yufx «btKu<ubs Bgw. frb§h©eltkk vrhvºt lkch 81 <t.26.02.2015bwsc <btb juch / bsqhtulwk dwsht< rcÕzekd yuLz
y^h fLMx[[fNl Jfombtkk VhSgt<hSMx[uNl fhtJJt ykdu ybj fhJtltu hnuNu <&t fuxjt juch jtJNtu <u vK sKtJJtLþk hnuNu.
juch yufx «btKu ftgoJtne lrn &E ntug <tu <u btxu ftuLx[tfxh mkÃËKovKu sJtc>th hnuNu. ylu <ulu vubuLx ytvJtbtk ytJNu lrn
<ubs ct¤ bswhtulu ftb Wvh htFe NftNu lrn.<ubs JF<tu JF< Bgw. frBNlh©e îtht fhJtbtkk ytJuj mh¾gwjhtule Nh<tu
ftuLx[[tfxhlu ckk^l f<to hnuNu.
18. ftuEvK ftgœtfeg jexeduNl ybœtJtœ Nnuhle ftuxobtk hnuNu.
19. ftuE fthKmh òu ftuLx[tfxhlu ftb l ytve Nftg <tu <u ykdu ftuLx[tfxh ftuEvK «fthltu LþfNtle- J¤<hltu n¬ >tJtu fhe NfNu lrn
fu ftg>tfeg ftgoJtne yt ykdu &E NfNu lrn. xuLzh bkswh >ltu y&o ftb ytve s >uJtLþk Au <uJtu &E NfNu lrn.
20. ytuVh y&Jt xuLzhbtk œNtoJuj ytRxbltu sÚ&tu mkCrJ< sÚ&tu Au subt atjw ftb œhBgtl VuhVth &Jtle N¾g<t hnuje Au.
21. M&¤ vrhÂM&r< / sYhegt< Bþsc ftb fhtJ<t xuLzhbtk sKtJuj fJtuLxexebtk J^ Dx &Nu <tu <u ykdu ftuLx[tfxh îtht ftuEvK «fthle
J^thtle ltKtkfeg btkdKe fhe NfNu lrn. ylu ftb ytuAw &tg <tu ftuLx[tfxhle J¤<hle btkdKe MJefthJtbtk ytJNu lrn.
22. mtEx vh jtJJtbtk ytJuj btjmtbtl hesufx fhJtbtk ytJu <tu ðþhk< r>l-1btk vh< jE sJtltu hnuNu. yLg&t ftuvtuohuNl îtht <u
hesufx btjltu rlftj fhe >uJtbtk ytJNu ylu <ule LþfNtlele sJtc>the ftuLx[tfxhle hnuNu.
23. su ftuLx[tfxh vtmu bswhtultu rJbtu, ydtW&e W<htÔgtu ntug <ublu «t^tLg ytve ftb ytve NfNu.
24. bsqhtu fu htn>theytulu ftuEvK «fthltu yfMbt<&tg <tu <ule vtujem ftgoJtnele fu juch yufx bwscle ftgoJtnele sJtc>the
yb.BGþrl.ftuvtuo.lt fboatheytule ftuEvK he<u hnuNu lrn.btºt ftuLx[tfxh s yt btxu sJtc>th hnuNu. bswhtulu dbçËx, nuÕbux nt<k
btuò rJduhu ftuLx[tfxhu VhSgt< ytvJtltk hnuNu. bswhtu <&t MþvhJtEÍ fu Bþft>bltu rJbtu vK W<thJtltu VhSgt< hnuNu. juch
yufx Bþsc ltuk^Ke fhtJe <ult rlgbtuLþk vtjl fhJt ftuLx[tfxh ck^tguj hnNu. ct¤ bswhtu htFe NftNu lrn.
25. bsqhtu fu htn>theytulu ftuEvK «fthltu yfMbt<&tg <tu <ule vtujem ftgoJtnele fu juch yufx bwscle ftgoJtnele sJtc>the
yb.BGþrl.ftuvtuo.lt fboatheytule ftuEvK he<u hnuNu lrn.btºt ftuLx[tfxh s yt btxu sJtc>th hnuNu. bswhtulu dbçËx, nuÕbux nt<k
btuò rJduhu ftuLx[tfxhu VhSgt< ytvJtltk hnuNu. bswhtu <&t MþvhJtEÍ fu Bþft>bltu rJbtu vK W<thJtltu VhSgt< hnuNu. juch
yufx Bþsc ltuk^Ke fhtJe <ult rlgbtuLþk vtjl fhJt ftuLx[tfxh ck^tguj hnNu. ct¤ bswhtu htFe NftNu lrn.
26. rcÕz´d ftble ytExbtu btxu - slhj xuflefj MvuNeVefuNl ytuV rcÕz´d Jfomle çþf Bþsc yLþmhJtltk hnuNu. Mt>h ÃþM<eft
øþsht< çþf Mxtumo 20-ce, zeMx[ef Ntuv´d, mufxh-21, dtk^eldh&e b¤e hnuNu. su Juc mtEx
www.ahmedabadcity.gov.inWvh Bþfuj Au.
27. bxehegj fu ceò xuMx´d hevtuxo ftuLxtfxhu vtu<tlt Fauo ftuvotuhuNl sKtJu <u søgtyu fhtJJtlt hnuNu. yt ykdultu mkÃËKo Fao <&t
Bgwrl.MxtVlu juctuhuxhe Mþ^e <&t buLGþVufah´d søgt Mþ^e jtJJt -jE sJtltu Fao vK ftuLx[tfxhu CtudJJtltu hnuNu.
28. btj su <u Mxtumo Wvh y&Jt mtEx Wvh jtuftulu lz<h l &tg <u he<u MËalt Bþsc W<thJtltu <ubs dtuXJJtltu hnuNu.
29. òu BGþ.yuLSlegh´d MxtV sKtJu <tu ftuLx[tfxhu atÕþ ftbu mtEx Wvh zeÍexj fubuht&e ftb atÕþ > vnujt, atÕþ ftbu <&t ftb ÃËKo
>ltk Vtuxtud{tVm BGþrl.yturVmbtk ytvJtltk hnuNu <u rmJtg ftbLþk vubuLx fhJtbtk ytJNu lrn òu MxtV MËalt ytvu <tu fubuhtbtk&e
ftuBÃGþxhbtk Vtuxt x[tLmVh fhe ytvJtlt hnuNu. yt ykdu ftuE vK J^thtltu Fao ytvJtbtk ytJNu lrn.
30. ftuEvK fthKmh xuLzh h> fhJtbtk ytJu <tu ftuLx[tfxh <u ykdu ftuEvK «fthltu n¬ >tJtu fu J¤<hle btkdKe fhe NfNu lrn. yt
Nh< MJeftgo ntug <ubKu s xuLzh ChÔþk.
31. bxehegÕm suJt fu hu<e, #xtu, mebuLx, vtEv, rJduhu MxtLzzo bxehegÕm MvuNeVefuNl «btKult jtJJtlt hnuNu. sgtk ftuE atuFJx l
&E ntug ðgtk ytE.yum.ftuz «btKu bxehegÕm jtJJtLþk <&t xuMx´d fhtJJtLþk hnuNu. <ubs ftuLx[tfxhu muBvj yu«wÔz fhtÔgt ct> ftb
NY fhtJJtLþk hnuNu.
32. yt xuLzhbtk òu ftuE ytExb hne dE ntug <tu <u atÕþ yum.ytu.yth.btk&e juJtbtk ytJNu ylu òu yum.ytu.yth.btk ytExb l ntug
<tu btfuox huEx&e huEx yultjemem fhe su CtJ Ft<t <hV&e ytvu <u ftuLx[tfxhu juJtltu hnuNu. yt mbSlu s xuLzh ChJtLþk hnuNu.
J^tht le ytRxb btk ftuLx[tfxhle btkdKe Bþsc CtJ b¤Nu lrn.
33. atÕþ ftb >hBgtl «tuxufNlle mkÃËKo sJtc>the ftuLx[tfxhle hnuNu subtk vevzt, >tuhzt, CgMËaf ctuzo, jtj xul , cuhefuxekd xuv,
ÃjtMxef vèe, rJ. ftuLx[tfxhu jtJJtLþk ylu mtaJJtLþk hnuNu. ylu ftuEvK yfMbt<&Nu <tu <ule mkÃËKo sJtc>the ftuLx[tfxhle hnuNu.
34. MxtV MËalt ytvu <tu mtEx Wvh zuEje «tud{um hSMxh ftuLx[tfxhu htFJtLþk hnuNu. >hhtus ytme.mexe yuLSlegh©ele <ubtk mne
juJtle hnuNu, <ubtk >hhtus ftb fh<t bswhtule mkÏgt, fhuj ftbdehe <&t yr^ftheytuyu ftb Mþ^thJt fu «tud{um J^thJt ltuk^ fhuj
ntug <tu <uLþk ftuBÃjtgLm ytvJtLþk hnuNu ytJe ltuk^ltk sJtc l &gu fu <u «btKu M&¤ Wvh ybj l &gu ftuLx[tfxhlu vulÕxe fhJtle
m•tt yuze.mexe yuLSlegh©elu hnuNu <u ykdu ftuLx[tfxh ftuE Jtk^tu jE NfNu lrn.
35. rlg< mbgbgto>tbtk ftb ÃþY l &gu&e xuLzh ¾jtuÍ bwsc ctfe ftbltkk 10.00% juFu vulÕxe BGþrl.ftuvtuohuNllu åþfJJtle hnuNu.
36. xuLzh le yt Nh<tu ce - 1 Vtubobtk sKtJuj Nh<tulu ytuJhYj fhNu.
Wvhtuf<<btb Nh<tu <&t rlgbtu buk ft¤SÃËJof Jtkauj Au ylu blu fçËj bksqh Au.
ftuLx[tfxhle mne - rm¬tu yuze.mexe yuLSlegh
btuctEj lkch mt&u (œrûtK Ítul)
The Bidder should satisfy all the below mentioned ALL criteria.
1.Register “D” class in PWD in Govt. R&B/CPWD/AMC
orequivalent registration with any other state Govt. or institutions.
2.The bidder should have experience of having successfully
completed either of the following similar works during last seven
years ending last day of month previous to the one in which tenders
A) One completed similar kind of work costing not less than the
amount equal to 65% to 70% of the estimated Tender amount.
(B) Two completed similar kind of works costing not less than the
amount equal to 40% to 50% of the estimated Tender amount.
(C) Three completed similar kind of works costing not less than the
amount equal to 35% to 40% of the estimated Tender amount.
Similar work define as The Bidder should have successfully completed
Interior of Auditorium Work.
DRAINAGE CATEGORY
Sr.No. Category Problem SLA Penalty per one
Problem Per day
1 Drainage Engineering No Drainage Machine hole Cover-Eng 24 Hours
2 Drainage Engineering Drainage-Other 48 hours
3 Drainage Engineering Drainage-Choking Of Line 48 hours
4 Drainage Engineering Drainage overflowing of mainline and 48 hours
distribution line on road
5 Drainage Engineering Drainage-Public Toilets and Urinals 72 hours
Drainage Line Blockage or Choking
6 Drainage Engineering Frequent Breakdown & Blockage Of Drain- 96 Hours
Signature of contractor with seal Deputy City Engineer-5(S.Z)
Date Ahmedabad Municipal Corporation
yufhthlwk Vtubo
(1) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt xuLzh hsw fh<tk vnujtk buk/ybu M&¤le bwjtft< je^e Au
ylu ftblu jd<t btjmtbtl, bswhe ylu ceS ctc<tulu jd<e M&trlf vrhrM&r<le ò<-btne<e
(2) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt ftuLx[tfxhtule Nh<tu rJd<tu ylu xuLzhlu jd<t >M<tJustu
ft¤SvwJof yÇgtm fgtuo Au ylu <u bwsc <ultu ybj fhJt mkb< Awk/Aeyu.
ftuLx[tfxhle mne - rm¬tu yuze.mexe yuLSlegh
btuctEj lkch mt&u (œrûtK Ítul)
" yb>tJt> BGþrlrmrvj ftuvtuohuNl”
œrûtK Ítul- Esluh Ftðþ
vtKe, z[ulus, vuJ´d, heEMxuxbuLxlt ftuLx[tfxhu Ftm JtkaJt ylu ægtlbtk htFJtle ctc< leau Bþsc Au.
" yt ftblt >huf ytExblt sÚ&tbtk ~ËLg &e cMmtu xftle JD^x &Jt mkCJ Au. ftuE ytExbltu CtJ
J^thtu ytvJtbtk ytJNu lrn. yBþf søgtyu swlt vÚ&h s VheJth heEMxux fhJtlt &Nu. <uJe >huf ytExbbtk J^^x
&tg fu ytExb yufÍefGþx l &tg <uÔþk vK clNu. ytlt btxu ftuEvK «fthle J¤<hle btkdKe fhJtle hnuNu lrn fu
CtJ J^thtu, vK ytvJtltu &Nu lrn. <ult btxu Ãþh<tk mt^ltu ylu bsqhtu ntug, yuf mt&u yluf søgtytuyu ftb
fhJtle ûtb<t ntug <ubKu s rJathelu xuLzh ChÔþk. bsqhtu l&e fu dtbzu s<t hÌtt Au fu ntu¤e, lJhtºte, r>Jt¤e, jøl
meÍl fu yLg <nuJthtubkt fu «mkdtubtk bsqhtu ytJ<t l&e <uJt fu ceò ftuEvK cntlt nuX¤ ftb ck^ htFe NftNu lrn
yLg&t htuslt Yt.250.00le J^thtle vulÕxe ftb ck^ hnu fu MËalt fh<t ytuAt bsqhtu ytJu <ulu je^u fhJtbtk
ftuLx[tfxhle mne yuze.mexe.yuLS.
rm¬t ylu btuctEj lkch (œrûtK Ítul)
AHMEDABAD MUNICIPAL CORPORATION
ENGGNIERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be as per tender notice after the order to start the works. Progress
of work should be in proportion to time limit. The details of reinforcement of R.C.C. work shall be as
per design and instructions of Add. City Engineer and his order will be considered final.
The contractor shall have to maintain account of steel, cement and other materials that may be
brought by him on site. This account shall be regularly maintained and kept open for inspection by
Municipal Staff. Watering of all the items shall be as per instructions otherwise no payment shall be
made to contractors. Mixing of concrete shall be done by concrete mixer machine. Arrangements of
binding vibrator for R.C.C. works if required shall have to be made by the contractor.
The contractor shall be remain responsible for Workmen’s compensation if any accident. The
contractor shall arrange for barricading at night and arrangement of Pagi at night to direct the traffic.
He shall be responsible for any damage to public. If any incident happen, during the execution of
work. In case of dispute for unseen or overlooked items the decision of the Dy. City Engineer shall be
final. The contractor shall have to give site clean of all rubbish during the work and at the time of
completion of work and hand over the site with final finishing of the work as directed. All the rejected
materials shall be removed from site within 24 hours by contractor at this risk and cost. Debris shall
have to cart daily from site.
For mixing mortar either for masonry or for plaster or for any other purpose contractor shall
have to prepare through of bigger size and mix the mortar in the required proportion. In on case he
shall be allowed to mix the mortar either on floor or any finished surfaces. The contractor shall have to
make his own arrangement for water required for the work.
If any extra item crops up during the progress of work the same shall be carried out by the
contractor and he shall be paid at the rate fixed by Add.C.E. as per the rate analysis based on latest
SOR or if item is not available in SOR than based on current market rates. In case of extra item
decision of Add. City Engg. shall remain final regarding rate.
If in the interest of the Corporation it is necessary to change either any site or the design of the
propose work the contractor shall carry out the same at his quoted rates without charges any extra and
the contractor will have to carry out the works and he will be paid at the rate quoted by him. No claim
for extra rate for subsequent changes in site and design is entertained.
The cubical contents of the cement bag shall be taken as 1-20 cft. Per bag and the contractors
shall have to prepare the measures boxes according to this measure.
Octroi exemption passes shall not be given for any materials required for the work. Contractor
will be fully responsible for compliance of the various provisions under contract Act. 1970 and the
Rules framed the to under.
The tender for the work shall remain open for a period (120) days from the date of opening of
the tenders for this work and that the tenderer shall not be allowed to withdraw on modify the offer on
his own during the period. If any tenderer withdraw or makes any modifications or addition in the
terms and conditions of his tender not acceptable to the Municipal Corporation the Municipal
Corporation shall without prejudice to any right or remedy be at liberty to forfeit in full the said
earnest money and black list the contractor.
If work is not started within specified time limit i.e. within ten days from the date of order to
start the work the penalty of the 0.01% tender Amount per day of delay of start shall be recovered
separately from the immediate bills payable to the contractor. Contractor has to make his own
arrangement for procurement of steel and cement.
Contractors should note the following conditions carefully :-
i) Conditional tender shall not be accepted.
ii) All tenders are to be submitted in duplicate without which the tenders are liable to be rejected.
iii) In case of tender downloaded from website, tender fee & EMD should be submitted in form of
iv) Condition of Form - B1 only Standard Specification of material & code of practice will be
applicable. Form B1 can be is available in website. Specification shall be as per ' R& B Dept. -
Govt. of Gujarat booklets of Building Works & and Road Works Specifications published by
Gujarat Book Depot, Sector-21. Gandhinagar. Other techinical condition will be applicable as
per tender condition only.
CONTRACTOR'SSIGNATURE & STAMP ADD. CITY ENGINEER
Mobile No.:- (South Zone)
AHMEDABAD MUNICIPAL CORPORATION ENGINEERING DEPARTMENT
TECHNICAL SPECIFICATIONS ITEMS REQUIRED DURING EXECUTION WORK
Name of work:- ઇ રુ વોડ, દ ણ ઝોન, અમદાવાદ િુ નિસપલ કોપ રશન હ તક આવેલ ુ શાભાઉ ઠાકર
All the general items of the building works are included above. If there is missing some
special item or non availability of technical spcification, the said item is excuted as per
instruction of engineer in charge bsed on Indian standard code of practice only.
REST OF ITEMS TECHNICAL SPECIFICATION & GUIDELINES ARE AS PER I.S. Code of
practice & as per R & B Dept. Guideline only.
STANDARD DETAILED TECHNICAL SPECIFICATION OF ITEMS
ITEM:1 Dismantling Existing Wall panelling :- Dismantling existing wall panelling at
any height and level including all frame work and showing the brickwall. This includes
stacking of all material at the corner shown by the Engineer in Charge within 500 Mts.
of the site. Rates includes necessary tools, tackles, scaffolds etc. complete to work at
any height and level.
ITEM:2 Chair Cover:- Removing existing damaged/torn chair upholstery fabric and
providing, stitching & fixing new approved quality upholstery fabric complete with all
necessary materials, labour, fittings, finishing, and making the chair complete in all
respects as directed by the Engineer-in-Charge.
ITEM:3 SITC of Fabric Wrapped Acoustic Wall Panel System:- Providing and fixing
acoustic wall treatment using approved make end gripper 15 mm Fabric Wrapped
Acoustic Panel System or equivalent, comprising ultra metal framework fixed to wall
with channels (15 x 45 x 15, Th. 0.6mm x 3660 L) at maximum 1200 mm centre to
centre vertically and supported by metal cleats and approved fasteners, ceiling
sections (80 X 26 X 51 X Th.0.5 X 3660 mm L) sections shall be fixed to (15 x 45 x
Th. 0.6 mm x 3660 L) channels at maximum 600 mm centre to centre horizontally
using approved clips/screws to form a rigid framework.The cavity between wall and
panel shall be filled with Synco PF Insulation Wool, 50 mm thick and 1000 GSM
density, having 100% water resistance properties.Fixing wood wool accoustic Boards
of size 1200 x 600 x 15 mm thickness over the framework and providing 6 mm thick
plywood backing strips of 50 mm width as required for installation of the fabric gripper
system.Providing and fixing end gripper Vinyl Gripper System comprising perimeter
tracks, half-wrap tracks, midseam tracks and other necessary accessories complete
with factoryapplied base tapes for enhanced fabric retention.Providing and fixing
Synco PF acoustic spacer pads of size 10 mm x 10 mm thickness between gripper
system and acoustic board using approved adhesive as per manufacturer's
recommendations. The complete acoustic wall treatment system shall achieve an
NRC (Noise Reduction Coefficient) value up to 1.00 , supported by valid test
certificates from a NABL-accredited laboratory.Supplying, cutting, stretching and fixing
FR Grade Acoustic Fabric Class-A (ASTM-E84 or B1 (DIN 4102 / GB/T B1) rating)
(Note : Shadet to be approved by the Consultants/Engineer in Charge with 1 mm
acoustic lamination) over the complete panel surface. The fabric shall be neatly
tensioned and inserted into the gripper system using manufacturerrecommended tools
to achieve a smooth, wrinkle-free finish.The item shall include all framework,
insulation, acoustic boards, grippers, tracks, plywood backing, acoustic spacers, FR
fabric, fasteners, adhesives, cutting, wastage, scaffolding, labour, transportation and
all accessories required for complete installation as per approved drawings and
directions of the Architect/Engineer-in Charge.Approved Makes: Ecotone / Hunter
Douglas Architectural India / Armstrong / Envirotech Systems / Credence Industries /
Unidus Accoustics/MMT Accoustics.
All the general items of the building works are included above. If there is missing some special item or
non availability of technical spcification, the said item is excuted as per instruction of engineer in
charge bsed on Indian standard code of practice only.
REST OF ITEMS TECHNICAL SPECIFICATION & GUIDELINES ARE AS PER I.S. Code of
practice & as per R & B Dept. Guideline only
Seal and Signature of the Bidder Add. City Engineer
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
TENDER 355 NOTICE.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].