| 1 | L1₹26.9 LAccepted-AOC 1ST FLOOR SHOP NO 206 NEAR GRAIN MARKIT NEW MANDI TOWN SHIP AMBALA SECTOR 8 AMBALA HARYANA 134003 | AMBALA | HARYANA | 134003 | L1 | Accepted-AOC BEING LOWEST BIDDER | |
| 2 | L2₹29.9 L+₹1.1 L (3.88%)Rejected-Finance | L2 | Rejected-Finance Other than lowest bidder | |
| 3 | L3₹29.9 L+₹1.1 L (3.88%)Rejected-Finance 195 MAHESH NAGAR AMBALA CANTT 133001 | AMBALA | HARYANA | 133001 | L3 | Rejected-Finance Other than lowest bidder | |
| 4 | L4₹36.7 L+₹8.0 L (27.7%)Rejected-Finance 205 PARSHAV VIHAR PLOT NO 50 1 P EXTN PATPARGANJ DELHI 110092 | DELHI | EAST DELHI | DELHI | 110092 | L4 | Rejected-Finance Other than lowest bidder |
| Sl No | Description | Qty | Unit | Raman Electric Trading Co L3 | sanjeev enterprises L4 | LAKHANPAL ELECTRIC L2 | AMBALA ENGINEERING CO L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches not exceeding 1.5 metre wide and not exceeding 1.5 metre in depth for foundation, shafts, man holes,for under ground cable / erection of poles, stays, locating fault of LT cable and stay assembly etc not exceeding 10 square metre on plan and getting out in any type of soil including dressing/trimming of sides and leveling, grading and ramming of bottom of excavation complete all as specified & directed. | 750 | Cubic Metre | 80 ₹60,000 Lowest | 100 ₹75,000 | 80 ₹60,000 Lowest | 101 ₹75,750 |
| 2.00 | All as per Ser item No. 1.00 here in before but depth exceeding 1.5 metre and not exceeding 3.0 metre. | 2 | Cubic Metre | 100 ₹200 Lowest | 150 ₹300 | 110 ₹220 | 122 ₹244 |
| 3.00 | Returning, filling in soil, including spreading, levelling, watering and well ramming in layers not exceeding 25cm thick each layer complete all as specified & directed. | 144 | Cubic Metre | 20 ₹2,880 Lowest | 30 ₹4,320 | 40 ₹5,760 | 22.2 ₹3,196.8 |
| 4.00 | Removing excavated material/soil to a distance not exceeding 50m and depositing where directed at a level not exceeding 1.5m above the starting point complete all as specified & directed. | 608 | Cubic Metre | 20 ₹12,160 Lowest | 30 ₹18,240 | 50 ₹30,400 | 21.2 ₹12,889.6 |
| 5.00 | Material and labour for sand cushioning to cable with a layer of sand 8 cm deep before laying the cable and 15 cms deep after laying the cable (punned down to 18 cms depth after laying and stretching of cable) complete all as specified & directed. | 226 | Cubic Metre | 200 ₹45,200 | 300 ₹67,800 | 60 ₹13,560 Lowest | 209.3 ₹47,301.8 |
| 6.00 | Material and labour for common burnt clay, sub class "B', old size, laid in vertical direction to cable as cable protection complete all as specified & directed. | 22 | 1000 Nos | 2,500 ₹55,000 | 3,500 ₹77,000 | 1,800 ₹39,600 Lowest | 2,100 ₹46,200 |
| 7.00 | Material and labour for PCC 1:4:8 type D-2 using 40mm graded aggregate, mechanically crushed stone for mass filling in pole pit and foundation etc. complete all as specified & directed. | 1.5 | Cubic Metre | 2,000 ₹3,000 | 1,500 ₹2,250 | 1,000 ₹1,500 Lowest | 1,400 ₹2,100 |
| 8.00 | Material and labour for cement concrete (1:3:6) type C-1 using 20mm graded crushed stone aggregate as in coping of pole and strut, stay around the pole etc complete all as specified & directed. | 8 | Cubic Metre | 1,000 ₹8,000 Lowest | 1,600 ₹12,800 | 1,000 ₹8,000 Lowest | 1,244 ₹9,952 |
| 9.00 | Material and labour for PCC 1:2:4 type B-1 using 20 mm graded stone aggregate for coping of poles including necessary form work and finishing the exposed surface even and fair with out using extra cement complete all as specified & directed. | 1.5 | Cubic Metre | 1,000 ₹1,500 Lowest | 1,700 ₹2,550 | 1,000 ₹1,500 Lowest | 1,299 ₹1,948.5 |
| 10.00 | Disconnecting & taking out defective underground cable from trenches, pole, pipe, floor, wall etc and locate the fault, rectify the defect and relaying the XLPE cable underground PVC insulated and overall sheathed aluminum conductor heavy duty 1100 volts including connecting and testing for any size complete all as specified & directed.
Note:- Excavation/earth work & sand cushioning, bricks and joint shall be measured & paid for separately. | 450 | Running Metre | 15 ₹6,750 | 10 ₹4,500 Lowest | 50 ₹22,500 | 44.2 ₹19,890 |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
18 Jun 2026, 6:00 pmClosed
GE UTILITY AMBALA
GE UTILITY AMBALA CANTT 133001
REPAIR AND MAINT OF LT ELECTRIC DISTRIBUTION SYSTEM AT SECTOR B2 UNDER GE UTILITY AMBALA
2026_MES_768215_1
CA NO GE U AMB 58 OF 2026-27
Open Tender
Civil Works
Item Rate
240 days
GE UTILITY AMBALA CANTT
AS PER TENDER DOCUMENTS
7 documents required · 7 mandatory
₹500
GE UTILITY AMBALA CANTT
₹80,000
17 Jul 2026
27 May 2026
20 Jun 2026
27 May 2026
18 Jun 2026
11 Jun 2026
27 May 2026 - 3 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in trenches not exceeding 1.5 metre wide and not exceeding 1.5 metre in depth for foundation, shafts, man holes,for under ground cable / erection of poles, stays, locating fault of LT cable and stay assembly etc not exceeding 10 square metre on plan and getting out in any type of soil including dressing/trimming of sides and leveling, grading and ramming of bottom of excavation complete all as specified & directed. | 750 | Cubic Metre | - | - |
| 2 | All as per Ser item No. 1.00 here in before but depth exceeding 1.5 metre and not exceeding 3.0 metre. | 2 | Cubic Metre | - | - |
| 3 | Returning, filling in soil, including spreading, levelling, watering and well ramming in layers not exceeding 25cm thick each layer complete all as specified & directed. | 144 | Cubic Metre | - | - |
| 4 | Removing excavated material/soil to a distance not exceeding 50m and depositing where directed at a level not exceeding 1.5m above the starting point complete all as specified & directed. | 608 | Cubic Metre | - | - |
| 5 | Material and labour for sand cushioning to cable with a layer of sand 8 cm deep before laying the cable and 15 cms deep after laying the cable (punned down to 18 cms depth after laying and stretching of cable) complete all as specified & directed. | 226 | Cubic Metre | - | - |
| 6 | Material and labour for common burnt clay, sub class "B', old size, laid in vertical direction to cable as cable protection complete all as specified & directed. | 22 | 1000 Nos | - | - |
| 7 | Material and labour for PCC 1:4:8 type D-2 using 40mm graded aggregate, mechanically crushed stone for mass filling in pole pit and foundation etc. complete all as specified & directed. | 1.5 | Cubic Metre | - | - |
| 8 | Material and labour for cement concrete (1:3:6) type C-1 using 20mm graded crushed stone aggregate as in coping of pole and strut, stay around the pole etc complete all as specified & directed. | 8 | Cubic Metre | - | - |
| 9 | Material and labour for PCC 1:2:4 type B-1 using 20 mm graded stone aggregate for coping of poles including necessary form work and finishing the exposed surface even and fair with out using extra cement complete all as specified & directed. | 1.5 | Cubic Metre | - | - |
| 10 | Disconnecting & taking out defective underground cable from trenches, pole, pipe, floor, wall etc and locate the fault, rectify the defect and relaying the XLPE cable underground PVC insulated and overall sheathed aluminum conductor heavy duty 1100 volts including connecting and testing for any size complete all as specified & directed.
Note:- Excavation/earth work & sand cushioning, bricks and joint shall be measured & paid for separately. | 450 | Running Metre | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.59 MB
BOQ_860307.xls
BOQ • 0.77 MB
Tender.pdf
Tender Documents • 0.85 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .