| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAccepted-AOC | ₹1.6 Cr | L1 | Accepted-AOC Accepted for part A only and for being L1 |
| 2 | L2₹2.4 Cr+₹78.5 L (49.6%)Rejected-Finance | ₹2.4 Cr+₹78.5 L (49.6%) | L2 | Rejected-Finance Being l2 |
Tender Value
₹3.2 Cr
EMD Value
₹4.7 L
Closing Date
5 Apr 2024, 12:00 pmClosed
Chief Engineer Project Swastik
O/O CE (P) Swastik C/o 99 APO Pin 931717 Burtuk East Sikkim
CONSTRUCTION OF SUB STRUCTURE WORKS FOR 200 FEET SINGLE LANE MODULAR STEEL BRIDGE AT KM 95.43 AND AT KM 85.130 ON GANGTOK -CHUNGTHANG ROAD
2024_BRO_646655_1
80571/E8
Open Tender
Construction Works
Lump-sum
90 days
AT KM 95.43 AND AT KM 85.130 ON GANGTOK -CHUNGTHAN
As per tender documents
8 documents required · 8 mandatory
₹0
₹4.7 L
Yes
O/O Chief Engineer Project Swastik
1 May 2024
15 Mar 2024
6 Apr 2024
15 Mar 2024
5 Apr 2024
20 Mar 2024
15 Mar 2024 - 20 Mar 2024
20 Mar 2024
Amount
PART-A :ITEM 1 CONSTRUCTION OF SUB STRUCTURE (ABUTMENTS) AS PER DRAWINGS FOR 200 FEET SINGLE LANE MODULAR (GALVANIZED) STEEL BRIDGE (TO BE CONSTRUCTED BY OTHER AGENCY) AT KM 95.43 ON GANGTOK -CHUNGTHANG ROAD AS PER APPROVED BRIDGE SCHEME AND DRAWINGS INCLUDING APPROACH WORKS AND RETAINING STRUCTURES BY EXECUTING ALL ITEMS OF WORKS REQUIRED FOR LAUNCHING OF BRIDGE.(JOB NO 303/561)
ITEM 2: CONSTRUCTION OF APPROACH ROAD WITH FMN, PMT AND SURFACING WORKS (TWO LANE SPECIFICATIONS WITH FMN WIDTH - 10 MTR)
With following details all as specified in particular specifications and as per Section No 400 and 500 of MoRT&H Specification (Vth revision) for Roads and Bridge Work for complete construction of approach road on both sides as per mention details below: (i) Length of approach road (a) Mangan side approach - 43 Mtr (b) Chungthang side approach - 44 Mtr (ii) Construction of retaining walls in RCC (M-20) as per drawings provided (a) 8(L) X10(H) - 4 Nos (b) 8(L) X07(H) - 4 Nos (c) 8(L) X06(H) - 1 Nos (d) 8(L) X04(H) - 3 Nos (iii) Surfacing works as per MoRT&H specifications:- (a) GSBC 15 cm thick in 7.60 mtr width (b) WMM 100 mm thick 01st layer in 7.30 mtr width (c) WMM 75 mm thick double layer in 7.30 mtr width (d) DBM 50 mm thick in 7.00 mtr width (e) BC 40 mm thick in 7.00 mtr width (f) Prime Coat and Tack Coat to be applied as per MORT&H specifications and as directed by E-I-C
PART-B CONSTRUCTION OF SUB STRUCTURE (ABUTMENTS) AS PER DRAWINGS FOR 200 FEET SINGLE LANE MODULAR (GALVANIZED) STEEL BRIDGE(TO BE CONSTRUCTED BY OTHER AGENCY) AT KM 85.130 ON GANGTOK -CHUNGTHANG ROAD AS PER APPROVED BRIDGE SCHEME AND DRAWINGS BY EXECUTING ALL ITEMS OF WORKS REQUIRED FOR LAUNCHING OF BRIDGE.Job No (303/563)
CONSTRUCTION OF SUB STRUCTURE (ABUTMENTS) AS PER DRAWINGS FOR 200 FEET SINGLE LANE MODULAR (GALVANIZED) STEEL BRIDGE(TO BE CONSTRUCTED BY OTHER AGENCY) AT KM 85.130 ON GANGTOK -CHUNGTHANG ROAD AS PER APPROVED BRIDGE SCHEME AND DRAWINGS BY EXECUTING ALL ITEMS OF WORKS REQUIRED FOR LAUNCHING OF BRIDGE.
V.K Gupta & Associates
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .