Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.6 LAccepted-AOC NEAR TELEPHONE EXCHANGE BIJROL ROAD BARAUT U P PATEL NAGAR BARAUT 250611 DISTT BAGHPAT | BAGHPAT | UTTAR PRADESH | 250611 | L1 | Accepted-AOC Overall accepted as L1 | |
| 2 | L2₹36.4 L+₹1.7 L (5.03%)Rejected-AOC | L2 | Rejected-AOC Overall accepted | |
| 3 | Rejected-Technical | - | Rejected-Technical The Bidder did not submit tender documents with tender cost and EMD in original | |
| 4 | Rejected-Technical LANE NO 03 PRAGATI VIHAR RISHIKESH | - | Rejected-Technical The Bidder did not qualifies the TQR and FQR |
| Sl No | Description | Qty | Unit | JAGAD ELECTRICAL AND FABRICATORS L2 | M/S AJAY TOMAR CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00(Supply) | |||||
| 2.00 | ACSR Panther Conductor. | 3.5 | Km. | 3,16,000 ₹11,79,500 Lowest | 3,50,000 ₹12,95,000 |
| 3.00 | GS Earthwire 7/3.15mm or 7/10 SWG. | 1 | Km. | 68,100 ₹78,600 | 65,000 ₹75,000 Lowest |
| 4.00 | 70 KN Standard Disc Insulator suitable for suspension fitting. | 200 | Nos. | 1,950 ₹3,95,200 | 1,100 ₹2,25,000 Lowest |
| 5.00 | Single Suspension Fitting (70 KN) suitable for Panther Conductor. | 20 | Nos. | 7,050 ₹1,42,040 | 6,000 ₹1,21,000 Lowest |
| 6.00 | Mid Span Compression Joint for ACSR Panther Conductor. | 30 | Nos. | 2,030 ₹61,560 | 1,600 ₹48,600 Lowest |
| 7.00 | Repair Sleeve for ACSR Panther. | 30 | Nos. | 1,640 ₹49,860 | 1,300 ₹39,600 Lowest |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
13 Dec 2024, 5:00 pmClosed
Chief Engineer
Office of CE, OandM, Kumaon Zone, PTCUL, Haldwani
Replacement of old and damaged conductor spans of and general maintenance of 132KV Bazpur-Haldwani transmission line under 220KV OandM Division, PTCUL, Haldwani
2024_PTC21_77757_1
CE(OandM)/PTCUL/HLD/49/2024-25
Open Tender
Electrical Works
Item Rate
180 days
132KV Bazpur-Haldwani line
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,360
EE, 220KV OandM Division, PTCUL, Haldwani
₹1.2 L
Office of CE, OandM, Kumaon Zone, PTCUL, Haldwani
9 Sept 2025
12 Nov 2024
18 Dec 2024
12 Nov 2024
13 Dec 2024
12 Nov 2024
9 Dec 2024
Amount
(Supply)
ACSR Panther Conductor.
GS Earthwire 7/3.15mm or 7/10 SWG.
70 KN Standard Disc Insulator suitable for suspension fitting.
Single Suspension Fitting (70 KN) suitable for Panther Conductor.
Mid Span Compression Joint for ACSR Panther Conductor.
Repair Sleeve for ACSR Panther.
Description of Work / Item(s)
Amount
(Dismantling & Erection)
Sorting, safe transportation of ACSR Panther conductor, Earth wire, Disc Insulator, tools and plants such as turn buckle, stay wire, ropes, lifts, pulleys, tools, clamps and connectors and other required accessories from the store yard at 220KV S/s, Haldwani to different work sites in rural areas of Bazpur and reserve forest areas in mototrable/non motorable roads, dense forest areas on suitable vehicel as well as on foot in a total stretch of approximately 70-80 Kms. along with proper loading, unloading and stacking of material as per directions of engineer incharge.
De-stringing of earth wire (damaged at tower No. 34 and 40) including all associated work for destringing of the earth wire between tower No. 33-35 and 40-41 as per direction of engineer incharge.
Laying, stringing, tensioning, clamping, jointing etc. complete with single earth wire 7/10 SWG including fixing of clamps and all accessories between tower No. 34 and 40 including all arrangements required for proper completion of work as per direction of engineer incharge.
Providing Temporary earthing at R and B phase between tower No. 1-2, B phase between tower No. 25-28, R and B phase between tower No. 42-44, R and B phase between tower No. 58-61, B phase between tower No. 67-71, B phase between tower No. 87-88 of 132KV Bazpur-Haldwani line for providing safe zone for safety of line workers complete in all respect as per direction of engineer incharge.
Fixing of adequate stays including erection of Turn Buckle with the help of D clamp stay wire and nozzling of stay wire at both ends, striging and cutting of earth wire for proper erection work on cross arms of R and B phae between tower No. 1-2, B phase between tower No. 25-28, R and B phase between tower No. 42-44, R and B phase between tower No. 58-61, B phase between tower No. 66-71, B phase between tower No. 87-88 of 132KV Bazpur-Haldwani line, complete in all respect as per direction of engineer incharge.
De-stringing of old and damaged spans of panther conductors from R and B phase between tower No. 1-2, B phase between tower No. 26-28, R and B phase between tower No. 43-44, R and B phase betweem tower No. 59-60, B phase between tower No. 67-71, B phase between tower No. 87-88 of 132KV Bazpur-Haldwani line along with safe opening of clamp, connector and fittings, arching horn and vibration dampers, lowering of insulator string with the help of liftey, pulley system and laying it properly on the ground complete in all respect includig all arrangement required for proper completion of work as per direction of engineer incharge.
Laying, stringing, tensioning, clamping, jointing etc. complete including hoisting of insulator string and fitting of jumpers, vibration dampers, arching horns, fixing of repair sleeves etc. by making all arrangements required for completion of work in all respect as per the direction of engineer incharge.
(a) For complete span replacement with new ACSR Panther Conductor in R and B phase between tower No. 1-2, B phase between tower No. 26-27, B phase between tower No. 43-44, B phse between tower No. 67-68, B phase between tower No. 69-70 and B phase between tower No. 70-71 of 132KV Bazpur-Haldwani line.
(b) For replacement of partailly damaged span with the help of mid span joint and repair sleeve in R and B phase between tower No. 43-44, R and B phase between tower No. 59-60, B phase between tower No. 87-88 of 132KV Bazpur-Haldwani line.
Safe and proper removal of temporary earthing at R and B phase between tower No. 1-2, B phase between tower No. 25-28, R and B phase between tower No. 42-44, R and B phase between tower No. 58-61, B phase between tower No. 67-71, B phase between tower No. 87-88 of 132KV Bazpur-Haldwani line for providing safe zone for safety of line workers complete in all respect as per direction of engineer incharge.
Safe and proper removal of turn buckle and stay wire etc. after completion of conductor replacement work between R and B phase between tower No. 1-2, B phase between tower No. 25-28, R and B phase between tower No. 42-44, R and B phase between tower No. 58-61, B phase between tower No. 66-71, B phase between tower No. 87-88 of 132KV Bazpur-Haldwani line, complete in all respect as per direction of engineer incharge.
Sorting and transportation of dismantled Panther Conductor, GS earth wire 7/10 SWG, other tower and conductor accessories from work site to store yard at 220KV S/s, Haldwani on suitable vehicle as well as on foot in a total stretch of approximately 70-80 Kms. along with proper loading, unloading and stacking including proper rolling, packing, loading, unloading and de-stacking at store complete in all respect as per direction of engineer incharge.
Description of Work / Item(s)
Amount
Total Part-A (Supply ) from BoQ1 sheet WITHOUT GST
Total Part-B (Erection) from BoQ2 sheet WITHOUT GST
Add GST* Amount on (Total of Part-A + Total of Part-B above)
JAGAD ELECTRICAL AND FABRICATORS (BID ID -350878)
JAGAD ELECTRICAL AND FABRICATORS (BID ID -350878)
JAGAD ELECTRICAL AND FABRICATORS (BID ID -350878)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .