| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.1 LAccepted-AOC | L1 | Accepted-AOC Agreement executed on 13/03/2026 | |
| 2 | L2₹6.4 L+₹26,301 (4.31%)Rejected-AOC | L2 | Rejected-AOC Higher rate and hence not admitted | |
| 3 | L3₹6.5 L+₹39,968 (6.56%)Rejected-Finance | L3 | Rejected-Finance Rejected Vide Resolution No2-2026 dtd.11-03-2026of peravoor GP |
| Sl No | Description | Qty | Unit | RAVEENDRAN. K L2 | kc joseph L3 | Mithun Viswanath L1 |
|---|---|---|---|---|---|---|
| 1.00Maintenance | ||||||
| 1.00 | 15.31:Dismantling tiled roofing with battens, boarding etc. complete including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. | 372.96 | sqm | 190.26 ₹70,960.13 | 194.35 ₹72,485.55 | 182.39 ₹68,024.9 Lowest |
| 1.00 | 15.14.2:Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead:Of sectional area below 40 square centimeters | 577.2 | metre | 16.14 ₹9,316.01 | 16.49 ₹9,518.03 | 15.47 ₹8,929.28 Lowest |
| 1.00 | 12.49:Providing & laying on roof pressed clay tile ridge (Mangalore tile) of 20 mm thickness and of approved pattern on steel frame work complete (steel frame work to be paid separately ). | 10 | metre | 85.46 ₹854.6 | 87.7 ₹877 | 81.93 ₹819.3 Lowest |
| 1.00 | 12.48:Providing & fixing on roof pressed clay tile (Mangalore tile) of 20 mm nominal thickness and of approved size and as per approved pattern on steel frame work complete (steel frame work to be paid separately) | 74.64 | sqm | 380.88 ₹28,428.88 | 389.08 ₹29,040.93 | 365.14 ₹27,254.05 Lowest |
| 1.00 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 2,838.2 | kg | 163.9 ₹4,65,180.98 | 167.42 ₹4,75,171.44 | 157.12 ₹4,45,937.98 Lowest |
| 1.01 | OD454439/2025-2026:Providing & fixing on roof pressed clay tile (Mangalore tile) of 20 mm nominal thickness and of approved size and as per approved pattern on steel frame work complete (steel frame work to be paid separately) | 295.59 | sqm | 186.56 ₹55,144.9 | 190.57 ₹56,330.21 | 178.85 ₹52,865.91 Lowest |
| 1.01 | OD253965/2025-2026:MP hip and ridge tiles set in lime mortar 1:2 incluing finishing edges Dptl material | 37 | sqm | 161.86 ₹5,988.82 | 165.34 ₹6,117.58 | 155.17 ₹5,741.29 Lowest |
Tender Value
₹6.8 L
EMD Value
₹16,933
Closing Date
9 Mar 2026, 2:00 pmClosed
SAJU P
AE OFFICE PERAVOOR PANCHAYATH
Annual Plan-PERAVOOR GP PRO NO66 25-26-PERUMPUNNA SCHOOL MAINTENANCE-General Civil Work
2026_LSGD_841257_4
ET-4/2025-26/AE/LSGD/PVR
Open Tender
Civil Works - Buildings
Item Rate
180 days
Peravoor GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,495
Yes
₹16,933
Yes
25 Mar 2026
2 Mar 2026
10 Mar 2026
2 Mar 2026
9 Mar 2026
2 Mar 2026
Maintenance
15.31:Dismantling tiled roofing with battens, boarding etc. complete including stacking of serviceable material and disposal of unserviceable material within 50 metres lead.
15.14.2:Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead:Of sectional area below 40 square centimeters
12.49:Providing & laying on roof pressed clay tile ridge (Mangalore tile) of 20 mm thickness and of approved pattern on steel frame work complete (steel frame work to be paid separately ).
12.48:Providing & fixing on roof pressed clay tile (Mangalore tile) of 20 mm nominal thickness and of approved size and as per approved pattern on steel frame work complete (steel frame work to be paid separately)
50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete
OD454439/2025-2026:Providing & fixing on roof pressed clay tile (Mangalore tile) of 20 mm nominal thickness and of approved size and as per approved pattern on steel frame work complete (steel frame work to be paid separately)
OD253965/2025-2026:MP hip and ridge tiles set in lime mortar 1:2 incluing finishing edges Dptl material
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1418641.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.37 MB
Tendernotice_2.pdf
PDF • 0.25 MB
Tendernotice_3.pdf
PDF • 0.25 MB
BOQ_1418641.xls
BOQ • 0.30 MB
PG.pdf
Tender Documents • 0.30 MB
AFFIDAVIT.pdf
Tender Documents • 0.28 MB
viewsbd.pdf
Tender Documents • 2.14 MB
FOT.pdf
Tender Documents • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .