| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹59.2 LAccepted-AOC KACHIRAYIL KARTHIKAPURAM PO | L1 | Accepted-AOC L1 | |
| 2 | L2₹65.2 L+₹6.0 L (10.1%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹65.2 L+₹6.0 L (10.1%)Rejected-Finance | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | SUNNY JOSEPH L3 | SAJI JOSEPH L2 | SANTO K J L1 |
|---|---|---|---|---|---|---|
| 1.00Bridge | ||||||
| 1.00 | 2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means | 0.02 | Hectare | 54,750.14 ₹985.5 | 54,750 ₹985.5 | 49,713.12 ₹894.84 Lowest |
| 1.00 | 12.9.C:Providing and constructing one span service road to reach island location from one pier location to another pier location | 10 | metre | 8,417.15 ₹84,171.5 | 8,417 ₹84,170 | 7,642.77 ₹76,427.7 Lowest |
| 1.00 | OD329194/2023-2024:RING BUND Type-I Putting up ring bund as per approved shape 2.5m bottom width, 1m top width using empty gunny/polythene bags filled with earth placed in 2 rows at 0.6m apart and filled in between with puddle clay to form bund for an average height 2.00m including labour dismantling the bund after completion of the work etc. complete | 15 | metre | 1,735.82 ₹26,037.3 | 1,735.82 ₹26,037.3 | 1,576.12 ₹23,641.8 Lowest |
| 1.00 | 12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means | 166.7 | cum | 83.25 ₹13,878.02 | 83.25 ₹13,878.02 | 75.59 ₹12,601.08 Lowest |
| 1.00 | 3.13.4.A:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work Hard Rock ( blasting prohibited ) - Mechanical Means | 27.24 | cum | 1,024.38 ₹27,904.11 | 1,024.38 ₹27,904.11 | 930.13 ₹25,336.74 Lowest |
| 1.01 | OD331835/2023-2024:Providing MS dowel bar with 25mm dia rod 2.00m long ( 1.00m into concrete and 1.00m into
rock )after drilling holes 30mm dia and filling the gap with cement grout (0.50kg/each) etc
complete. | 76 | each | 997.73 ₹75,827.48 | 997.73 ₹75,827.48 | 905.93 ₹68,850.68 Lowest |
| 1.01 | 12.8.D.1.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M25 - Using Concrete Mixer | 7.08 | cum | 9,842.98 ₹69,727.67 | 9,842.98 ₹69,727.67 | 8,937.42 ₹63,312.68 Lowest |
| 1.01 | 12.8.G.2.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M30 - Using Batching Plant, Transit Mixer and Concrete Pump | 40.2 | cum | 8,451.31 ₹3,39,742.66 | 8,451.31 ₹3,39,742.66 | 7,673.78 ₹3,08,485.96 Lowest |
| 1.01 | 13.5.G.p.2:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M30 - Height upto 5m - using Batching Plant, Transit Mixer and Concrete Pump | 72.44 | cum | 8,982.08 ₹6,50,688.82 | 8,982.08 ₹6,50,688.82 | 8,155.72 ₹5,90,824.82 Lowest |
Tender Value
₹65.2 L
EMD Value
₹50,000
Closing Date
9 Sept 2025, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assistant Engineer
LID AND EW SECTION ALAKODE GP
Annual Plan-Project No. 254/2025-26-Construction of Morani Bridge in Alakode GP-General Civil Work
2025_LSGD_791090_25
5-E-TEN/ALKD/2025-2026
Open Tender
Civil Works - Bridges
Item Rate
365 days
Alakode
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
Yes
₹50,000
Yes
29 Sept 2025
27 Aug 2025
11 Sept 2025
27 Aug 2025
9 Sept 2025
27 Aug 2025
Amount
Bridge
2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means
12.9.C:Providing and constructing one span service road to reach island location from one pier location to another pier location
OD329194/2023-2024:RING BUND Type-I Putting up ring bund as per approved shape 2.5m bottom width, 1m top width using empty gunny/polythene bags filled with earth placed in 2 rows at 0.6m apart and filled in between with puddle clay to form bund for an average height 2.00m including labour dismantling the bund after completion of the work etc. complete
12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means
3.13.4.A:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work Hard Rock ( blasting prohibited ) - Mechanical Means
OD331835/2023-2024:Providing MS dowel bar with 25mm dia rod 2.00m long ( 1.00m into concrete and 1.00m into rock )after drilling holes 30mm dia and filling the gap with cement grout (0.50kg/each) etc complete.
12.8.D.1.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M25 - Using Concrete Mixer
12.8.G.2.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M30 - Using Batching Plant, Transit Mixer and Concrete Pump
13.5.G.p.2:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M30 - Height upto 5m - using Batching Plant, Transit Mixer and Concrete Pump
14.1C.1.1.B:"Furnishing and Placing Reinforced Cement Concrete Grade M30 Using Concrete Mixer as per drawing and Technical Specification. For r solid slab super-structure - Height 5m to 10 m
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
13.6:Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications
14.2:Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
13.14:Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications.
14.10:PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification.
14.11:Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification.
OD332564/2023-2024:Construction of precast RCC railing of M30 Grade, aggregate size not exceeding 12 mm, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 1800 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications.
3.17:Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.
13.9.A:Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification Granular material
OD332603/2023-2024:Bailing out water Using pump above 5HP and upto 10HP- Bailing out water with engine and pump set above 5HP and up to 10HP including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
3.16:Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
OD332614/2023-2024:PVC WEEP Holes - Providing weep holes using 75mm dia pvc pipe 4kg/sq cm including all cost and conveyance of all materials and all labour charges etc. complete
OD98673/2025-2026:Random Rubble Dry Masonry (coursed/uncoursed ) Work in Foundation complete as per Drawing and Technical Specifications. (modified from 12.7.B)
13.5.E.P.1:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M20 - Using concrete Mixer - Height upto 5m
SAJI JOSEPH (BID ID -2328626)
SUNNY JOSEPH (BID ID -2328614)
Bidder Name
SUNNY JOSEPH
SANTO K J
SAJI JOSEPH
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1304987.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .