Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC 37 1A MOMINPORE ROAD KOLKATA 700 023 | KOLKATA | MURSHIDABAD | WEST BENGAL | 700023 | ₹1.4 Cr | L1 | Accepted-AOC Being L1. |
| 2 | L2₹1.6 Cr+₹23.3 L (17.1%)Rejected-Finance | ₹1.6 Cr+₹23.3 L (17.1%) | L2 | Rejected-Finance Being L2 |
| 3 | L3₹1.6 Cr+₹25.7 L (18.9%)Rejected-Finance PLOT NO 37 BADANPUR OLD SER NO 34658 NEAR SAI BARAT PALACE PAWAN BHUMI SHAKTI NAGAR JABALPUR MADHYA PRADESH 482001 | JABALPUR | MADHYA PRADESH | 482001 | ₹1.6 Cr+₹25.7 L (18.9%) | L3 | Rejected-Finance Being L3 |
| 4 | L4₹2.5 Cr+₹1.2 Cr (85.2%)Rejected-Finance A 99 SECTOR 4 AIROLI NAVI MUMBAI 400708 | NAVI MUMBAI | THANE | MAHARASHTRA | 400708 | ₹2.5 Cr+₹1.2 Cr (85.2%) | L4 | Rejected-Finance Being L4 |
| 5 | Rejected-Technical 1 3 NA LAKSHMI NARAYANTALA ROAD BOTANICAL GARDEN HOWRAH WEST BENGAL 711103 | HOWRAH | WEST BENGAL | 711103 | - | - | Rejected-Technical Non responsive |
Tender Value
₹1.9 Cr
EMD Value
₹3.9 L
Closing Date
9 Feb 2024, 6:00 pmClosed
AGM EE
AAI Ops. Building, NSCBI Airport Kolkata
Works Contract for RMO AC Equipment at NSCBI Airport dg. 2023-26. SH All Inclusive / Comprehensive maintenance contract of window ACs, Split ACs, Ductable ACs, Package AC for 3 years
2024_AAI_181332_1
05/EMD-I/2023-24
Open Tender
Electrical Works
Works
1095 days
AAI Ops. Building, NSCBI Airport Kolkata
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Yes
₹3.9 L
Yes
4 Apr 2024
11 Jan 2024
12 Feb 2024
12 Jan 2024
9 Feb 2024
19 Jan 2024
12 Jan 2024 - 19 Jan 2024
Amount
SH: I To carryout Day to day maintenance of Window AC, Split AC, Ductable AC of various capacity 1 Ph/3 Ph including all accessories of AC units by providing sufficient manpower & attending complaints / faults / breakdown , rectification and ensuring serviceability / satisfactory working condition and maintaining all records as per PMI schedule as per the special conditions of contract throughout the year as per the instruction of the Engineer - in - charge or his authorized representative and as per the requirement of works at various installations inside/outside the operational area of Airport. [Quoted rate should be inclusive of mediclaim premium]
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
SH : II Annual maintainance of 1.5 TR Window type AC units including replacement of all Spare parts like capacitors, Relays, Contractors, Refrigerant, Repairing of PCB , Condenser & Cooling Coil, Compressors, Rewinding of Motor & Gas charging, Rectification of System Leakage and Rectification of any kind of Breakdown of above AC Units Complete as Required.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
Annual maintainance of 1.0 TR Split type AC units including replacement of all Spare parts like capacitors, Relays, Contractors, Refrigerant, Repairing of PCB , Condenser & Cooling Coil, Compressors, Rewinding of Motor & Gas charging, Rectification of System Leakage and Rectification of any kind of Breakdown of above AC Units Complete as Required.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
Annual maintainance of 1.5 TR Split type AC units including replacement of all Spare parts like capacitors, Relays, Contractors, Refrigerant, Repairing of PCB , Condenser & Cooling Coil, Compressors, Rewinding of Motor & Gas charging, Rectification of System Leakage and Rectification of any kind of Breakdown of above AC Units Complete as Required.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
Annual maintainance of 2 TR Split type AC units including replacement of all Spare parts like capacitors, Relays, Contractors, Refrigerant, Repairing of PCB , Condenser & Cooling Coil, Compressors, Rewinding of Motor & Gas charging, Rectification of System Leakage and Rectification of any kind of Breakdown of above AC Units Complete as Required.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
Annual maintainance of 2 TR Slim Line Split type AC units including replacement of all Spare parts like capacitors, Relays, Contractors, Refrigerant, Repairing of PCB , Condenser & Cooling Coil, Compressors, Rewinding of Motor & Gas charging, Rectification of System Leakage and Rectification of any kind of Breakdown of above AC Units Complete as Required.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
Annual maintainance of 3 TR Single Split type AC units including replacement of all Spare parts like capacitors, Relays, Contractors, Refrigerant, Repairing of PCB , Condenser & Cooling Coil, Compressors, Rewinding of Motor & Gas charging, Rectification of System Leakage and Rectification of any kind of Breakdown of above AC Units Complete as Required.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
Annual maintainance of 3 TR Slim Line Split type AC units including replacement of all Spare parts like capacitors, Relays, Contractors, Refrigerant, Repairing of PCB , Condenser & Cooling Coil, Compressors, Rewinding of Motor & Gas charging, Rectification of System Leakage and Rectification of any kind of Breakdown of above AC Units Complete as Required.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
Annual maintainance of 4 TR Slim Line Split type AC units including replacement of all Spare parts like capacitors, Relays, Contractors, Refrigerant, Repairing of PCB , Condenser & Cooling Coil, Compressors, Rewinding of Motor & Gas charging, Rectification of System Leakage and Rectification of any kind of Breakdown of above AC Units Complete as Required.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
Annual maintainance of 5.0 TR Ductable Split type AC units including replacement of all Spare parts like capacitors, Relays, Contractors, Refrigerant, Repairing of PCB , Condenser & Cooling Coil, Compressors, Rewinding of Motor & Gas charging, Rectification of System Leakage and Rectification of any kind of Breakdown of above AC Units Complete as Required.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
Annual maintainance of 5.5 TR Ductable Split type AC units including replacement of all Spare parts like capacitors, Relays, Contractors, Refrigerant, Repairing of PCB , Condenser & Cooling Coil, Compressors, Rewinding of Motor & Gas charging, Rectification of System Leakage and Rectification of any kind of Breakdown of above AC Units Complete as Required.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
Annual maintainance of 7.5 TR Ductable Split type AC units including replacement of all Spare parts like capacitors, Relays, Contractors, Refrigerant, Repairing of PCB , Condenser & Cooling Coil, Compressors, Rewinding of Motor & Gas charging, Rectification of System Leakage and Rectification of any kind of Breakdown of above AC Units Complete as Required.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
Annual maintainance of 8.5 TR Ductable Split type AC units including replacement of all Spare parts like capacitors, Relays, Contractors, Refrigerant, Repairing of PCB , Condenser & Cooling Coil, Compressors, Rewinding of Motor & Gas charging, Rectification of System Leakage and Rectification of any kind of Breakdown of above AC Units Complete as Required.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
Annual maintainance of 11.0 TR Ductable Split type AC units including replacement of all Spare parts like capacitors, Relays, Contractors, Refrigerant, Repairing of PCB , Condenser & Cooling Coil, Compressors, Rewinding of Motor & Gas charging, Rectification of System Leakage and Rectification of any kind of Breakdown of above AC Units Complete as Required.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
Annual maintainance of 15.0 TR Ductable Split type AC units including replacement of all Spare parts like capacitors, Relays, Contractors, Refrigerant, Repairing of PCB , Condenser & Cooling Coil, Compressors, Rewinding of Motor & Gas charging, Rectification of System Leakage and Rectification of any kind of Breakdown of above AC Units Complete as Required.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
Annual maintainance of 17.0 TR Ductable Split type AC units including replacement of all Spare parts like capacitors, Relays, Contractors, Refrigerant, Repairing of PCB , Condenser & Cooling Coil, Compressors, Rewinding of Motor & Gas charging, Rectification of System Leakage and Rectification of any kind of Breakdown of above AC Units Complete as Required.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
SH : III Dismantling of 1/1.5/2 TR Window AC from existing location and shifting the same in the store etc. as required.
a) For 1st Year
b) For 2nd Year
C) For 3Rd Year
Dismantling of 1/1.5/2 TR Split AC from existing location and shifting the same in the store etc. as required.
a) For 1st Year
b) For 2nd Year
C) For 3Rd Year
Dismantling of 3/4 TR Split AC from existing location and shifting the same in the store etc. as required.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
Dismantling of 5/7.5 TR Split AC from existing location and shifting the same in the store etc. as required.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
Installation/testing and commissioning of 1.5/2 TR window AC with suitable wooden frame i/c making opening in the wall and making opening good with sand cement plaster etc as required.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
Installation/testing and commissioning of 1.5/2 TR window AC including gas charging in the existing opening with suitable wooden etc as required.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
Installation/testing and commissioning of 1/ 1.5/2 TR Split AC i/c dehydration ,leak,testing,pressure testing and gas charging etc as required.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
Installation/testing and commissioning of 3/ 4 TR Split AC i/c dehydration ,leak,testing,pressure testing and gas charging etc as required.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
Installation/testing and commissioning of 5/7.5 TR ductable AC i/c dehydration ,leak,testing,pressure testing and gas charging etc as required.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
Supply and laying of 3x2.5 Sq.mm PVC insulated PVC sheathed unarmoured copper conductor cable on wall surface/recess etc as required and as per direction of Engineer-in-charge.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
Supply and fixing of 1 "dia hard PVC pipe for drain line on wall surface/recess etc as required and as per direction of Engineer-in-charge.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
Supply and fixing following refrigerant piping with superlon insulation on wall surface /recess etc as required and as per direction of Engineer-in-charge.
3/8" copper pipe with Nitrile Rubber insulation
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
5/8" copper pipe with Nitrile Rubber insulation
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
1/4" copper pipe with Nitrile Rubber insulation
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
1/2" copper pipe with Nitrile Rubber insulation
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
supply of R- 22/32/410/407 Reefrigent.
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
supply of 7/8 Copper Pipe
a) For 1st Year
b) For 2nd Year
c) For 3rd Year
Supply of 1.0 TR 1 PH Rotary Compressor
Supply of 1.5 TR 1 PH Rotary Compressor
Supply of 2.0 TR 1 PH Rotary Compressor
Supply of 3.0 TR 3 PH Scroll Compressor
Supply of 5.0 TR 3 PH Scroll Compressor
Supply of 5.5 TR 3 PH Scroll Compressor
Supply of 7.5 TR 3 PH Scroll Compressor
Supply of 8.5 TR 3 PH Scroll Compressor
V Save Electronics Pvt Ltd
Zamzam Refrigeration and airconditioning
Aqua Cool Co.Pvt Ltd
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .